SWM_Report.pdf

PDF 505 KB Posted

Attached to
Greenbelt Park Federal contract opportunity
Solicitation number
693C73-19-B-000004
Issued by
Department of Transportation Federal Highway Administration

About this file

SWM_Report

View the file

Other files for this federal contract opportunity

Other files attached to Greenbelt Park, newest first.
File Type Posted
Results_of_Bid_Opening_-_NP-GREE_11(1).pdf PDF
FHWA_FONSI.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Pavement_Report_Addendum.pdf PDF
Plans_-_NP-GREE_11(1).pdf PDF
VETS-4212_Form.pdf PDF
Hydraulic_Report.pdf PDF
ESC_SWM_Plans.pdf PDF
Final_EA.pdf PDF
Geotechnical_Report.pdf PDF
Pavement_Report.pdf PDF
FP14_Eng.pdf PDF
NPS_FONSI_SOF.pdf PDF
Pavement_Memo_SWI.pdf PDF
IFB_Solicitation_-_NP-GREE_11(1).pdf PDF
Synopsis_-_GREE_11(1).doc DOC document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

December 1, 2014

Stormwater Management Report

FHWA/NPSProjectNo.PRA‐GREE11(1)
MDENo.11‐SF‐0286
ConstructionofNewBridgeOverStillCreekandRehabilitationofRoads
andParkingAreas

Greenbelt Park, National Park Service

Prince George’s County, Maryland

Owner:GreenbeltPark,NationalParkService
6565GreenbeltRoadGreenbelt,
Maryland20770

Applicant: Kevin S. Rose

FederalHighwayAdministration
EasternFederalLandsHighwayDivision
21400RidgetopCircle
Sterling,Virginia20166
Phone:571‐434‐1592/Fax:571‐434‐1577

Kevin.Rose@dot.gov

Table of Contents

Project Introduction

Summary of Recommendations

Overview of Project

Purpose and Scope

Project Location

ESD Alternatives Analysis

Alternative Surfaces

A‐1. Green Roofs

A‐2. Permeable Pavements

A‐3. Reinforced Turf

Nonstructural Practices

B‐1. Disconnection of Roof

B‐2. Disconnection of Non‐Rooftop Runoff

B‐3. Sheetflow to Conservation Areas

Micro‐Scale Practices

M‐1. Rainwater Harvesting

M‐2. Submerged Gravel Wetlands

M‐3. Landscape Infiltration

M‐4. Infiltration Berms

M‐5. Dry Wells

M‐6. Micro‐Bioretention

M‐7. Rain Gardens

M‐8. Swales

M‐9. Enhanced Filters

Technical Analysis and Design

Hydrologic Analysis

Hydraulic Analysis

CONCLUSION

List of Figures

Figure 1 – Project Vicinity Map

Figure 2 – Project Location Map

List of Tables

Table 1 – Existing Impervious Area

Table 2 – Increase in Impervious Area

Table 3 – Disconnection of Non‐Rooftop Runoff Summary

Appendices

Appendix A – Hydrologic Supporting Information

A‐1 – SWM DA and Disconnection of Non‐Rooftop Runoff locations

A‐2 – Soil Map

Appendix B – Satellite Imagery

Appendix C ‐ USGS National Hydrography Dataset (NHD)

