697DCK-21-R-00417.pdf
PDF 401 KB Posted
- Attached to
- Award Salt Lake City ATCT CRAC Unit Optimization Federal contract opportunity
- Solicitation number
- 697DCK-21-R-00417
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 1.pdf | ||
| Survey.pdf | ||
| SLC-ATCT-TRACON-CRU-RECORD DRAWINGS.pdf | ||
| SOW SLC CRU UPGRADE.pdf | ||
| COVID Spec language.pdf | ||
| DB.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Transportation Federal Aviation Administration
Request for Offers (RFO) Cover Letter
Solicitation Package
Project Name: SLC ATCT CRAC Unit Optimization
Location: Salt Laker City, UT
Solicitation No.: 697DCK-21-R-00417
Issue Date: August 16, 2021
Submit Offers to: Darren.odegard@faa.gov
Submit Offers by: September 7, 2021
Special Instructions:
1) Insurance is required (See Contract Clause 3.4.1-12 Insurance (Jul 1996) for required coverage limits).
Employer’s liability coverage of at least $100,000.00 shall be required.
General Liability. Bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000.00 per occurrence.
Automobile liability coverage of at least $200,000.00 per person and $500,000 per occurrence for bodily injury and $200,000.00 per occurrence for property damage
2) Payment and Performance Bonds are required (See Contract Clauses 3.4.1-5 Payment Bond Requirements, 3.4.1-4 Performance Bond Requirements.
3) Set Aside: This procurement is open to ALL interested business entities regardless of size.
4) NAICS Code: 238220: Plumbing, Heating and Air Conditioning Contractors.
5) BADGING, The Contractor is required to acquire ALL necessary FAA and Airport badges.
6) PROJECT START: Work under this contract is anticipated to start in October 2021, COVID dependent.
7) Estimated Price Range: Is between $100,000.00 and $300,000.00.
8) Site Visit: One site visit will be held on August 23, 2021 at 10am. It is optional, but Offerors are highly encouraged to intend. Due to COVID, group size is limited and no Offeror may bring no more than one other person (two people total). Should the group size exceed the limit of eight people total, another site visit will be held after the first one for the overflow.
Offerors choosing to attend must provide the name(s) of those who will be attending to darren.odegard@faa.gov, by August 20, 2021 at 1400 PST. Specific instructions for the site visit as well as the local POC will be provided to those who submit an email. If a second group is required, it will happen after the first session, andplacement will be based on when the email was received.
You will be notified of which group you are in.
mailto:darren.odegard@faa.gov
SOLICITATION, OFFER
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder"
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED BID (RFP)
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
2200 S. 216TH STREET
DES MOINES WA 98198-6547
AAQ530ANM-AFN
Darren Odegard 206-231-3022 x
08/17/2021 2
PURCHASE REQUEST NO.
697DCK-21-R-00417
10. THE CONTRACT AUTHORITY REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
The contractor shall provide all equipment, material, labor and supervision for the installation and integration of Liebert iCOM control upgrade on three (3) Liebert computer room units (CRU) to include the replacement of incompatible hot and cold water valves and the integration of new controllers to the existing building automation system (BAS).
Additionally, the contractor shall provide all equipment, material, labor and supervision for the installation and integration of Liebert electrically commutated
(EC) fan upgrades on nine (9) CRUs.
11. The Contractor shall begin performance within
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award notice to proceed. The performance period is mandatory, negotiable. (See ________________________________________________ .)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and is not required.is, B. An offer guarantee
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers must be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address. The solicitation number, and the date and time offers are due.
D. Offers providing less than
12B. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in item 12B.)
5 15 calendar days and complete it within ________________ ________________ calendar days after receiving
09/07/2021 x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Contract Authority acceptance after the date offers are due will not be considered and will _________________ be rejected.
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Contract Authority in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13D. Failure to insert any number means the offeror accepts the minimum in item 13D.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (MUST BE FULLY COMPLETED BY OFFEROR)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Contract Authority)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Contract Authority solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. CONTRACT AUTHORITY 31C. AWARD DATE
BY
2PAGE OF
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
2200 S. 216TH STREET
DES MOINES WA 98198-6547
AAQ530ANM-AFN
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
Section B - Supplies or Services/Prices Section B - Schedule
B001. PRICES/COSTS: Furnish all labor, materials, equipment, transportation, insurance, notifications, licenses, permits, fees and supervision necessary to complete the optimization of the Salt Lake City ATCT CRAC units in Salt Lake City, UT. Contractor must perform all work in accordance with the Specifications, drawings, contract clauses, and wage rates.
