CLIN_STRUCTURE_6309R3281206.docx

DOCX document 13 KB Posted

Attached to
Inlet Channels Removal of Solids Federal contract opportunity
Solicitation number
6309R3281206
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

CLIN structure

View the file

Other files for this federal contract opportunity

Other files attached to Inlet Channels Removal of Solids, newest first.
File Type Posted
Nogales_WD.pdf PDF
6309R3281206_SOW_revised.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN STRUCTURE 6309R3281206

CLIN
Description
Qty
Unit
Unit Price
Total Price
001
BASE PERIOD

1. The contractor shall provide all equipment, parts and labor necessary to remove accumulated solids from basins within 48 hours from request. Up to 1500 cubic yards of solids may be removed per fiscal year, up to 100 cubic yards per visit. Invoices will be submitted at a flat rate per visit. May require bi-weekly visits during the rainy season and during the dry season, once every month or two.

2. The contractor shall provide a vacuum truck with adequate capacity, extendable boom, and all the necessary hoses to collect accumulated solids in the inlet basins, up to 100 cubic yards per visit.

3. The Contractor is responsible for training all personnel involved in providing this service in the biological and physical hazards associated with working in and around the basins.

4. The Contractor shall supply all required Personnel Protective Equipment to personnel working in the removal of the settled solids from the basins.

5. The collected solids are to be transported to and unloaded at a designated area on site.

6. IBWC personnel will close inlet slide gates as best as practical to minimize waste inflow into the channels while the settled solids are being removed.

Period of Performance: 07/15/2016-09/30/2016

SV
12
002
OPTION YEAR ONE

1. The contractor shall provide all equipment, parts and labor necessary to remove accumulated solids from basins within 48 hours from request. Up to 1500 cubic yards of solids may be removed per fiscal year, up to 100 cubic yards per visit. Invoices will be submitted at a flat rate per visit. May require bi-weekly visits during the rainy season and during the dry season, once every month or two.

2. The contractor shall provide a vacuum truck with adequate capacity, extendable boom, and all the necessary hoses to collect accumulated solids in the inlet basins, up to 100 cubic yards per visit.

3. The Contractor is responsible for training all personnel involved in providing this service in the biological and physical hazards associated with working in and around the basins.

4. The Contractor shall supply all required Personnel Protective Equipment to personnel working in the removal of the settled solids from the basins.

5. The collected solids are to be transported to and unloaded at a designated area on site.

6. IBWC personnel will close inlet slide gates as best as practical to minimize waste inflow into the channels while the settled solids are being removed.

Period of Performance: 10/01/2016-09/30/2017

SV
24
003
OPTIONAL YEAR TWO

1. The contractor shall provide all equipment, parts and labor necessary to remove accumulated solids from basins within 48 hours from request. Up to 1500 cubic yards of solids may be removed per fiscal year, up to 100 cubic yards per visit. Invoices will be submitted at a flat rate per visit. May require bi-weekly visits during the rainy season and during the dry season, once every month or two.

2. The contractor shall provide a vacuum truck with adequate capacity, extendable boom, and all the necessary hoses to collect accumulated solids in the inlet basins, up to 100 cubic yards per visit.

3. The Contractor is responsible for training all personnel involved in providing this service in the biological and physical hazards associated with working in and around the basins.

4. The Contractor shall supply all required Personnel Protective Equipment to personnel working in the removal of the settled solids from the basins.

5. The collected solids are to be transported to and unloaded at a designated area on site.

6. IBWC personnel will close inlet slide gates as best as practical to minimize waste inflow into the channels while the settled solids are being removed.

Period of Performance: 10/01/2017-09/30/2018

SV
24
004
OPTIONAL YEAR 3

1. The contractor shall provide all equipment, parts and labor necessary to remove accumulated solids from basins within 48 hours from request. Up to 1500 cubic yards of solids may be removed per fiscal year, up to 100 cubic yards per visit. Invoices will be submitted at a flat rate per visit. May require bi-weekly visits during the rainy season and during the dry season, once every month or two.

2. The contractor shall provide a vacuum truck with adequate capacity, extendable boom, and all the necessary hoses to collect accumulated solids in the inlet basins, up to 100 cubic yards per visit.

3. The Contractor is responsible for training all personnel involved in providing this service in the biological and physical hazards associated with working in and around the basins.

4. The Contractor shall supply all required Personnel Protective Equipment to personnel working in the removal of the settled solids from the basins.

5. The collected solids are to be transported to and unloaded at a designated area on site.

6. IBWC personnel will close inlet slide gates as best as practical to minimize waste inflow into the channels while the settled solids are being removed.

Period of Performance: 10/01/2018-09/30/2019

SV
24
005
OPTIONAL YEAR FOUR

1. The contractor shall provide all equipment, parts and labor necessary to remove accumulated solids from basins within 48 hours from request. Up to 1500 cubic yards of solids may be removed per fiscal year, up to 100 cubic yards per visit. Invoices will be submitted at a flat rate per visit. May require bi-weekly visits during the rainy season and during the dry season, once every month or two.

2. The contractor shall provide a vacuum truck with adequate capacity, extendable boom, and all the necessary hoses to collect accumulated solids in the inlet basins, up to 100 cubic yards per visit.

3. The Contractor is responsible for training all personnel involved in providing this service in the biological and physical hazards associated with working in and around the basins.

4. The Contractor shall supply all required Personnel Protective Equipment to personnel working in the removal of the settled solids from the basins.

5. The collected solids are to be transported to and unloaded at a designated area on site.

6. IBWC personnel will close inlet slide gates as best as practical to minimize waste inflow into the channels while the settled solids are being removed.

Period of Performance: 10/01/2019-09/30/2020

SV
24

TOTAL