6973GH-25-R-00006.pdf

PDF 355 KB Posted

Attached to
CAVU-2100 Power Supply Assemblies Federal contract opportunity
Solicitation number
6973GH-25-R-00006
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document is a Solicitation for CAVU-2100 Power Supply Assemblies issued by the Federal Aviation Administration (FAA). The FAA requires these power supplies to support CAVU-2100 Multimode Digital Radios used in FAA En-Route Communication facilities. The solicitation is for a 1-year base contract with four 1-year option periods. The contractor must provide all labor, facilities, equipment, and materials to fulfill the Statement of Work. First article testing will be required. This is a full and open competition with NAICS code 334220 and a 1,250 employee size standard. Proposals are due by email on December 10, 2024 at 2:00 PM Central Time. The minimum contract value is $2,500 and the maximum is $1,500,000.

View the file

Other files for this federal contract opportunity

Other files attached to CAVU-2100 Power Supply Assemblies, newest first.
File Type Posted
Attachment 1 SOW MDR Power Supply.pdf PDF
Attachment 2 Past Performance Experience Information Form.pdf PDF
SecureZIP Attachments.zip ZIP file
SOW Attachment 28 Drawings combined.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD

3. SOLICITATION TYPE1. CONTRACT NO. 2. SOLICITATION NUMBER

6. ISSUED BY CODE 7. ADDRESS OFFER TO (If other than Item 6)

5. REQUISITION/PURCHASE NUMBER

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder"

NEGOTIATED BID (RFP)

SEALED BID (IFB)

4. DATE ISSUED

PAGE OF PAGES

1 63

C. E-MAIL ADDRESS

EXT.NUMBERAREA CODE

B. TELEPHONE (NO COLLECT CALLS)A. NAME

9. FOR

INFORMATION

CALL

CAUTION: LATE Submissions, Modifications and Withdrawals. All offers are subject to all terms and conditions contained in this solicitation.

(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 7, or if hand carried, in the

SOLICITATION

8. Sealed offers in original and

PART IV - REPRESENTATIONS AND INSTRUCTIONS

OTHER STATEMENTS OF OFFERORS

EVALUATION FACTORS FOR AWARD

INSTR., CONDS., AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND

LIST OF ATTACHMENTS

CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

I

J

K

L

M SPECIAL CONTRACT REQUIREMENTS

CONTRACT ADMINISTRATION DATA

DELIVERIES OR PERFORMANCE

INSPECTION AND ACCEPTANCE

PACKAGING AND MARKING

DESCRIPTION/SPECS./WORK STATEMENT

SUPPLIES OR SERVICES AND PRICE/COST

SOLICITATION/CONTRACT FORM

PART II - CONTRACT CLAUSESPART I - THE SCHEDULE

H

G

F

E

D

C

B

A

SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)

10. TABLE OF CONTENTS

17. OFFER DATE16. SIGNATURE

SUCH ADDRESS IN SCHEDULE.

IS DIFFERENT FROM ABOVE - ENTER

14C. CHECK IF REMITTANCE ADDRESS

EXT.NUMBERAREA CODE

14B. TELEPHONE NUMBER

(Type or print)AND

ADDRESS

OF

OFFEROR

CODE FACILITY

15. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER14A. NAME

DATEAMENDMENT NO.DATEAMENDMENT NO.

and related documents numbered and dated):

amendments to the SOLICITATION for offerors

(The offeror acknowledges receipt of

13. ACKNOWLEDGEMENT OF AMENDMENTS

CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)12. DISCOUNT FOR PROMPT PAYMENT the designated point(s), within the time specified in the schedule.

by the offeror) from the date for receipt of offers specified above , to furnish any or all items upon which prices are offered at the price set opposite each item , delivered at

11. In compliance with the above, the undersigned agrees, if this offer is accepted within ______________ calendar days (60 calendar days unless a different period is inserted

NOTE: Item 11 does not apply if the solicitation includes Minimum Bid Acceptance Period .

OFFER (Must be fully completed by offeror)

IMPORTANT - Award will be made on this Form, or by other authorized official written notice.

