610-18-103 Legionella - Drawings.pdf
PDF 16 MB Posted
- Attached to
- Correct Legionella Deficiencies Federal contract opportunity
- Solicitation number
- 36C25021B0016
About this file
This federal contract opportunity solicitation requests corrective services to address Legionella deficiencies at the Northern IN VA Healthcare System Marion Campus. The solicitation seeks a contractor to provide all tools, equipment, parts, materials, labor and supervision necessary to complete Correct Legionella Deficiencies Project 610-18-103 in accordance with the attached drawings and statement of work. This is a 100% set-aside for a Service-Disabled Veteran Owned Small Business. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003.pdf | ||
| 36C25021B0016 0002 Posting.pdf | ||
| 610-18-103 Pre-Bid Solicitation Site Visit Sign in Sheet.pdf | ||
| 36C25021B0016 0001.pdf | ||
| IN20210002 WD.pdf | ||
| 36C25021B0016_1.pdf | ||
| Contractor Certification Regarding Safety and Environmental.pdf | ||
| 610-18-103 Legionella - Specifications.pdf | ||
| RFI Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/2
/2
:3 :3
P
M
GI001
PROJECT COVER
1 1WLF
Correct Legionella Deficiencies (Marion)
VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953
September 25, 2020
BID DOCUMENTS
610-18-10317-279
Correct Legionella Deficiencies (Marion)
VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953
VA PROJECT #: 610-18-103 APOGEE PROJECT #: 17-279
DJR
DRAWING LIST
No. Description Dwg of Dwg
PP146 FIRST FLOOR PLUMBING PLAN - AREA 185-8 65 95
PP147 FIRST FLOOR PLUMBING PLAN - AREA 185-9 66 95
PP148 BOILER BUILDING 76 PARTIAL PLUMBING PLAN 67 95
PP161 SECOND FLOOR PLUMBING PLAN - AREA 172-1 68 95
PP162 SECOND FLOOR PLUMBING PLAN - AREA 172-2 69 95
PP163 SECOND FLOOR PLUMBING PLAN - AREA 172-3 70 95
PP164 SECOND FLOOR PLUMBING PLAN - AREA 172-4 71 95
PP165 SECOND FLOOR PLUMBING PLAN - AREA 172-5 72 95
PP166 SECOND FLOOR PLUMBING PLAN - AREA 172-6 73 95
PP167 SECOND FLOOR PLUMBING PLAN - AREA 172-8 74 95
PP168 SECOND FLOOR PLUMBING PLAN - AREA 172-9 75 95
PP169 SECOND FLOOR PLUMBING PLAN - AREA 172-11 76 95
PP170 SECOND FLOOR PLUMBING PLAN - AREA 172-12 77 95
PP171 SECOND FLOOR PLUMBING PLAN - AREA 172-13 78 95
PP172 SECOND FLOOR PLUMBING PLAN - AREA 172-14 79 95
PP173 SECOND FLOOR PLUMBING PLAN - AREA 172-15 80 95
PP174 SECOND FLOOR PLUMBING PLAN - AREA 172-16 81 95
PP175 SECOND FLOOR PLUMBING PLAN - AREA 172-17 82 95
PP176 SECOND AND THIRD FLOOR PLUMBING PLANS - AREA 172-18 83 95
PP177 SECOND FLOOR PLUMBING PLAN - AREA 172-19 84 95
PP178 SECOND FLOOR PLUMBING PLAN - AREA 172-20 85 95
PP179 SECOND FLOOR PLUMBING PLAN - AREA 185-2 86 95
PP180 SECOND FLOOR PLUMBING PLAN - AREA 185-4 87 95
PP181 SECOND FLOOR PLUMBING PLAN - AREA 185-5 88 95
PP182 SECOND FLOOR PLUMBING PLAN - AREA 185-6 89 95
PP183 SECOND FLOOR PLUMBING PLAN - AREA 185-7 90 95
PP184 SECOND FLOOR PLUMBING PLAN - AREA 185-8 91 95
PP185 SECOND FLOOR PLUMBING PLAN - AREA 185-9 92 95
P-501 PLUMBING DETAILS 93 95
P-601 PLUMBING SCHEDULES 94 95
P-602 PLUMBING CONTROLS 95 95
DRAWING LIST
No. Description Dwg of Dwg
GENERAL
GI001 PROJECT COVER 1 1
PLUMBING
P-001 DOMESTIC WATER PIPING GENERAL INFORMATION 1 95
P-002 ELECTRICAL GENERAL INFORMATION 2 95
PS101 SITE PLUMBING PLAN 3 95
PD101 BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-4 4 95
PD102 BASEMENT PLUMBING DEMOLITION PLANS - AREAS 172-7, 15, AND 18 5 95
PD105 BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-12 6 95
PD106 BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-13 7 95
PD109 BASEMENT PLUMBING DEMOLITION PLAN - AREA 185-2 8 95
PD123 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-3 9 95
PD124 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-4 10 95
PD125 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-5 11 95
PD126 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-6 12 95
PD129 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-11 13 95
PD130 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-12 14 95
PD131 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-13 15 95
PD132 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-14 16 95
PD136 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-18 17 95
PD142 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 185-4 18 95
PD145 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 185-7 19 95
PD147 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 185-9 20 95
PD164 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 172-4 21 95
PD165 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 172-5 22 95
PD170 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 172-12 23 95
PD171 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 172-13 24 95
PD172 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 172-14 25 95
PD176 SECOND AND THIRD FLOOR PLUMBING DEMOLITION PLANS - AREA 172-18 26 95
PP101 BASEMENT PLUMBING PLAN - AREA 172-4 27 95
PP102 BASEMENT PLUMBING PLANS - AREAS 172-7, 15, AND 18 28 95
PP103 BASEMENT PLUMBING PLANS - AREAS 172-10, 16, AND 19 29 95
PP104 BASEMENT PLUMBING PLAN - AREA 172-11 30 95
PP105 BASEMENT PLUMBING PLAN - AREA 172-12 31 95
PP106 BASEMENT PLUMBING PLAN - AREA 172-13 32 95
PP107 BASEMENT PLUMBING PLAN - AREA 172-14 33 95
PP108 BASEMENT PLUMBING PLANS - AREAS 172-17 AND 20 34 95
PP109 BASEMENT PLUMBING PLAN - AREA 185-2 35 95
