610-18-103 Legionella - Drawings.pdf

PDF 16 MB Posted

Attached to
Correct Legionella Deficiencies Federal contract opportunity
Solicitation number
36C25021B0016
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This federal contract opportunity solicitation requests corrective services to address Legionella deficiencies at the Northern IN VA Healthcare System Marion Campus. The solicitation seeks a contractor to provide all tools, equipment, parts, materials, labor and supervision necessary to complete Correct Legionella Deficiencies Project 610-18-103 in accordance with the attached drawings and statement of work. This is a 100% set-aside for a Service-Disabled Veteran Owned Small Business. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files for this federal contract opportunity

Other files attached to Correct Legionella Deficiencies, newest first.
File Type Posted
Amendment 0003.pdf PDF
36C25021B0016 0002 Posting.pdf PDF
610-18-103 Pre-Bid Solicitation Site Visit Sign in Sheet.pdf PDF
36C25021B0016 0001.pdf PDF
IN20210002 WD.pdf PDF
36C25021B0016_1.pdf PDF
Contractor Certification Regarding Safety and Environmental.pdf PDF
610-18-103 Legionella - Specifications.pdf PDF
RFI Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/2

/2

:3 :3

P

M

GI001

PROJECT COVER

1 1WLF

Correct Legionella Deficiencies (Marion)

VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953

September 25, 2020

BID DOCUMENTS

610-18-10317-279

Correct Legionella Deficiencies (Marion)

VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953

VA PROJECT #: 610-18-103 APOGEE PROJECT #: 17-279

DJR

DRAWING LIST

No. Description Dwg of Dwg

PP146 FIRST FLOOR PLUMBING PLAN - AREA 185-8 65 95

PP147 FIRST FLOOR PLUMBING PLAN - AREA 185-9 66 95

PP148 BOILER BUILDING 76 PARTIAL PLUMBING PLAN 67 95

PP161 SECOND FLOOR PLUMBING PLAN - AREA 172-1 68 95

PP162 SECOND FLOOR PLUMBING PLAN - AREA 172-2 69 95

PP163 SECOND FLOOR PLUMBING PLAN - AREA 172-3 70 95

PP164 SECOND FLOOR PLUMBING PLAN - AREA 172-4 71 95

PP165 SECOND FLOOR PLUMBING PLAN - AREA 172-5 72 95

PP166 SECOND FLOOR PLUMBING PLAN - AREA 172-6 73 95

PP167 SECOND FLOOR PLUMBING PLAN - AREA 172-8 74 95

PP168 SECOND FLOOR PLUMBING PLAN - AREA 172-9 75 95

PP169 SECOND FLOOR PLUMBING PLAN - AREA 172-11 76 95

PP170 SECOND FLOOR PLUMBING PLAN - AREA 172-12 77 95

PP171 SECOND FLOOR PLUMBING PLAN - AREA 172-13 78 95

PP172 SECOND FLOOR PLUMBING PLAN - AREA 172-14 79 95

PP173 SECOND FLOOR PLUMBING PLAN - AREA 172-15 80 95

PP174 SECOND FLOOR PLUMBING PLAN - AREA 172-16 81 95

PP175 SECOND FLOOR PLUMBING PLAN - AREA 172-17 82 95

PP176 SECOND AND THIRD FLOOR PLUMBING PLANS - AREA 172-18 83 95

PP177 SECOND FLOOR PLUMBING PLAN - AREA 172-19 84 95

PP178 SECOND FLOOR PLUMBING PLAN - AREA 172-20 85 95

PP179 SECOND FLOOR PLUMBING PLAN - AREA 185-2 86 95

PP180 SECOND FLOOR PLUMBING PLAN - AREA 185-4 87 95

PP181 SECOND FLOOR PLUMBING PLAN - AREA 185-5 88 95

PP182 SECOND FLOOR PLUMBING PLAN - AREA 185-6 89 95

PP183 SECOND FLOOR PLUMBING PLAN - AREA 185-7 90 95

PP184 SECOND FLOOR PLUMBING PLAN - AREA 185-8 91 95

PP185 SECOND FLOOR PLUMBING PLAN - AREA 185-9 92 95

P-501 PLUMBING DETAILS 93 95

P-601 PLUMBING SCHEDULES 94 95

P-602 PLUMBING CONTROLS 95 95

DRAWING LIST

No. Description Dwg of Dwg

GENERAL

GI001 PROJECT COVER 1 1

PLUMBING

P-001 DOMESTIC WATER PIPING GENERAL INFORMATION 1 95

P-002 ELECTRICAL GENERAL INFORMATION 2 95

PS101 SITE PLUMBING PLAN 3 95

PD101 BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-4 4 95

PD102 BASEMENT PLUMBING DEMOLITION PLANS - AREAS 172-7, 15, AND 18 5 95

PD105 BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-12 6 95

PD106 BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-13 7 95

PD109 BASEMENT PLUMBING DEMOLITION PLAN - AREA 185-2 8 95

PD123 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-3 9 95

PD124 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-4 10 95

PD125 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-5 11 95

PD126 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-6 12 95

PD129 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-11 13 95

PD130 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-12 14 95

PD131 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-13 15 95

PD132 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-14 16 95

PD136 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-18 17 95

PD142 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 185-4 18 95

PD145 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 185-7 19 95

PD147 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 185-9 20 95

PD164 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 172-4 21 95

PD165 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 172-5 22 95

PD170 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 172-12 23 95

PD171 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 172-13 24 95

PD172 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 172-14 25 95

PD176 SECOND AND THIRD FLOOR PLUMBING DEMOLITION PLANS - AREA 172-18 26 95

PP101 BASEMENT PLUMBING PLAN - AREA 172-4 27 95

PP102 BASEMENT PLUMBING PLANS - AREAS 172-7, 15, AND 18 28 95

PP103 BASEMENT PLUMBING PLANS - AREAS 172-10, 16, AND 19 29 95

PP104 BASEMENT PLUMBING PLAN - AREA 172-11 30 95

PP105 BASEMENT PLUMBING PLAN - AREA 172-12 31 95

PP106 BASEMENT PLUMBING PLAN - AREA 172-13 32 95

PP107 BASEMENT PLUMBING PLAN - AREA 172-14 33 95

PP108 BASEMENT PLUMBING PLANS - AREAS 172-17 AND 20 34 95

PP109 BASEMENT PLUMBING PLAN - AREA 185-2 35 95

PP110 BASEMENT PLUMBING PLAN - AREA 185-3 36 95

PP111 BASEMENT PLUMBING PLAN - AREA 185-4 37 95

PP112 BASEMENT PLUMBING PLANS - AREAS 185-6, 7, AND 8 38 95

PP113 BASEMENT PLUMBING PLAN - AREA 174 39 95

PP114 PLUMBING PLAN - AREA 175 40 95

PP121 FIRST FLOOR PLUMBING PLAN - AREA 172-1 41 95

PP122 FIRST FLOOR PLUMBING PLAN - AREA 172-2 42 95

PP123 FIRST FLOOR PLUMBING PLAN - AREA 172-3 43 95

PP124 FIRST FLOOR PLUMBING PLAN - AREA 172-4 44 95

PP125 FIRST FLOOR PLUMBING PLAN - AREA 172-5 45 95

PP126 FIRST FLOOR PLUMBING PLAN - AREA 172-6 46 95

PP127 FIRST FLOOR PLUMBING PLAN - AREA 172-8 47 95

PP128 FIRST FLOOR PLUMBING PLAN - AREA 172-9 48 95

PP129 FIRST FLOOR PLUMBING PLAN - AREA 172-11 49 95

PP130 FIRST FLOOR PLUMBING PLAN - AREA 172-12 50 95

PP131 FIRST FLOOR PLUMBING PLAN - AREA 172-13 51 95

PP132 FIRST FLOOR PLUMBING PLAN - AREA 172-14 52 95

PP133 FIRST FLOOR PLUMBING PLAN - AREA 172-15 53 95

PP134 FIRST FLOOR PLUMBING PLAN - AREA 172-16 54 95

PP135 FIRST FLOOR PLUMBING PLAN - AREA 172-17 55 95

PP136 FIRST FLOOR PLUMBING PLAN - AREA 172-18 56 95

PP137 FIRST FLOOR PLUMBING PLAN - AREA 172-19 57 95

PP138 FIRST FLOOR PLUMBING PLAN - AREA 172-20 58 95

PP140 FIRST FLOOR PLUMBING PLAN - AREA 172-21 59 95

PP141 FIRST FLOOR PLUMBING PLAN - AREA 185-2 60 95

PP142 FIRST FLOOR PLUMBING PLAN - AREA 185-4 61 95

PP143 FIRST FLOOR PLUMBING PLAN - AREA 185-5 62 95

PP144 FIRST FLOOR PLUMBING PLAN - AREA 185-6 63 95

PP145 FIRST FLOOR PLUMBING PLAN - AREA 185-7 64 95

76, 172, 174, 175, AND 185

BUILDING 172

BUILDING 175

(GENERATORS)