27. AWARD DATE

(Signature of Contracting Officer)

26. CONTRACT AUTHORITY

24. PAYMENT WILL BE MADE BY

25. NAME OF CONTRACTING OFFICER (Type or print)

CODE 23. ADMINISTERED BY (If other than Item 6)

ITEM

(4 copies unless otherwise specified)

22. SUBMIT INVOICES TO ADDRESS SHOWN IN21. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

20. ACCOUNTING AND APPROPRIATION19. AMOUNT18. ACCEPTED AS TO ITEMS NUMBERED

AWARD (To be completed by CONTRACT AUTHORITY)

CODE

11/14/2024 X

AAQ710-AFN

AAQ-710 LOGISTICS CENTER ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

OKLAHOMA CITY OK 73125

1400 CT 12/10/2024

Connie M. Houpt 405 connie.m.houpt@faa.gov

954-7854

X

X

X

X

X

X

X

X

X

X

X

X

X

PAGE(S)

Connie M. Houpt

6973GH-25-R-00006

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 63

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

6973GH-25-R-00006

00001 FIRST ARTICLE TEST UNITS 10 EA

CAVU 2100 Power Supply Rev 1 p/n 100025730

Electronic & IT: 03

00002 BASE CONTRACT PERIOD 600 EA

CAVU 2100 Power Supply Rev 1 p/n 100025730

Electronic & IT: 03

00003 FIRST OPTION PERIOD 600 EA

CAVU 2100 Power Supply Rev 1 p/n 100025730

Electronic & IT: 03

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 365

00004 SECOND OPTION PERIOD 600 EA

CAVU 2100 Power Supply Rev 1 p/n 100025730

Electronic & IT: 03

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 730

00005 THIRD OPTION PERIOD 600 EA

CAVU 2100 Power Supply Rev 1 p/n 100025730

Electronic & IT: 03

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 1095

00006 FOURTH OPTION PERIOD 600 EA

CAVU 2100 Power Supply Rev 1 p/n 100025730

Electronic & IT: 03

(Option Line Item)

(Expected Exercise Date/Days After Award: ) 1460

Section A - Solicitation/Contract Form

Section B - Supplies or Services/Prices Section B - Schedule

The contractor shall furnish all labor, facilities, materials and equipment, services, and transportation required to furnish the CAVU 2100 Power Supplies set forth below in accordance with the terms, conditions, and provisions set forth herein. Details of the units to be furnished can be found at Section C herein and all other related attachments referenced at Section J.

This is an Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The precise quantities of units and support required are unknown and will be ordered as needed with the issuance of task orders. Estimated requirements are not a representation to an offeror or contractor that the estimated quantity will be ordered, or that conditions affecting requirements will be stable or normal. The only person authorized to either issue or modify delivery orders under this IDIQ contract is the Contracting Officer.

The minimum obligation under this contract is $2,500.00. This amount (at least) will be obligated on the first delivery order, issued concurrently with the contract. The Government has no obligation to order additional units or issue additional delivery orders to the contractor beyond the minimum obligation specified above. The maximum obligation under this contract is $1,500,000.00.

ITEM SUPPLIES/SERVICES EST. ANNUAL

QUANTITY UNIT UNIT PRICE EST. TOTAL

AMOUNT

00001 FIRST ARTICLE TEST UNITS

CAVU 2100 Power Supply Rev 1 10 EA $______ $________ p/n 100025730

00002 BASE CONTRACT PERIOD

CAVU 2100 Power Supply Rev 1 600 EA $______ $________ p/n 100025730

00003 FIRST OPTION PERIOD

CAVU 2100 Power Supply Rev 1 600 EA $______ $________ p/n 100025730

00004 SECOND OPTION PERIOD

CAVU 2100 Power Supply Rev 1 600 EA $______ $________ p/n 100025730

00005 THIRD OPTION PERIOD

CAVU 2100 Power Supply Rev 1 600 EA $______ $________ p/n 100025730

00006 FOURTH OPTION PERIOD

CAVU 2100 Power Supply Rev 1 600 EA $______ $________ p/n 100025730

TOTAL ESTIMATED POTENTIAL VALUE $________

Clause List

The remainder of this page has been intentionally left blank.

Section C - Description/Specifications Scope of Work

Clause List

C.1 SCOPE OF WORK

The contractor shall supply the CAVU-2100 Power Supply Assemblies identified in Section B, Supplies or Services and Prices/Costs, in accordance with Section B and the attached Statement of Work listed in Section J.

C.2 SPECIFICATIONS

The following documents, SOW attachments, are applicable to this acquisition:

a. Attachment 1 CAVU 2100 SOW Test Procedures.pdf

b. Attachment 2 TemperatureChamberTesting.pdf

c. Attachment 3 CAVU_2100_TEST.pdf

d. Attachment 4_Cover_TestingAll_MDR_TX_RX_ITTvsRev1_PS_w_BackPage26.pdf

e. Attachment 5 CAVU-2100 NOT USED Label Description.pdf

f. Attachment 6 CAVU-2100 Panel Label.jpg

g. Attachment 7 Heat Sink 8199217b.pdf

h. Attachment 8 CAVU2100_PWRSUPPLY_Rev2_20190425.pdf

i. Attachment 9 20190708_CAVU2100PWRSUP_BOM_Baseline_PWB8199132-FAA-2A.xlsx

j. Attachment 10 CAVU-2100 Power Supply Assembly Drawings – Bottom.pdf

k. Attachment 11 CAVU-2100 Power Supply Assembly Drawings – Top.pdf

l. Attachment 12 CAVU-2100 Power Supply Composite Drill Drawing.pdf

m. Attachment 13 CAVU-2100 Power Supply PCB 3D Prints - Bottom.pdf

n. Attachment 14 CAVU-2100 Power Supply PCB 3D Prints – Top.pdf

o. Attachment 15 CAVU-2100 Power Supply PCB PCB Prints – Bottom.pdf

p. Attachment 16 CAVU-2100 Power Supply PCB PCB Prints – Top.pdf

q. Attachment 17 CAVU-2100 Power Supply Schematic Prints.pdf

r. Attachment 18 CAVU2100_AC_Monitor_CableAssembly_Rev1a_8220004_01092018.pdf

s. Attachment 19 8220005 Assembly Drawing – Top.pdf

t. Attachment 20 8220005 Composite Drill Drawing.pdf

u. Attachment 21 8220005 PCB 3D Prints - Bottom.pdf

v. Attachment 22 8220005 PCB 3D Prints - Top.pdf

w. Attachment 23 8220005 PCB Prints - Bottom.pdf

x. Attachment 24 8220005 PCB Prints - Top.pdf

y. Attachment 25 8220005 Schematic Prints - Top.pdf

z. Attachment 26 TDR for 100027530 CAVU2100 PSU.pdf

aa. Attachment 27 PHS&T for MDR Power Supply 10 yr 100027530.pdf bb.Attachment 28 Drawings combined.pdf

Section D - Packaging and Marking Clause List

AC2102 PRESERVATION, PACKAGING, PACKING AND MARKING (JUL 1997)

(a) All items unless otherwise specified shall be individually packaged to American Society for Testing and Materials (ASTM) D 3951 (packaging). Performance testing of packaging will be IAW ASTM D 4169 assurance level II distribution cycle 18.

(b) All items shall be marked IAW Mil STD 129 ‘Marking for Shipment and Storage’. Bar coding is required, 128 symbology is preferred; however, 3 of 9 will be accepted.

(c) Common hardware items shall be packaged in multiple unit pack quantities compatible with the unit of issue (UI) or Quantity per unit pack (QUP). BULK QUANTITIES ARE NOT ACCEPTABLE.

(d) The following paragraph concerns only Federal Aviation Administration (FAA) items that are shipped to a contractor for repair:

The FAA will endeavor to ship all items in reusable containers. All items shall be returned to the FAA in the same or equal (see A. above) containers. In those instances where material is shipped in specialized containers (plastic/fiberglass shipping cases, metal crates, etc.), that material will be returned in the original container. If an FAA-owned container is not reusable, the contractor shall notify the Contracting Officer, offer to furnish a new comparable container, and state its price. At its option, the FAA may accept the contractor's offer, or independently furnish a suitable shipment container.

Copies of the ASTMs can be attained from:

ASTM

100 Barr Harbor Dr.

West Conshohocken, PA 19428

(610) 832-9500

Copies of Mil STD 129 can be attained from:

DODSSP

Customer Service

Standardization Documents Order Desk

700 Robbins Avenue Building 4D

Philadelphia, PA 19111-5094

Section E - Inspection and Acceptance Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.4-2 INSPECTION OF SUPPLIES - FIXED PRICE (NOV 1997)

3.10.4-16 RESPONSIBILITY FOR SUPPLIES (APR 1996)

AC0350 FIRST ARTICLE TEST AND DISPOSITION REQUIREMENTS (JUL 2015)

(a) Performance or other characteristics which the First Article(s) must meet, and detailed technical data requirements for testing of the first article(s) (including necessary data to be submitted in First Article(s) Test Report, if applicable) are: Statement of Work, paragraph 4.2.1 First Article Testing.

(b) The approved First Article(s) shall serve as a manufacturing standard.

(c) Disposition of First Article(s) shall be as follows:

The first article(s) will be retained by the Government and not be included as part of the production quantity.

AC1906 INSPECTION AND ACCEPTANCE (JAN 1997)

(a) The Government reserves the right to have its authorized representative inspect the material at the contractor's plant prior to shipment. To facilitate such inspection, the contractor shall give the Contracting Officer a written or telegraphic notice at least ten (10) working days prior to readiness for inspection. Such notice shall include FAA delivery order number, FAA contract number, and date of proposed inspection. The offeror shall indicate in the following space the location of the plant where the material will be available for inspection.

Plant

Location

(b) The Government may waive inspection at contractor's plant. In such event, final inspection will be at destination.

(c) In the event the Government does choose to inspect at the contractor's plant, final inspection at destination shall be ONLY for damage in transit, quantity, item substitution, and visual defects.

