SWM_Report.pdf
PDF 505 KB Posted
- Attached to
- Greenbelt Park Federal contract opportunity
- Solicitation number
- 693C73-19-B-000004
About this file
SWM_Report
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results_of_Bid_Opening_-_NP-GREE_11(1).pdf | ||
| FHWA_FONSI.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Pavement_Report_Addendum.pdf | ||
| Plans_-_NP-GREE_11(1).pdf | ||
| VETS-4212_Form.pdf | ||
| Hydraulic_Report.pdf | ||
| ESC_SWM_Plans.pdf | ||
| Final_EA.pdf | ||
| Geotechnical_Report.pdf | ||
| Pavement_Report.pdf | ||
| FP14_Eng.pdf | ||
| NPS_FONSI_SOF.pdf | ||
| Pavement_Memo_SWI.pdf | ||
| IFB_Solicitation_-_NP-GREE_11(1).pdf | ||
| Synopsis_-_GREE_11(1).doc | DOC document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
December 1, 2014
Stormwater Management Report
| FHWA/NPS | Project | No. | PRA‐GREE | 11(1) |
| MDE | No. | 11‐SF‐0286 |
| Construction | of | New | Bridge | Over | Still | Creek | and | Rehabilitation | of | Roads |
| and | Parking | Areas |
Greenbelt Park, National Park Service
Prince George’s County, Maryland
| Owner: | Greenbelt | Park, | National | Park | Service | |||
| 6565 | Greenbelt | Road | Greenbelt, | |||||
| Maryland | 20770 |
Applicant: Kevin S. Rose
| Federal | Highway | Administration | ||
| Eastern | Federal | Lands | Highway | Division |
| 21400 | Ridgetop | Circle | ||
| Sterling, | Virginia | 20166 | ||
| Phone: | 571‐434‐1592 | / | Fax: | 571‐434‐1577 |
Kevin.Rose@dot.gov
Table of Contents
Project Introduction
Summary of Recommendations
Overview of Project
Purpose and Scope
Project Location
ESD Alternatives Analysis
Alternative Surfaces
A‐1. Green Roofs
A‐2. Permeable Pavements
A‐3. Reinforced Turf
Nonstructural Practices
B‐1. Disconnection of Roof
B‐2. Disconnection of Non‐Rooftop Runoff
B‐3. Sheetflow to Conservation Areas
Micro‐Scale Practices
M‐1. Rainwater Harvesting
M‐2. Submerged Gravel Wetlands
M‐3. Landscape Infiltration
M‐4. Infiltration Berms
M‐5. Dry Wells
M‐6. Micro‐Bioretention
M‐7. Rain Gardens
M‐8. Swales
M‐9. Enhanced Filters
Technical Analysis and Design
Hydrologic Analysis
Hydraulic Analysis
CONCLUSION
List of Figures
Figure 1 – Project Vicinity Map
Figure 2 – Project Location Map
List of Tables
Table 1 – Existing Impervious Area
Table 2 – Increase in Impervious Area
Table 3 – Disconnection of Non‐Rooftop Runoff Summary
Appendices
Appendix A – Hydrologic Supporting Information
A‐1 – SWM DA and Disconnection of Non‐Rooftop Runoff locations
A‐2 – Soil Map
Appendix B – Satellite Imagery
Appendix C ‐ USGS National Hydrography Dataset (NHD)
Appendix D: Soils Information
Appendix E: Boring Locations Map
Appendix F: Maryland’s Geologic Map
Appendix G: Boring Logs
1 Stormwater Management Report PRA‐GREE 11(1)
| PROJECT | INTRODUCTION | ||||||||||||||||
| The | project | will | involve | improvement | of | the | roads | and | parking | lots | open | to | public | at | the | Greenbelt | |
| National | Park | in | Prince | George’s | County, | MD. | According | to | the | park | official, | the | roads | had | suffered | ||
| damage | during | potentially | a | 25 | year | storm | in | June | 2009 | when | the | water | surface | had | come | within | a |
| foot | or | two | of | overtopping | the | road. | The | project | includes | culvert | replacements, | bridge | construction, | ||||
| stormwater | management | and | pavement | rehabilitation. |
| SUMMARY | OF | RECOMMENDATIONS | ||||||
| The | following | are | the | hydraulic | recommendations | for | the | project: |
