Design Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract_of_Offers_p.2.pdf | ||
| Abstract_of_Offers_p.1.pdf | ||
| Bid_Result.pdf | ||
| Responses_to_Questions.pdf | ||
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| 693JF719B000004_-_OHARA_HALL_POOL.pdf | ||
| SOW_-_OHara_Hall_Pool_Upgrade_Construction.pdf | ||
| Picture_File.pdf | ||
| 19.05.01_USMMA_O'Hara_Hall_Pool_-_100__CD_Combined_Set.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN SPECIFICATIONS
100% Construction Documents
DCML 18-070
USMMA O'Hara Hall Pool Upgrade Project Location:
U.S Merchant Marine Academy 300 Steamboat Road, Kings Point
NY - 11024
May 1st , 2019
DCM Architecture & Engineering, LLC 339 N. Front St. Camden, NJ 08102
TABLE OF CONTENTS
DIVISION 03 – SWIMMING POOL
03 11 00 – POOL EQUIPMENTS
DIVISION 22 – PLUMBING
22 51 00 – POOL HEATER
DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING
23 05 00 – COMMON WORK RESULTS FOR HVAC
23 05 23 – GENERAL DUTY VALVES
23 05 29 – HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 07 00 – HVAC INSULATION
23 09 93 – SEQUENCE OF OPERATION
23 21 13 – HYDRONIC PIPING
23 21 23 – HYDRONIC PUMP
DIVISION 26 – ELECTRICAL
26 05 00 – COMMON WORK RESULTS FOR ELECTRICAL
26 51 31 – RACEWAY FOR ELECTRICAL SYSTEM
O'Hara Hall Pool Upgrade Pool Equipment’s United States Merchant Marine Academy Kings Point, New York
DCM Architecture & Engineering Pool Equipment’s 399 N. Front Street 131100 - 1 Camden NJ - 08102 December 07, 2018
SECTION 13 11 00 – POOL EQUIPMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract.
1.2 SUMMARY
A. This Section includes the following pool equipment’s:
1. Water Level Controller – Aquaticontrol # ELC 800r
2. Ultraviolet System – Ultraviolet System INC Model # CLP64A8-XN
1.3 SUBMITTALS
A. Product Data: For each type of equipment indicated.
PART 2 - PRODUCTS
2.1 Water Level Controller – Aquaticontrol # ELC 800r
• Housing and Mounting The controller shall be housed in a watertight NEMA 4X UL94 5V UL flammability rated Polycarbonate enclosure to meet IP66 and NEMA 4, 4X, 12 and 13 ratings. The enclosure and connections shall be designed to eliminate any possibility of corrosion and/or damage to the internal components of the controller. The enclosure shall be mounted using the four mounting holes located under the lid and outside of the gasket seal. For user ease, the controller should be mounted so the display is near eye level with solid mounting. The controller shall be factory wired and tested for functionality.
• Controls The controller shall have a user-friendly menu driven operating system. It shall utilize a 3-switch user interface, 2 direction arrows and a select key with a short audible click with each key press and an alarm reset button. An easy to read LCD display shall power down after a 15-minute period of no key entries and shall come back “on” by pressing any key. The overlay shall consist of embossed polycarbonate overlay with clear labeling.
• Indicators The green LED power rocker switch located at the left of the controller shall indicate that the primary power supplies are working, green LED on front of controller shall indicate power; yellow LED shall indicate when the level sensor detects the fluid level, two red LEDs shall indicate an alarm condition exists, blue LED shall indicate when filling is occurring. There shall also be an audible indicator for alarm conditions with an option in the menu to have it on or off, “yes” and “no” respectively.
• Timings FILL ON DELAY (time between sensor not sensing water and fill solenoid opening) shall be adjustable from 15 seconds to 99 seconds. FILL OFF DELAY (time solenoid valve is allowed to stay on after sensor begins sensing water) shall
O'Hara Hall Pool Upgrade Pool Equipment’s
399 N. Front Street 131100 - 2 be adjustable from 2 seconds to 99 seconds. MAX FILL TIME (solenoid on time limit) shall be adjustable from 20 to 240 minutes and shall be able to disable for continuous filling. LOW WATER DELAY (time required before alarm is triggered) shall be adjustable from 10 seconds to 99 seconds.
• Outputs The solenoid valve shall be 1 solid state relay output at 24VAC, 1.85A. Auxiliary shall be a mechanical relay output with C, NO, and NC contacts available at a terminal block. This relay is for remote annunciation of an alarm condition, or to interrupt power to the circulation pump during low water condition. Any of the following four conditions will initiate an alarm condition and all of them actuate on the relay output, the red LED and audible alarm.
a. Maximum Fill Time Exceeded (Filled longer than setting), normal functions disabled until reset.
b. Low Water Condition (low water detected) auto or manual restore (select auto or manual during programming).
c. Level Sensor Problem (Sensor not working properly), auto restore.
d. Low Water Sensor Problem (Sensor not working properly), auto restore.
LOW WATER ALARM RESET shall be programmable between automatic (once low water level is resolved, alarm resets relay and normal functions resume; alarm light shall continue to flash to indicate an alarm condition occurred; pressing reset button clears alarm) and manual (once low water alarm is triggered, low water level must be resolved and alarm reset button must be pressed to allow controller to operate).