Clin # Description Quantity Price
001 SLC ATCT CRAC unit optimization 1 Job $__________
The offered price must encompass all costs related to (a) direct and indirect labor, fringe benefits, overhead, G&A expenses, profit, material, equipment, other direct costs, insurance, freight, handling, transportation, inspection, testing, operation and maintenance manuals, bonds, etc., (b) federal, state, and local taxes, (c) all applicable fees permits, licenses, and (d) any miscellaneous charges.
Effective April 1, 1996, the Federal Aviation Administration (FAA) began operating under the new FAA Acquisition Management System. The 1996 DOT Appropriation Act, Public Law 104-50, mandated that the FAA rewrite its acquisition regulations and granted legislative relief from certain laws. The Federal Acquisition Regulations (FAR), Federal Acquisition Streamlining Act of 1994, Small Business Act, and Competition in Contracting Act, are three of these laws.
Clause List
The remainder of this page has been intentionally left blank.
Section C - Description/Specifications Scope of Work
The contractor shall provide all equipment, material, labor and supervision for the installation and integration of Liebert iCOM control upgrade on three (3) Liebert computer room units (CRU) to include the replacement of incompatible hot and cold water valves and the integration of new controllers to the existing building automation system (BAS).
Additionally, the contractor shall provide all equipment, material, labor and supervision for the installation and integration of Liebert electrically commutated (EC) fan upgrades on nine (9) CRUs.
See Statement of Work and drawings for complete details.
Section D - Packaging and Marking
Section E - Inspection and Acceptance Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:
https://fast.faa.gov/contractclauses.cfm.
(End of clause)
3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)
Section F - Deliveries or Performance
Section G - Contract Administration Data Clause List
3.10.1-23 CONTRACTING OFFICER'S REPRESENTATIVE-CONSTRUCTION CONTRACTS (APR
2012)
(a) The Contracting Officer may appoint other Government personnel to accomplish certain contract administration matters. While there shall be various titles and divisions of duties for these individuals, generically they are known as Contracting Officer's Representatives (CORs). The Contracting Officer will provide written notice of COR appointment(s), setting forth the authorities and limitations, to the Contractor within 5 calendar days prior to the notice to proceed. COR duties may include, but are not limited to:
(1) Perform as the authorized representative of the Contracting Officer for technical matters, including interpretation of specifications and drawings, and inspection and review of work performed.
(2) Perform as the authorized representative of the Contracting Officer for administrative matters, including reviewing payments, and updated delivery schedules.
(b) These representatives are authorized to act for the Contracting Officer in all specifically delegated matters pertaining to the contract, except:
(1) contract modifications that change the contract price or cost, technical requirements or time for performance, unless delegated field change order authority;
(2) suspension or termination of the Contractor's right to proceed, either for default or for convenience;
(3) final decisions on any matters subject to appeal, e.g., disputes under the "Contract Disputes" clause; and
(4) final acceptance under the contract.
(End of clause)
Section H - Special Contract Requirements Clause List
3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020)
(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:
(1) Contracts written on paper and contracts in electronic form;
(2) Pen-and-ink signatures and electronic signatures; and
(3) Other legally-required written records and the same information in electronic form.
(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.
(c) Certain documents may need to be provided or maintained in original form, such as large-scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.
(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.
(e) Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA- 1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm. This is based on the National Institute of Standards and Technology (NIST) Policy Statement on Hash Functions dated August 5, 2015. Further guidance on the use of SHA-256 is in NIST Special Publication (SP) 800-57 Part 1, section
5.6.2 as amended and SP 800-131A, Revision 1 dated November 6, 2015. Additional guidance on the use of SHA-3 is in NIST SP 800-185 as amended.
(f) Contractors do not have to update documents previously digitally signed using SHA-1 hash algorithms unless the document requires updating. The FAA and contractors may continue to use SHA-1 for the following applications:
Verifying old digital signatures and time stamps, generating and verifying hash-based message authentication codes (HMACs), key derivation functions (KDFs), and random bit/number generation.