| 1. The | existing | 2 | – | 10.25’ | span | by | 6’ | rise | corrugated | metal | arch | culverts | (Appendix | A‐1) | on | the | ||
| Park | Central | Rd | (Rte. | 11) | at | the | Still | Creek | crossing | should | be | replaced | by | a | 70’ | long, | single | |
| span | bridge. | In | addition, | 5 | relief | 24” | corrugated | metal | pipes | (CMPs) | ‐ | 2 | on | one | side | and | 3 | on |
| the | other, | should | be | installed | to | reconnect | the | floodplain. |
| 2. The | Still | Creek | channel | should | be | lined | with | Class | 4 | riprap | (FP | 14), | as | a | countermeasure | for |
| scour. | Also | the | existing | scour | hole | should | be | filled | in | with | native | channel | material. |
| 3. The | existing | 2 | – | 36” | reinforced | concrete | pipes | (RCP) | (Appendix | A‐2) | on | Main | Entrance | Rd. | |
| (Rte. | 10) | should | be | replaced | by | a | 7’ | span | by | 4’ | rise | reinforced | concrete | box | (RCB). |
| 4. The | existing | 36” | CMP | (Appendix | A‐3) | on | Rte. | 11 | should | be | replaced | by | a | 10’ | span | by | 6’ | rise |
| reinforced | concrete | box | (RCB). |
| 5. Wet | swales | and | disconnection | of | non‐rooftop | runoff | should | be | used | to | satisfy | MD’s |
| stormwater | management | requirements. |
2 Stormwater Management Report PRA‐GREE 11(1)
OVERVIEW OF PROJECT
| PURPOSE | AND | SCOPE | |||||||||||||||||
| Still | Creek | is | currently | conveyed | under | the | Park | central | Road | via | two | 10.25 | feet | span | by | 6 | feet | rise | |
| corrugated | metal | arch | culverts. | The | culverts | drain | an | urban | watershed | of | approximately | 2.4 | square | ||||||
| miles | and | appear | to | be | sized | adequately | but | urbanization | upstream | of | the | park | could | be | causing | ||||
| increased | peak | runoff | and | degradation | of | the | stream | profile. | According | to | the | park | personnel, | a | 25 | ||||
| year | storm | event | in | June | of | 2009 | had | caused | the | Still | Creek | to | come | within | a | foot | or | two | of |
| overtopping | the | road. | The | storm | appeared | to | have | accelerated | the | channel | degradation | and | piping | ||||||
| through | the | existing | culverts. | Due | to | this, | the | park | had | requested | Eastern | Federal | Lands | Highway | |||||
| Division | (EFLHD) | to | assess | the | pavement | and | culvert | at | the | Still | Creek | crossing. |
| EFLHD | conducted | a | site | visit | on | October | 1, | 2009 | and | noticed | that | the | pavement | was | sagging | a | few | ||
| inches | above | the | existing | culverts. | Per | park | personnel, | this | sagging | had | not | changed | significantly | ||||||
| since | the | June | 2009 | storm. | Two | posts | supporting | the | timber | guardrail | along | the | curve | were | leaning | ||||
| back | and | a | rail | had | rotated. | The | south | culvert | was | carrying | the | low | flow | and | piping | was | observed | ||
| between | the | two | culverts | on | the | eastern | fill | slope. | A | five | feet | deep | scour | hole | was | observed | at | the | |
| outlet | and | the | culvert | outlets | were | perched | approximately | 3 | feet | above | the | water | surface. | The | |||||
| culvert | bottoms | were | corroded | and | the | channel | appeared | to | have | degraded | both | upstream | and | ||||||
| downstream | of | the | culverts. | Also, | bank | erosion | of | the | Still | creek | had | caused | trees | to | fall | into | the |
stream.