• Power The controller shall be provided with a six-foot three wire power cord, 18 AWG;
the controller operates on 90 to 130 VAC, 50/60 Hz and is fused at 2 amps with a user protected 5x20mm fuse. The controller shall have a 40VA, 24VAC transformer that is protected with a 2.0A Polyfused to external loads, this allows the system to power up to a 30VA valve as well as power the internal electronics and provide power for use with a remote alarm indicator if desired. There shall be a separation of high voltage and low voltage provided in the controller.
Watertight strain reliefs are provided for all cordage. The power to the unit is switched on the side of the controller.
Proximity Switch Sensor Sensing shall be controlled automatically within +/- 1/8" (4mm) of nominal water level. Supply voltage to sensor shall be 12 to 24V DC from controller (Operating voltage shall range from 10 to 30V DC). Current consumption shall be ≤15mA.
Response frequency shall be 100Hz. Maximum control output shall be 200mA.
Sensor operating temperature shall be -25 to 70ºC. Operating humidity shall range from 35 to 95% RH.
• Ambient Conditions The ELC-800r shall work in ambient conditions of 0 to 60ºC, although in extreme temperatures the display contrast may have to be adjusted. The sealed case shall insure the unit can operate in very humid environments.
• Safeties Changes to the parameters shall be password protected so that settings are secure.
All settings shall be saved into non-volatile memory so they are not lost during a power outage. The 24VAC shall be monitored by the microcontroller. If it detects that the polyfuse is open because of an over-current condition or that no load is present when it turns “on” the valve, an alarm is output.
O'Hara Hall Pool Upgrade Pool Equipment’s
399 N. Front Street 131100 - 3
2.2 Ultraviolet System – Model # CLP64A8-XN
A. Menu driven digital interface with touch pad for easy command initiation.
B. Incoming AC voltage monitor – Alarm when voltage falls outside factory set threshold.
C. Digital displayed, resettable total operating hour meter.
D. Power supply enclosure temperature sensors.
E. UV vessel water temperature sensor.
F. UV intensity sensors.
G. Output alarm relay.
H. Thermoplastic NEMW enclosure
PART 3 - EXECUTION
3.1 Warranty
A. Warranty shall be one year on parts and labor
END OF SECTION 131100
O'Hara Hall Pool Upgrade POOL HEATER
DCM Architecture & Engineering Pool Heater 399 N. Front Street 230500 - 1
SECTION 22 51 00 – POOL HEATER
1.1 SUMMARY
A. Section Includes:
1. Pool heater.
1.2 REFERENCES
A. Comply with appropriate standards.
1. American Society of Mechanical Engineers: ASME.
1.3 SUBMITTALS
A. Submit data on all materials.
B. Product Data: Submit dimensioned drawings of water heaters indicating components and connections to other equipment and piping. Submit electrical characteristics and connection locations.
C. Manufacturer's Installation Instructions: Submit mounting and support requirements.
D. Manufacturer's Certificate: Certify products meet or exceed specified requirements.
1.4 WARRANTY
A. One-year standard warranty.
PART 2 - PRODUCTS
2.1 POOL HEATER
A. Manufacturers:
1. Pentair Powermax High Performance Commercial Pool Heater
B. Type: electronic ignition, natural gas fired, outdoor unit.
C. Model Number: PM1250NACC3PXN
2.2 EXHAUST VENT COVER & AIR INTAKE KIT
A. Manufacturers:
1. Pentair
O'Hara Hall Pool Upgrade POOL HEATER
DCM Architecture & Engineering Pool Heater 399 N. Front Street 230500 - 2
B. Model Number:
1. Exhaust Vent Cover # D2007700
2. Air Intake Kit # D2008000
3.1 INSTALLATION
A. Install pool heater in accordance with manufacturers instruction.
B. Install the following piping accessories.
1. On supply:
a. Strainer.
b. Shutoff valve.
2. On return:
a. Shutoff valve.
C. Install electrical devices furnished loose for field mounting.
END OF SECTION 22 51 00
O'Hara Hall Pool Upgrade COMMON WORK RESULTS FOR HVAC
DCM Architecture & Engineering Common Work Results for HVAC
SECTION 230500 - COMMON WORK RESULTS FOR HVAC
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Piping materials and installation instructions common to most piping systems.
2. Transition fittings.
3. Mechanical demolition.
4. Equipment installation requirements common to equipment sections.
5. Painting and finishing.
6. Concrete bases.
7. Supports and anchorages.
1.3 DEFINITIONS
A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.
B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.
C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.
D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in duct shafts.
E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures. Examples include installations within unheated shelters.
F. The following are industry abbreviations for plastic materials:
1. ABS: Acrylonitrile-butadiene-styrene plastic.
2. CPVC: Chlorinated polyvinyl chloride plastic.
3. PE: Polyethylene plastic.
4. PVC: Polyvinyl chloride plastic.
G. The following are industry abbreviations for rubber materials:
1. EPDM: Ethylene-propylene-diene terpolymer rubber.
2. NBR: Acrylonitrile-butadiene rubber.
1.4 SUBMITTALS
A. Product Data: For the following:
1. Transition fittings.
2. Hanger Systems
B. Welding certificates.
1. Continuity Logs
2. WPS Welding Process Specifications
3. PQR Reports
1.5 QUALITY ASSURANCE
A. Steel Support Welding: Qualify processes and operators according to AWS D1.1, "Structural Welding Code--Steel."
B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications."
1. Comply with provisions in ASME B31 Series, "Code for Pressure Piping."
2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current.
C. Electrical Characteristics for Mechanical Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes are appropriately modified. If minimum energy ratings or efficiencies are specified, equipment shall comply with requirements.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.
B. Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending.