(End of Clause)
3.8.2-17 KEY PERSONNEL AND FACILITIES (JUL 2019)
(a) The personnel and/or facilities as specified below are considered essential to the work being performed hereunder and may, with the consent of the contracting parties, be changed from time to time during the course of the contract.
(b) Prior to removing, replacing, or diverting any of the specified personnel and/or facilities, the Contractor must notify in writing, and receive consent from, the Contracting Officer reasonably in advance of the action and must submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this contract.
(c) No diversion will be made by the Contractor without the written consent of the Contracting Officer.
(d) The key personnel and/or facilities under this contract are:
Project Superintendant [ ]
(List key personnel and/or facilities)
Section I - Contract Clauses Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:
https://fast.faa.gov/contractclauses.cfm.
(End of clause)
3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JUL 2018)
3.2.2.3-42 DIFFERING SITE CONDITIONS (JUL 2004)
3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (JUL 2004)
3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 2004)
3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2004)
3.2.2.3-47 PERMITS AND RESPONSIBILITIES (JUL 2004)
3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS (JUL 2004)
3.2.2.3-50 PROPERTY PROTECTION (OCT 2014)
3.2.2.3-51 OPERATIONS AND STORAGE AREAS (APR 2012)
3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2004)
3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2004)
3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (MAR 2009)
3.2.2.3-62 PRECONSTRUCTION CONFERENCE (JUL 2004)
3.2.2.3-68 SAFETY AND HEALTH (OCT 2014)
3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (OCT 2015)
3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2011)
3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)
3.2.5-1 OFFICIALS NOT TO BENEFIT (APR 2021)
3.2.5-3 GRATUITIES OR GIFTS (OCT 2019)
3.2.5-4 CONTINGENT FEES (OCT 1996)
3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2019)
3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 1996)
3.3.1-2 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (JUL 2018)
3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2021)
3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS
(OCT 2012)
3.3.1-31 PROGRESS PAYMENTS (JUL 2018)
3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD
MANAGEMENT (JUL 2018)
3.4.1-10 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (OCT 2020)
3.4.2-6 TAXES - CONTRACTS PERFORMED IN U.S. POSSESSIONS OR PUERTO RICO (OCT
1996)
3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (JUL 2019)
3.5-1 AUTHORIZATION AND CONSENT (JAN 2019)
3.6.2-18 DAVIS BACON ACT (OCT 2018)
3.6.2-19 WITHHOLDING-LABOR VIOLATIONS (JUL 2017)
3.6.2-20 PAYROLLS AND BASIC RECORDS (APR 2017)
3.6.2-21 APPRENTICES, TRAINEES, AND HELPERS (JAN 2019)
3.6.2-22 SUBCONTRACTS (LABOR STANDARDS) (JAN 2019)
3.6.2-23 CERTIFICATION OF ELIGIBILITY (JAN 2019)
3.6.2-39 TRAFFICKING IN PERSONS (APR 2019)
3.6.3-13 AFFIRMATIVE PROCUREMENT OF RECYCLED CONTENT AND PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (JAN 2020)
3.6.3-14 USE OF ENVIRONMENTALLY PREFERABLE PRODUCTS (JAN 2020)
3.6.3-16 DRUG FREE WORKPLACE (MAR 2009)
3.6.3-17 EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (JAN 2020)
3.6.3-19 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS (JAN 2020)
3.6.3-21 EFFICIENCY IN WATER CONSUMING PRODUCTS AND SERVICES (JAN 2020)
3.6.3-23 DELIVERY OF ELECTRONIC AND PAPER DOCUMENTS (JAN 2020)
3.6.3-24 ASBESTOS NESHAP COMPLIANCE (OCT 2015)
3.6.3-25 AEROSOLS (OCT 2016)
3.6.3-26 FOAMS (OCT 2016)
3.6.4-5 BUY AMERICAN - STEEL AND MANUFACTURED PRODUCTS (JUL 2010)
3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)
3.6.4-23 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (JAN 2021)
3.9.1-1 CONTRACT DISPUTES (JAN 2020)
3.9.1-2 PROTEST AFTER AWARD (AUG 1997)
3.10.1-7 BANKRUPTCY (APR 1996)
3.10.1-8 SUSPENSION OF WORK (SEP 1998)
3.10.1-15 CHANGES-CONSTRUCTION, DISMANTLING, DEMOLITION, OR REMOVAL OF
IMPROVEMENTS (JUL 1996)
3.10.1-16 CHANGES AND CHANGED CONDITIONS (APR 1996)
3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)
3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT
1996)
3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996)
3.13-5 SEAT BELT USE BY CONTRACTOR EMPLOYEES (OCT 2001)
3.13-13 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JAN 2011)
3.2.2.3-41 PERFORMING WORK (JUL 2004)
The Contractor (you) must perform, using your own organization, work equivalent to at least 20 percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if you request a reduction and the CO determines that it would be to the Government's advantage to do so.