| Due | to | the | above | mentioned | conditions, | the | park | had | initially | requested | EFLHD | to | repair | the | ||
| damage | sustained | to | the | Still | Creek | culverts | and | the | pavement | above | it. | But | a | further | site | |
| investigation | had | revealed | that | a | large | portion | of | the | pavement | within | the | Greenbelt | National | Park | ||
| had | deteriorated | and | several | other | culverts | were | identified | as | deficient. | Also, | the | floodplain | at | the | ||
| Still | Creek | culverts | was | severely | constricted | from | approximately | 250 | feet | upstream | and | |||||
| downstream | of | the | culvert | to | 50 | feet | at | the | culvert | crossing. | After | assessing | these | conditions, | it | was |
| decided | that | the | project | scope | should | include | the | following: |
| 1. Floodplain | analysis | of | the | Still | Creek | crossing. | ||
| 2. Pavement | rehabilitation | of | the | following | roads | and | parking | lots: |
| a. Route | 10 | |||||||||||
| b. Route | 11 | |||||||||||
| c. Park | Police | Substation | parking | area | (Rte. | 0900) | ||||||
| d. Park | Headquarters | parking | area | (Rte. | 0906) | |||||||
| e. Laurel | Picnic | area | access | road | (Rte. | 0201) | and | the | Laurel | Picnic | parking | area |
| f. Holly | Picnic | Parking | area | (Rte. | 0902) | |||||||
| g. Sweetgum | Picnic | Loop | (Rte. | 0200) | and | the | Sweetgum | Picnic | parking | area | ||
| h. Dogwood | Natural | Trail | parking | area | (Rte. | 0903) |
| 3. Culvert | replacement | at | Sta. | 201+64 | on | Rte. | 10 |
| 4. Culvert | replacement | at | Sta. | 3+11 | on | Rte. | 11 |
| 5. Stormwater | management | (SWM) |
3 Stormwater Management Report PRA‐GREE 11(1)
| PROJECT | LOCATION | ||||||||||||||
| The | project | is | located | within | Greenbelt | National | Park | in | Prince | George’s | county, | MD. | Figures | 1 | and |
| 2 | show | a | vicinity | and | a | location | map | respectively. |
FIGURE 1 – PROJECT VICINITY MAP
4 Stormwater Management Report PRA‐GREE 11(1)
FIGURE 2 – PROJECT LOCATION MAP
5 Stormwater Management Report PRA‐GREE 11(1)
ESD ALTERNATIVES ANALYSIS
| The | strategy | of | Environmental | Site | Design, | or | ESD, | relies | on | integrating | site | design, | natural | hydrology, | and | ||
| smaller | controls | to | capture | and | treat | runoff. | The | following | is | a | summary | of | the | analysis | of | all | ESD |
| practices | and | their | suitability | for | implementation | on | this | project. |
ALTERNATIVE SURFACES
| A‐1. | GREEN | ROOFS | ||||||||||||
| There | are | no | proposed | buildings | associated | with | this | project. | Therefore, | this | practice | was | not | |
| considered. | The | project | is | linear | in | nature | and | involves | road | work. |
| A‐2. | PERMEABLE | PAVEMENTS | ||||||||||||||||
| Percolation | test | did | not | yield | favorable | results | for | the | use | of | permeable | pavements | on | parking | lots. | Soil | D | is |
| predominant | throughout | the | project. | Therefore, | this | practice | was | not | considered. |
| A‐3. | REINFORCED | TURF | |||||||||||||||||||
| Most | reinforced | turf | has | a | lower | load | bearing | capacity | than | conventional | pavements. | Therefore, | |||||||||
| applications | should | be | limited | to | locations | that | do | not | receive | heavy | vehicle | traffic | and | where | sub | soils | are | ||||
| not | compacted. | Due | to | the | fact | that | the | parking | areas | of | this | project | are | heavily | used | and | so | the | loads | on | |
| the | pavement | would | be | relatively | high | this | practice | is | not | considered | to | be | the | most | suitable | for | this |
project.