C. Dust covers for all duct openings until functional testing is performed.
1.7 COORDINATION
A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for mechanical installations.
B. Coordinate installation of required supporting devices and set sleeves in poured-in-place concrete and other structural components as they are constructed.
399 N. Front Street 230500 - 3
C. Coordinate requirements for access panels and doors for mechanical items requiring access that are concealed behind finished surfaces. Access panels and doors are specified in Division 8 Section "Access Doors and Frames."
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where subparagraph titles below introduce lists, the following requirements apply for product selection:
1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the manufacturers specified.
2. Manufacturers: Subject to compliance with requirements, provide products by the manufacturers specified.
2.2 PIPE, TUBE, AND FITTINGS
A. Refer to individual Division 15 piping Sections for pipe, tube, and fitting materials and joining methods.
B. Pipe Threads: ASME B1.20.1 for factory-threaded pipe and pipe fittings.
2.3 JOINING MATERIALS
A. Refer to individual Division 15 piping Sections for special joining materials not listed below.
B. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.
1. ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch maximum thickness unless thickness or specific material is indicated.
a. Full-Face Type: For flat-face, Class 125, cast-iron and cast-bronze flanges.
b. Narrow-Face Type: For raised-face, Class 250, cast-iron and steel flanges.
2. AWWA C110, rubber, flat face, 1/8 inch thick, unless otherwise indicated; and full-face or ring type, unless otherwise indicated.
C. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated.
D. Plastic, Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated.
E. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813.
F. Brazing Filler Metals: AWS A5.8, BCuP Series, copper-phosphorus alloys for general-duty brazing, unless otherwise indicated; and AWS A5.8, BAg1, silver alloy for refrigerant piping, unless otherwise indicated.
399 N. Front Street 230500 - 4
G. Welding Filler Metals: Comply with AWS D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.
H. Solvent Cements for Joining Plastic Piping:
1. ABS Piping: ASTM D 2235.
2. CPVC Piping: ASTM F 493.
3. PVC Piping: ASTM D 2564. Include primer according to ASTM F 656.
4. PVC to ABS Piping Transition: ASTM D 3138.
I. Fiberglass Pipe Adhesive: As furnished or recommended by pipe manufacturer.
2.4 TRANSITION FITTINGS
A. AWWA Transition Couplings: Same size as, and with pressure rating at least equal to and with ends compatible with, piping to be joined.
1. Manufacturers:
a. Cascade Waterworks Mfg. Co.
b. Dresser Industries, Inc.; DMD Div.
c. Ford Meter Box Company, Incorporated (The); Pipe Products Div.
d. JCM Industries.
e. Smith-Blair, Inc.
f. Viking Johnson.
2. Underground Piping NPS 1-1/2 and Smaller: Manufactured fitting or coupling.
3. Underground Piping NPS 2 and Larger: AWWA C219, metal sleeve-type coupling.
4. Aboveground Pressure Piping: Pipe fitting.
B. Plastic-to-Metal Transition Fittings: CPVC and PVC one-piece fitting with manufacturer's Schedule 80 equivalent dimensions; one end with threaded brass insert, and one solvent-cement-joint end.
1. Manufacturers:
a. Eslon Thermoplastics.
C. Plastic-to-Metal Transition Adaptors: One-piece fitting with manufacturer's SDR 11 equivalent dimensions; one end with threaded brass insert, and one solvent-cement-joint end.
a. Thompson Plastics, Inc.
D. Plastic-to-Metal Transition Unions: MSS SP-107, CPVC and PVC four-part union. Include brass end, solvent-cement-joint end, rubber O-ring, and union nut.
399 N. Front Street 230500 - 5
a. NIBCO INC.
b. NIBCO, Inc.; Chemtrol Div.
E. Flexible Transition Couplings for Underground Nonpressure Drainage Piping: ASTM C 1173 with elastomeric sleeve, ends same size as piping to be joined, and corrosion-resistant metal band on each end.
1. Manufacturers:
a. Cascade Waterworks Mfg. Co.
b. Fernco, Inc.
c. Mission Rubber Company.
d. Plastic Oddities, Inc.
PART 3 - EXECUTION
3.1 PIPING SYSTEMS - COMMON REQUIREMENTS
A. Install piping according to the following requirements and Division 15 Sections specifying piping systems.
B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems.
Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.
C. Install piping in concealed locations, unless otherwise indicated and except in equipment rooms and service areas.
D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.
E. Install piping to permit valve servicing.
F. Install piping at indicated slopes.
G. Install piping free of sags and bends.
H. Install fittings for changes in direction and branch connections.
I. Install piping to allow application of insulation.
J. Select system components with pressure rating equal to or greater than system operating pressure.
K. Verify final equipment locations for roughing-in.
L. Refer to equipment specifications in other Sections of these Specifications for roughing-in requirements.
399 N. Front Street 230500 - 6
3.2 PIPING JOINT CONSTRUCTION
A. Join pipe and fittings according to the following requirements and Division 15 Sections specifying piping systems.
B. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
C. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.
D. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end.
Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy complying with ASTM B 32.
E. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube" Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8.
F. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:
1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.
2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.
G. Welded Joints: Construct joints according to AWS D10.12, using qualified processes and welding operators according to Part 1 "Quality Assurance" Article.
H. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application.
Install gasket concentrically positioned. Use suitable lubricants on bolt threads.
3.3 PIPING CONNECTIONS
A. Make connections according to the following, unless otherwise indicated:
1. Install unions, in piping NPS 2 and smaller, adjacent to each valve and at final connection to each piece of equipment.