BUILDING 185

BUILDING 174

BUILDING 76

(BOILERS)

CAMPUS MAIN ENTRANCE

BUILDING 136

(WATER TOWER)

BUILDING 52

(FACILITIES)

DocuSign Envelope ID: 15FBC5B4-7F6F-4418-9DFF-1C525C06303C

9/24/2020

PLUMBING ABBREVIATIONS

PIPING SYSTEM

PLUMBING SYMBOLS

ANNOTATION SYMBOLS

EXISTING

NEW KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

LIGHT ITALIC TEXT INDICATES EXISTING

ITEM

PLUMBING EQUIPMENT DESIGNATION

(NEW FIXTURE OR EQUIPMENT)

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMITS OF DEMOLITION

P-###

P-###

PLUMBING AND ARCHITECTURAL GENERAL NOTES

PLUMBING AND ARCHITECTURAL DEMOLITION GENERAL NOTES

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE

PROCEEDING WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED.

REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST

MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES

DAMAGED AT NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING

AND WORK OF OTHER TRADES.

10. REMOVE ACT CEILING TILES AND GRID AS REQUIRED TO PERFORM PLUMBING WORK IN SPACE. SALVAGE ACT CEILING

AND GRID FOR REINSTALLATION AFTER COMPLETION OF PLUMBING WORK.

11. REMOVE GYPSUM BOARD OR PLASTER WALLS AND CEILING, FLOORING AS REQUIRED TO PERFORM PLUMBING WORK

IN SPACE.

12. REMOVE GYPSUM BOARD OR PLASTER WALLS TO FRAMING, ACT CEILING TILE AND GRID, AND FLOORING AS REQUIRED TO PERFORM PLUMBING WORK IN SPACE. SALVAGE ACT CEILING AND GRID FOR REINSTALLATION AFTER COMPLETION

OF PLUMBING WORK.

13. ALL DEAD LEG PIPING IS TO BE REMOVED WHERE IT CAN BE REMOVED WITHOUT MAJOR DAMAGE TO WALLS. WHERE IT IS BURIED IN WALLS, COLUMNS, ETC. AND IS VERY DIFFICULT TO REMOVE, IT MAY BE ABANDONED IN PLACE. WHERE

ABANDONED, BOTH ENDS ARE TO BE CAPPED OR OTHERWISE PLUGGED.

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE

FOR THE PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND

CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR

EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. AT EACH NEW PLUMBING FIXTURE WITH A QUICK ACTING VALVE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS IF ONE IS NOT ALREADY PRESENT.

PROVIDE ACCESS PANEL AS REQUIRED.

8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE. SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED

OTHERWISE.

9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS

AND FLOORS. FIRESTOP SHALL BE RED IN COLOR.

11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES

AND APPLICABLE VA STANDARDS.

14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF

PIPING WITH EXISTING CONDITIONS.

16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND

ARRANGEMENT OF PIPING SYSTEMS.

17. CONTRACTOR SHALL SUBMIT SCHEDULE OF WORK AND OUTAGES TWO WEEKS IN ADVANCE OF WORK ON

PARTICULAR AREAS.

18. CONTRACTOR SHALL PROVIDE POTABLE WATER FOR DRINKING AND WATER FOR FLUSHING FIXTURES DURING

SHUTDOWN.

19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS

CONTRACT, UNLESS NOTED OTHERWISE.

20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF

PROJECT.

21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

22. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

23. REINSTALL ACT TILES AND GRID PER SPECIFICATION 095100 AS REQUIRED TO PERFORM PLUMBING WORK.

24. INSTALL GYPSUM BOARD ON EXISTING STUD WALL AND CEILING FRAMING. FEATHER EXISTING GYPSUM BOARD OR PLASTER FINISH INTO NEW GYPSUM BOARD AS REQUIRED TO PERFORM PLUMBING WORK. FINISH AND PAINT TO

MATCH ADJACENT EXISTING WALL AND CEILING.