PP110 BASEMENT PLUMBING PLAN - AREA 185-3 36 95
PP111 BASEMENT PLUMBING PLAN - AREA 185-4 37 95
PP112 BASEMENT PLUMBING PLANS - AREAS 185-6, 7, AND 8 38 95
PP113 BASEMENT PLUMBING PLAN - AREA 174 39 95
PP114 PLUMBING PLAN - AREA 175 40 95
PP121 FIRST FLOOR PLUMBING PLAN - AREA 172-1 41 95
PP122 FIRST FLOOR PLUMBING PLAN - AREA 172-2 42 95
PP123 FIRST FLOOR PLUMBING PLAN - AREA 172-3 43 95
PP124 FIRST FLOOR PLUMBING PLAN - AREA 172-4 44 95
PP125 FIRST FLOOR PLUMBING PLAN - AREA 172-5 45 95
PP126 FIRST FLOOR PLUMBING PLAN - AREA 172-6 46 95
PP127 FIRST FLOOR PLUMBING PLAN - AREA 172-8 47 95
PP128 FIRST FLOOR PLUMBING PLAN - AREA 172-9 48 95
PP129 FIRST FLOOR PLUMBING PLAN - AREA 172-11 49 95
PP130 FIRST FLOOR PLUMBING PLAN - AREA 172-12 50 95
PP131 FIRST FLOOR PLUMBING PLAN - AREA 172-13 51 95
PP132 FIRST FLOOR PLUMBING PLAN - AREA 172-14 52 95
PP133 FIRST FLOOR PLUMBING PLAN - AREA 172-15 53 95
PP134 FIRST FLOOR PLUMBING PLAN - AREA 172-16 54 95
PP135 FIRST FLOOR PLUMBING PLAN - AREA 172-17 55 95
PP136 FIRST FLOOR PLUMBING PLAN - AREA 172-18 56 95
PP137 FIRST FLOOR PLUMBING PLAN - AREA 172-19 57 95
PP138 FIRST FLOOR PLUMBING PLAN - AREA 172-20 58 95
PP140 FIRST FLOOR PLUMBING PLAN - AREA 172-21 59 95
PP141 FIRST FLOOR PLUMBING PLAN - AREA 185-2 60 95
PP142 FIRST FLOOR PLUMBING PLAN - AREA 185-4 61 95
PP143 FIRST FLOOR PLUMBING PLAN - AREA 185-5 62 95
PP144 FIRST FLOOR PLUMBING PLAN - AREA 185-6 63 95
PP145 FIRST FLOOR PLUMBING PLAN - AREA 185-7 64 95
76, 172, 174, 175, AND 185
BUILDING 172
BUILDING 175
(GENERATORS)
BUILDING 185
BUILDING 174
BUILDING 76
(BOILERS)
CAMPUS MAIN ENTRANCE
BUILDING 136
(WATER TOWER)
BUILDING 52
(FACILITIES)
DocuSign Envelope ID: 15FBC5B4-7F6F-4418-9DFF-1C525C06303C
9/24/2020
PLUMBING ABBREVIATIONS
PIPING SYSTEM
PLUMBING SYMBOLS
ANNOTATION SYMBOLS
EXISTING
NEW KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
LIGHT ITALIC TEXT INDICATES EXISTING
ITEM
PLUMBING EQUIPMENT DESIGNATION
(NEW FIXTURE OR EQUIPMENT)
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMITS OF DEMOLITION
P-###
P-###
PLUMBING AND ARCHITECTURAL GENERAL NOTES
PLUMBING AND ARCHITECTURAL DEMOLITION GENERAL NOTES
1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE
PROCEEDING WITH WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED.
REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST
MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.
5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.
7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES
DAMAGED AT NO ADDITIONAL COST.
8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING
AND WORK OF OTHER TRADES.
10. REMOVE ACT CEILING TILES AND GRID AS REQUIRED TO PERFORM PLUMBING WORK IN SPACE. SALVAGE ACT CEILING
AND GRID FOR REINSTALLATION AFTER COMPLETION OF PLUMBING WORK.
11. REMOVE GYPSUM BOARD OR PLASTER WALLS AND CEILING, FLOORING AS REQUIRED TO PERFORM PLUMBING WORK
IN SPACE.
12. REMOVE GYPSUM BOARD OR PLASTER WALLS TO FRAMING, ACT CEILING TILE AND GRID, AND FLOORING AS REQUIRED TO PERFORM PLUMBING WORK IN SPACE. SALVAGE ACT CEILING AND GRID FOR REINSTALLATION AFTER COMPLETION
OF PLUMBING WORK.
13. ALL DEAD LEG PIPING IS TO BE REMOVED WHERE IT CAN BE REMOVED WITHOUT MAJOR DAMAGE TO WALLS. WHERE IT IS BURIED IN WALLS, COLUMNS, ETC. AND IS VERY DIFFICULT TO REMOVE, IT MAY BE ABANDONED IN PLACE. WHERE
ABANDONED, BOTH ENDS ARE TO BE CAPPED OR OTHERWISE PLUGGED.
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE
FOR THE PURPOSES INTENDED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND
CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR
EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
7. AT EACH NEW PLUMBING FIXTURE WITH A QUICK ACTING VALVE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS IF ONE IS NOT ALREADY PRESENT.
PROVIDE ACCESS PANEL AS REQUIRED.
8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE. SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED
OTHERWISE.
9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH
SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS
AND FLOORS. FIRESTOP SHALL BE RED IN COLOR.
11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND
APPLICABLE VA STANDARDS.
12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.
13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES
AND APPLICABLE VA STANDARDS.
14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF
PIPING WITH EXISTING CONDITIONS.
16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND
ARRANGEMENT OF PIPING SYSTEMS.
17. CONTRACTOR SHALL SUBMIT SCHEDULE OF WORK AND OUTAGES TWO WEEKS IN ADVANCE OF WORK ON
PARTICULAR AREAS.
18. CONTRACTOR SHALL PROVIDE POTABLE WATER FOR DRINKING AND WATER FOR FLUSHING FIXTURES DURING
SHUTDOWN.
19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS
CONTRACT, UNLESS NOTED OTHERWISE.
20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF
PROJECT.
21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
22. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.
23. REINSTALL ACT TILES AND GRID PER SPECIFICATION 095100 AS REQUIRED TO PERFORM PLUMBING WORK.
24. INSTALL GYPSUM BOARD ON EXISTING STUD WALL AND CEILING FRAMING. FEATHER EXISTING GYPSUM BOARD OR PLASTER FINISH INTO NEW GYPSUM BOARD AS REQUIRED TO PERFORM PLUMBING WORK. FINISH AND PAINT TO
MATCH ADJACENT EXISTING WALL AND CEILING.