Appendix D: Soils Information

Appendix E: Boring Locations Map

Appendix F: Maryland’s Geologic Map

Appendix G: Boring Logs

1 Stormwater Management Report PRA‐GREE 11(1)

PROJECTINTRODUCTION
TheprojectwillinvolveimprovementoftheroadsandparkinglotsopentopublicattheGreenbelt
NationalParkinPrinceGeorge’sCounty,MD.Accordingtotheparkofficial,theroadshadsuffered
damageduringpotentiallya25yearstorminJune2009whenthewatersurfacehadcomewithina
footortwoofovertoppingtheroad.Theprojectincludesculvertreplacements,bridgeconstruction,
stormwatermanagementandpavementrehabilitation.
SUMMARYOFRECOMMENDATIONS
Thefollowingarethehydraulicrecommendationsfortheproject:
1. Theexisting2–10.25’spanby6’risecorrugatedmetalarchculverts(AppendixA‐1)onthe
ParkCentralRd(Rte.11)attheStillCreekcrossingshouldbereplacedbya70’long,single
spanbridge.Inaddition,5relief24”corrugatedmetalpipes(CMPs)‐2ononesideand3on
theother,shouldbeinstalledtoreconnectthefloodplain.
2. TheStillCreekchannelshouldbelinedwithClass4riprap(FP14),asacountermeasurefor
scour.Alsotheexistingscourholeshouldbefilledinwithnativechannelmaterial.
3. Theexisting2–36”reinforcedconcretepipes(RCP)(AppendixA‐2)onMainEntranceRd.
(Rte.10)shouldbereplacedbya7’spanby4’risereinforcedconcretebox(RCB).
4. Theexisting36”CMP(AppendixA‐3)onRte.11shouldbereplacedbya10’spanby6’rise
reinforcedconcretebox(RCB).
5. Wetswalesanddisconnectionofnon‐rooftoprunoffshouldbeusedtosatisfyMD’s
stormwatermanagementrequirements.

2 Stormwater Management Report PRA‐GREE 11(1)

OVERVIEW OF PROJECT

PURPOSEANDSCOPE
StillCreekiscurrentlyconveyedundertheParkcentralRoadviatwo10.25feetspanby6feetrise
corrugatedmetalarchculverts.Theculvertsdrainanurbanwatershedofapproximately2.4square
milesandappeartobesizedadequatelybuturbanizationupstreamoftheparkcouldbecausing
increasedpeakrunoffanddegradationofthestreamprofile.Accordingtotheparkpersonnel,a25
yearstormeventinJuneof2009hadcausedtheStillCreektocomewithinafootortwoof
overtoppingtheroad.Thestormappearedtohaveacceleratedthechanneldegradationandpiping
throughtheexistingculverts.Duetothis,theparkhadrequestedEasternFederalLandsHighway
Division(EFLHD)toassessthepavementandculvertattheStillCreekcrossing.
EFLHDconductedasitevisitonOctober1,2009andnoticedthatthepavementwassaggingafew
inchesabovetheexistingculverts.Perparkpersonnel,thissagginghadnotchangedsignificantly
sincetheJune2009storm.Twopostssupportingthetimberguardrailalongthecurvewereleaning
backandarailhadrotated.Thesouthculvertwascarryingthelowflowandpipingwasobserved
betweenthetwoculvertsontheeasternfillslope.Afivefeetdeepscourholewasobservedatthe
outletandtheculvertoutletswereperchedapproximately3feetabovethewatersurface.The
culvertbottomswerecorrodedandthechannelappearedtohavedegradedbothupstreamand
downstreamoftheculverts.Also,bankerosionoftheStillcreekhadcausedtreestofallintothe

stream.

Duetotheabovementionedconditions,theparkhadinitiallyrequestedEFLHDtorepairthe
damagesustainedtotheStillCreekculvertsandthepavementaboveit.Butafurthersite
investigationhadrevealedthatalargeportionofthepavementwithintheGreenbeltNationalPark
haddeterioratedandseveralotherculvertswereidentifiedasdeficient.Also,thefloodplainatthe
StillCreekculvertswasseverelyconstrictedfromapproximately250feetupstreamand
downstreamoftheculvertto50feetattheculvertcrossing.Afterassessingtheseconditions,itwas
decidedthattheprojectscopeshouldincludethefollowing:
1. FloodplainanalysisoftheStillCreekcrossing.
2. Pavementrehabilitationofthefollowingroadsandparkinglots:
a. Route10
b. Route11
c. ParkPoliceSubstationparkingarea(Rte.0900)
d. ParkHeadquartersparkingarea(Rte.0906)
e. LaurelPicnicareaaccessroad(Rte.0201)andtheLaurelPicnicparkingarea
f. HollyPicnicParkingarea(Rte.0902)
g. SweetgumPicnicLoop(Rte.0200)andtheSweetgumPicnicparkingarea
h. DogwoodNaturalTrailparkingarea(Rte.0903)
3. CulvertreplacementatSta.201+64onRte.10
4. CulvertreplacementatSta.3+11onRte.11
5. Stormwatermanagement(SWM)

3 Stormwater Management Report PRA‐GREE 11(1)

PROJECTLOCATION
TheprojectislocatedwithinGreenbeltNationalParkinPrinceGeorge’scounty,MD.Figures1and
2showavicinityandalocationmaprespectively.