25. INSTALL FLOOR TILE AS REQUIRED TO PERFORM PLUMBING WORK IN SPACE TO MATCH EXISTING.

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REFRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

B BRINE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

CW COLD WATER

D DRAIN

DCWS DOMESTIC COLD WATER SUPPLY

DHCW DOMESTIC HARD COLD WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FIRE SUPPRESSION

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HW HOT WATER

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICRA INFECTION CONTROL RISK

ASSESSMENT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PASCAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RPBP REDUCED PRESSURE BACKFLOW

PREVENTOR

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

THRU THROUGH

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

W\ WITH

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WQMS WATER QUALITY MONITORING

STATION

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

PHASING NOTES

1. THIS FACILITY OPERATES 24 HOURS PER DAY, 7 DAYS PER WEEK. CONSTRUCTION WORK SHALL BE PHASED TO MINIMIZE BOTH QUANTITY AND DURATION OF SHUTDOWNS. SCHEDULE ALL SHUTDOWNS WITH THE CONTRACTING

OFFICER'S REPRESENTATIVE (COR) A MINIMUM OF TWO (2) WEEKS IN ADVANCE.

2. SUBMIT A DETAILED PHASING PLAN FOR REVIEW BY THE COR, ARCHITECT AND ENGINEER. PHASING PLAN SHALL INCLUDE, BUT NOT BE LIMITED TO, START AND END DATES OF ALL TASKS THROUGHOUT THE ENTIRE PROJECT, AND

DATE AND DURATION OF SUGGESTED SHUTDOWNS.

3. TO MINIMIZE SHUTDOWNS, MAKE CONNECTIONS TO EXISTING PIPING VIA "HOT TAPPING" WHEREVER POSSIBLE, IN

ORDER TO ALLOWS THE PIPING TO REMAIN ACTIVE.

4. WORK IN OFFICES, CONFERENCE ROOMS, EXAM ROOMS, CONSULTATION ROOMS, AND OTHER SIMILAR AREAS THAT ARE OCCUPIED ON A REGULAR BASIS DURING BUSINESS HOURS SHALL BE PERFORMED AFTER BUSINESS HOURS.

GENERALLY, AFTER HOURS MEANS FROM 6 P.M. UNTIL 5 A.M. COORDINATE EXACT HOURS WITH THE COR. SPECIFIC APPROVAL FROM THE COR IS REQUIRED TO PERFORM WORK IN THESE AREAS DURING BUSINESS HOURS.

5. ALL MEANS OF EGRESS SHALL BE MAINTAINED DURING CONSTRUCTION. ACCESSIBLE ICRA BARRIERS SHALL BE

ERECTED AND TAKEN DOWN AS REQUIRED TO MEET THE VA SCHEDULING REQUIREMENTS.

6. TEMPORARILY REMOVE CEILINGS, LIGHT FIXTURES, AIR DEVICES, CEILING-MOUNTED FIRE ALARM DEVICES AND SMOKE DETECTORS, CEILING-MOUNTED WIRELESS ACCESS POINTS, AND ALL OTHER CEILING-MOUNTED ITEMS IN ORDER TO ACCOMPLISH WORK. CEILING REMOVAL INCLUDES, BUT IS NOT LIMITED TO, REMOVING CEILING TILES, CEILING T-BAR GRID, AND PARTIALLY OR FULLY REMOVING HARD SURFACE CEILINGS. SPRINKLER HEADS SHALL BE TURNED UP WITHIN THE AREA OF WORK. THERE ARE BOTH LAY-IN CEILINGS AND HARD SURFACE CEILINGS IN THE AREAS OF WORK. AFTER WORK ABOVE CEILINGS IS COMPLETED, REINSTALL CEILINGS AND REINSTALL ALL CEILING-MOUNTED DEVICES AND EQUIPMENT. TURN SPRINKLER HEADS BACK DOWN AND REINSTALL IN CEILING. ANY ITEMS DAMAGED AS A RESULT OF THE DEMOLITION OR NEW WORK SHALL BE REPLACED AT NO ADDITIONAL COST TO THE GOVERNMENT.