(d) Final acceptance will be at destination.

(e) The provisions of this clause shall in no way be construed to limit the rights of the Government under the clause entitled "Inspection of Supplies - Fixed-Price" (AMS 3.10.4-2).

Section F - Deliveries or Performance Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.1-9 STOP-WORK ORDER (OCT 1996)

3.10.1-24 NOTICE OF DELAY (MAR 2009)

3.11-34 F.O.B. DESTINATION (APR 1999)

3.2.2.8-2 VARIATION IN QUANTITY (JUL 2024)

(a) A variation in the quantity of any contract item will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) below.

(b) The permissible variation must be limited to: 1 % increase and 0% decrease [CO must insert percentages]. This permissible variation must be limited to CLINs 00002-00006 *

*[CO must insert the designations(s) to which the percentages apply, such as (1) the total contract quantity, (2) item 1 only, (3) each quantity specified in the delivery schedule, (4) the total item quantity for each destination, or (5) the total quantity of each item without regard to destination.]

(End of clause)

3.2.2.8-6 TIME OF DELIVERY (NOV 1997)

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

(Contracting Officer insert specific details)

ITEM NO. QUANTITY WITHIN DAYS AFTER DATE

OF CONTRACT

00001 10 60 00002-00006 per delivery order 60

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, may be rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS AFTER DATE

OF CONTRACT

(b) Attention is directed to provisions of the screening information request/contract that provide that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (i) five calendar days for delivery of the award through the ordinary mails, or (ii) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term 'working day' excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer may be rejected.

(End of clause)

AC0168 AUTHORIZED PERFORMANCE (JUL 2015)

The execution of a contract shall not constitute authority for the contractor to commence performance. Performance shall be ordered by the issuance of a formal delivery order by an authorized Contracting Officer of the Mike Monroney Aeronautical Center. Orders issued orally or by written telecommunications shall reference a formal delivery order number and shall be confirmed by issuance of the formal delivery order.

AC1604 CONTRACT PERIOD (JUN 2015)

The effective period of this contract is 1 year from the effective date of the contract, or as may be extended by options issued hereunder.

F.1 DIVERSION OF SHIPMENT UNDER F.O.B. DESTINATION CONTRACTS

(a) When a place of delivery is changed in accordance with the Changes clause of this contract, the contract price shall be adjusted pursuant to that clause for any resulting increase or decrease in the cost of performance. No adjustment shall be made for changes in transportation costs when supplies are identically priced for delivery regionally or nationally and the place of delivery is changed within the area to which the identical price applies. In all other cases, price adjustments due to changes in transportation costs shall be determined by comparing the cost of--

(1) Shipments to the new destinations as evidenced by copy of paid freight bills to be supplied by the Contractor with the invoice; and

(2) Shipments to the original or old destination as evidenced by copy of the appropriate paid freight bills to be supplied by the Contractor, or, in the event no shipments were made, as evidenced by the applicable rates of a common or contract carrier. If carrier rates are not publicly filed with any regulatory body, (e.g., interstate shipments moving by rail piggyback service) the Contractor shall provide a copy of the contract, letter agreement or other written communication from carriers quoting the rates/changes that would have been applied for shipments to the original or old destination.

(b) If (1) shipments to the new destination are made by the Contractor's owned or leased trucks and/or (2) shipments to the original destination were made or would have been made by the Contractor's owned or leased trucks, the Contractor shall so certify. The Government shall make an appropriate adjustment in contract prices for payment purposes by substituting a rate equal to 70 percent of the lowest applicable rate published in common carrier tariffs as of the date of shipment for the Contractor's actual rate or contemplated transportation costs.

(c) If any or all of the following data are not clearly shown on, or available from, copies of paid freight bills for each diverted shipment, the Contractor shall supply a statement showing the--

(1) Full name of the carrier or carriers in the routing;

(2) Number of containers;

(3) Gross shipping weight;

(4) Actual date of shipment; and

(5) Freight description for the supplies as indicated in the ‘National Motor Freight Classification’ or the ‘Uniform Freight Classification’ (Rail).

F.2 CHANGE TO INDIVIDUAL DELIVERY ORDER SCHEDULE

(a) The delivery schedule(s) of all delivery orders issued hereunder shall be established in accordance with the terms of the contract.

(b) In the event that the Contractor fails to deliver in accordance with the established delivery schedule(s) and if such failure is not due to an excusable delay as defined in the Default clause of this contract, the Government and the Contractor may at the Government's option, negotiate a revised delivery schedule(s) in exchange for adequate consideration to the Government. A contract modification will not be required, but the delivery order(s) shall be amended in writing accordingly.

(c) A delivery order change or amendment made pursuant to this clause shall not affect the delivery schedule(s) of any other delivery order(s) issued under this contract.

