CLIN_STRUCTURE_6309R3281206.docx
DOCX document 13 KB Posted
- Attached to
- Inlet Channels Removal of Solids Federal contract opportunity
- Solicitation number
- 6309R3281206
About this file
CLIN structure
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Nogales_WD.pdf | ||
| 6309R3281206_SOW_revised.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN STRUCTURE 6309R3281206
| CLIN |
| Description |
| Qty |
| Unit |
| Unit Price |
| Total Price |
| 001 |
| BASE PERIOD |
1. The contractor shall provide all equipment, parts and labor necessary to remove accumulated solids from basins within 48 hours from request. Up to 1500 cubic yards of solids may be removed per fiscal year, up to 100 cubic yards per visit. Invoices will be submitted at a flat rate per visit. May require bi-weekly visits during the rainy season and during the dry season, once every month or two.
2. The contractor shall provide a vacuum truck with adequate capacity, extendable boom, and all the necessary hoses to collect accumulated solids in the inlet basins, up to 100 cubic yards per visit.
3. The Contractor is responsible for training all personnel involved in providing this service in the biological and physical hazards associated with working in and around the basins.
4. The Contractor shall supply all required Personnel Protective Equipment to personnel working in the removal of the settled solids from the basins.
5. The collected solids are to be transported to and unloaded at a designated area on site.
6. IBWC personnel will close inlet slide gates as best as practical to minimize waste inflow into the channels while the settled solids are being removed.
Period of Performance: 07/15/2016-09/30/2016
| SV |
| 12 |
| 002 |
| OPTION YEAR ONE |
1. The contractor shall provide all equipment, parts and labor necessary to remove accumulated solids from basins within 48 hours from request. Up to 1500 cubic yards of solids may be removed per fiscal year, up to 100 cubic yards per visit. Invoices will be submitted at a flat rate per visit. May require bi-weekly visits during the rainy season and during the dry season, once every month or two.
2. The contractor shall provide a vacuum truck with adequate capacity, extendable boom, and all the necessary hoses to collect accumulated solids in the inlet basins, up to 100 cubic yards per visit.
3. The Contractor is responsible for training all personnel involved in providing this service in the biological and physical hazards associated with working in and around the basins.
4. The Contractor shall supply all required Personnel Protective Equipment to personnel working in the removal of the settled solids from the basins.
5. The collected solids are to be transported to and unloaded at a designated area on site.
6. IBWC personnel will close inlet slide gates as best as practical to minimize waste inflow into the channels while the settled solids are being removed.
Period of Performance: 10/01/2016-09/30/2017
| SV |
| 24 |
| 003 |
| OPTIONAL YEAR TWO |
1. The contractor shall provide all equipment, parts and labor necessary to remove accumulated solids from basins within 48 hours from request. Up to 1500 cubic yards of solids may be removed per fiscal year, up to 100 cubic yards per visit. Invoices will be submitted at a flat rate per visit. May require bi-weekly visits during the rainy season and during the dry season, once every month or two.
2. The contractor shall provide a vacuum truck with adequate capacity, extendable boom, and all the necessary hoses to collect accumulated solids in the inlet basins, up to 100 cubic yards per visit.
3. The Contractor is responsible for training all personnel involved in providing this service in the biological and physical hazards associated with working in and around the basins.
4. The Contractor shall supply all required Personnel Protective Equipment to personnel working in the removal of the settled solids from the basins.
5. The collected solids are to be transported to and unloaded at a designated area on site.
6. IBWC personnel will close inlet slide gates as best as practical to minimize waste inflow into the channels while the settled solids are being removed.
Period of Performance: 10/01/2017-09/30/2018
| SV |
| 24 |
| 004 |
| OPTIONAL YEAR 3 |
1. The contractor shall provide all equipment, parts and labor necessary to remove accumulated solids from basins within 48 hours from request. Up to 1500 cubic yards of solids may be removed per fiscal year, up to 100 cubic yards per visit. Invoices will be submitted at a flat rate per visit. May require bi-weekly visits during the rainy season and during the dry season, once every month or two.
2. The contractor shall provide a vacuum truck with adequate capacity, extendable boom, and all the necessary hoses to collect accumulated solids in the inlet basins, up to 100 cubic yards per visit.
3. The Contractor is responsible for training all personnel involved in providing this service in the biological and physical hazards associated with working in and around the basins.
4. The Contractor shall supply all required Personnel Protective Equipment to personnel working in the removal of the settled solids from the basins.
5. The collected solids are to be transported to and unloaded at a designated area on site.
6. IBWC personnel will close inlet slide gates as best as practical to minimize waste inflow into the channels while the settled solids are being removed.
Period of Performance: 10/01/2018-09/30/2019
| SV |
| 24 |
| 005 |
| OPTIONAL YEAR FOUR |
1. The contractor shall provide all equipment, parts and labor necessary to remove accumulated solids from basins within 48 hours from request. Up to 1500 cubic yards of solids may be removed per fiscal year, up to 100 cubic yards per visit. Invoices will be submitted at a flat rate per visit. May require bi-weekly visits during the rainy season and during the dry season, once every month or two.
2. The contractor shall provide a vacuum truck with adequate capacity, extendable boom, and all the necessary hoses to collect accumulated solids in the inlet basins, up to 100 cubic yards per visit.
3. The Contractor is responsible for training all personnel involved in providing this service in the biological and physical hazards associated with working in and around the basins.
4. The Contractor shall supply all required Personnel Protective Equipment to personnel working in the removal of the settled solids from the basins.
5. The collected solids are to be transported to and unloaded at a designated area on site.
6. IBWC personnel will close inlet slide gates as best as practical to minimize waste inflow into the channels while the settled solids are being removed.
Period of Performance: 10/01/2019-09/30/2020
| SV |
| 24 |
TOTAL
File details come from the government source that posted it. Updated .