PIPE RISER MARK

RISER NUMBER

RISER PIPING SYSTEM TYPE

DEAD LEG PIPING MARK

DEAD LEG SCHEDULE NUMBER

PIPE DEAD LEG

DL

DCWR

DHWS

FS FIRE SUPPRESSION

ST STORM

PD PUMP DISCHARGE

OFD OVERFLOW STORM DRAIN

GW GREASE WASTE

OW OIL WASTE

SAN SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

AW ACID WASTE

N2 NITROGEN

N2O NITROUS OXIDE

MA MEDICAL AIR

O2 OXYGEN

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

OV OIL VENT

AV ACID VENT

NPCW NONPOTABLE COLD WATER

DI DE-IONIZED WATER

SCW SOFTENED COLD WATER

B BRINE WATER

RO REVERSE OSMOSIS WATER

DOMESTIC CW RECIRCULATION

DOMESTIC HOT WATER

D DRAIN

HW 140 DOMESTIC HOT WATER (OTHER TEMP)

PG PROPANE GAS

DHWR DOMESTIC HW RECIRCULATION

FS

ST

PD

OFD

GW

OW

SAN

CD

CA

AW

N2

N2O

MA

O2

WAGD

VAC

D

PG

V

OV

AV

HW 140

SCW

NPCW

DI

RO

NON-INSULATED PIPING MARK

NON-INSULATED SCHEDULE NUMBER

NON-INSULATED PIPE

NI

RCW RAW COLD WATER

RAW RAW WATER

RCW

RAW

DHCW DOMESTIC HARD COLD WATERDHCW

DCWS DOMESTIC COLD WATER

B

NG NATURAL GASNG

MECHANICAL EQUIPMENT TAG

EQUIPMENT TYPE

EQUIPMENT SEQUENCE NUMBER

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CONTROL VALVE

GATE VALVE

GLOBE VALVE

SAFETY RELIEF VALVE

SOLENOID VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

PLUG VALVE

PLUMBING SYMBOLS

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT - ROUND OR SQUARE

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

OR

CO

PIPE SLOPE ARROW

AV

F

P

T

M

BALANCING/SHUTOFF VALVE

CALIBRATED BALANCING VALVE

EXPANSION VALVE

GAS COCK

VACUUM RELIEF VALVE

QUICK OPEN VALVE

PLUMBING EQUIPMENT DESIGNATION

(EXISTING FIXTURE OR EQUIPMENT)

P-###

ASBESTOS CONTAINING MATERIAL (ACM) STATEMENT

(PLACE AN "X" IN THE APPROPRIATE BOX.)

THIS FACILITY CONTAINS NO KNOWN OR SUSPECTED ASBESTOS.

THIS FACILITY CONTAINS ASBESTOS THAT WILL BE REMOVED BY THE VAMC.

THIS FACILITY CONTAINS ASBESTOS THAT WILL BE REMOVED UNDER THIS

CONTRACT.

THIS FACILITY CONTAINS ASBESTOS THAT WILL BE REMOVED UNDER A

SEPARATE CONTRACT.

NOTES:

1. IF THE CONTRACTOR OBSERVES ANY POSSIBLE ASBESTOS OR ASBESTOS CONTAINING

MATERIALS, THEY SHALL NOTIFY THE COR IMMEDIATELY.

2. WORK SHALL NOT PROCEED IN AREAS OR ON SYSTEMS SUSPECTED OF CONTAINING

ASBESTOS UNTIL THE CONTRACTOR IS NOTIFIED BY THE COR THAT THE AREA IS ASBESTOS

FREE.

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4 :2

P

M

P-001

DOMESTIC WATER PIPING GENERAL

INFORMATION

1 95WLF

Correct Legionella Deficiencies (Marion)

VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953

September 25, 2020

BID DOCUMENTS

610-18-10317-279

DJR

76, 172, 174, 175, AND 185

GENERAL ELECTRICAL NOTES

1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE

WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL

APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST

EDITION OF THE NATIONAL ELECTRICAL CODE.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE

BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL

PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH

THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE

APPLICABLE BUILDING CODES.

4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED

MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.

5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.

6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.

7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID

CONFLICT DURING CONSTRUCTION.

8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR

SPARE, OR SPACE.

9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.

PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS

MUST COMPLY WITH "BUY AMERICAN ACT".

10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR

EQUIPMENT MANUFACTURER'S SPECIFICATIONS.

11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE

DEVICE'S SCREW TERMINALS.

12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS

NOTED OTHERWISE.