FIGURE 1 – PROJECT VICINITY MAP

4 Stormwater Management Report PRA‐GREE 11(1)

FIGURE 2 – PROJECT LOCATION MAP

5 Stormwater Management Report PRA‐GREE 11(1)

ESD ALTERNATIVES ANALYSIS

ThestrategyofEnvironmentalSiteDesign,orESD,reliesonintegratingsitedesign,naturalhydrology,and
smallercontrolstocaptureandtreatrunoff.ThefollowingisasummaryoftheanalysisofallESD
practicesandtheirsuitabilityforimplementationonthisproject.

ALTERNATIVE SURFACES

A‐1.GREENROOFS
Therearenoproposedbuildingsassociatedwiththisproject.Therefore,thispracticewasnot
considered.Theprojectislinearinnatureandinvolvesroadwork.
A‐2.PERMEABLEPAVEMENTS
Percolationtestdidnotyieldfavorableresultsfortheuseofpermeablepavementsonparkinglots.SoilDis
predominantthroughouttheproject.Therefore,thispracticewasnotconsidered.
A‐3.REINFORCEDTURF
Mostreinforcedturfhasalowerloadbearingcapacitythanconventionalpavements.Therefore,
applicationsshouldbelimitedtolocationsthatdonotreceiveheavyvehicletrafficandwheresubsoilsare
notcompacted.Duetothefactthattheparkingareasofthisprojectareheavilyusedandsotheloadson
thepavementwouldberelativelyhighthispracticeisnotconsideredtobethemostsuitableforthis

project.

NONSTRUCTURAL PRACTICES

B‐1.DISCONNECTIONOFROOF
Thispracticeisnotapplicablefortheanalysis;Noroofspresentintheproject.
B‐2.DISCONNECTIONOFNON‐ROOFTOPRUNOFF
Thispracticeisused.

Space

Apermeable,vegetatedtreatmentareaequaltotheminimumflowpathlengthneededfortreatmentmustbe
availabledowngradientoftheimperviouscovertoeffectivelydisconnectrunoff.

Topography

Runoffmustbeconveyedassheetlowontoandacrossopenareastomaintainproperdisconnection.The
disconnectionsshouldbelocatedongradualslopes(<5%)anddirectedawayfrombuildings.

Hotspot Runoff

Disconnectionsshouldnotbeusedtotreathotspotsthatgeneratehigherconcentrationsofhydrocarbons,
tracemetals,ortoxicantsthanarefoundintypicalstormwaterrunoffandmaycontaminategroundwater.

The proposed use does not generate hotspot runoff.

6 Stormwater Management Report PRA‐GREE 11(1)

B‐3.SHEETFLOWTOCONSERVATIONAREAS
Thispracticeisnotapplicablebecauseevidenceofarecordedlegaleasementcouldnotbeprovidedto
protecttheconservationareasfromfuturedevelopmentactivities.

MICRO‐SCALE PRACTICES

M‐1.RAINWATERHARVESTING
Thispracticeisnotapplicablefortheanalysis;Norooftopspresentintheprojecttobeabletodirectflow
intotherainbarrels.Also,aestheticswasofconcernduetothepristinenatureofthepark.
M‐2.SUBMERGEDGRAVELWETLANDS
Thispracticeisnotapplicablefortheanalysis;Limitedprojectspace,noroadwaymedianspresentinthe

project.