2. Install flanges, in piping NPS 2-1/2 and larger, adjacent to flanged valves and at final connection to each piece of equipment.
3. Dry Piping Systems: Install dielectric unions and flanges to connect piping materials of dissimilar metals.
4. Wet Piping Systems: Install dielectric coupling and nipple fittings to connect piping materials of dissimilar metals.
3.4 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS
A. Install equipment to allow maximum possible headroom unless specific mounting heights are not indicated.
B. Install equipment level and plumb, parallel and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.
399 N. Front Street 230500 - 7
C. Install mechanical equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference to other installations. Extend grease fittings to accessible locations.
D. Install equipment to allow right of way for piping installed at required slope.
3.5 PAINTING
A. Paint piping to match existing schemes.
B. Damage and Touchup: Repair marred and damaged factory-painted finishes with materials and procedures to match original factory finish.
3.6 CONCRETE BASES
A. Concrete Bases: Anchor equipment to concrete base according to equipment manufacturer's written instructions and according to seismic codes at Project.
1. Construct concrete bases of dimensions indicated, but not less than 4 inches larger in both directions than supported unit.
2. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch centers around the full perimeter of the base.
3. Install epoxy-coated anchor bolts for supported equipment that extend through concrete base, and anchor into structural concrete floor.
4. Place and secure anchorage devices. Use supported equipment manufacturer's setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
5. Install anchor bolts to elevations required for proper attachment to supported equipment.
6. Install anchor bolts according to anchor-bolt manufacturer's written instructions.
7. Use 5000-psi, 28-day compressive-strength concrete and reinforcement.
3.7 ERECTION OF METAL SUPPORTS AND ANCHORAGES
A. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor mechanical materials and equipment.
B. Field Welding: Comply with AWS D1.1.
END OF SECTION 230500
O'Hara Hall Pool Upgrade GENERAL DUTY VALVES
DCM Architecture & Engineering General Duty Valves
SECTION 230523 – GENERAL-DUTY VALVES
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract.
1.2 SUMMARY
A. This Section includes the following general-duty valves:
1. Float Valve – CLA VAL Model # 124-01
2. Automatic Balancing Valve – Haya Fluid Controls Model # Mesurflo 2540
3. Butterfly Valve - Hayward Model # BYV11080A0EK000
1.3 SUBMITTALS
A. Product Data: For each type of valve indicated. Include body, seating, and trim materials;
valve design; pressure and temperature classifications; end connections; arrangement;
dimensions; and required clearances. Include list indicating valve and its application.
Include rated capacities; shipping, installed, and operating weights; furnished specialties; and accessories.
1.4 QUALITY ASSURANCE
A. ASME Compliance: ASME B31.1 for power piping valves and ASME B31.9 for building services piping valves.
1. Exceptions: Domestic hot- and cold-water, sanitary waste, and storm drainage piping valves unless referenced.
B. ASME Compliance for Ferrous Valves: ASME B16.10 and ASME B16.34 for dimension and design criteria.
C. NSF Compliance: NSF 61 for valve materials for potable-water service.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Prepare valves for shipping as follows:
1. Protect internal parts against rust and corrosion.
2. Protect threads, flange faces, grooves, and weld ends.
3. Set angle, gate, and globe valves closed to prevent rattling.
4. Set ball and plug valves open to minimize exposure of functional surfaces.
5. Set butterfly valves closed or slightly open.
6. Block check valves in either closed or open position.
B. Use the following precautions during storage:
O'Hara Hall Pool Upgrade GENERAL DUTY VALVES
1. Maintain valve end protection.
2. Store valves indoors and maintain at higher than ambient dew-point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures.
C. Use sling to handle large valves; rig sling to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.
PART 2 - PRODUCTS
2.1 Float Valve – CLA VAL Model# 124-01
A. Pressure Rating – 300 psi max B. Temperature Rating – 180-degree F C. Material – Nylon Reinforced Delrin, Stainless Steel, Monel with Buna-N seal. Float tank – Brass and PVC, Base plate – 316 Stainless Steel, Float – 304 Stainless Steel D. Float – 180mm diameter E. Float Rod- 2 (12”) sections of PVC rod F. Adjustment Range – 1” min to 18” max with PVC rod, 1” min to 18” max with Stainless Steel rod.
2.2 Automatic Balancing Valve – Haya Fluid Control Model # 2540
A. FNPT Inlet/Outlet Connections.
B. 5 GPM Increments.
C. Changeable GPM flow Cartages D. Differential operating pressure – 5-80 PSID, 40-200 GPM E. +/- 10% Accuracy.
F. Operation Temperature range 32-degree F to 225-degree F.
G. Valves labeled with model#, size and flow rate.
H. Dry seal pipe threaded.
I. Valve body suitable for 400 psig.
2.3 Butterfly Valve – Hayward Model # BYV1180AEK000
A. Once piece injected molded PVC, CPVC or GFPP Body.
B. PVC, CPVC, GFPP disc material.
C. Hand lever with 19 lockable positions & 360-degree interlocking splines.
D. External disc position and flow indicator.
E. Hydro dynamic centric disc for increased flow performance.
F. Over sized liner face maximizes surface contact with flanges.
G. Stem bearing and seal retainer for absolute stem retaining gland.
H. All sizes meet ANSI B16.10 / ISO 5752 narrow face to face dimension.
O'Hara Hall Pool Upgrade GENERAL DUTY VALVES
399 N. Front Street 230500 - 3
3.1 EXAMINATION
A. Examine piping system for compliance with requirements for installation tolerances and other conditions affecting performance.