13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC

CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.

16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN

APPROVED THIRD PARTY TESTING AGENCY.

17. FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE

SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC

PROTECTIVE MEASURES DISABLE THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE

MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT

BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY.

PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.

18. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE

BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS

DETERMINED BY THE OWNER, SHALL BE PROVIDED.

19. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.

20. ALL ELECTRICAL WORK IS INDICATED ON THE PLUMBING PLANS.

A1 b

E1 c d

T1

'LPN'

ELECTRICAL SYMBOL NOTES

THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER

CASE LETTER AND NUMBER.

THE SWITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.

EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.

EXIT SIGNS: STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING

MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES

DIRECTIONAL ARROW ON ILLUMINATED FACE(S).

DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER

FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR

THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND

REQUIREMENTS.

PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING

SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR

DESIGNATION CODES.

SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE

NUMBER INDICATED IN THE HEXAGON.

HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT

DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.

CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL

SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.

SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE

A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.

'LPN'-1,3,5

EXAMPLE 1: WALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE

AND DIRECTIONAL ARROW.

EXAMPLE 2: CEILING MOUNTED EXIT SIGN TYPE 'E2' WITH DOUBLE

FACE AND DIRECTIONAL ARROWS.

E2

EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS

CONTROLLED BY SWITCH 'c'.

EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING FIXTURES INDICATED BY 'd'.

EXAMPLE: TRANSFORMER TYPE 'T1'.

EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.

# DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE

NOTE NUMBER INDICATED IN THE SQUARE.

L L

ELECTRICAL ABBREVIATIONS LIST

SS STAINLESS STEEL

SSW SELECTOR SWITCH

STD STANDARD

SURF SURFACE MOUNTED

SW SWITCH

SWBD SWITCHBOARD

SYM SYMMETRICAL

SYS SYSTEM

TC TIMECLOCK

TEL TELEPHONE

TEL/DATA TELEPHONE/DATA

TERM TERMINAL

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TR TAMPER RESISTANT

T-STAT THERMOSTAT

TTB TELEPHONE TERMINAL BOARD

TTC TELEPHONE TERMINAL

CABINET

TV TELEVISION

TYP TYPICAL

UC UNDER COUNTER

UE UNDERGROUND ELECTRICAL

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITER'S LABORATORY

UT UNDERGROUND TELEPHONE

UTP UNSHIELDED TWISTED PAIR

UTIL UTILITY

UV UNIT VENTILATOR OR

ULTRAVIOLET

V VOLT

VA VOLT-AMPERES

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W WATT

W/ WITH

WH WATER HEATER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFR TRANSFER

ANGLE

@ AT

DELTA

' FEET

" INCHES

# NUMBER

Φ PHASE

C CENTER LINE

P PLATE

MTS MANUAL TRANSFER SWITCH

MTR MOTOR, MOTORIZED

NA NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION

NFDS NON-FUSED SAFETY DISCONNECT

SWITCH

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OVERHEAD

OL OVERLOAD

PA PUBLIC ADDRESS

PB PULL BOX OR PUSHBUTTON

PBPU PREFABRICATED BEDSIDE PATIENT

UNIT

PCB POLYCHLORINATED BIPHENYL

PC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PIV POST INDICATING VALVE

PNL PANEL

POE POWER-OVER-ETHERNET

PR PAIR

PRI PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (CONDUIT)

PWR POWER

QTY QUANTITY

RCP REFLECTED CEILING PLAN

RCPT RECEPTACLE

REQD REQUIRED

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

RTU ROOF TOP UNIT

SC SURFACE CONDUIT

SEC SECONDARY

SF SQUARE FEET/FOOT

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SIMSIMILAR

S/N SOLID NEUTRAL

SPEC SPECIFICATION

SPKR SPEAKER

SP SPARE

SR SURFACE RACEWAY

1P 1 POLE (2P, 3P, 4P, ETC.)

1PH 1 PHASE

2/C TWO-CONDUCTOR (3/C, 4/C, ETC.)

W2 TWO-WIRE (3W, 4W, ETC.)