(End of clause)
3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (JUL 2004)
The Contractor (you) must
(a) begin work under this contract within 5 calendar days after the date you receive the notice to proceed,
(b) perform the work diligently, and
(c) complete the entire work ready for use not later than 15 calendar days. The time allowed for completion must include final cleanup of the premises.
3.3.1-33 SYSTEM FOR AWARD MANAGEMENT (JUL 2018)
(a) Definitions. As used in this clause
"Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
"Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.)
This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.
"Registered in the SAM database" means that the Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the SAM database.
"System for Award Management (SAM) Database" means the primary Government repository for Contractor information required for the conduct of business with the Government.
(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number
(i) If located within the United States, by calling Dun and Bradstreet at 1-866-705-5711 or via the Internet at http://fedgov.dnb.com/webform; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company Physical Street Address, City, State, and ZIP Code.
(iv) Company Mailing Address, City, State and ZIP Code (if different from physical street address).
(v) Company Telephone Number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document. If registered in SAM as a Service-Disabled Veteran-Owned Small Business (SDVOSB), by submission of an offer, the offeror acknowledges that they are designated as a SDVOSB by the Department of Veterans Affairs, and this designation appears as such on the Veteran Affairs website, https://www.vip.vetbiz.gov.
(g)(1)(i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in AMS Procurement Guidance, the Contractor must provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to:
(A) change the name in the SAM database;
(B) comply with the requirements of AMS regarding novation and change-of-name agreements; and
(C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide the Contracting Officer with the notification, sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor must not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims. Assignees must be separately registered in the SAM database. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of payment" paragraph of the EFT clause of this contract.
(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at http://www.sam.gov.
(End of Clause)
3.6.3-12 ASBESTOS - FREE CONSTRUCTION (APR 2017)
(a) In performing this contract, the Contractor must not use asbestos or asbestos-containing building materials during construction, renovation, and/or modernization of this facility.
(b) The Contractor must provide to the Contracting Officer (CO) a signed statement [CO state due date of statement here related to completion of the project] indicating that no asbestos or asbestos-containing building materials were used during construction, renovation, and/or modernization of this facility. The Contractor's certification under this clause is considered to be a material requirement of the contract and the FAA may withhold payment pending submittal and receipt of an acceptable certification.
(c) The FAA retains the right to conduct sampling of contractor building materials used during construction, renovation, and/or modernization of this facility to verify that they are asbestos-free. If asbestos-containing material is found, the Contractor must bear the expense of the sampling conducted by the FAA, remove and replace the asbestos-containing material and decontaminate the site of asbestos contamination caused by the Contractor at no additional cost to the Government. In addition, the Contractor must bear the expense of all testing (bulk sampling and air sampling conducted by the contactor and the FAA) to determine that the asbestos removal and site decontamination are satisfactorily completed. The Contractor must follow all applicable federal, state, and local asbestos regulatory requirements as well as applicable FAA Orders with respect to asbestos abatement when the Contractor is required to remove asbestos materials they have installed.
3.6.3-22 CONSTRUCTION WASTE MANAGEMENT (JAN 2020)
(a) In performance of this contract, the Contractor must establish a program to minimize waste generation, as well as recycle, reuse, and salvage construction and demolition (C&D) debris generated to the maximum extent possible.
Before commencing work, the Contractor must submit a Waste Management Plan to the Contracting Officer within 15 days after contract award prior to the start of construction activities. This plan must address the following:
(1) General: Provide an overall strategy for managing C&D debris associated with the project.