25. INSTALL FLOOR TILE AS REQUIRED TO PERFORM PLUMBING WORK IN SPACE TO MATCH EXISTING.
A/E ARCHITECT/ENGINEER
AC ABOVE CEILING
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
AFG ABOVE FINISHED GRADE
ASD ADJUSTABLE SPEED DRIVE
ASHRAE AMERICAN SOCIETY HEATING,
REFRIGERATING, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
B BRINE
BAS BUILDING AUTOMATION SYSTEM
BF BELOW FLOOR
BFP BACKFLOW PREVENTER
BG BELOW GRADE
BH BOOSTER HEATER
BHP BREAK HORSEPOWER
BJ BETWEEN JOISTS
BOP BOTTOM OF PIPE
BSP BLACK STEEL PIPE
BT BATHTUB
BTUH BRITISH THERMAL UNITS PER HOUR
C CELSIUS
CF COMBINATION FIXTURE
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
COND CONDENSATE
CP CONDENSATE PUMP
CS CLINICAL SINK
CV CONTROL VALVE
CW COLD WATER
D DRAIN
DCWS DOMESTIC COLD WATER SUPPLY
DHCW DOMESTIC HARD COLD WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DF DRINKING FOUNTAIN
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL
SYSTEM
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYEWASH STATION
EX EXISTING
F FAHRENHEIT
FA FROM ABOVE
FB FROM BELOW
FBO FURNISHED BY OTHERS
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FIRE SUPPRESSION
FS FLOOR SINK
FU FIXTURE UNITS
G GALLON
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUTS
GD GARBAGE DISPOSAL
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB (INTERIOR)
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HW HOT WATER
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ICRA INFECTION CONTROL RISK
ASSESSMENT
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SINK BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PASCAL
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAUGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS
RPBP REDUCED PRESSURE BACKFLOW
PREVENTOR
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MIN
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FOOT
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TDL TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE
THRU THROUGH
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V SANITARY VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
W\ WITH
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WHD WALL HYDRANT
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WQMS WATER QUALITY MONITORING
STATION
WS WASTE STACK
YCO YARD CLEANOUT
YH YARD HYDRANT
PHASING NOTES
1. THIS FACILITY OPERATES 24 HOURS PER DAY, 7 DAYS PER WEEK. CONSTRUCTION WORK SHALL BE PHASED TO MINIMIZE BOTH QUANTITY AND DURATION OF SHUTDOWNS. SCHEDULE ALL SHUTDOWNS WITH THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR) A MINIMUM OF TWO (2) WEEKS IN ADVANCE.
2. SUBMIT A DETAILED PHASING PLAN FOR REVIEW BY THE COR, ARCHITECT AND ENGINEER. PHASING PLAN SHALL INCLUDE, BUT NOT BE LIMITED TO, START AND END DATES OF ALL TASKS THROUGHOUT THE ENTIRE PROJECT, AND
DATE AND DURATION OF SUGGESTED SHUTDOWNS.
3. TO MINIMIZE SHUTDOWNS, MAKE CONNECTIONS TO EXISTING PIPING VIA "HOT TAPPING" WHEREVER POSSIBLE, IN
ORDER TO ALLOWS THE PIPING TO REMAIN ACTIVE.
4. WORK IN OFFICES, CONFERENCE ROOMS, EXAM ROOMS, CONSULTATION ROOMS, AND OTHER SIMILAR AREAS THAT ARE OCCUPIED ON A REGULAR BASIS DURING BUSINESS HOURS SHALL BE PERFORMED AFTER BUSINESS HOURS.
GENERALLY, AFTER HOURS MEANS FROM 6 P.M. UNTIL 5 A.M. COORDINATE EXACT HOURS WITH THE COR. SPECIFIC APPROVAL FROM THE COR IS REQUIRED TO PERFORM WORK IN THESE AREAS DURING BUSINESS HOURS.
5. ALL MEANS OF EGRESS SHALL BE MAINTAINED DURING CONSTRUCTION. ACCESSIBLE ICRA BARRIERS SHALL BE
ERECTED AND TAKEN DOWN AS REQUIRED TO MEET THE VA SCHEDULING REQUIREMENTS.
6. TEMPORARILY REMOVE CEILINGS, LIGHT FIXTURES, AIR DEVICES, CEILING-MOUNTED FIRE ALARM DEVICES AND SMOKE DETECTORS, CEILING-MOUNTED WIRELESS ACCESS POINTS, AND ALL OTHER CEILING-MOUNTED ITEMS IN ORDER TO ACCOMPLISH WORK. CEILING REMOVAL INCLUDES, BUT IS NOT LIMITED TO, REMOVING CEILING TILES, CEILING T-BAR GRID, AND PARTIALLY OR FULLY REMOVING HARD SURFACE CEILINGS. SPRINKLER HEADS SHALL BE TURNED UP WITHIN THE AREA OF WORK. THERE ARE BOTH LAY-IN CEILINGS AND HARD SURFACE CEILINGS IN THE AREAS OF WORK. AFTER WORK ABOVE CEILINGS IS COMPLETED, REINSTALL CEILINGS AND REINSTALL ALL CEILING-MOUNTED DEVICES AND EQUIPMENT. TURN SPRINKLER HEADS BACK DOWN AND REINSTALL IN CEILING. ANY ITEMS DAMAGED AS A RESULT OF THE DEMOLITION OR NEW WORK SHALL BE REPLACED AT NO ADDITIONAL COST TO THE GOVERNMENT.
PIPE RISER MARK
RISER NUMBER
RISER PIPING SYSTEM TYPE
DEAD LEG PIPING MARK
DEAD LEG SCHEDULE NUMBER
PIPE DEAD LEG
DL
DCWR
DHWS
FS FIRE SUPPRESSION
ST STORM
PD PUMP DISCHARGE
OFD OVERFLOW STORM DRAIN
GW GREASE WASTE
OW OIL WASTE
SAN SANITARY WASTE
CD CONDENSATE DRAIN
CA COMPRESSED AIR
AW ACID WASTE
N2 NITROGEN
N2O NITROUS OXIDE
MA MEDICAL AIR
O2 OXYGEN
WAGD WASTE ANESTHETIC GAS DISPOSAL
VAC VACUUM
V SANITARY VENT
OV OIL VENT
AV ACID VENT
NPCW NONPOTABLE COLD WATER
DI DE-IONIZED WATER
SCW SOFTENED COLD WATER
B BRINE WATER
RO REVERSE OSMOSIS WATER
DOMESTIC CW RECIRCULATION
DOMESTIC HOT WATER
D DRAIN
HW 140 DOMESTIC HOT WATER (OTHER TEMP)
PG PROPANE GAS
DHWR DOMESTIC HW RECIRCULATION
FS
ST
PD
OFD
GW
OW
SAN
CD
CA
AW
N2
N2O
MA
O2
WAGD
VAC
D
PG
V
OV
AV
HW 140
SCW
NPCW
DI
RO
NON-INSULATED PIPING MARK
NON-INSULATED SCHEDULE NUMBER
NON-INSULATED PIPE
NI
RCW RAW COLD WATER
RAW RAW WATER
RCW
RAW
DHCW DOMESTIC HARD COLD WATERDHCW
DCWS DOMESTIC COLD WATER
B
NG NATURAL GASNG
MECHANICAL EQUIPMENT TAG
EQUIPMENT TYPE
EQUIPMENT SEQUENCE NUMBER
3-WAY CONTROL VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CONTROL VALVE
GATE VALVE
GLOBE VALVE
SAFETY RELIEF VALVE
SOLENOID VALVE
BACKFLOW PREVENTER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
HOSE BIBB / SILLCOCK
PLUG VALVE
PLUMBING SYMBOLS
PRESSURE REDUCING VALVE (WATER)
PRESSURE REGULATOR (GAS)
PIPE ANCHOR
PIPE GUIDES
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
WYE STRAINER
WYE STRAINER W/DRAIN VALVE
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT - ROUND OR SQUARE
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
FLEXIBLE PIPE CONNECTOR
WATER METER
PUMP
AUTOMATIC AIR VENT
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
FLOW SWITCH
TEMPERATURE SWITCH
OR
OR
CO
PIPE SLOPE ARROW
AV
F
P
T
M
BALANCING/SHUTOFF VALVE
CALIBRATED BALANCING VALVE
EXPANSION VALVE
GAS COCK
VACUUM RELIEF VALVE
QUICK OPEN VALVE
PLUMBING EQUIPMENT DESIGNATION
(EXISTING FIXTURE OR EQUIPMENT)
P-###
ASBESTOS CONTAINING MATERIAL (ACM) STATEMENT
(PLACE AN "X" IN THE APPROPRIATE BOX.)