3PH 3 PHASE

A AMPERE

AAP ALARM ANNUNCIATOR PANEL

AC ABOVE COUNTER

AIR CONDITIONER

ALTERNATING CURRENT

ACC ACCESSIBLE

ACLG ABOVE CEILING

ADO AUTOMATIC DOOR OPENER

A/E ARCHITECT/ENGINEER

AF AMP FRAME

AFC AVAILABLE FAULT CURRENT (KILOAMPS)

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFI ARC FAULT CIRCUIT INTERRUPTER

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AIC AMPERE INTERRUPTING CAPACITY

AL ALUMINUM

ALTALTERNATE

AMP AMPERE

APPROX APPROXIMATELY

ARCH ARCHITECT, ARCHITECTURAL

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEM

BATT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISHED FLOOR

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

BYP BYPASS

C CONDUIT

CAB CABINET

CALC CALCULATED

CAP CAPACITY

CAT CATALOG, CATEGORY

CATV COMMUNITY ANTENNA TELEVISION

CB CIRCUIT BREAKER

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR-FURNISHED

CKT CIRCUIT

CLG CEILING

COAX COAXIAL CABLE

COMM COMMUNICATION

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION OR CONTINUOUS

CONTR CONTRACTOR

COORDCOORDINATE

CPT CONTROL POWER TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CTR CENTER

CU COPPER

CU FT CUBIC FEET

dB DECIBEL

DB DIRECT BURIAL

DC DIRECT CURRENT

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLISH/DEMOLITION

DEPT DEPARTMENT

DIA DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DS SAFETY DISCONNECT SWITCH

DT DOUBLE THROW

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EG EQUIPMENT GROUND

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EMIELECTROMAGNETIC INTERFERENCE

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

EPO EMERGENCY POWER OFF

EQUIP EQUIPMENT

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WALL HEATER

ELECTRIC WATER HEATER

EX EXISTING

EXP EXPLOSION PROOF

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FCU FAN COIL UNIT

FIXT FIXTURE

FLR FLOOR

FLUOR FLUORESCENT

FU FUSE

FUDS FUSED SAFETY DISCONNECT SWITCH

FVR FULL VOLTAGE REVERSING

FVNR FULL VOLTAGE NON-REVERSING

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GFI GROUND FAULT CIRCUIT INTERRUPTER

GND GROUND

GRS GALVANIZED RIGID STEEL (CONDUIT)

GYP BDGYPSUM BOARD

HID HIGH-INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HTR HEATER

HV HIGH VOLTAGE

HVAC HEATING, VENTILATING AND AIR

CONDITIONING

IES ILLUMINATION ENGINEERING SOCIETY

IG ISOLATED GROUND

IMCINTERMEDIATE METAL CONDUIT

IR INFRARED

I/W INTERLOCK WITH

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

LED LIGHT-EMITTING DIODE

LF LINEAR FEET/FOOT

LM LUMEN

LRA LOCKED ROTOR AMPS

LT LIGHT

LTG LIGHTING

LTNG LIGHTNING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

METAL-CLAD (CONDUIT)

MCA MINIMUM CIRCUIT AMPACITY

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MFR MANUFACTURER

MFS MAIN FUSED DISCONNECT SWITCH

MH MANHOLE

MICMICROPHONE

MINMINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MOA MULTIOUTLET ASSEMBLY

MSBD MAIN SWITCHBOARD

MT MOUNT

SHORT CIRCUIT CURRENT CALCULATIONS WILL BE

PERFORMED ON THE ELECTRICAL SYSTEM USING A

BOLTED THREE PHASE FAULT CONDITION FOR

CALCULATIONS TO ACHIEVE MAXIMUM THERMAL AND

MECHANICAL STRESS TO THE SYSTEM FOR

CALCULATIONS PURPOSES. EXISTING SHORT CIRCUIT

VALUES WILL BE USED OUTSIDE THE WORK AREA, FOR

THE STARTING POINT OF THE CALCULATIONS.

METHOD OF SHORT CIRCUIT

CURRENT CALCULATIONS

USING OHM'S LAW AND THE KNOWN RESISTIVITY

CONSTANT OF CONDUCTOR METAL (CIRCULAR MIL-OHM

PER FOOT) FOR COPPER CONDUCTORS, OUR INTENT IS

TO CALCULATE THE REQUIRED WIRE SIZE NECESSARY SO

AS NOT TO EXCEED THE RECOMMENDED VOLTAGE DROP

OF 3% FOR BRANCH CIRCUIT CONDUCTORS.