(d) This clause shall not limit the Government's rights under the Default clause.

Section G - Contract Administration Data Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.1-22 CONTRACTING OFFICER'S REPRESENTATIVE (APR 2012)

AC4530 WARRANTY - COMMERCIAL PRODUCTS (JUN 2015)

(a) The contractor warrants that the products (‘products’ includes equipment, fabrication processes, raw or finished materials, and intermediate assemblies) conform to contract requirements. The contractor also warrants that products are free of design defects (except defects in FAA-provided final designs) and defects in materials or workmanship.

(b) The contractor shall replace or repair any products which fail in operation within 12 months from the date of receipt. The Contracting Officer will give written notice of any defect or nonconformance to the contractor within a reasonable period of time after discovery. Replacements of contract items shall be made promptly and on an FOB destination basis. FAA will install replacements at no expense to the contractor.

(c) Products replaced under the provisions of this warranty shall remain the property of FAA unless the contractor wishes to obtain ownership. In this case, the contractor shall notify FAA of such in writing not later than the date of receipt by FAA of the replacement products. The contractor is responsible for packaging and shipping costs.

(d) The rights and remedies of FAA provided in this clause are in addition to and do not limit any rights afforded to FAA by any other clause of this contract or under applicable Federal or State law, including the Uniform Commercial Code.

AC4550 DELIVERIES TO THE MIKE MONRONEY AERONAUTICAL CENTER (MMAC) (JUL

2015)

(a) Security procedures at the MMAC require that all mail, materials, packages or parcels of any kind be delivered to a central screening point, for inspection by the FAA. This affects mail and other deliveries destined for all organizations located on MMAC property, including government organizations, contractors and permit holders.

After passing security inspection, the mail or material may be handled and delivered by the FAA. FAA will make every reasonable effort to conduct inspections and handle items in a careful manner so as to avoid damage or delay.

(b) This inspection is for the benefit of the FAA only. The FAA makes no representation that any material passing inspection is without hazard, poses no threat, or that it conforms in form, fit, function or quantity to the expectations of the intended recipient.

(c) The FAA shall not be liable for any 1) loss, damage or shortage of any mail or materials, 2) injury, or 3) delay in performance resulting from such inspection and handling, unless liable under the Federal Tort Claims Act (28 U.S.C. 2671-2680).

(d) Any item destined for the contractor that fails to pass inspection remains the property of the contractor, who is responsible for its disposition and coordination with law enforcement agencies as necessary.

Section H - Special Contract Requirements Clause List

3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020)

(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:

(1) Contracts written on paper and contracts in electronic form;

(2) Pen-and-ink signatures and electronic signatures; and

(3) Other legally-required written records and the same information in electronic form.

(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.

(c) Certain documents may need to be provided or maintained in original form, such as large-scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.

(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.

(e) Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA- 1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm. This is based on the National Institute of Standards and Technology (NIST) Policy Statement on Hash Functions dated August 5, 2015. Further guidance on the use of SHA-256 is in NIST Special Publication (SP) 800-57 Part 1, section

5.6.2 as amended and SP 800-131A, Revision 1 dated November 6, 2015. Additional guidance on the use of SHA-3 is in NIST SP 800-185 as amended.

(f) Contractors do not have to update documents previously digitally signed using SHA-1 hash algorithms unless the document requires updating. The FAA and contractors may continue to use SHA-1 for the following applications:

Verifying old digital signatures and time stamps, generating and verifying hash-based message authentication codes (HMACs), key derivation functions (KDFs), and random bit/number generation.

(End of Clause)

AC3007 ECONOMIC PRICE ADJUSTMENT CONTRACT WITH OPTION TERMS (JUN 1999)

a. If the Government exercises its option to extend the contract term in accordance with clause 3.2.4-35 entitled, ‘Option to Extend the Term of the Contract’, the prices of contract line items 00003-00006 shall be subject to adjustment, at the request of either contract party, in accordance with this clause.

b. Contract price adjustment under this clause shall be limited to one occurrence per option term, and each line item price is limited to a maximum of a 10% increase, or 10% decrease, per occurrence. There is no minimum amount of adjustment that may be considered under this clause.

c. The contractor warrants that the prices in this contract do not include any allowance for any contingency to cover increased costs for which adjustment is provided under this clause.

d. Definitions, for purposes of this clause:

(1) The economic indicator shall be the Producers Price Index published on the Internet by the U.S. Department of Labor, Bureau of Labor Statistics (http://stats.bls.gov).

(2) The base price index shall be the latest published economic indicator [including data identified as ‘(P) preliminary’] as of the SIR opening date, for purposes of calculating adjustment of the option term prices.

(3) The adjusting price index shall be the latest published economic indicator [including data identified as ‘(P) preliminary] as of 120 days prior to expiration of the contract term.