NONSTRUCTURAL PRACTICES
| B‐1. | DISCONNECTION | OF | ROOF | ||||||||||
| This | practice | is | not | applicable | for | the | analysis; | No | roofs | present | in | the | project. |
| B‐2. | DISCONNECTION | OF | NON‐ROOFTOP | RUNOFF |
| This | practice | is | used. |
Space
| A | permeable, | vegetated | treatment | area | equal | to | the | minimum | flow | path | length | needed | for | treatment | must | be |
| available | down | gradient | of | the | impervious | cover | to | effectively | disconnect | runoff. |
Topography
| Runoff | must | be | conveyed | as | sheetlow | onto | and | across | open | areas | to | maintain | proper | disconnection. | The |
| disconnections | should | be | located | on | gradual | slopes | (<5%) | and | directed | away | from | buildings. |
Hotspot Runoff
| Disconnections | should | not | be | used | to | treat | hotspots | that | generate | higher | concentrations | of | hydrocarbons, | |
| trace | metals, | or | toxicants | than | are | found | in | typical | stormwater | runoff | and | may | contaminate | groundwater. |
The proposed use does not generate hotspot runoff.
6 Stormwater Management Report PRA‐GREE 11(1)
| B‐3. | SHEETFLOW | TO | CONSERVATION | AREAS | ||||||||||||
| This | practice | is | not | applicable | because | evidence | of | a | recorded | legal | easement | could | not | be | provided | to |
| protect | the | conservation | areas | from | future | development | activities. |
MICRO‐SCALE PRACTICES
| M‐1. | RAINWATER | HARVESTING | |||||||||||||||||
| This | practice | is | not | applicable | for | the | analysis; | No | rooftops | present | in | the | project | to | be | able | to | direct | flow |
| into | the | rain | barrels. | Also, | aesthetics | was | of | concern | due | to | the | pristine | nature | of | the | park. |
| M‐2. | SUBMERGED | GRAVEL | WETLANDS | |||||||||||||
| This | practice | is | not | applicable | for | the | analysis; | Limited | project | space, | no | roadway | medians | present | in | the |
project.
M‐3. LANDSCAPE INFILTRATION
| This | practice | is | not | applicable | for | the | analysis; | Applicable | mostly | for | commercial | and | residential | land | uses |
| per | Chapter | 5, | Section | M‐3. |
| M‐4. | INFILTRATION | BERMS | |||||||||||||||
| This | practice | is | not | applicable | for | the | analysis; | Infiltration | berms | could | not | be | used | due | to | higher | slopes |
| along | the | roadway | and | also | due | to | the | absence | of | parallel | contours | along | the | road. |
| M‐5. | DRY | WELLS | ||||||||||||||
| This | practice | is | not | applicable | for | the | analysis; | Applicable | for | larger | sites | per | Chapter | 5, | Section | M‐5. |
| M‐6. | MICRO‐BIORETENTION | |||||||||||||||
| This | practice | is | not | applicable | for | the | analysis; | Not | enough | space | for | their | location; | also | ground | |
| disturbance | had | to | be | kept | to | a | minimum | due | to | the | environmentally | sensitive | nature | of | the | project. |
| M‐7. | RAIN | GARDENS | ||||||||||||||
| This | practice | is | not | applicable | for | the | analysis; | Not | enough | space | for | their | location; | also | ground | |
| disturbance | had | to | be | kept | to | a | minimum | due | to | the | environmentally | sensitive | nature | of | the | project. |
| M‐8. | SWALES | ||||||||||||||
| This | practice | is | not | applicable | for | the | analysis. | SWM | requirements | were | met | using | a | combination | of |
| disconnection | of | non‐rooftop | runoff | and | a | reduction | in | impervious | area. |
| M‐9. | ENHANCED | FILTERS | ||||||||||||||||
| This | practice | is | not | applicable | for | the | analysis; | Enhanced | Filters | are | not | required | due | to | the | nature | of | this |
project.