1. Proceed with installation only after unsatisfactory conditions have been corrected.
B. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.
C. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.
D. Examine threads on valve and mating pipe for form and cleanliness.
E. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper size, length, and material. Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage.
F. Do not attempt to repair defective valves; replace with new valves.
3.2 VALVE INSTALLATION
A. Piping installation requirements are specified in other Division 23 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.
B. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.
C. Locate valves for easy access and provide separate support where necessary.
D. Install valves in horizontal piping with stem at or above center of pipe.
E. Install valves in position to allow full stem movement.
F. Install chainwheel operators on valves NPS 4 and larger and more than 96 inches above floor.
Extend chains to 60 inches above finished floor elevation.
3.3 ADJUSTING
A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing. Replace valves if persistent leaking occurs.
END OF SECTION 230523
O'Hara Hall Pool Upgrade HANGERS AND SUPPORTS FOR HVAC PIPING
DCM Architecture & Engineering Hangers and Supports for HVAC Piping and Equipment 399 N. Front Street 230529 - 1
SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND
EQUIPMENT
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following hangers and supports for mechanical system piping and equipment:
1. Steel pipe hangers and supports.
2. Trapeze pipe hangers.
3. Metal framing systems.
4. Thermal-hanger shield inserts.
5. Fastener systems.
6. Pipe stands.
7. Pipe positioning systems.
8. Equipment supports.
B. Related Sections include the following:
1. Division 5 Section "Metal Fabrications" for structural-steel shapes and plates for trapeze hangers for pipe and equipment supports.
2. Division 13 Section "Fire-Suppression Piping" for pipe hangers for fire-protection piping.
3. Division 15 Section "Mechanical Vibration and Seismic Controls" for vibration isolation devices.
4. Division 15 Section "Pipe Expansion Fittings and Loops" for pipe guides and anchors.
5. Division 15 Section(s) "Metal and Nonmetal Ducts” for duct hangers and supports.
1.3 DEFINITIONS
A. MSS: Manufacturers Standardization Society for The Valve and Fittings Industry Inc.
B. Terminology: As defined in MSS SP-90, "Guidelines on Terminology for Pipe Hangers and
Supports."
1.4 PERFORMANCE REQUIREMENTS
A. Supports for multiple pipes, including pipe stands, capable of supporting combined weight of supported systems, system contents, and test water.
B. Equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.
C. Seismic-restraint hangers and supports for piping and equipment and obtain approval from authorities having jurisdiction.
O'Hara Hall Pool Upgrade HANGERS AND SUPPORTS FOR HVAC PIPING
DCM Architecture & Engineering Hangers and Supports for HVAC Piping and Equipment 399 N. Front Street 230529 - 2
1.5 SUBMITTALS
A. Product Data: For the following:
1. Steel pipe hangers and supports.
2. Thermal-hanger shield inserts.
3. Powder-actuated fastener systems.
4. Pipe positioning systems.
5. Drop In Anchor Hardware
B. Shop Drawings: Show fabrication and installation details and include calculations for the following:
1. Trapeze pipe hangers. Include Product Data for components.
2. Metal framing systems. Include Product Data for components.
3. Pipe stands. Include Product Data for components.
4. Equipment supports.
5. Duct Support Systems
C. Welding certificates.
1.6 QUALITY ASSURANCE
A. Welding: Qualify procedures and personnel according to ASME Boiler and Pressure Vessel Code: Section IX.
B. Welding: Qualify procedures and personnel according to the following:
1. AWS D1.1, "Structural Welding Code--Steel."
2. AWS D1.2, "Structural Welding Code--Aluminum."
3. AWS D1.3, "Structural Welding Code--Sheet Steel."
4. AWS D1.4, "Structural Welding Code--Reinforcing Steel."
5. ASME Boiler and Pressure Vessel Code: Section IX.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
1. Carpenter and Paterson, 3900 River Rd, Pennsauken NJ 08110 Ph(856)-488-1988
2.2 STEEL PIPE HANGERS AND SUPPORTS
A. Description: MSS SP-58, Types 1 through 58, factory-fabricated components. Refer to Part 3 "Hanger and Support Applications" Article for where to use specific hanger and support types.
B. Galvanized, Metallic Coatings: Pre-galvanized or hot dipped.
C. Nonmetallic Coatings: Plastic coating, jacket, or liner.
D. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion for support of bearing surface of piping.
O'Hara Hall Pool Upgrade HANGERS AND SUPPORTS FOR HVAC PIPING
DCM Architecture & Engineering Hangers and Supports for HVAC Piping and Equipment 399 N. Front Street 230529 - 3
2.3 TRAPEZE PIPE HANGERS
A. Description: MSS SP-69, Type 59, shop- or field-fabricated pipe-support assembly made from structural-steel shapes with MSS SP-58 hanger rods, nuts, saddles, and U-bolts.
2.4 METAL FRAMING SYSTEMS
A. Description: MFMA-3, shop- or field-fabricated pipe-support assembly made of steel channels and other components.
B. Coatings: Manufacturer's standard finish, unless bare metal surfaces are indicated.
C. Nonmetallic Coatings: Plastic coating, jacket, or liner.
2.5 THERMAL-HANGER SHIELD INSERTS
A. Description: 100-psig-minimum, compressive-strength insulation insert encased in sheet metal shield.
B. Manufacturers:
1. Carpenter & Paterson, Inc.
C. Insulation-Insert Material for Cold Piping: Water-repellent treated, ASTM C 533, Type I calcium silicate or ASTM C 552, Type II cellular glass with vapor barrier.
