614-18-107 Arch Part 2.pdf

PDF 10 MB Posted

Attached to
Y1DA--Replace Security Camera Surveillance System Federal contract opportunity
Solicitation number
36C24920R0074_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document contains architectural drawings and plans for a project to replace a security camera surveillance system at the Memphis VA Medical Center. The drawings show the proposed location of new security cameras and equipment on the ground floor of Building 1, including areas for new equipment installation, wall construction details, and notes specifying finish materials and access controls. The related federal contract opportunity is solicitation number 36C24920R0074_1 for replacing the security camera surveillance system, issued by the Department of Veterans Affairs Veterans Health Administration VISN 9. The estimated period of performance and response date are not specified.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--Replace Security Camera Surveillance System, newest first.
File Type Posted
36C24920R0074 0002.docx DOCX document
36C24920R0074 0001.pdf PDF
S02-Specifications (Proj 614-18-107) Repl Sec Cam Surv System (Memphis VAMC).pdf PDF
614-18-107 Elec Part 20 B10 and Site.pdf PDF
614-18-107 Arch Part 3.pdf PDF
614-18-107 Elec Part 4 SCC.pdf PDF
614-18-107 Elec Part 13 B1A Systems.pdf PDF
614-18-107 Elec Part 10 B1 Systems.pdf PDF
S02 Solicitation.pdf PDF
614-18-107 Elec Part 2 SCC.pdf PDF
614-18-107 Mech Part 2.pdf PDF
614-18-107 Elec Part 14 B1A Systems.pdf PDF
VA Supplemental Drawings and Schedule - Cameras Print.pdf PDF
614-18-107 General Part 1.pdf PDF
614-18-107 Elec Part 19 B7 Systems.pdf PDF
614-18-107 Elec Part 18 B7 Power.pdf PDF
614-18-107 General Part 2.pdf PDF
614-18-107 Elec Part 12 B1A Power.pdf PDF
614-18-107 Elec Part 5.pdf PDF
614-18-107 Elec Part 6 B1 Power.pdf PDF
614-18-107 Elec Part 8 B1 Systems.pdf PDF
614-18-107 Elec Part 3 SCC.pdf PDF
Wage Determination.doc DOC document
614-18-107 Elec Part 1.pdf PDF
614-18-107 Mech Part 1.pdf PDF
614-18-107 Elec Part 15 B1A Systems.pdf PDF
614-18-107 Elec Part 7 B1 Power.pdf PDF
614-18-107 Arch Part 4.pdf PDF
614-18-107 Elec Part 11 B1A Power.pdf PDF
614-18-107 Elec Part 16 B5 Power.pdf PDF
614-18-107 Elec Part 17 B5 Systems.pdf PDF
614-18-107 Elec Part 9 B1 Systems.pdf PDF
614-18-107 Arch Part 1.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

sw sw sw sw sw sw sw sw swSRSR SR SR SR s s ss s s ss s s s s s s s s s

SR

SR

SR

SR

SR

SR

s s s s s s s s s s s s s s s s ss s s s s s s s s s s s s s s C

A

1.A-200

23'-3 1/2"

1.A-200

5'-4''

1.A-200 9

13'-1''

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

CEC1

AutoCAD SHX Text

CEG 6

AutoCAD SHX Text

CEG 7

AutoCAD SHX Text

CEG 4

AutoCAD SHX Text

CEC2

AutoCAD SHX Text

CEG3

AutoCAD SHX Text

CEG 5A

AutoCAD SHX Text

CEG 5B

AutoCAD SHX Text

CEG 5C

AutoCAD SHX Text

CEG 1

AutoCAD SHX Text

CEG 52

AutoCAD SHX Text

CEG 53

AutoCAD SHX Text

CEG 54B

AutoCAD SHX Text

CEG1

AutoCAD SHX Text

CEG4

AutoCAD SHX Text

CEC2

AutoCAD SHX Text 1.A-100

AutoCAD SHX Text

SJD

AutoCAD SHX Text

ARCHITECTURAL NEW WORK PLANS BUILDING 1 GROUND FLOOR

AutoCAD SHX Text

DML

AutoCAD SHX Text F5

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

BID DOCUMENTS FOR CONSTRUCTION

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE SECURITY CAMERA SURVEILLANCE SYSTEM

AutoCAD SHX Text 614-18-107

AutoCAD SHX Text 04-23-2020

AutoCAD SHX Text

1030 JEFFERSON AVE, MEMPHIS, TN 38104

AutoCAD SHX Text

MEMPHIS VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

KEY PLAN - GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text F1

AutoCAD SHX Text F5

AutoCAD SHX Text

SCALE 1/4' = 1'-0''

AutoCAD SHX Text

PARTIAL GROUND FLOOR PLAN - ARCHITECTURAL NEW WORK

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FEC EX.