(4) Contract price or contract line item price shall be the unit price reflected in Section B of the contractor's offer, incorporated into the contract at the time of award, or as later changed by formal contract modification executed by the Contracting Officer.

e. Contractor requests for adjustment under this clause must be submitted to the Contracting Officer in writing no later than 45 days after receipt of the Government's preliminary notice of intent to exercise the option to extend the contract term. The Contracting Officer may, at his/her sole discretion, receive and act upon a request submitted at any time prior to the expiration of the current contract term.

f. Adjustments under this clause shall be made only to the contract prices applicable to the option period identified in the Government's preliminary notice. In no event will the contract prices of an expired contract term be adjusted under this clause.

g. The option period contract unit price shall be adjusted by multiplying the unit price by the percentage difference between the applicable base price index and adjusting price index, subject to the limitations described in paragraph b above. If the adjusting price index is lower than the base price index, the contract unit price will be decreased by the same percentage. If the adjusting price index is higher than the base price index, the contract unit price will be increased by the same percentage.

AC4555 NOTICE OF CONTRACTOR TESTIMONY (SEP 2006)

(a) The contractor shall notify the Contracting Officer promptly in writing of its intention, or the intention of its employees, subcontractors of any tier, or subcontractor employees, either voluntarily or under compulsion of competent authority, to provide sworn testimony on any matter related to or arising under the work required by and/or performed under, this contract. Such written notification at a minimum shall consist of the date and time of the testimony, identification of the court, board, or other body before which the testimony is made, the nature of the testimony to be given to the extent it is known at the time of this report, the nature of the contractor’s involvement in the proceeding and any other circumstances related to the work performed under or related to the contract and the proceeding in which the testimony will be taken.

(b) The contractor shall include the substance of this clause, including this paragraph (b), in all subcontracts executed under this contract and shall require all subcontractors to provide the required report to the contractor.

AC4557 STRIKES OR PICKETING

Notwithstanding any other provision hereof, the Contractor is responsible for delays arising out of labor disputes, including but not limited to strikes, if such strikes are reasonably avoidable. A delay caused by a strike or by picketing which constitutes an unfair labor practice is not excusable unless the Contractor takes all reasonable and appropriate action to end such a strike or picketing, such as the filing of a charge with the National Labor Relations Board, the use of other available Government procedures, and the use of private boards or organizations for the settlement of disputes.

Section I - Contract Clauses Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023)

3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024)

3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (OCT 2015)

3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)

3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)

3.2.2.8-1 MATERIAL REQUIREMENT (OCT 2019)

3.2.5-1 OFFICIALS NOT TO BENEFIT (OCT 2024)

3.2.5-3 GRATUITIES OR GIFTS (OCT 2024)

3.2.5-4 CONTINGENT FEES (OCT 2024)

3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2024)

3.2.5-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE FAA (OCT 2024)

3.2.5-7 DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (OCT 2024)

3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 2024)

3.3.1-1 PAYMENTS (JUL 2018)

3.3.1-6 DISCOUNTS FOR PROMPT PAYMENT (JUL 2018)

3.3.1-9 INTEREST (APR 2023)

3.3.1-10 AVAILABILITY OF FUNDS (OCT 2024)

3.3.1-15 ASSIGNMENT OF CLAIMS (JUL 2018)

3.3.1-17 PROMPT PAYMENT (OCT 2024)

3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS

(OCT 2012)

3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD

MANAGEMENT (OCT 2024)

3.3.2-1 FAA COST PRINCIPLES (OCT 2019)

3.4.2-6 TAXES - CONTRACTS PERFORMED IN U.S. POSSESSIONS OR PUERTO RICO (OCT

1996)

3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (JUL 2019)

3.5-1 AUTHORIZATION AND CONSENT (APR 2023)

3.5-13 RIGHTS IN DATA - GENERAL (OCT 2014)

3.6.1-3 UTILIZATION OF SMALL, SMALL DISADVANTAGED, WOMEN-OWNED, SERVICE-

DISABLED VETERAN OWNED, AND HUBZONE SMALL BUSINESS CONCERNS (JAN 2021)

3.6.1-15 POST-AWARD SMALL BUSINESS PROGRAM RE-REPRESENTATION (JUL 2023)

3.6.2-4 WALSH-HEALEY PUBLIC CONTRACTS ACT (OCT 2018)

3.6.2-9 EQUAL OPPORTUNITY (JUL 2023)

3.6.2-12 EQUAL OPPORTUNITY FOR VETERANS (APR 2022)

3.6.2-13 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (APR 2022)

3.6.2-39 TRAFFICKING IN PERSONS (OCT 2024)

3.6.2-44 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS

ACT (JUL 2023)