D. Insulation-Insert Material for Hot Piping: Water-repellent treated, ASTM C 533, Type I calcium silicate or ASTM C 552, Type II cellular glass.
E. For Trapeze or Clamped Systems: Insert and shield shall cover entire circumference of pipe.
F. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.
G. Insert Length: Extend 2 inches beyond sheet metal shield for piping operating below ambient air temperature.
2.6 FASTENER SYSTEMS
A. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened portland cement concrete with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
1. Manufacturers:
a. Hilti, Inc.
b. ITW Ramset/Red Head.
c. Masterset Fastening Systems, Inc.
d. MKT Fastening, LLC.
e. Powers Fasteners.
B. Mechanical-Expansion Anchors: Insert-wedge-type zinc-coated steel, for use in hardened portland cement concrete with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
1. Manufacturers:
a. B-Line Systems, Inc.; a division of Cooper Industries.
b. Red-Head
O'Hara Hall Pool Upgrade HANGERS AND SUPPORTS FOR HVAC PIPING
DCM Architecture & Engineering Hangers and Supports for HVAC Piping and Equipment 399 N. Front Street 230529 - 4
c. Hilti, Inc.
d. ITW Ramset/Red Head.
e. MKT Fastening, LLC.
f. Powers Fasteners.
2.7 PIPE STAND FABRICATION
A. Pipe Stands, General: Shop or field-fabricated assemblies made of manufactured corrosion-resistant components to support roof-mounted piping.
B. Compact Pipe Stand: One-piece plastic unit with integral-rod-roller, pipe clamps, or V-shaped cradle to support pipe, for roof installation without membrane penetration.
C. Coordinate subparagraph and list below with Part 2 "Manufacturers" Article. Retain "Available" for nonproprietary and delete for semiproprietary specifications.
D. Low-Type, Single-Pipe Stand: One-piece plastic base unit with plastic roller, for roof installation without membrane penetration.
2.8 PIPE POSITIONING SYSTEMS
A. Description: IAPMO PS 42, system of metal brackets, clips, and straps for positioning piping in pipe spaces for plumbing fixtures for commercial applications.
2.9 EQUIPMENT SUPPORTS
A. Description: Welded, shop- or field-fabricated equipment support made from structural-steel shapes.
2.10 MISCELLANEOUS MATERIALS
A. Structural Steel: ASTM A36/ A36M, steel plates, shapes, and bars; black and galvanized.
B. Grout: ASTM C 1107, factory-mixed and -packaged, dry, hydraulic-cement, nonshrink and nonmetallic grout; suitable for interior and exterior applications.
1. Properties: Nonstaining, noncorrosive, and nongaseous.
2. Design Mix: 5000-psi, 28-day compressive strength.
PART 3 - EXECUTION
3.1 HANGER AND SUPPORT APPLICATIONS
A. Specific hanger and support requirements are specified in Sections specifying piping systems and equipment.
B. Comply with MSS SP-69 for pipe hanger selections and applications that are not specified in piping system Sections.
C. Use hangers and supports with galvanized, metallic coatings for piping and equipment that will not have field-applied finish.
D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.
E. Use padded hangers for piping that is subject to scratching.
F. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
O'Hara Hall Pool Upgrade HANGERS AND SUPPORTS FOR HVAC PIPING
DCM Architecture & Engineering Hangers and Supports for HVAC Piping and Equipment 399 N. Front Street 230529 - 5
1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of non-insulated or insulated stationary pipes, NPS 1/2 to NPS 30.
2. Yoke-Type Pipe Clamps (MSS Type 2): For suspension of 120 to 450 deg F pipes, NPS 4 to NPS 16 requiring up to 4 inches of insulation.
3. Carbon- or Alloy-Steel, Double-Bolt Pipe Clamps (MSS Type 3): For suspension of pipes, NPS 3/4 to NPS 24 requiring clamp flexibility and up to 4 inches of insulation.
4. Steel Pipe Clamps (MSS Type 4): For suspension of cold and hot pipes, NPS 1/2 to NPS 24 if little or no insulation is required.
5. Pipe Hangers (MSS Type 5): For suspension of pipes, NPS 1/2 to NPS 4 to allow off-center closure for hanger installation before pipe erection.
6. Adjustable Swivel Split- or Solid-Ring Hangers (MSS Type 6): For suspension of non-insulated stationary pipes, NPS 3/4 to NPS 8.
7. Adjustable, Steel Band Hangers (MSS Type 7): For suspension of non-insulated stationary pipes, NPS 1/2 to NPS 8.
8. Adjustable Band Hangers (MSS Type 9): For suspension of non-insulated stationary pipes, NPS 1/2 to NPS 8.
9. Adjustable Swivel-Ring Band Hangers (MSS Type 10): For suspension of non-insulated stationary pipes, NPS 1/2 to NPS 2.
10. Split Pipe-Ring with or without Turnbuckle-Adjustment Hangers (MSS Type 11): For suspension of non-insulated stationary pipes, NPS 3/8 to NPS 8.
11. Extension Hinged or 2-Bolt Split Pipe Clamps (MSS Type 12): For suspension of non-insulated stationary pipes, NPS 3/8 to NPS 3.