THIS FACILITY CONTAINS NO KNOWN OR SUSPECTED ASBESTOS.
THIS FACILITY CONTAINS ASBESTOS THAT WILL BE REMOVED BY THE VAMC.
THIS FACILITY CONTAINS ASBESTOS THAT WILL BE REMOVED UNDER THIS
CONTRACT.
THIS FACILITY CONTAINS ASBESTOS THAT WILL BE REMOVED UNDER A
SEPARATE CONTRACT.
NOTES:
1. IF THE CONTRACTOR OBSERVES ANY POSSIBLE ASBESTOS OR ASBESTOS CONTAINING
MATERIALS, THEY SHALL NOTIFY THE COR IMMEDIATELY.
2. WORK SHALL NOT PROCEED IN AREAS OR ON SYSTEMS SUSPECTED OF CONTAINING
ASBESTOS UNTIL THE CONTRACTOR IS NOTIFIED BY THE COR THAT THE AREA IS ASBESTOS
FREE.
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :2
P
M
P-001
DOMESTIC WATER PIPING GENERAL
INFORMATION
1 95WLF
Correct Legionella Deficiencies (Marion)
VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953
September 25, 2020
BID DOCUMENTS
610-18-10317-279
DJR
76, 172, 174, 175, AND 185
GENERAL ELECTRICAL NOTES
1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE
WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL
APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST
EDITION OF THE NATIONAL ELECTRICAL CODE.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE
BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL
PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH
THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE
APPLICABLE BUILDING CODES.
4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED
MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.
5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.
6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.
7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID
CONFLICT DURING CONSTRUCTION.
8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR
SPARE, OR SPACE.
9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.
PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS
MUST COMPLY WITH "BUY AMERICAN ACT".
10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR
EQUIPMENT MANUFACTURER'S SPECIFICATIONS.
11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE
DEVICE'S SCREW TERMINALS.
12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS
NOTED OTHERWISE.
13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.
14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.
15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC
CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.
16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN
APPROVED THIRD PARTY TESTING AGENCY.
17. FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE
SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC
PROTECTIVE MEASURES DISABLE THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE
MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT
BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY.
PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.
18. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE
BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS
DETERMINED BY THE OWNER, SHALL BE PROVIDED.
19. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.
20. ALL ELECTRICAL WORK IS INDICATED ON THE PLUMBING PLANS.
A1 b
E1 c d
T1
'LPN'
ELECTRICAL SYMBOL NOTES
THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER
CASE LETTER AND NUMBER.
THE SWITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.
EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.
EXIT SIGNS: STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING
MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES
DIRECTIONAL ARROW ON ILLUMINATED FACE(S).
DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.
THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.
TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER
FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR
THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND
REQUIREMENTS.
PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING
SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR
DESIGNATION CODES.
SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE
NUMBER INDICATED IN THE HEXAGON.
HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT
DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.
CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL
SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.
SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE
A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.
'LPN'-1,3,5
EXAMPLE 1: WALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE
AND DIRECTIONAL ARROW.
EXAMPLE 2: CEILING MOUNTED EXIT SIGN TYPE 'E2' WITH DOUBLE
FACE AND DIRECTIONAL ARROWS.
E2
EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS
CONTROLLED BY SWITCH 'c'.
EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING FIXTURES INDICATED BY 'd'.
EXAMPLE: TRANSFORMER TYPE 'T1'.
EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.
# DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE
NOTE NUMBER INDICATED IN THE SQUARE.
L L
ELECTRICAL ABBREVIATIONS LIST
SS STAINLESS STEEL
SSW SELECTOR SWITCH
STD STANDARD
SURF SURFACE MOUNTED
SW SWITCH
SWBD SWITCHBOARD
SYM SYMMETRICAL
SYS SYSTEM
TC TIMECLOCK
TEL TELEPHONE
TEL/DATA TELEPHONE/DATA
TERM TERMINAL
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TR TAMPER RESISTANT
T-STAT THERMOSTAT
TTB TELEPHONE TERMINAL BOARD
TTC TELEPHONE TERMINAL
CABINET
TV TELEVISION
TYP TYPICAL
UC UNDER COUNTER
UE UNDERGROUND ELECTRICAL
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
UT UNDERGROUND TELEPHONE
UTP UNSHIELDED TWISTED PAIR
UTIL UTILITY
UV UNIT VENTILATOR OR
ULTRAVIOLET
V VOLT
VA VOLT-AMPERES
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W WATT
W/ WITH
WH WATER HEATER
W/O WITHOUT
WP WEATHERPROOF
XFMR TRANSFORMER
XFR TRANSFER
ANGLE
@ AT
DELTA
' FEET
" INCHES
# NUMBER
Φ PHASE
C CENTER LINE
P PLATE
MTS MANUAL TRANSFER SWITCH
MTR MOTOR, MOTORIZED
NA NOT APPLICABLE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURER'S ASSOCIATION
NFDS NON-FUSED SAFETY DISCONNECT
SWITCH
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OL OVERLOAD
PA PUBLIC ADDRESS
PB PULL BOX OR PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT
UNIT
PCB POLYCHLORINATED BIPHENYL
PC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PIV POST INDICATING VALVE
PNL PANEL
POE POWER-OVER-ETHERNET
PR PAIR
PRI PRIMARY
PROJ PROJECTION
PRV POWER ROOF VENTILATOR
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (CONDUIT)
PWR POWER
QTY QUANTITY
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
REQD REQUIRED
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
RTU ROOF TOP UNIT
SC SURFACE CONDUIT
SEC SECONDARY
SF SQUARE FEET/FOOT
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SIMSIMILAR
S/N SOLID NEUTRAL
SPEC SPECIFICATION
SPKR SPEAKER
SP SPARE
SR SURFACE RACEWAY
1P 1 POLE (2P, 3P, 4P, ETC.)
1PH 1 PHASE
2/C TWO-CONDUCTOR (3/C, 4/C, ETC.)
W2 TWO-WIRE (3W, 4W, ETC.)