7 Stormwater Management Report PRA‐GREE 11(1)
TECHNICAL ANALYSIS AND DESIGN
| HYDROLOGIC | ANALYSIS | |||||||||||||||||
| The | Hydrology | for | SWM | was | based | on | the | methods | outlined | in | Maryland’s | Stormwater | ||||||
| Management | Guidelines | of | 2010. | The | project | falls | primarily | under | the | redevelopment | category | and | ||||||
| so | a | rainfall | (PE) | of | 1 | inch | was | used | to | calculate | the | water | quality | volume | required | for | ||
| environmental | site | design | (ESDV). | Due | to | the | widening | of | the | road | at | the | proposed | bridge | ||||
| approaches, | and | pavement | work | at | the | parking | lots, | there | will | be | an | increase | of | 2,552 | ft2 | in | the | |
| impervious | area, | requiring | treatment | under | the | new | development | criteria. | Per | table | 5.3 | of | the | MD’s | ||||
| SWM | guidelines, | for | the | existing | soil | group | D, | a | PE | of | 1.8 | inches | was | used | to | calculate | the | ESDV |
| required | for | the | new | development | for | the | project. | The | calculations | for | the | hydrology | for | SWM | are |
| shown | in | the | subsequent | sections. | Please | refer | to | Appendix | A‐1 | for | the | SWM | DAs. |
| The | ESDv | for | SWM | was | calculated | using | a | combination | of | redevelopment | and | new‐development |
| criteria | per | MD’s | guidelines. |
Redevelopment
| Per | MD’s | SWM | guidelines | of | 2010, | if | the | existing | impervious | area | of | the | project | is | greater | than | 40% |
| of | the | total | disturbed | area, | then | the | project | falls | under | redevelopment | requirements. | The | |||||
| impervious | area | of | the | project | is | 50% | and | so | ESDV | calculations | for | redevelopment | requirements | ||||
| were | performed | as | follows. |
TABLE 1 – EXISTING IMPERVIOUS AREA
Road/Parking Lot Area (sf) Type of Work
Main Entrance Rd. (Rt. 10) 527 Full Depth Reclamation
Park Central Rd. (Rt. 11) 23,740 Full Depth Reclamation
Bike Trail at Good Luck Rd. 2,006 Full Depth Reclamation
Good Luck Trail 29,975 Pavement Removal
Total (sf) 56,248
Existing Conditions
Existing Impervious Area (Refer to Table 1) = 56,248 square feet or 1.29 acres
Site Area = 2.59 acres
Imperviousness (I) = 1.29/2.59 = 50%
| Since | I> | 40%, | under | redevelopment | conditions, | the | project | must | either | decrease | existing | |||
| imperviousness | within | the | LOD | by | 50% | or | provide | water | quality | treatment | for | an | equivalent | area. |
| This | means | that | impervious | area | reduction | and/or | water | quality | treatment | shall | be | |||
| provided | for | 50% | of | 1.29 | acres | or | 0.65 | acres. |
8 Stormwater Management Report PRA‐GREE 11(1)
Proposed Conditions
Site Area = 2.60 acres
Proposed Impervious Area = 26,272 square feet or 0.60 acres
Impervious Area Reduction = 1.29 acres – 0.60 acres = 0.69 acres
| Since | the | Impervious | area | reduction | of | 0.69 | acres | is | greater | than | the | required | impervious |
| area | reduction | of | 0.65 | acres, | this | satisfies | the | ESDv | requirements | for | the | Redevelopment | part |
| of | this | project. |
New Development
| Due | to | the | widening | of | the | roadway | at | the | proposed | bridge | at | the | Still | Creek | crossing, | new | ||
| impervious | area | is | being | added | to | the | project. | There | is | also | minor | increase | in | impervious | areas | in | ||
| the | parking | lots. | Refer | to | Table | 2 | for | a | summary | of | the | increase | in | impervious | areas. | The | amount | of |
| runoff | from | the | increase | imperviousness | will | be | reduced | to | a | level | equivalent | to | woods | in | good | |||
| condition | for | the | 1‐year, | 24 | hour | rainfall | event. | The | calculations | for | ESDV | are | shown | below. |
TABLE 2 – INCREASE IN IMPERVIOUS AREA
Road/Parking Lot Area (sf) Type of work
Rt. 11 Bridge & approaches 2,460 Full Depth Reconstruction
Sweetgum Parking 24 Full Depth New
Holly Parking 68 Full Depth New
Total (sf) 2,552
Increase in Impervious Area = 2,552 ft2 / 43560 sq.ft/ac = 0.06 acres
| The | new | impervious | area | will | be | located | on | D | soils, | (Refer | to | Appendix | B‐4 | for | the | Soil | Map), | |
| therefore | according | to | Table | 5.3 | of | the | MD | SWM | design | manual, | the | PE | is | 1.8 | inches | for | 0.06 | acres. |
ESDV = (PE)(Rv)(A)/12
Where, PE = 1.8 inch
RV = 0.05 + (0.009)(I); I = 100%
RV = 0.05 + (0.009 x 100) = 0.95
IART (A) = 0.06 acres
9 Stormwater Management Report PRA‐GREE 11(1)
ESDV = (1.8)(0.95)(0.06) x 43560/12
ESDV = 364 cu. ft.
