Pavement_Report_Addendum.pdf

PDF 85 KB Posted

Attached to
Greenbelt Park Federal contract opportunity
Solicitation number
693C73-19-B-000004
Issued by
Department of Transportation Federal Highway Administration

About this file

Pavement Report_Addendum

View the file

Other files for this federal contract opportunity

Other files attached to Greenbelt Park, newest first.
File Type Posted
Results_of_Bid_Opening_-_NP-GREE_11(1).pdf PDF
FHWA_FONSI.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Plans_-_NP-GREE_11(1).pdf PDF
SWM_Report.pdf PDF
VETS-4212_Form.pdf PDF
Hydraulic_Report.pdf PDF
ESC_SWM_Plans.pdf PDF
Final_EA.pdf PDF
Geotechnical_Report.pdf PDF
Pavement_Report.pdf PDF
FP14_Eng.pdf PDF
NPS_FONSI_SOF.pdf PDF
Pavement_Memo_SWI.pdf PDF
IFB_Solicitation_-_NP-GREE_11(1).pdf PDF
Synopsis_-_GREE_11(1).doc DOC document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 1 Pages

Form FHWA-201 (Rev. 11-67)

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA- 121 for informal correspondence. MINUTE-MEMO

M:\PROJECTS\gree\11(1)\Techserv\Pavement\Correspondence\GREE 11(1)_Pavement Report_Addendum.doc

SUBJECT: Project PRA GREE 11(1) – Addendum to the Pavement Report No. FY 14-02

TO MESSAGE/COMMENT FROM/DATE

R. Kotadia Project Manager

And:

S. Nawaz Highway Design Manager

This memorandum is an addendum to the Pavement Report No. FY 14-02, dated June 2014. The purpose of this memo is to amend the pavement recommendations for Routes 10 and 11, specifically, the Full-Depth Reclamation (FDR) with cement outlined in Table 3 of the report. The recommendations for FDR provided in Table 3 of the report should be replaced with the recommendations for pavement reconstruction according to the requirements outlined in the following table.

Recommendations for Pavement Reconstruction (Routes 10 and 11)

Layer Minimum Thickness

(in) Comments

AC Surface Course

1 ½

Asphalt Concrete Pavement – Gyratory Method (GACP), 0.3 to < 3 x 106 ESAL’s, 3/8” Nominal Maximum Size Aggregate

(NMSA), Type III B Roughness Asphalt Tack

Coat

AC Tack Coat as per Section 412 of the FP- 14 Specifications

AC Base Course

3 GACP, 0.3 to 3 x 106 ESAL’s, ¾” NMSA

Aggregate Base Course

Base Aggregate, Grading C or D, as per Section 301 of the FP-14 Specifications

Geotextile -- Separation and Stabilization Geotextile

Class 2, Type E, per Section 207 of FP-14 Specifications

Also, the same surface mix for the road, as described in the above table, can be used for the parking areas.

M. Elias Acting Pavement Team Leader

6/21/2018 cc: Highway Design (N. Makwana)

2018-06-21T16:59:40-0400
MOHAMMED B ELIAS

File details come from the government source that posted it.