3PH 3 PHASE
A AMPERE
AAP ALARM ANNUNCIATOR PANEL
AC ABOVE COUNTER
AIR CONDITIONER
ALTERNATING CURRENT
ACC ACCESSIBLE
ACLG ABOVE CEILING
ADO AUTOMATIC DOOR OPENER
A/E ARCHITECT/ENGINEER
AF AMP FRAME
AFC AVAILABLE FAULT CURRENT (KILOAMPS)
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFI ARC FAULT CIRCUIT INTERRUPTER
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AIC AMPERE INTERRUPTING CAPACITY
AL ALUMINUM
ALTALTERNATE
AMP AMPERE
APPROX APPROXIMATELY
ARCH ARCHITECT, ARCHITECTURAL
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
BATT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISHED FLOOR
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
BYP BYPASS
C CONDUIT
CAB CABINET
CALC CALCULATED
CAP CAPACITY
CAT CATALOG, CATEGORY
CATV COMMUNITY ANTENNA TELEVISION
CB CIRCUIT BREAKER
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR-FURNISHED
CKT CIRCUIT
CLG CEILING
COAX COAXIAL CABLE
COMM COMMUNICATION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUATION OR CONTINUOUS
CONTR CONTRACTOR
COORDCOORDINATE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CTR CENTER
CU COPPER
CU FT CUBIC FEET
dB DECIBEL
DB DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLISH/DEMOLITION
DEPT DEPARTMENT
DIA DIAMETER
DISC DISCONNECT
DIST DISTRIBUTION
DN DOWN
DS SAFETY DISCONNECT SWITCH
DT DOUBLE THROW
DWG DRAWING
EC ELECTRICAL CONTRACTOR
EG EQUIPMENT GROUND
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EMIELECTROMAGNETIC INTERFERENCE
EMS ENERGY MANAGEMENT SYSTEM
EMT ELECTRICAL METALLIC TUBING
EPO EMERGENCY POWER OFF
EQUIP EQUIPMENT
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WALL HEATER
ELECTRIC WATER HEATER
EX EXISTING
EXP EXPLOSION PROOF
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FCU FAN COIL UNIT
FIXT FIXTURE
FLR FLOOR
FLUOR FLUORESCENT
FU FUSE
FUDS FUSED SAFETY DISCONNECT SWITCH
FVR FULL VOLTAGE REVERSING
FVNR FULL VOLTAGE NON-REVERSING
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
GND GROUND
GRS GALVANIZED RIGID STEEL (CONDUIT)
GYP BDGYPSUM BOARD
HID HIGH-INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HTR HEATER
HV HIGH VOLTAGE
HVAC HEATING, VENTILATING AND AIR
CONDITIONING
IES ILLUMINATION ENGINEERING SOCIETY
IG ISOLATED GROUND
IMCINTERMEDIATE METAL CONDUIT
IR INFRARED
I/W INTERLOCK WITH
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT-AMPERE
KVAR KILOVOLT-AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
LED LIGHT-EMITTING DIODE
LF LINEAR FEET/FOOT
LM LUMEN
LRA LOCKED ROTOR AMPS
LT LIGHT
LTG LIGHTING
LTNG LIGHTNING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
METAL-CLAD (CONDUIT)
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MFR MANUFACTURER
MFS MAIN FUSED DISCONNECT SWITCH
MH MANHOLE
MICMICROPHONE
MINMINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MOA MULTIOUTLET ASSEMBLY
MSBD MAIN SWITCHBOARD
MT MOUNT
SHORT CIRCUIT CURRENT CALCULATIONS WILL BE
PERFORMED ON THE ELECTRICAL SYSTEM USING A
BOLTED THREE PHASE FAULT CONDITION FOR
CALCULATIONS TO ACHIEVE MAXIMUM THERMAL AND
MECHANICAL STRESS TO THE SYSTEM FOR
CALCULATIONS PURPOSES. EXISTING SHORT CIRCUIT
VALUES WILL BE USED OUTSIDE THE WORK AREA, FOR
THE STARTING POINT OF THE CALCULATIONS.
METHOD OF SHORT CIRCUIT
CURRENT CALCULATIONS
USING OHM'S LAW AND THE KNOWN RESISTIVITY
CONSTANT OF CONDUCTOR METAL (CIRCULAR MIL-OHM
PER FOOT) FOR COPPER CONDUCTORS, OUR INTENT IS
TO CALCULATE THE REQUIRED WIRE SIZE NECESSARY SO
AS NOT TO EXCEED THE RECOMMENDED VOLTAGE DROP
OF 3% FOR BRANCH CIRCUIT CONDUCTORS.
METHOD OF VOLTAGE DROP
CALCULATIONS
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :2
P
M
P-002
ELECTRICAL GENERAL INFORMATION
2 95WLF
Correct Legionella Deficiencies (Marion)
VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953
September 25, 2020
BID DOCUMENTS
610-18-10317-279
DJR
76, 172, 174, 175, AND 185
National
Cemetery
National
Cemetery
National
Cemetery
34 33
FROM LINCOLN BLVD.
1" 1"
1" 1"
1" 1"
6"6"
6"
8"
6"
6"
2"
1"
4"
6"
6"
6"
1" COPPER
TUBING
EMERGENCY CITY
WATER CONNECTION
6"
6"
6" 1"
6"
4"
6"
6"
8"4"
4"
8"
6"
1"
PLASTIC LINE
8"
6' 6"
2"
6"
2"
6"
6"
2"
8"
8"
6"
4"
1"
1/2"
4"
2"
3"
6"
8"
8" 8"
6"
6" 1"
8"
10"
12"
4" 3"
6" 8"
8"
8"
8"
6"
6" 6"
6"
6"
6"
4"
6"
6"
3"
1" Plastic
M
8"
8"
6"
12"
12"
12"
3"
12" VALVE & TEE 51' WEST OF HYDRANT
12" VALVE 11' WEST OF HYDRANT
3"
3"
3"
6"
2.5"
2.5"
2.5"
2.5"
4"
16"
4"
12"
12"
12"
6"
6"
6"
8"
3" 6"
6" 6"
6"
12"
12"
12"
12"
12"
12"
6"6"
4"
6"
6"
6"
D
IX
R O
A D
P A R K
D R
IV
E
38 Street
L in c o ln
B o u le v a rd
McMahon
G ra y R o a d Steel Circle
Avenue
C o tt a g e
A v e n u e
B la c k
R o a d
B la c k R o a d
C o tt a g e
A v e n u e
G ra y R o a d
Water Street
Black Road
Black Road
Water Street
Nelson
Avenue
Orchard
Avenue
M c M a h o n
A v e n u e
Doctors Road
V in e
Drive
Vine
Railroad Avenue
M e c h a n ic s A v e n u e
Kuder Place
Indiana Avenue
Indiana Avenue
H y d e R o a d
Irw in
D riv e
Chapman Avenue
Chapman
H y d e R o a d
M a rio n R o a d
B la ck R o a d
O rc h a rd
A v e n u e
Indiana Avenue
F lo w e r
S tre e t
F lo w e r S tre e t
Chapman Avenue
Ave.