M‐3. LANDSCAPE INFILTRATION

Thispracticeisnotapplicablefortheanalysis;Applicablemostlyforcommercialandresidentiallanduses
perChapter5,SectionM‐3.
M‐4.INFILTRATIONBERMS
Thispracticeisnotapplicablefortheanalysis;Infiltrationbermscouldnotbeusedduetohigherslopes
alongtheroadwayandalsoduetotheabsenceofparallelcontoursalongtheroad.
M‐5.DRYWELLS
Thispracticeisnotapplicablefortheanalysis;ApplicableforlargersitesperChapter5,SectionM‐5.
M‐6.MICRO‐BIORETENTION
Thispracticeisnotapplicablefortheanalysis;Notenoughspacefortheirlocation;alsoground
disturbancehadtobekepttoaminimumduetotheenvironmentallysensitivenatureoftheproject.
M‐7.RAINGARDENS
Thispracticeisnotapplicablefortheanalysis;Notenoughspacefortheirlocation;alsoground
disturbancehadtobekepttoaminimumduetotheenvironmentallysensitivenatureoftheproject.
M‐8.SWALES
Thispracticeisnotapplicablefortheanalysis.SWMrequirementsweremetusingacombinationof
disconnectionofnon‐rooftoprunoffandareductioninimperviousarea.
M‐9.ENHANCEDFILTERS
Thispracticeisnotapplicablefortheanalysis;EnhancedFiltersarenotrequiredduetothenatureofthis

project.

7 Stormwater Management Report PRA‐GREE 11(1)

TECHNICAL ANALYSIS AND DESIGN

HYDROLOGICANALYSIS
TheHydrologyforSWMwasbasedonthemethodsoutlinedinMaryland’sStormwater
ManagementGuidelinesof2010.Theprojectfallsprimarilyundertheredevelopmentcategoryand
soarainfall(PE)of1inchwasusedtocalculatethewaterqualityvolumerequiredfor
environmentalsitedesign(ESDV).Duetothewideningoftheroadattheproposedbridge
approaches,andpavementworkattheparkinglots,therewillbeanincreaseof2,552ft2inthe
imperviousarea,requiringtreatmentunderthenewdevelopmentcriteria.Pertable5.3oftheMD’s
SWMguidelines,fortheexistingsoilgroupD,aPEof1.8incheswasusedtocalculatetheESDV
requiredforthenewdevelopmentfortheproject.ThecalculationsforthehydrologyforSWMare
showninthesubsequentsections.PleaserefertoAppendixA‐1fortheSWMDAs.
TheESDvforSWMwascalculatedusingacombinationofredevelopmentandnew‐development
criteriaperMD’sguidelines.

Redevelopment

PerMD’sSWMguidelinesof2010,iftheexistingimperviousareaoftheprojectisgreaterthan40%
ofthetotaldisturbedarea,thentheprojectfallsunderredevelopmentrequirements.The
imperviousareaoftheprojectis50%andsoESDVcalculationsforredevelopmentrequirements
wereperformedasfollows.

TABLE 1 – EXISTING IMPERVIOUS AREA

Road/Parking Lot Area (sf) Type of Work

Main Entrance Rd. (Rt. 10) 527 Full Depth Reclamation

Park Central Rd. (Rt. 11) 23,740 Full Depth Reclamation

Bike Trail at Good Luck Rd. 2,006 Full Depth Reclamation

Good Luck Trail 29,975 Pavement Removal

Total (sf) 56,248

Existing Conditions

Existing Impervious Area (Refer to Table 1) = 56,248 square feet or 1.29 acres

Site Area = 2.59 acres

Imperviousness (I) = 1.29/2.59 = 50%

SinceI>40%,underredevelopmentconditions,theprojectmusteitherdecreaseexisting
imperviousnesswithintheLODby50%orprovidewaterqualitytreatmentforanequivalentarea.
Thismeansthatimperviousareareductionand/orwaterqualitytreatmentshallbe
providedfor50%of1.29acresor0.65acres.

8 Stormwater Management Report PRA‐GREE 11(1)

Proposed Conditions

Site Area = 2.60 acres

Proposed Impervious Area = 26,272 square feet or 0.60 acres

Impervious Area Reduction = 1.29 acres – 0.60 acres = 0.69 acres

SincetheImperviousareareductionof0.69acresisgreaterthantherequiredimpervious
areareductionof0.65acres,thissatisfiestheESDvrequirementsfortheRedevelopmentpart
ofthisproject.

