Questions Answers Pearland.docx

DOCX document 12 KB Posted

Attached to
Shelter Replacement Pearland TX Federal contract opportunity
Solicitation number
6973GH-21-R-00014
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document contains questions and answers regarding a federal solicitation for construction services. The Federal Aviation Administration is seeking a contractor to construct a new RTR shelter located in Pearland, Texas as described in the scope of work and attachments. Questions addressed include the distance between the air traffic control tower and RTR site, manhole specifications, responsibility for cable installation between the transformer and meter, required conduit size and type, and bore requirements under Airfield Lane. Additional tower specifications are provided including platform size, wind load rating, and tower design standards. Offers are due by December 11, 2020 and are to be submitted electronically to the point of contact.

View the file

Other files for this federal contract opportunity

Other files attached to Shelter Replacement Pearland TX, newest first.
File Type Posted
Amendment 0001-Pearland.pdf PDF
Performance Bond.pdf PDF
Payment Bond.pdf PDF
6973GH-21-R-00014.pdf PDF
Wage Determination.pdf PDF
Contractor Release Form.doc DOC document
Experience Information Form.pdf PDF
LVJ RTR Specifications.pdf PDF
LVJ RTR Construction PDFs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6973GH-21-R-00014

Pearland, TX Questions & Answers

Specifications 1.01E: What is the distance between the ATCT building from the RTR site? I’m having difficulty finding it on my aerial pictures, so I’m going to contact the SSC to find this out. How many manholes? One manhole every 1,200 feet with a full loop in each manhole for cable slack

LVJ-D-RTR-C003 Note 1 vs Numbered Legend F&I 3: Who furnished and installs cables between transformer and meter? Depends on the electrical company. I will contacting the SSC to find out who the electric company, the account number, the location of the existing transformer and see what their policy is. But it will most likely be either the electric company or us will do the installation. What size and type of conduit is required?

LVJ-D-RTR-C003 Are we to bore under Airfield Lane? If so is HDPE acceptable? HDPE schedule 80 pipe is acceptable for under Airfield Lane

LVJ-D-RTR-G004 SOW Note 1: Where are the adjacent towers? There are no adjacent towers. The contractor will need to coordinate with FAA personnel to transfer Frequencies to new tower from existing tower.

Additional Tower Specifications:

Size of platform - 6 arm mount Wind Load - 140 MPH Tower Specifications - TIA-222-H