N e ls o n A v e n u e
O rc h a rd
A v e n u e
M I S
S I S
S I N
E W
A
R
I V
E R
Chapman Avenue
R o a d
Road
B la ck
R o a d
B la ck
R o a d
River RoadWater Street
Material
Compound
Vehicle
Compound
Cemetery
Dump
42 41
T504
T516
53144
75 55
17 184
313029
37 38
(1301)
(HA3)
Main Entrance
(HA-2)
(HA-4)
(HA-6)
(HA-5)
(3004)
(3G01)
(HA-7)
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :3
P
M
PS101
SITE PLUMBING PLAN
3 95JT
Correct Legionella Deficiencies (Marion)
VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953
September 25, 2020
BID DOCUMENTS
610-18-10317-279
DJR
Scale: 1" = 100'-0"
SITE PLUMBING PLAN 0 10050 200
NORTH
TRUE
01 6" BUILDING WATER SERVICE ENTRANCE
SERVING BUILDINGS 172, 174, AND 175.
02 6" BUILDING WATER SERVICE ENTRANCE
SERVING BUILDING 185.
03 6" CAMPUS WATER SERVICE ENTRANCE IN
BUILDING 76.
04 6" BUILDING WATER SERVICE ENTRANCE
SERVING BUILDING 138.
05 6" FIRE SERVICE AND ALTERNATE RAW WATER
SERVICE ENTRANCE SERVING BUILDINGS 172,
174, AND 175.
06 6" ALTERNATE RAW WATER SERVICE ENTRANCE
SERVING BUILDING 138.
07 INSPECT AND PROVIDE A COMPREHENSIVE
WRITTEN SUMMARY OF TANK SANITARY, SAFETY,
SECURITY, STRUCTURAL INTEGRITY, AND
COATING SYSTEM CONDITIONS. DISINFECT AND
STERILIZE PRIOR TO RETURNING TOWER TO
SERVICE. SEE SPECIFICATIONS FOR
INSPECTION REQUIREMENTS, ETC.
76, 172, 174, 175, AND 185
UP
1 1/2" DCWS
3/4" DHWS
3/4" DHWR
1 1/2" DCWS
3/4" DHWS
3/4" DHWR
3/4" DHWR
3/4" DHWS
3/4" DCWS
3/4" DCWS
3/4" DHWS
3/4" DHWR
/1 PD106/1 PD105
/1 PD105 /1 PD106
D-UNIT SOILED UTILITY
B019A
TRASH
B019B
STORAGE
B019
CORRIDOR
CB2-2
MECHANICAL
B018 Room
B002
TRASH
B004A
C-UNIT SOILED UTILITY
B004B
STORAGE
B004
CORRIDOR
CB2-9
ELEVATOR LOBBY
CB2-1
ELEVATOR
PS-3
ELEVATOR
ELEVATOR
Room
B003
EQUIPMENT ROOM
B017 STAIRS
S1-B
EQUIPMENT ROOM
B005
ELECTRICAL ROOM
B015
CORRIDOR
CB2-2
CORRIDOR
CB2-9
P-501
DCWS
DHWS
DHWR
D C W S
D H W S
D H W R
DCWS
DHWS
DHWR
D H W R
D H W S
D C W S
D H W R
D H W S
D C W S
DCWS
DHWS
DHWR
D C W S
D H W S
D H W R
D C W S
D H W S
D H W R
DCWS
DHWS
P-501
1 1/4" DCWS
3/4" DHWS
3/4" DHWR
D H W R
D H W S
D C W S
DHWR
4-3
DHWS
4-2
DCWS
4-1
P-606*
CAPPED-OFF REDUCED PRESSURE BACKFLOW PREVENTOR
ISOLATION VALVES IN VERTICAL PIPES
1" DCWS
1/2" DCWS
P-103*
P-403*
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
DL
DL
DL
DL
P-501
DL
DL
P-803*
P-803*P-803* P-803*
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :3
P
M
PD101
BASEMENT PLUMBING DEMOLITION
PLAN - AREA 172-4
4 95JT
Correct Legionella Deficiencies (Marion)
VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953
September 25, 2020
BID DOCUMENTS
610-18-10317-279
DJR
Scale: 1/4" = 1'-0"
BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-4
01 DCWS, DHWS, AND DHWR RISER UP TO 1ST
FLOOR. SEE 1/PP124 FOR CONTINUATION.
02 REMOVE EXISTING PIPE AND CAP BRANCH AS
CLOSE AS POSSIBLE TO THE ACTIVE MAIN.
03 REMOVE EXISTING PIPE BACK TO LIMIT OF
DEMOLITION AND MAKE READY FOR NEW
CONNECTION TO DHWR.
04 REMOVE EXISTING FIXTURE AND RELATED
PIPING.
0 2 4 8
NORTH
PLAN
KEY PLAN
SCALE: NO SCALE
185-8
BASEMENT
185-7185-6
185-4
185-2 185-3
172-20
172-17
172-14
172-10
172-13
172-4
172-12
172-16
172-19
172-18
172-15
172-11
172-7
A
A
B
B C
B
CD
E
C
N
PLAN
NORTH
N
T R
U E
N O
R T
H
PIPE TUNNEL
B026
PIPE TUNNEL
B026
CORRIDOR
CB2-4
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
6" RCW 04
6" RCW
HOSE BIBB DRAIN VALVE
R C W
R C W
R C W
R C W
RC
W
OUTLINE OF BUILDING ABOVE, TYP. /3 PD102
/3 PD102
CORRIDOR
CB2-5
CORRIDOR
CB2-5
BUILDING SERVICE ISOLATION VALVE IN VERTICAL PIPE
/2 PD102
/2 PD102
BUILDING 172 CORRIDOR
CB2-6
CORRIDOR
CB2-5
SOILED UTILITY
B027
ELEVATOR
PS-8
ELEVATOR
PS-7
BUILDING 138 CORRIDOR
C002
LIGHT WELL
BUILDING 138 Room
R C W
R C W
6" RCW
4" RCW
4" RCW
BUILDING 138
WATER SERVICE
FLOW METER
SYSTEM
BUILDING 138 MECHANICAL
3/4" DHWS
3/4" DCWS
3/4" DCWS
3/4" DHWS
TRAP PRIMER
01 02
DL
DL
DL
1/2" DCWS
BUILDING SERVICE ISOLATION VALVE IN VERTICAL PIPE
A. THERE IS NO NEW DOMESTIC WATER PIPING
WORK IN SOME OF THE AREAS SHOWN ON THIS
SHEET.
B. THIS SHEET IS INCLUDED IN THE PLAN SET SO
ALL AREAS OF BUILDINGS 172 AND 185 ARE
SHOWN TO INDICATE ANY EXISTING PIPING AND
AREAS WITH NO DOMESTIC WATER PIPING.
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :4
P
M
PD102
BASEMENT PLUMBING DEMOLITION
PLANS - AREAS 172-7, 15, AND 18
5 95WLF
Correct Legionella Deficiencies (Marion)
VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953
September 25, 2020
BID DOCUMENTS
610-18-10317-279
DJR
0 2 4 8
NORTH
PLAN
0 2 4 8
NORTH
PLAN
0 2 4 8
NORTH
PLAN
01 REMOVE EXISTING PIPE FROM CAPPED FAUCET
ROUGH-IN UP IN CHASE TO FIRST FLOOR. SEE
1/PD136 FOR CONTINUATION.