ESDV = 364 cu.ft.
10 Stormwater Management Report PRA‐GREE 11(1)
| HYDRAULIC | ANALYSIS | ||
| a. Disconnection | of | Non‐Rooftop | Runoff: |
| Per | Chapter | 5, | Section | N‐2, | Table | 5.7 | of | MD’s | SWM | guidelines, | disconnection | of | non‐rooftop | runoff | |||||||
| can | be | used | to | treat | a | PE | of | up | to | 1 | inch | provided | the | length | of | disconnection | is | the | same | as | the |
| length | of | contributing | flow | from | impervious | area. | The | length | of | disconnection | must | be | between | 10 | |||||||
| ft. | and | 75 | ft. | Disconnection | of | non‐rooftop | runoff | is | being | proposed | at | 2 | separate | locations | for | the | |||||
| project | site. | A | 1 | to | 2 | foot | wide | gravel | (No. | 67 | stone) | transition | strip | will | be | constructed | on | the | side | ||
| of | the | road | where | the | disconnection | is | located | in | order | to | ensure | that | runoff | will | flow | in | a | safe | and | ||
| non‐erosive | manner. | The | disconnection | will | be | directed | over | hydrologic | soil | groups | (HSG) | B | and | C | |||||||
| per | the | soil | map | obtained | from | Natural | Resources | Conservation | Survey’s | (NRCS) | Web | Soil | survey | ||||||||
| database | (Appendix | A | – | 2). | Table | 3 | provides | the | approximate | locations | of | the | disconnections | of | |||||||
| non‐rooftop | runoff, | along | with | their | respective | DAs | and | the | ESDVs. | The | total | impervious | area | being | |||||||
| treated | using | disconnection | of | non‐rooftop | runoff | is | 5134 | ft2. | Using | disconnection | of | non‐rooftop | |||||||||
| runoff, | a | total | ESDV | of | 428 | ft3 | will | be | provided. | This | will | satisfy | the | required | ESDV | of | 364 | ft3 | and | the | |
| required | IART | of | 2,552 | ft2 | or | 0.06 | acres | These | 2 | locations | will | be | shown | on | the | final | construction | ||||
| plans | along | with | their | respective | DAs. | Please | refer | to | Appendix | A‐1 | for | the | locations | of | this | best | |||||
| management | practice | (BMP). |
TABLE 3 – DISCONNECTION OF NON‐ROOFTOP RUNOFF SUMMARY
STA DA (ft2) PE (IN) ESDv (ft3) Location Slope (%)
16+00 to 17+76 3654 1 305 LEFT 4.3
24+22 to 25+00 1480 1 123 LEFT 3.2
TOTAL 5134 428
11 Stormwater Management Report PRA‐GREE 11(1)
CONCLUSION
| The | SWM | design | was | conducted | per | latest | MD | requirements. | We | believe | that | by | using | a | |
| combination | of | disconnection | of | non‐rooftop | runoff | and | a | reduction | in | impervious | area, | the | SWM | ||
| requirements | have | been | met. | At | the | same | time, | the | ground | disturbance | has | been | kept | to | a |
| minimum, | thus | providing | ESD | to | the | maximum | extent | possible | (MEP). |
12 Stormwater Management Report PRA‐GREE 11(1)
APPENDICES
File details come from the government source that posted it.