(2) Waste Identification: Indicate anticipated types and quantities by weight of demolition, site-clearing and construction waste generated by the Project. Include estimated quantities by weight and assumptions for estimates.
A site assessment may be necessary to estimate the types of materials that will be generated during construction and/or demolition. If a site visit is needed, the Contractor must notify the FAA of this as soon as possible, with the FAA arranging in turn for the contractor site visit to take place as soon as possible.
(3) Waste Reduction Work Plan: List each type of waste and whether it will be salvaged, recycled, or disposed of in landfill or incinerator. Include points of waste generation, estimated total weight of each type of waste, final disposition for each waste type, and handling and transportation procedures.
(4) Salvaged Materials: For each type of material that is salvaged or recycled, describe the type of material, source, estimated quantity, and receiving entity. Include names, addresses, and telephone numbers for the receiving individuals and/or organizations.
(5) Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility.
(6) Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location on Project site where materials separation will be located.
(b) This plan must be found acceptable by the FAA Contracting Officer's Representative (COR) or the COR's designated representative prior to the Contractor receiving a Notice-to-Proceed. The plan's acceptability will be promptly determined by the FAA based on the knowledge of the site(s) covered under the Plan. The Contract must implement the approved Waste Management Plan during the term of the contract.
(c) The Contractor must document all C&D disposal and diversion efforts and submit a Construction and Demolition Debris Diversion Report to the CO and COR monthly. A copy of the report must also be submitted to the EOSH Services construction waste management address at 9-AJW-ConstructionWaste@faa.gov.
The monthly Construction and Demolition Debris Diversion Report must contain the following information:
(1) FAA facility name and address, report date and reporting period, contract number, and project name;
(2) Pick up date;
(3) Waste material type;
(4) Disposed C&D waste weight in short tons less container weight, method of waste material disposal, and reason why waste was not diverted;
(5) Recycled waste weight in short tons less container weight;
(6) Composted waste (off-site) weight in short tons less container weight;
(7) Reused materials weight in short tons less container weight; and
(8) Total weight of C&D waste (i.e., sum of disposed, recycled, composted, and reused waste) in short tons less container weight.
The Contractor must ensure that facilities used for recycling, reuse, and disposal are authorized for the intended use to the required extent by federal, state, and local regulations.
(d) If the value of this contract when awarded is less than $150,000, this clause does not take effect in this contract.
(End of Clause)
3.6.4-3 BUY AMERICAN ACT - CONSTRUCTION MATERIALS (APR 2021)
(a) The Buy American Act (41 U.S.C. §§ 8301-8305) and Executive Order No. 10582, dated December 17, 1954, as amended, provide that the Government give preference to domestic construction material. The restrictions of the Buy American Act do not apply when FAA determines use of a particular domestic construction material: (i) would unreasonably increase the cost (the cost of particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent, unless the agency head determines a higher percentage would be appropriate); (ii) would be impracticable; or (iii) is not mined, produced, or manufactured in sufficient and reasonably available commercial quantities of a satisfactory quality. This restriction also does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
[Contracting Officer to list applicable excepted materials or indicate "none"]
(b) Definitions:
(1) "Components," as used in this clause, means those articles, materials, and supplies incorporated directly into construction materials.
(2) "Construction material," as used in this clause, means an article, material, or supply brought to the construction site for incorporation into the building or work. Construction material also includes an item brought to the site pre-assembled from articles, materials or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, which are discrete systems incorporated into a public building or work and which are produced as a complete system, will be evaluated as a single and distinct construction material regardless of when or how the individual parts or components of such systems are delivered to the construction site.
(3) "Domestic construction material," as used in this clause, means (i) an unmanufactured construction material mined or produced in the United States, or (ii) a construction material manufactured in the United States, if the cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind as the construction materials determined to be unavailable will be treated as domestic.
(c) The Contractor agrees that only domestic construction material must be used by the Contractor, subcontractors, material men, and suppliers in the performance of this contract, except for foreign construction materials, if any, listed in this contract.
(d) Request for determination of inapplicability of the Buy American Act:
(1) Any Contractor request to use foreign construction material in accordance with paragraph(a) of this clause must include adequate information for Government evaluation of the request, including:
(i) A description of the foreign and domestic construction materials;
(ii) Unit of measure;
(iii) Quantity;
(iv) Price;
(v) Time of delivery or availability;
(vi) Location of the construction project;
(vii) Name and address of the proposed supplier; and
(viii) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (a) of this clause.