3.6.3-14 USE OF ENVIRONMENTALLY PREFERABLE PRODUCTS (OCT 2024)

3.6.3-17 EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (OCT 2024)

3.6.3-23 DELIVERY OF ELECTRONIC AND PAPER DOCUMENTS (OCT 2024)

3.6.4-5 FAA BUY AMERICAN PREFERENCE - STEEL AND MANUFACTURED GOODS (APR

2022)

3.6.4-8 BUY AMERICAN ACT AND FAA BUY AMERICAN PREFERENCE - USMCA

IMPLEMENTATION ACT - BALANCE OF PAYMENTS PROGRAM (JAN 2024)

3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)

3.6.6-1 DRUG FREE WORKPLACE (APR 2023)

3.6.6-2 SEAT BELT USE BY CONTRACTOR EMPLOYEES (APR 2023)

3.6.6-3 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JUL 2023)

3.8.9-2 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (JUL 2023)

3.9.1-1 CONTRACT DISPUTES (JAN 2020)

3.9.1-2 PROTEST AFTER AWARD (AUG 1997)

3.10.1-7 BANKRUPTCY (APR 1996)

3.10.1-12 CHANGES - FIXED-PRICE (APR 1996)

3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)

3.10.1-28 CHANGES REQUIRED BY AMS (JAN 2024)

3.10.4-23 CONTRACTOR AND SUBCONTRACTOR COMPLIANCE WITH FASTENER ACT (NOV

1997)

3.10.5-1 PRODUCT IMPROVEMENT/ TECHNOLOGY ENHANCEMENT (APR 1996)

3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT

1996)

3.10.6-4 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (JAN 2020)

3.13-14 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (OCT 2023)

3.2.2.3-39 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR DATA OTHER

THAN CERTIFIED COST OR PRICING DATA - MODIFICATIONS (JAN 2022)

(a) Request for exception from certified cost or pricing data requirements.

(1) In lieu of submitting certified cost or pricing data for modifications under this contract, on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in paragraphs (a)(1)(i) and (ii) of this clause. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.

(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Information on modifications of contracts or subcontracts for commercial items.

(A) If-

(1) The original contract or subcontract was granted an exception from certified cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or was a contract or subcontract for the acquisition of a commercial item; and

(2) The modification (to the contract or subcontract) is not exempted based on one of these exceptions, then the Contractor may provide information to establish that the modification would not change the contract or subcontract from a contract or subcontract for the acquisition of a commercial item to a contract or subcontract for the acquisition of an item other than a commercial item.

(B) For a commercial item exception, the Contractor must provide, at a minimum, information on prices at which the same item or similar items have previously been sold that is adequate for evaluating the reasonableness of the price of the modification. Dependent upon the commercial items being catalog items, market-priced items, or items included on an active Federal Supply Service Multiple Award Schedule contract, the Contractor must include the corresponding information pursuant to that of which is described in paragraphs (a)(1)(B)(1); (a)(1)(B)(2) or (a)(1)(B)(3) of this clause:

(1) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.

(2) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.

(3) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.

(2) The Contractor grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this clause, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Contractor's determination of the prices to be offered in the catalog or marketplace.

(b) Requirements for certified cost or pricing data.

If the offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:

(1) The offeror must prepare and submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with the information contained at AMS Guidance T3.2.3.G.1 "Instructions for Submitting Certified Cost/Price Proposals for Supplies, Services, or Construction," which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in AMS T3.2.3.G.1 are incorporated as a mandatory format to be used in this contract.

(2) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror must submit a Certificate of Current Cost or Pricing Data that conforms to the instructions contained in the Appendix G1 to AMS Guidance T3.2.3, 'Cost and Price Methodology."

(End of clause)

3.2.4-2 FIXED-PRICED CONTRACTS WITH ECONOMIC PRICE ADJUSTMENT-STANDARD

SUPPLIES (JUL 2024)

(a) The Contractor warrants that the unit price stated in the "Schedule" for ________ [offeror insert "Schedule" line item number(s)] is not in excess of the Contractor's applicable established price in effect on the contract date for like quantities of the same item. The term unit price excludes any part of the price directly resulting from requirements for preservation, packaging, or packing beyond standard commercial practice. The term established price means a price that

(1) is an established catalog or market price for a commercial item sold in substantial quantities to the general public, and

(2) is the net price after applying any standard trade discounts offered by the Contractor.

(b) The Contractor must promptly notify the Contracting Officer of the amount and effective date of each decrease in any applicable established price. Each corresponding contract unit price must be decreased by the same percentage that the established price is decreased. The decrease must apply to those items delivered on and after the effective date of the decrease in the Contractor's established price, and this contract must be modified accordingly.

