Q&A_05-23-19.pdf
PDF 59 KB Posted
- Attached to
- OR LINCOLN 807(1), Five Rivers Road Overlay Federal contract opportunity
- Solicitation number
- 69056719B000007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum.pdf | ||
| Amendment_A001.pdf | ||
| OR_LINCOLN_807(1)_Five_Rivers_Overlay_Plans_100__FINAL_4-02-19.pdf | ||
| Cascade_Creek_Bridge_Inspection_Report.pdf | ||
| Alsea_River_Bridge_Inspection_Report_(1).pdf | ||
| IFB.pdf | ||
| Site_2_Five_Rivers_Bridge_No_1_Alignment_&_Profile_Report.pdf | ||
| Site_1_Alsea_River_Bridge_Alignment_&_Profile_Report.pdf | ||
| Site_4_Five_Rivers_Bridge_No_2_Alignment_&_Profile_Report.pdf | ||
| Five_Rivers_Overlay_100__Cross_Sections_04-04-19.pdf | ||
| Site_3_Cascade_Creek_Bridge_Alignment_&_Profile_Report.pdf | ||
| Five_Rivers_Bridge_No._2_Inspection_Report.pdf | ||
| Five_Rivers_Bridge_No._1_Inspection_Report.pdf | ||
| PROJECT_DESCRIPTION_OR_5_Rivers.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR LINCOLN 807(1)
Five Rivers Road Overlay
# General Technical Question Answer Date
1 X Will you allow the contractor to pull water from the Alsea River? Any permits or charges?
See the last paragraph on Page A‐2a of the Notice to Bidders.
5/23/19
2 X What is required for bid item A0500 MINOR
BRIDGE WORK?
See Section 575 of the Special Contract Requirements and the applicable Plan Sheets.
5/23/19
3 X Page F‐17 of the plan set calls for a concrete footing under the impact attenuator. How is this footing paid?
See Subsection 109.05(b) of FP‐14. 5/23/19
4 X How was the embankment quantity determined? It doesn’t seem as though 400 CUYD will be required.
Bid according to quantities shown in the bid documents.
5/23/19
5 X What was the intent and/or need of bid item
A0800 TEMP TRAFFIC CONTROL, TRAFFIC
SIGNAL SYSTEM?
See Sections 156 and 635. 5/23/19
6 X What are (A0840) TEMPORARY TRAFFIC
CONTROL, VEHICLE POSITIONING GUIDES
See Plan Sheet G.4, and Subsection 635.13A of the Special Contract Requirements.
5/23/19
7 X
Will AASHTO T 283 and AASHTO T340 – 1‐ results be accepted as an alternative to Hamburg Wheel‐Tract Testing AASHTO T 324 section 401.03 (c)(3)(a)(2)?
No. 5/23/19
8 X Will you consider moving up the start date of the project from August 5th?
See Far Clause 52.211‐10 on Page C‐17 of the solicitation.
5/23/19
Check General or Technical
9 X Will you consider pushing the bid date 1 week due to Memorial Day Holiday next week and the long lead time for project start date?
Not at this time. 5/23/19