AutoCAD SHX Text

NEW WORK PLAN LEGEND

AutoCAD SHX Text

DESIGNATED WHEELCHAIR AREA

AutoCAD SHX Text

AREA NOT IN CONTRACT

AutoCAD SHX Text

NEW PLUMBING FIXTURE

AutoCAD SHX Text

2 HOUR FIRE RATED PARTITION (90 MIN. DOOR)

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET (NEW)

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET (EXISTING)

AutoCAD SHX Text

REFER TO 1.A-600 FOR EQUIPMENT AND FINISH PLAN.

AutoCAD SHX Text

1. INFILL EXISTING OPENING. ALIGN WITH ADJACENT WALL CONSTRUCTION. INFILL EXISTING OPENING. ALIGN WITH ADJACENT WALL CONSTRUCTION. 2. NOT USED. NOT USED. 3. PROVIDE NEW FINISHES (FLOOR, BASE, WALL AND CEILING.) PROVIDE NEW FINISHES (FLOOR, BASE, WALL AND CEILING.) 4. PROVIDE DOOR AND FRAME WITH ACCESS CONTROLS. PROVIDE DOOR AND FRAME WITH ACCESS CONTROLS. 5. EXISTING DOOR TO REMAIN. EXISTING DOOR TO REMAIN. 6. ELECTRIFIED CARD READER. ELECTRIFIED CARD READER. 7. EXTEND EXISTING WALL TO DECK TO MATCH RATING OF EXISTING ADJACENT EXTEND EXISTING WALL TO DECK TO MATCH RATING OF EXISTING ADJACENT WALLS.