02 REMOVE EXISTING TRAP PRIMER AND PIPING
FROM 6" AFF UP TO MAIN. CAP PIPE THAT RUNS
DOWN THRU THE FLOOR AT 6" AFF.
03 BUILDING 138 WATER SERVICE ENTRANCE.
04 RCW DOWN FROM 1ST FLOOR. SEE 1/PD123 FOR
CONTINUATION.
Scale: 1/4" = 1'-0"
BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-7
Scale: 1/4" = 1'-0"
BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-15
Scale: 1/4" = 1'-0"
BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-18
KEY PLAN
SCALE: NO SCALE
185-8
BASEMENT
185-7185-6
185-4
185-2 185-3
172-20
172-17
172-14
172-10
172-13
172-4
172-12
172-16
172-19
172-18
172-15
172-11
172-7
A
A
B
B C
B
CD
E
C
N
PLAN
NORTH
N
T R
R T
H
/1 PD101
P D
/1 PD101
/1 PD106
ELECTRICAL ROOM
B015
CORRIDOR
CB2-2
P-803*
P-803*
P-502*
P-502*
6" RCW
RCW RCW RCW
RCW RCW
RCW RCW
PIPE TUNNEL
B024
CORRIDOR
CB2-4
PIPE TUNNEL
B024
H.A.C.
B023
TRASH
B022
E-UNIT SOILED UTILITY
B021
EMS STORAGE
B020
Room
B016
CLEAN LINEN
B014
CORRIDOR
CB2-3
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
DHWS
D H W S
D C W S
DCWS
DHWS
D C W S
P-501
6" RCW
D C W S
D H W S
D H W R
D C W S
D H W S
D H W R
DHWR
DHWS
RCW
DCWS
1 1/4" DCWS
3/4" DHWS
3/4" DHWR
1 1/4" DCWS
DL
OUTLINE OF BUILDING ABOVE, TYP.
3/4" DCWS
3/4" DHWS
DHWS
6-2
DCWS
6-1
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :5
P
M
PD105
BASEMENT PLUMBING DEMOLITION
PLAN - AREA 172-12
6 95AD
Correct Legionella Deficiencies (Marion)
VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953
September 25, 2020
BID DOCUMENTS
610-18-10317-279
DJR
KEY PLAN
SCALE: NO SCALE
185-8
BASEMENT
185-7185-6
185-4
185-2 185-3
172-20
172-17
172-14
172-10
172-13
172-4
172-12
172-16
172-19
172-18
172-15
172-11
172-7
A
A
B
B C
B
CD
E
C
N
T R
R T
H
N
PLAN
NORTH
01 REMOVE EXISTING PIPE AND CAP BRANCH AS
CLOSE AS POSSIBLE TO THE ACTIVE MAIN.
02 DCWS AND DHWS RISERS DOWN FROM 1ST
FLOOR. SEE 1/PD130 FOR CONTINUATION.
03 REMOVE EXISTING FIXTURE AND RELATED
PIPING.
04 REMOVE EXISTING PIPE AND TEMPORARILY CAP
FOR CONNECTION FOR NEW WORK.
0 2 4 8
NORTH
PLAN
Scale: 1/4" = 1'-0"
BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-12
/1 PD101
P D
/1 PD101
/1 PD105
EQUIPMENT ROOM
B005
CORRIDOR
CB2-9
CLEAN LINEN
B014
CORRIDOR
CB2-3
RCW RCW RCW
DCWS
D C W S
D H W S
6" RCW
6" RCW
STAFF LOUNGE
B013
B-UNIT SOILED UTILITY
B012
TRASH
B011
H.A.C.
B010
BUILDING 172 CORRIDOR
CB2-8
CORRIDOR
CB2-7
CORRIDOR
CB2-7
BUILDING 172 CORRIDOR
CB2-8
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
OUTLINE OF BUILDING ABOVE, TYP.
P-803*
P-803*
DHWS
7-2
DCWS
7-1
3/4" DHWS
3/4" DCWS
3/4" DCWS
P-501
6" RCW
DL
DL
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :5
P
M
PD106
BASEMENT PLUMBING DEMOLITION
PLAN - AREA 172-13
7 95AD
Correct Legionella Deficiencies (Marion)
VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953
September 25, 2020
BID DOCUMENTS
610-18-10317-279
DJR
KEY PLAN
SCALE: NO SCALE
185-8
BASEMENT
185-7185-6
185-4
185-2 185-3
172-20
172-17
172-14
172-10
172-13
172-4
172-12
172-16
172-19
172-18
172-15
172-11
172-7
A
A
B
B C
B
CD
E
C
N
T R
R T
H
N
PLAN
NORTH
01 REMOVE EXISTING PIPE AND CAP BRANCH AS
CLOSE AS POSSIBLE TO THE ACTIVE MAIN.
02 DCWS AND DHWS RISERS DOWN FROM 1ST
FLOOR. SEE 1/PD131 FOR CONTINUATION.
03 REMOVE EXISTING FIXTURE AND RELATED
PIPING.
04 DCWS TO TRAP PRIMER.
05 REMOVE EXISTING PIPE AND TEMPORARILY CAP
FOR CONNECTION FOR NEW WORK.
0 2 4 8
NORTH
PLAN
Scale: 1/4" = 1'-0"
BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-13
/1 PP111
P P
P P
/1 PP111
P-521*
M
4" RCW01 3/4" DHWR
1" DHWS
1 1/2" DCWS
BRINE TANK
DOMESTIC
WATER
SOFTENER
DOMESTIC
WATER
SOFTENER
DOMESTIC
WATER
HEATER
DOMESTIC
WATER
HEATER
1" DCWS 03
D C W S
D H W S
DCWS
RCW
D C W S
R C W
D H W S
D C W S
D H W S
D C W S
D C W S
D H W S
D H W R
RCW
DHWS
RCW
DHWR
DHWS
DCWS
DHWR
DHWR
DHWS
DCWS
RCW
DCWS
RCW
R C W
RCW
DCWS
DHWS
D C W S
D H W R
2" RCW
4" DCWS
3" DHWS
1" DHWR
1" DCWS
1" DCWS
AREAWAY
#3
TUNNEL
UNEXCAVATED
UNEXCAVATED
BUILDING 124 CRAWL SPACE
MECHANICAL ROOM
B6
CORRIDOR
CB2
CORRIDOR
CB2
Room
B5
Room
B4
CORRIDOR
CB2
P-501
R C W
OUTLINE OF BUILDING ABOVE, TYP.
RCW
DHWS
DCWS
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :0
P
M
PD109
BASEMENT PLUMBING DEMOLITION
PLAN - AREA 185-2
8 95WLF
Correct Legionella Deficiencies (Marion)
VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953
September 25, 2020
BID DOCUMENTS
610-18-10317-279
DJR
0 2 4 8
NORTH
PLAN
Scale: 1/4" = 1'-0"
BASEMENT PLUMBING DEMOLITION PLAN - AREA 185-2
01 BUILDING WATER SERVICE ENTRANCE.
02 DCWS, DHWS, AND DHWR UP TO FIRST FLOOR.
SEE 1/PP141 FOR CONTINUATION.