12. U-Bolts (MSS Type 24): For support of heavy pipes, NPS 1/2 to NPS 30.
13. Clips (MSS Type 26): For support of insulated pipes not subject to expansion or contraction.
14. Pipe Saddle Supports (MSS Type 36): For support of pipes, NPS 4 to NPS 36 with steel pipe base stanchion support and cast-iron floor flange.
15. Pipe Stanchion Saddles (MSS Type 37): For support of pipes, NPS 4 to NPS 36, with steel pipe base stanchion support and cast-iron floor flange and with U-bolt to retain pipe.
16. Adjustable Pipe Saddle Supports (MSS Type 38): For stanchion-type support for pipes, NPS 2-1/2 to NPS 36, if vertical adjustment is required, with steel pipe base stanchion support and cast-iron floor flange.
17. Single Pipe Rolls (MSS Type 41): For suspension of pipes, NPS 1 to NPS 36, from 2 rods if longitudinal movement caused by expansion and contraction might occur.
18. Adjustable Roller Hangers (MSS Type 43): For suspension of pipes, NPS 2-1/2 to NPS 20, from single rod if horizontal movement caused by expansion and contraction might occur.
19. Complete Pipe Rolls (MSS Type 44): For support of pipes, NPS 2 to NPS 42, if longitudinal movement caused by expansion and contraction might occur but vertical adjustment is not necessary.
20. Pipe Roll and Plate Units (MSS Type 45): For support of pipes, NPS 2 to NPS 24, if small horizontal movement caused by expansion and contraction might occur and vertical adjustment is not necessary.
21. Adjustable Pipe Roll and Base Units (MSS Type 46): For support of pipes, NPS 2 to NPS 30, if vertical and lateral adjustment during installation might be required in addition to expansion and contraction.
G. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers, NPS 3/4 to
NPS 20.
O'Hara Hall Pool Upgrade HANGERS AND SUPPORTS FOR HVAC PIPING
DCM Architecture & Engineering Hangers and Supports for HVAC Piping and Equipment 399 N. Front Street 230529 - 6
2. Carbon- or Alloy-Steel Riser Clamps (MSS Type 42): For support of pipe risers, NPS 3/4 to NPS 20, if longer ends are required for riser clamps.
H. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel Turnbuckles (MSS Type 13): For adjustment up to 6 inches for heavy loads.
2. Steel Clevises (MSS Type 14): For 120 to 450 deg F piping installations.
3. Swivel Turnbuckles (MSS Type 15): For use with MSS Type 11, split pipe rings.
4. Malleable-Iron Sockets (MSS Type 16): For attaching hanger rods to various types of building attachments.
5. Steel Weldless Eye Nuts (MSS Type 17): For 120 to 450 deg F piping installations.
I. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel or Malleable Concrete Inserts (MSS Type 18): For upper attachment to suspend pipe hangers from concrete ceiling.
2. Top-Beam C-Clamps (MSS Type 19): For use under roof installations with bar-joist construction to attach to top flange of structural shape.
3. Side-Beam or Channel Clamps (MSS Type 20): For attaching to bottom flange of beams, channels, or angles.
4. Center-Beam Clamps (MSS Type 21): For attaching to center of bottom flange of beams.
5. Welded Beam Attachments (MSS Type 22): For attaching to bottom of beams if loads are considerable and rod sizes are large.
6. C-Clamps (MSS Type 23): For structural shapes.
7. Top-Beam Clamps (MSS Type 25): For top of beams if hanger rod is required tangent to flange edge.
8. Side-Beam Clamps (MSS Type 27): For bottom of steel I-beams.
9. Steel-Beam Clamps with Eye Nuts (MSS Type 28): For attaching to bottom of steel I-beams for heavy loads.
10. Linked-Steel Clamps with Eye Nuts (MSS Type 29): For attaching to bottom of steel I-beams for heavy loads, with link extensions.
11. Malleable Beam Clamps with Extension Pieces (MSS Type 30): For attaching to structural steel.
12. Welded-Steel Brackets: For support of pipes from below, or for suspending from above by using clip and rod. Use one of the following for indicated loads:
a. Light (MSS Type 31): 750 lb.
b. Medium (MSS Type 32): 1500 lb.
c. Heavy (MSS Type 33): 3000 lb.
13. Side-Beam Brackets (MSS Type 34): For sides of steel or wooden beams.
14. Plate Lugs (MSS Type 57): For attaching to steel beams if flexibility at beam is required.
15. Horizontal Travelers (MSS Type 58): For supporting piping systems subject to linear horizontal movement where headroom is limited.
J. Saddles and Shields: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
O'Hara Hall Pool Upgrade HANGERS AND SUPPORTS FOR HVAC PIPING
DCM Architecture & Engineering Hangers and Supports for HVAC Piping and Equipment 399 N. Front Street 230529 - 7
1. Steel Pipe-Covering Protection Saddles (MSS Type 39): To fill interior voids with insulation that matches adjoining insulation.
2. Protection Shields (MSS Type 40): Of length recommended in writing by manufacturer to prevent crushing insulation.
3. Thermal-Hanger Shield Inserts: For supporting insulated pipe.
K. Spring Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Restraint-Control Devices (MSS Type 47): Where indicated to control piping movement.
2. Spring Cushions (MSS Type 48): For light loads if vertical movement does not exceed 1-
1/4 inches.
3. Spring-Cushion Roll Hangers (MSS Type 49): For equipping Type 41 roll hanger with springs.
4. Spring Sway Braces (MSS Type 50): To retard sway, shock, vibration, or thermal expansion in piping systems.
5. Variable-Spring Hangers (MSS Type 51): Preset to indicated load and limit variability factor to 25 percent to absorb expansion and contraction of piping system from hanger.