The Contractor must certify:

(1) on each invoice that each unit price stated in it reflects all decreases required by this clause; or

(2) on the final invoice that all required price decreases have been applied as required by this clause.

(c) If the Contractor's applicable established price is increased after the contract date, the corresponding contract unit price must be increased, upon the Contractor's written request to the Contracting Officer, by the same percentage that the established price is increased, and the contract must be modified accordingly, subject to the following limitations:

(1) The aggregate of the increases in any contract unit price under this clause must not exceed 10 percent of the original contract unit price.

(2) The increased contract unit price must be effective:

(i) on the effective date of the increase in the applicable established price if the Contracting Officer receives the Contractor's written request within 10 days thereafter; or

(ii) if the written request is received later, on the date the Contracting Officer receives the request.

(3) The increased contract unit price must not apply to quantities scheduled under the contract for delivery before the effective date of the increased contract unit price, unless failure to deliver before that date results from causes beyond the control and without the fault or negligence of the Contractor.

(4) No modification of unit price must be executed under this paragraph (c) until the Contracting Officer verifies the increase in the applicable established price.

(5) Within 30 days after receipt of the Contractor's written request, the Contracting Officer may cancel, without liability to either party, any undelivered portion of the contract items affected by the requested increase.

(d) During the time allowed for the cancellation provided for in subparagraph (c)(5) above, and thereafter if there is no cancellation, the Contractor must continue deliveries according to the contract delivery schedule, and the Government will pay for such deliveries at the contract unit price, increased to the extent provided by paragraph (c) above.

(End of clause)

3.2.4-16 ORDERING (OCT 2024)

(a) Any supplies and services to be furnished under this contract must be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract. Such orders may be issued from the date of contract award through the effective date of final option years and any task orders issued thereunder.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of a conflict between a delivery order or task order and this contract, the contract must control.

(c) If mailed, a delivery order or task order is considered "issued" when the FAA deposits the order in the mail.

Orders issued by facsimile, email or other electronic commerce methods are considered "issued" when the FAA sends the order. Orders may be issued orally only if authorized in the contract.

(End of clause)

3.2.4-17 ORDER LIMITATIONS (OCT 2019)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $1,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor-

(1) Any order for a single item in excess of $200,000.00;

(2) Any order for a combination of items in excess of $200,000.00; or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

(c) If this is a requirements contract, the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor must honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 15 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons.

Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

3.2.4-20 INDEFINITE QUANTITY (OCT 2019)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance must be made only as authorized by orders issued in accordance with the "Ordering" clause. The Contractor must furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the maximum. The Government will order at least the quantity of supplies or services designated in the Schedule as the minimum.

(c) Except for any limitations on quantities in the "Order Limitations" clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period must be completed by the Contractor within the time specified in the order. The contract must govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor must not be required to make any deliveries under this contract after the delivery date required by order(s) placed within the ordering period.

(End of clause)

3.2.4-35 OPTION TO EXTEND THE TERM OF THE CONTRACT (JUL 2021)

(a) The Government may extend the term of this contract by written notice (contract modification) to the Contractor prior to the expiration of the current period of performance provided, that the Government will give the Contractor a preliminary written notice of its intent to extend at least 30 days [60 days unless a different number of days is inserted] before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract must be considered to include this option provision.

(c) The total duration of this contract, including the exercise of any options under this clause, must not exceed six

(6) (months) five (5) (years).

(End of clause)

3.3.1-11 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR 1996)

Funds are not presently available for performance under this contract beyond the current fiscal period. The FAA's obligation for performance of this contract beyond that date is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the FAA for any payment may arise for performance under this contract beyond the current fiscal period, until funds are made available to the Contracting Officer for performance and until the Contractor receives notice of availability, to be confirmed in writing by the Contracting Officer.

(End of clause)

3.3.1-33 SYSTEM FOR AWARD MANAGEMENT (JAN 2024)

(a) Definitions. As used in this clause

"Registered in the SAM database" means that the Contractor has entered all mandatory information, including the Unique Identity Identifier (UEI) or the Electronic Funds Transfer indicator, into the SAM database.

"System for Award Management (SAM) database" means the primary Government repository for Contractor information required for the conduct of business with the Government.

"Unique Entity Identifier (UEI)" (also known as the Unique Entity ID) means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

"Electronic Funds Transfer indicator" means a 4-character suffix to the Unique Entity Identifier. This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer. The UEI will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.

(c) If the offeror does not have a UEI, it should contact www.sam.gov directly to obtain one.

The offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(3) Company Physical Street Address, City, State, and ZIP Code.

(4) Company Mailing Address, City, State and ZIP Code (if different from physical street address).

(5) Company Telephone Number.

(6) Date the company was started.

(7) Number of employees at your location.

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company Headquarters name and address (reporting relationship within your entity).

(d) If…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .