23 Questions and Answers.pdf

PDF 74 KB Posted

Attached to
GGG ATCT Modular Facility Longview TX Federal contract opportunity
Solicitation number
6973GH-23-R-00009
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document contains questions and answers regarding a federal solicitation for a modular facility in Longview, Texas. The solicitation is for the purchase and installation of a 56 foot by 36 foot modular building to serve as an air traffic control tower facility. It will include four offices, a conference room, reception area, restroom, storage office, kitchen, and open area. The contractor will be responsible for final utility connections and compliance with specifications for lighting, plumbing, millwork, and other finish elements. The facility is for use by the Federal Aviation Administration at their Tech Ops location in Longview.

View the file

Other files for this federal contract opportunity

Other files attached to GGG ATCT Modular Facility Longview TX, newest first.
File Type Posted
23 Floor Plan Questions.pdf PDF
16 Attachment 5 Performance Bond.pdf PDF
16 Attachment 1 Statement of Work.pdf PDF
16 Attachment 3 Contractor Release Form.doc DOC document
16 Attachment 6 Past Experience Form.docx DOCX document
16 6973GH-23-R-00009.pdf PDF
16 Attachment 2 WD.pdf PDF
16 Attachment 4 Payment Bond.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

6973GH-23-R-00009

ATCT Mod Facility Longview, TX

Question 1: Will your team (FAA) bring all of the utilities to the modular building perimeter and we are to make all final utility connections?

Answer 1: Utilities are around the modular building location and is responsibility of contractor to bring them up and do the connections.

Question 2: Is there an existing utility map that shows the utility locations?

Answer 2: It’s in the drawing package.

Question 3: Please confirm if Cipher Locks are required for all doors

Answer 3: We would like to take off the existing card reader and install it on the new front door. One Cipher lock please on side entrance.

Question 4: Will the building require STC-rated walls and doors as stated in the SOW?

Answer 4: Only for the ATM office walls and door please.

Question 5: Can we substitute LED lights instead of Fluorescent lights?

Answer 5: LED lights only please and can be the fluorescent style.

Question 6: Can we substitute PEX or CPVC for copper plumbing?

Answer 6: Copper for domestic water please.

Question 7: Are Venetian blinds 1” mini blinds?

Answer 7: PVC type that can black out when needed.

Question 8: Are LED light fixtures acceptable ILO fluorescent?

Answer 8: yes.

Question 9: Is there a specified preference for stair, platform, ramp and awning materials?

Answer 9: Wood.

The following questions are pertaining to the millwork items. Please reference the attached Floor Plan with markups:

Question 10: Figure 1; Base Cabinets only? (no uppers shown)

Answer 10: Base and Upper cabinets on top of the sink. Eliminate cabinets as marked #2.

Question 11: Figure 2; Uppers or Shelving? (there may not be enough space in a 5'-8" wide Breakroom)

Answer 11: same answer as #10.

Question 12: Figure 3; Base Cabinets?

Answer 12: Base cabinets please.

Question 13: Figure 4; Base Cabinets?

Answer 13: Eliminate cabinet.

Question 14: Figure 5; Base Cabinets?

Answer 14: Eliminate cabinet.

Question 15: Figure 6; Is the Reception Desk shown in our scope? Would it be classified as furniture or millwork?

Answer 15: Not in SOW or scope.

File details come from the government source that posted it. Updated .