6. Variable-Spring Base Supports (MSS Type 52): Preset to indicated load and limit variability factor to 25 percent to absorb expansion and contraction of piping system from base support.
7. Variable-Spring Trapeze Hangers (MSS Type 53): Preset to indicated load and limit variability factor to 25 percent to absorb expansion and contraction of piping system from trapeze support.
8. Constant Supports: For critical piping stress and if necessary to avoid transfer of stress from one support to another support, critical terminal, or connected equipment. Include auxiliary stops for erection, hydrostatic test, and load-adjustment capability. These supports include the following types:
a. Horizontal (MSS Type 54): Mounted horizontally.
b. Vertical (MSS Type 55): Mounted vertically.
c. Trapeze (MSS Type 56): Two vertical-type supports and one trapeze member.
L. Comply with MSS SP-69 for trapeze pipe hanger selections and applications that are not specified in piping system Sections.
M. Comply with MFMA-102 for metal framing system selections and applications that are not specified in piping system Sections.
N. Use powder-actuated fasteners or mechanical-expansion anchors instead of building attachments where required in concrete construction.
O. Use pipe positioning systems in pipe spaces behind plumbing fixtures to support supply and waste piping for plumbing fixtures.
3.2 HANGER AND SUPPORT INSTALLATION
A. Steel Pipe Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Install hangers, supports, clamps, and attachments as required to properly support piping from building structure.
B. Trapeze Pipe Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Arrange for grouping of parallel runs of horizontal piping and support together on field-fabricated trapeze pipe hangers.
O'Hara Hall Pool Upgrade HANGERS AND SUPPORTS FOR HVAC PIPING
DCM Architecture & Engineering Hangers and Supports for HVAC Piping and Equipment 399 N. Front Street 230529 - 8
1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified above for individual pipe hangers.
2. Field fabricate from ASTM A 36/A 36M, steel shapes selected for loads being supported.
Weld steel according to AWS D1.1.
C. Fiberglass Pipe Hanger Installation: Comply with applicable portions of MSS SP-69 and MSS SP-89. Install hangers and attachments as required to properly support piping from building structure.
D. Metal Framing System Installation: Arrange for grouping of parallel runs of piping and support together on field-assembled metal framing systems.
E. Fiberglass Strut System Installation: Arrange for grouping of parallel runs of piping and support together on field-assembled fiberglass struts.
F. Thermal-Hanger Shield Installation: Install in pipe hanger or shield for insulated piping.
G. Fastener System Installation:
1. Install powder-actuated fasteners for use in lightweight concrete or concrete slabs less than 4 inches thick in concrete after concrete is placed and completely cured. Use operators that are licensed by powder-actuated tool manufacturer. Install fasteners according to powder-actuated tool manufacturer's operating manual.
2. Install mechanical-expansion anchors in concrete after concrete is placed and completely cured. Install fasteners according to manufacturer's written instructions.
H. Pipe Stand Installation:
1. Pipe Stand Types except Curb-Mounting Type: Assemble components and mount on smooth roof surface. Do not penetrate roof membrane.
2. Curb-Mounting-Type Pipe Stands: Assemble components or fabricate pipe stand and mount on permanent, stationary roof curb. Refer to Division 7 Section "Roof Accessories" for curbs.
I. Pipe Positioning System Installation: Install support devices to make rigid supply and waste piping connections to each plumbing fixture. Refer to Division 15 Section "Plumbing Fixtures" for plumbing fixtures.
J. Install hangers and supports complete with necessary inserts, bolts, rods, nuts, washers, and other accessories.
K. Equipment Support Installation: Fabricate from welded-structural-steel shapes.
L. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.
M. Install lateral bracing with pipe hangers and supports to prevent swaying.
N. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping. Install concrete inserts before concrete is placed;
fasten inserts to forms and install reinforcing bars through openings at top of inserts.
O. Load Distribution: Install hangers and supports so piping live and dead loads and stresses from movement will not be transmitted to connected equipment.
P. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and so maximum pipe deflections allowed by ASME B31.1 (for power piping) and ASME B31.9 (for building services piping) are not exceeded.
Q. Insulated Piping: Comply with the following:
O'Hara Hall Pool Upgrade HANGERS AND SUPPORTS FOR HVAC PIPING
DCM Architecture & Engineering Hangers and Supports for HVAC Piping and Equipment 399 N. Front Street 230529 - 9
1. Attach clamps and spacers to piping.
a. Piping Operating above Ambient Air Temperature: Clamp may project through insulation.
b. Piping Operating below Ambient Air Temperature: Use thermal-hanger shield insert with clamp sized to match OD of insert.
c. Do not exceed pipe stress limits according to ASME B31.1 for power piping and ASME B31.9 for building services piping.
2. Install MSS SP-58, Type 39, protection saddles if insulation without vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation.
a. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.
3. Install MSS SP-58, Type 40, protective shields on cold piping with vapor barrier. Shields shall span an arc of 180 degrees.
a. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.
4. Shield Dimensions for Pipe: Not less than the following:
a. NPS 1/4 to NPS 3-1/2: 12 inches long and 0.048 inch thick.
b. NPS 4: 12 inches long and 0.06 inch thick.
c. NPS 5 and NPS 6: 18 inches long and 0.06 inch thick.
d. NPS 8 to NPS 14: 24 inches long and 0.075 inch thick.
e. NPS 16 to NPS 24: 24 inches long…