A request based on unreasonable cost must include a reasonable survey of the market and a completed price comparison table in the format of paragraph (4) below.
The price of construction material must include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
Any Contractor request for a determination submitted after contract award must explain why the Contractor could not reasonably have foreseen the need for such a determination and could not have requested the determination before contract award. If the Contractor does not provide a satisfactory explanation, the Contracting Officer need not make a favorable determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act
(4) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor must include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC MATERIAL PRICE COMPARISON
Construction Material Unit of Measure Quantity Price($)*
Item 1 Foreign Construction Material [ ] [ ] [ ] Domestic Construction Material [ ] [ ] [ ] Item 2 Foreign Construction Material [ ] [ ] [ ] Domestic Construction Material [ ] [ ] [ ]
(List name, address, phone number, and contact for supplier surveyed. Attach copy of response, if oral, attach summary)
*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
(End of clause)
3.10.1-19 MODIFICATION COST PROPOSAL - PRICE BREAKDOWN (CONSTRUCTION) (JUL
1996)
(a) The contractor, in connection with any proposal it makes for a contract modification, shall furnish a price breakdown, itemized as required by the Contracting Officer. The breakdown shall be in enough detail to permit an analysis of all material, labor, equipment, subcontract, and overhead costs, as well as profit, and shall cover all work involved in the modification, whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by similar price breakdowns from those subcontractors.
(b) In addition, if the proposal includes a time extension, a justification thereof shall also be furnished.
Notwithstanding any other provisions of this contract, it is mutually understood that the time extension for changes in the work will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of work. The contract completion dates will be extended only for those specific elements so delayed and the remaining contract completion dates for all other portions of the work will not be altered.
(c) The proposal, together with the price breakdown and time extension justification, shall be furnished by the date specified by the Contracting Officer.
(End of clause)
3.10.1-20 WARRANTY-CONSTRUCTION (JUL 1996)
(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.
(c) The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor's expense any damage to Government owned or controlled real or personal property, when that damage is the result of :
(1) The Contractor's failure to conform to contract requirements; or
(2) Any defect of equipment, material, workmanship, or design furnished by the Contractor.
(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor's warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.
(e) The Contracting Officer will notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.
(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense.
(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall:
(1) Obtain all warranties that would be given in normal commercial practice;
(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer, and
(3) Enforce all warranties for the benefit of the Government if directed by the Contracting Officer.
(h) In the event the Contractor's warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor's, manufacturer's, or supplier's warranty.
(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government furnished material or design.
(j) This warranty shall not limit the Government's rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.
(End of clause)
3.10.2-1 SUBCONTRACTS (FIXED-PRICE CONTRACTS) (JAN 2019)
(a) Consent to subcontract in this clause applies to subcontracts resulting from unpriced modifications to this contract if required as indicated under (b) or (c) below.
(b) Subcontract, as used in this clause, includes but is not limited to purchase orders, and changes and modifications to purchase orders. The Contractor must notify the Contracting Officer reasonably in advance of entering into any subcontract if the Contractor does not have an approved purchasing system and if the subcontract:
(1) Is proposed to exceed $150,000; or
(2) Is one of a number of subcontracts with a single subcontractor, under this contract, for the same or related supplies or services, that in the aggregate are expected to exceed $150,000.
(c) If the contractor has an approved purchasing system, the contractor nevertheless must obtain the Contracting Officer's written consent before placing the following subcontracts:
[Fillin subcontract] [Fillin subcontract] [Fillin subcontract]
(d) The advance notification required by paragraphs (b) and (c) above must include-
(1) A description of the supplies or services to be subcontracted;
(2) Identification of the type of subcontract to be used;
(3) Identification of the proposed subcontractor and an explanation of why and how the proposed subcontractor was selected, including the competition obtained;
(4) The proposed subcontract price and the Contractor's cost or price analysis;
(5) The subcontractor's current, complete, and accurate cost or pricing data and Certificate of Current Cost or Pricing Data, if required by other contract provisions;
(6) The subcontractor's Disclosure Statement or Certificate relating to Cost Accounting Standards when such data are required by other provisions of this contract; and
(7) A negotiation memorandum reflecting-
(i) The principal elements of the subcontract price negotiations;
(ii) The most significant considerations controlling establishment of initial or revised prices;
(iii) The reason cost or pricing data were or were not required;
(iv) The extent, if any, to which the Contractor did not rely on the subcontractor's cost or pricing data in determining the price objective and in negotiating the final price;
(v) The extent, if any, to which it was recognized in the negotiation that the subcontractor's cost or pricing data were not accurate, complete, or current; the action taken by the Contractor and subcontractor; and the effect of any such defective data on the total price negotiated;
(vi) The reasons for any significant difference between the Contractor's price objective and the price negotiated; and
(vii) A complete explanation of the incentive fee or profit plan when incentives are used. The explanation must identify each critical performance element, management decisions used to quantify each incentive element, reasons for the incentives, and a summary of all trade-off possibilities considered.