AutoCAD SHX Text

KEY NOTES

AutoCAD SHX Text

GENERAL PLAN NOTES

AutoCAD SHX Text REFER TO SHEET 1.A-001 FOR ABBREVIATIONS, SYMBOLS AND OTHER GENERAL INFORMATION RELATED TO THIS PROJECT. REFER TO PROJECT SPECIFICATIONS SECTION 01 00 00, GENERAL REQUIREMENTS FOR ADDITIONAL INFORMATION / REQUIREMENTS. REFER TO INFECTION CONTROL PLANS AND SPECIFICATION SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION / REQUIREMENTS. REFER TO MECHANICAL, ELECTRICAL AND PLUMBING (MEP) DRAWINGS AND SPECIFICATIONS FOR DELINEATION OF ASSEMBLIES AND SYSTEMS TO BE PROVIDED WITHIN THEIR RESPECTIVE PORTIONS OF THE WORK. CONTRACTOR TO COORDINATE THE WORK OF ALL TRADES AND MATERIAL SUPPLIERS INVOLVED WITH OR WORKING ON THIS PROJECT. CONTRACTOR TO VERIFY THE EXISTING SITE CONDITIONS AND IMMEDIATELY NOTIFY THE COR OF ANY DISCREPANCY BETWEEN EXISTING CONDITIONS SHOWN AND CONFIGURATIONS INDICATED BY CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL EMPLOY ONLY THOSE TRADE CONTRACTORS WITH SUFFICIENT EXPERIENCE IN THE PERFORMANCE OF WORK WITHIN A HOSPITAL ENVIRONMENT. VAMC RESERVES THE RIGHT TO REQUIRE THE REMOVAL OF ANY PARTICULAR TRADE CONTRACTOR - AT NO PENALTY TO VAMC - IF THEIR WORK OR BEHAVIOR AT THE FACILITY PUTS AT RISK THE PROJECT'S TIMELY COMPLETION, QUALITY OF THE WORK, OR THE SAFETY OF THEMSELVES, VAMC EMPLOYEES, PATIENTS OR VISITORS. IT IS STRONGLY ENCOURAGED FOR ALL BIDDING CONTRACTORS TO VISIT THE FACILITY PRIOR TO PREPARING PROPOSALS. PRE-BID WALK THROUGH TO BE COORDINATED WITH CONTRACTING OFFICER REPRESENTATIVE (COR). CONTRACTOR SHALL MAINTAIN EGRESS PATHWAYS THROUGH THE DEMOLITION AND CONSTRUCTION AREA THROUGH THE CONSTRUCTION PERIOD. MAINTAIN PUBLIC EGRESS PATHS IN AREAS SURROUNDING NEW OR DEMOLITION WORK SHOWN. COORDINATE EXITING REQUIREMENTS WITH VAMC COR. WORK INDICATED TO OCCUR IN PASSAGES AND PUBLIC CORRIDORS SHALL BE PERFORMED ONLY AFTER NORMAL VAMC HOURS OF OPERATION OR ON WEEKENDS OR HOLIDAYS. IF WORK IN PASSAGES OR CORRIDORS IS NOT COMPLETED PRIOR TO START OF NORMAL WORK HOURS FOR VAMC - CONTRACTOR SHALL RETURN PASSAGE / CORRIDOR FINISHES TO SUBSTANTIALLY ORIGINAL CONDITION. (CEILING CAVITY ENCLOSED - NO OPENINGS IN WALLS OR FLOORS.) CONTRACTOR SHALL COORDINATE WORK TO LIMIT ANY INTERRUPTION OF PATIENT CARE SERVICES AND NORMAL FACILITY OPERATIONS TO AN ABSOLUTE MINIMUM. CONTRACTOR SHALL COORDINATE IN ADVANCE THE PERFORMANCE OF ALL WORK THAT CREATES DISRUPTIVE NOISE OR VIBRATION IN THE VICINITY OF THE WORK AREA NO LESS THAN 48 HOURS IN ADVANCE OF SUCH ACTIVITY'S OCCURRENCE. WRITTEN NOTICE TO COR IS REQUIRED. SUCH WORK MAY BE REQUIRED TO OCCUR OUTSIDE NORMAL (7:30 A.M. - 4:00 P.M. MONDAY THROUGH FRIDAY) VAMC HOURS OF OPERATION. IF REQUIRED BY THE SCOPE OF WORK, INTERRUPTIONS TO EXISTING UTILITIES SERVING THE BUILDING (OR SITE) WILL ONLY BE ALLOWED UNDER EXTREME CIRCUMSTANCES AND FOR LIMITED PERIODS OF TIME. REQUEST FOR ANTICIPATED SHUTDOWNS AFFECTING THE OCCUPANCY/USE OF FACILITY MUST BE REQUESTED OF THE COR (MINIMUM) 2-WEEKS PRIOR TO THE PLANNED SHUT DOWN. REQUEST FOR TEMPORARY SHUT DOWN MUST BE ACCOMPANIED BY SCHEDULE SHOWING TIME-CERTAIN THAT AFFECTED UTILITY WILL BE RETURNED TO NORMAL OPERATION. ANY NEW CONSTRUCTION INDICATED AT ROOF LEVEL - THAT REQUIRES PENETRATION OF THE EXISTING ROOFING SYSTEM - SHALL BE CAREFULLY ADDRESSED BY CONTRACTOR TO ASSURE THE CONTINUOUS WATERTIGHT ENCLOSURE OF THE FACILITY. WHERE CUTTING AND PATCHING IS REQUIRED TO INSTALL NEW WORK - CONTRACTOR TO COORDINATE WITH ROOFING SUB-CONTRACTOR TO ASSURE THE IMMEDIATE PATCHING OF ANY DISTURBED ROOFING SYSTEM AREAS. PATCH ROOF TO LIKE-NEW CONDITION AT ALL PENETRATIONS REQUIRED THROUGH THE EXISTING ROOFING SYSTEM. FOLLOW EXISTING ROOF SYSTEM MANUFACTURERS GUIDELINES TO ASSURE ROOF PATCHES WILL BE WATERTIGHT AND MAINTAIN EXISTING ROOFING WARRANTIES WHERE ACTIVE. PROVIDE (MINIMUM) 15 YEAR WARRANTY FOR WATER TIGHTNESS OF ALL NEW ROOFING SYSTEM PATCHES ASSOCIATED WITH THE PROJECT.

AutoCAD SHX Text A.

AutoCAD SHX Text B.

AutoCAD SHX Text C.

AutoCAD SHX Text D.

AutoCAD SHX Text E.

AutoCAD SHX Text F.

AutoCAD SHX Text G.

AutoCAD SHX Text H.

AutoCAD SHX Text I.

AutoCAD SHX Text J.

AutoCAD SHX Text K.

AutoCAD SHX Text L.

AutoCAD SHX Text M.

AutoCAD SHX Text N.

AutoCAD SHX Text O.

AutoCAD SHX Text P.

614-18-107_1.A-100
Sheets and Views
614-18-107_1.A-100
614-18-107_1.A-101
614-18-107_1.A-200

File details come from the government source that posted it. Updated .