New Development

DuetothewideningoftheroadwayattheproposedbridgeattheStillCreekcrossing,new
imperviousareaisbeingaddedtotheproject.Thereisalsominorincreaseinimperviousareasin
theparkinglots.RefertoTable2forasummaryoftheincreaseinimperviousareas.Theamountof
runofffromtheincreaseimperviousnesswillbereducedtoalevelequivalenttowoodsingood
conditionforthe1‐year,24hourrainfallevent.ThecalculationsforESDVareshownbelow.

TABLE 2 – INCREASE IN IMPERVIOUS AREA

Road/Parking Lot Area (sf) Type of work

Rt. 11 Bridge & approaches 2,460 Full Depth Reconstruction

Sweetgum Parking 24 Full Depth New

Holly Parking 68 Full Depth New

Total (sf) 2,552

Increase in Impervious Area = 2,552 ft2 / 43560 sq.ft/ac = 0.06 acres

ThenewimperviousareawillbelocatedonDsoils,(RefertoAppendixB‐4fortheSoilMap),
thereforeaccordingtoTable5.3oftheMDSWMdesignmanual,thePEis1.8inchesfor0.06acres.

ESDV = (PE)(Rv)(A)/12

Where, PE = 1.8 inch

RV = 0.05 + (0.009)(I); I = 100%

RV = 0.05 + (0.009 x 100) = 0.95

IART (A) = 0.06 acres

9 Stormwater Management Report PRA‐GREE 11(1)

ESDV = (1.8)(0.95)(0.06) x 43560/12

ESDV = 364 cu. ft.

ESDV = 364 cu.ft.

10 Stormwater Management Report PRA‐GREE 11(1)

HYDRAULICANALYSIS
a. DisconnectionofNon‐RooftopRunoff:
PerChapter5,SectionN‐2,Table5.7ofMD’sSWMguidelines,disconnectionofnon‐rooftoprunoff
canbeusedtotreataPEofupto1inchprovidedthelengthofdisconnectionisthesameasthe
lengthofcontributingflowfromimperviousarea.Thelengthofdisconnectionmustbebetween10
ft.and75ft.Disconnectionofnon‐rooftoprunoffisbeingproposedat2separatelocationsforthe
projectsite.A1to2footwidegravel(No.67stone)transitionstripwillbeconstructedontheside
oftheroadwherethedisconnectionislocatedinordertoensurethatrunoffwillflowinasafeand
non‐erosivemanner.Thedisconnectionwillbedirectedoverhydrologicsoilgroups(HSG)BandC
perthesoilmapobtainedfromNaturalResourcesConservationSurvey’s(NRCS)WebSoilsurvey
database(AppendixA–2).Table3providestheapproximatelocationsofthedisconnectionsof
non‐rooftoprunoff,alongwiththeirrespectiveDAsandtheESDVs.Thetotalimperviousareabeing
treatedusingdisconnectionofnon‐rooftoprunoffis5134ft2.Usingdisconnectionofnon‐rooftop
runoff,atotalESDVof428ft3willbeprovided.ThiswillsatisfytherequiredESDVof364ft3andthe
requiredIARTof2,552ft2or0.06acresThese2locationswillbeshownonthefinalconstruction
plansalongwiththeirrespectiveDAs.PleaserefertoAppendixA‐1forthelocationsofthisbest
managementpractice(BMP).

TABLE 3 – DISCONNECTION OF NON‐ROOFTOP RUNOFF SUMMARY

STA DA (ft2) PE (IN) ESDv (ft3) Location Slope (%)

16+00 to 17+76 3654 1 305 LEFT 4.3

24+22 to 25+00 1480 1 123 LEFT 3.2

TOTAL 5134 428

11 Stormwater Management Report PRA‐GREE 11(1)

CONCLUSION

TheSWMdesignwasconductedperlatestMDrequirements.Webelievethatbyusinga
combinationofdisconnectionofnon‐rooftoprunoffandareductioninimperviousarea,theSWM
requirementshavebeenmet.Atthesametime,thegrounddisturbancehasbeenkepttoa
minimum,thusprovidingESDtothemaximumextentpossible(MEP).

12 Stormwater Management Report PRA‐GREE 11(1)

APPENDICES