(e) The Contractor must obtain the Contracting Officer's written consent before placing any subcontract for which advance notification is required under paragraph (b) above. However, the Contracting Officer may ratify in writing any such subcontract. Ratification will constitute the consent of the Contracting Officer.
(f) Even if the Contractor's purchasing system has been approved, the Contractor must obtain the Contracting Officer's written consent before placing subcontracts identified below:
(g) Unless the consent or approval specifically provides otherwise, neither consent by the Contracting Officer to any subcontract nor approval of the Contractor's purchasing system will constitute a determination:
(1) of the acceptability of any subcontract terms or conditions,
(2) of the acceptability of any subcontract price or of any amount paid under any subcontract, or
(3) to relieve the Contractor of any responsibility for performing this contract.
(h) No subcontract placed under this contract will provide for payment on a cost-plus-a-percentage-of-cost basis.
(i) The Government reserves the right to review the Contractor's purchasing system.
(End of clause)
3.13-16 RECORDS MANAGEMENT (JAN 2020)
(a) Definitions.
Federal record as defined in 44 U.S.C. § 3301, means all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them. The term Federal record:
(1) Includes all FAA records.
(2) Does not include personal materials.
(3) Applies to records created, received, or maintained by Contractors pursuant to a FAA contract.
(4) May include deliverables and documentation associated with deliverables.
(b) Requirements.
(1) Compliance. The contractor must comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chapters 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by Privacy Act of 1974 (5 U.S.C. 552a), to the extent that the Privacy Act applies to any records maintained by the Contractor. These policies include the preservation of all Federal records, regardless of form or characteristics, mode of transmission, or state of completion.
(2) Applicability. All data created for Government use and delivered to, or falling under, the legal control of the Government, are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33. Such Federal records must be managed and scheduled for disposition only as permitted by the Federal Records Act, relevant statute or regulation, and FAA Order 1350.14 "Records Management" at https://www.faa.gov/documentLibrary/media/Order/FAA_1350.14B.pdf.
(3) Records maintenance. While in Contractor's custody, the Contractor is responsible for preventing the alienation or unauthorized destruction of FAA records, including all forms of mutilation. Records may not be removed from the legal custody of FAA or destroyed except in accordance with the provisions of the agency records schedules and with the written concurrence of the FAA Agency Records Officer (ARO) (or the ARO's designate) and Contracting Officer, as appropriate. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the Contractor must report the event to the Contracting Officer in accordance with 36 CFR 1230, Unlawful or Accidental Removal, Defacing, Alteration, or Destruction of Records, for reporting to NARA by FAA Records Management. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
(4) Unauthorized disclosure. The Contractor must notify the Contracting Officer within 2 (two) hours of discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment.
Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the contract. The Contractor must ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor must not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government's behalf, without the express written permission of the FAA ARO (or the ARO's designate) and the Contracting Officer. Destruction of records is expressly prohibited unless in accordance with the contract.
(c) Records management contracts - where the contractor is required to design, develop, and/or operate a system of records, the following additional requirements apply:
During the contract, the FAA ARO (or ARO's designate) has the right to inspect where the records are stored (digitally or paper records) in order to ensure they are properly protected from the elements and/or loss. This inspection must be coordinated through the Contracting Officer or the Contracting Officer's Representative. The contractor must be provided 30 calendar days' notice of such inspections. This clause may be tailored to provide for a different notice period. Additional details regarding such inspections consistent with this clause may be specified in the Statement of Work.