PROJECT_DESCRIPTION_OR_5_Rivers.pdf
PDF 208 KB Posted
- Attached to
- OR LINCOLN 807(1), Five Rivers Road Overlay Federal contract opportunity
- Solicitation number
- 69056719B000007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum.pdf | ||
| Q&A_05-23-19.pdf | ||
| Amendment_A001.pdf | ||
| Alsea_River_Bridge_Inspection_Report_(1).pdf | ||
| IFB.pdf | ||
| OR_LINCOLN_807(1)_Five_Rivers_Overlay_Plans_100__FINAL_4-02-19.pdf | ||
| Cascade_Creek_Bridge_Inspection_Report.pdf | ||
| Site_2_Five_Rivers_Bridge_No_1_Alignment_&_Profile_Report.pdf | ||
| Site_1_Alsea_River_Bridge_Alignment_&_Profile_Report.pdf | ||
| Site_4_Five_Rivers_Bridge_No_2_Alignment_&_Profile_Report.pdf | ||
| Five_Rivers_Overlay_100__Cross_Sections_04-04-19.pdf | ||
| Site_3_Cascade_Creek_Bridge_Alignment_&_Profile_Report.pdf | ||
| Five_Rivers_Bridge_No._2_Inspection_Report.pdf | ||
| Five_Rivers_Bridge_No._1_Inspection_Report.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR LINCOLN 807(1), Five Rivers Road Overlay, Lincoln County, Oregon
The work consists of grading; asphalt pavement milling (micro-milling); asphalt rejuvenating emulsion scrub seal; asphalt concrete paving; bridge railing and guardrail installation; pavement markings; and other small items of work. The project includes bridge rail installation of 4 bridges.
Project length: 10.5 miles
Tentative Fixed Completion Date: Fall 2019 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $3 million to $5 million
Location: approximately 25 miles east of Waldport, OR.
DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14 Base Schedule
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes 157 Soil Erosion & Sediment Control (erosion control devices) All
DIVISION 200 – Earthwork 204 Excavation & Embankment 1000 CY
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 300 Ton
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 17,000 Ton 412 Asphalt Tack Coat (asphalt surface treatment) 66 Ton 413 Asphalt Pavement Milling (Micro-Milling) 146,000 SY 413 Asphalt Pavement Milling,2 inch depth 1,600 SY 421 Polymer Modified, Rejuvenating Asphalt Emulsion Scrub Seal 146,000 SY 421 Polymer Modified, Rejuvenating Asphalt Emulsion 225 Ton 421 Blotter 900 Ton
DIVISION 550 – Bridge Construction 556 Bridge Railing 1,200 LNFT
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Base Schedule
DIVISION 600 – Incidental Construction 617 Guardrail 450 LNFT 622 Rental Equipment Yes 623 General Labor Yes 634 Permanent Pavement Markings (traffic pavement markings) 42 Miles 635 Temporary Traffic Control – Flagger 500 HR 635 Temporary Traffic Control – Pilot Car 635 Temporary Traffic Control All
| DIVISION 200 – Earthwork |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |
| DIVISION 550 – Bridge Construction |