03 REMOVE EXISTING PIPE AND CAP BRANCH AS
CLOSE AS POSSIBLE TO THE ACTIVE MAIN.
04 EXISTING PIPE TO HVAC SYSTEM.
KEY PLAN
SCALE: NO SCALE
185-8
BASEMENT
185-7185-6
185-4
185-2 185-3
172-20
172-17
172-14
172-10
172-13
172-4
172-12
172-16
172-19
172-18
172-15
172-11
172-7
A
A
B
B C
B
CD
E
C
N
PLAN
NORTH
N
T R
R T
H
P
P D
P D
PATIENT ROOM
1D-128
PATIENT ROOM
1D-129
BATHROOM
1D-129A
CORRIDOR
C1-24
MECHANICAL ROOM
1D-122
PATIENT ROOM
1D-123
PATIENT ROOM
1D-125
PATIENT ROOM
1D-127
BATHROOM
1D-123A
BATHROOM
1D-125A
BATHROOM
1D-127A
CORRIDOR
C1-24
STAIR
S7-1
PATIENT ROOM
1D-124
PATIENT ROOM
1D-126
TOILET
1D-124A
CHASE
1D-130
P-111* P-414* P-414*
P-111* P-111* P-414*
P-701*P-701*
P-805*
P-403*
P-415*
P-111*
P-403*
P-701*
D H W S
D C W S
D H W S
D C W S
D H W S
D C W S
DCWS
DHWS
DCWS
DHWS
DHWR
DCWS
DHWS
DHWR
D H W S
D C W S
1" DHWR
1" DHWS
2" DCWS
2 1/2" DCWS
1 1/2" DHWS
1" DHWR
D H W S
D C W S
6" RCW
0405 6" RCW
6" FS
6" FS
R C W
R C W
RCW
01 01 01
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :0
P
M
PD123
FIRST FLOOR PLUMBING DEMOLITION
PLAN - AREA 172-3
9 95WLF
Correct Legionella Deficiencies (Marion)
VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953
September 25, 2020
BID DOCUMENTS
610-18-10317-279
DJR
0 2 4 8
NORTH
PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-3
01 DCWS AND DHWS RISERS UP TO 2ND FLOOR. SEE
1/PP163 FOR CONTINUATION.
02 REMOVE EXISTING PIPE AND TEMPORARILY CAP
FOR CONNECTION FOR NEW WORK.
03 FIRE SUPPRESSION WATER SERVICE ENTRANCE.
SEE 1/PS101 FOR CONTINUATION.
04 FIRE SUPPRESSION SERVICE BACKFLOW
PREVENTOR.
05 WET FIRE SUPPRESSION SERVICE TO BUILDING.
06 RCW DOWN TO BASEMENT. SEE 1/PD102 FOR
CONTINUATION.
07 EXISTING EMERGENCY RAW DOMESTIC COLD
WATER SERVICE OFF OF FIRE SUPPRESSION
WATER SERVICE WITH NORMALLY CLOSED VALVE
IN VERTICAL PIPE.
KEY PLAN
SCALE: NO SCALE
185-8 185-9
185-7185-6
185-4 185-5
185-2
172-18
172-20
172-21
172-15 172-16
172-17
172-11 172-14 172-12 172-13
172-8 172-9
172-4 172-5
172-1 172-2
172-3 172-6
FIRST
FLOOR
A
B
CD
E
A
B C
B C
172-19
A
A
B
B C
N
PLAN
NORTH
N
T R
R T
H
P D
P D
2 1/2" DCWS
1 1/2" DHWS
2" DHWS
1 1/2" DHWR
2 1/2" DCWS
1 1/2" DHWS
1" DHWR
3/4" DHWR
DCWS
DHWS
DHWR
D C W S
D H W S
D H W R
PATIENT ROOM
1D-128
Room
1D-113
CORRIDOR
C1-23
SHOWER
1D-114
SHOWERS
1D-114A
Room
1D-112
CLEAN UTILITY
1D-111
CLEAN LINENS
1D-110
Room
1D-109
ELECTRICAL ROOM
1D-132
TOILET
1D-128A
CORRIDOR
C1-22
NURSES STATION
1D-105
SOILED UTILITY
1D-108
H.A.C.
1D-107
Room
1D-106
ATRIUM
1A-109
Room
1D-104
Room
1D-102
Room
1D-100
CORRIDOR
C1-21
CORRIDOR
C1-22
Room
1D-101
Room
1D-139
Room
1E-147
Room
1D-138
Room
1D-137
Room
1D-103
Room
1D-105A
Room
1D-105B
RESTROOM
1D-136
Room
1D-135
LAUNDRY
1D-134
BATHROOM
1D-133A
PATIENT ROOM
1D-133
PATIENT ROOM
1D-131
PATIENT ROOM
1D-129
BATHROOM
1D-129A
BATHROOM
1D-131A
CORRIDOR
C1-24
PATIENT ROOM
1D-115
TOILET
1D-116A
PATIENT ROOM
1D-116
P D
P D
1" DHWR
DCWS
DHWS
3" DCWS
D C W S
D H W S
D H W R
D C W S
D H W S
D H W R
3" DCWS
2" DHWS
1 1/2" DHWR
DHWS
DCWS
D C W S
D H W S
D C W S
D H W S
D H W S
D C W S
D C W S
D H W S
D C W S
D H W S
D C W S
D C W S
D H W S
D H W R
DCWS
DHWS
DHWR
DHWS
DCWS
D C W S
D H W S
D H W R
D C W S
D H W S
D H W R
DCWS
DHWS
DHWR
DCWS
DHWS
DHWR
P-403*
P-415* P-104*
P-604*
P-414* P-104* P-111*
P-414*
P-701*P-701*
P-701*
P-103* P-403*
P-104* P-415*
P-808*
2 1/2" DCWS
1 1/2" DHWS
1" DHWR
2 1/2" DCWS
1 1/2" DHWS
1" DHWR
P-415*
P-201
P-103*
P-701*
P-701* P-701*
P-701*
SINK
TUB
P-403*
1" DHWS
1 1/2" DCWS
P-403*
P-505*
P-802*
P-502*
3/4" DHWS
3/4" DCWS01
3/4" DCWS
3/4" DHWS
02 04
DHWS
DCWS
DHWS
DCWS
SINK
P-501
P-501
P-501
DCWS
4-1
DHWS
4-2
DHWR
4-3
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :1
P
M
PD124
FIRST FLOOR PLUMBING DEMOLITION
PLAN - AREA 172-4
10 95AD
Correct Legionella Deficiencies (Marion)
VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953
September 25, 2020
BID DOCUMENTS
610-18-10317-279
DJR
01 REMOVE EXISTING PIPE AND CAP BRANCH AS
CLOSE AS POSSIBLE TO THE ACTIVE MAIN.
02 REMOVE EXISTING PIPE UP AND DOWN IN WALL
TO FIXTURE AND TO SECOND FLOOR. SEE
1/PD164 FOR CONTINUATION.
03 REMOVE EXISTING FIXTURE AND RELATED
PIPING.
04 REMOVE EXISTING…