METHOD OF VOLTAGE DROP

CALCULATIONS

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4 :2

P

M

P-002

ELECTRICAL GENERAL INFORMATION

2 95WLF

Correct Legionella Deficiencies (Marion)

VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953

September 25, 2020

BID DOCUMENTS

610-18-10317-279

DJR

76, 172, 174, 175, AND 185

National

Cemetery

National

Cemetery

National

Cemetery

34 33

FROM LINCOLN BLVD.

1" 1"

1" 1"

1" 1"

6"6"

6"

8"

6"

6"

2"

1"

4"

6"

6"

6"

1" COPPER

TUBING

EMERGENCY CITY

WATER CONNECTION

6"

6"

6" 1"

6"

4"

6"

6"

8"4"

4"

8"

6"

1"

PLASTIC LINE

8"

6' 6"

2"

6"

2"

6"

6"

2"

8"

8"

6"

4"

1"

1/2"

4"

2"

3"

6"

8"

8" 8"

6"

6" 1"

8"

10"

12"

4" 3"

6" 8"

8"

8"

8"

6"

6" 6"

6"

6"

6"

4"

6"

6"

3"

1" Plastic

M

8"

8"

6"

12"

12"

12"

3"

12" VALVE & TEE 51' WEST OF HYDRANT

12" VALVE 11' WEST OF HYDRANT

3"

3"

3"

6"

2.5"

2.5"

2.5"

2.5"

4"

16"

4"

12"

12"

12"

6"

6"

6"

8"

3" 6"

6" 6"

6"

12"

12"

12"

12"

12"

12"

6"6"

4"

6"

6"

6"

D

IX

R O

A D

P A R K

D R

IV

E

38 Street

L in c o ln

B o u le v a rd

McMahon

G ra y R o a d Steel Circle

Avenue

C o tt a g e

A v e n u e

B la c k

R o a d

B la c k R o a d

C o tt a g e

A v e n u e

G ra y R o a d

Water Street

Black Road

Black Road

Water Street

Nelson

Avenue

Orchard

Avenue

M c M a h o n

A v e n u e

Doctors Road

V in e

Drive

Vine

Railroad Avenue

M e c h a n ic s A v e n u e

Kuder Place

Indiana Avenue

Indiana Avenue

H y d e R o a d

Irw in

D riv e

Chapman Avenue

Chapman

H y d e R o a d

M a rio n R o a d

B la ck R o a d

O rc h a rd

A v e n u e

Indiana Avenue

F lo w e r

S tre e t

F lo w e r S tre e t

Chapman Avenue

Ave.

N e ls o n A v e n u e

O rc h a rd

A v e n u e

M I S

S I S

S I N

E W

A

R

I V

E R

Chapman Avenue

R o a d

Road

B la ck

R o a d

B la ck

R o a d

River RoadWater Street

Material

Compound

Vehicle

Compound

Cemetery

Dump

42 41

T504

T516

53144

75 55

17 184

313029

37 38

(1301)

(HA3)

Main Entrance

(HA-2)

(HA-4)

(HA-6)

(HA-5)

(3004)

(3G01)

(HA-7)

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4 :3

P

M

PS101

SITE PLUMBING PLAN

3 95JT

Correct Legionella Deficiencies (Marion)

VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953

September 25, 2020

BID DOCUMENTS

610-18-10317-279

DJR

Scale: 1" = 100'-0"

SITE PLUMBING PLAN 0 10050 200

NORTH

TRUE

01 6" BUILDING WATER SERVICE ENTRANCE

SERVING BUILDINGS 172, 174, AND 175.

02 6" BUILDING WATER SERVICE ENTRANCE

SERVING BUILDING 185.

03 6" CAMPUS WATER SERVICE ENTRANCE IN

BUILDING 76.

04 6" BUILDING WATER SERVICE ENTRANCE

SERVING BUILDING 138.

05 6" FIRE SERVICE AND ALTERNATE RAW WATER

SERVICE ENTRANCE SERVING BUILDINGS 172,

174, AND 175.

06 6" ALTERNATE RAW WATER SERVICE ENTRANCE

SERVING BUILDING 138.

07 INSPECT AND PROVIDE A COMPREHENSIVE

WRITTEN SUMMARY OF TANK SANITARY, SAFETY,

SECURITY, STRUCTURAL INTEGRITY, AND

COATING SYSTEM CONDITIONS. DISINFECT AND

STERILIZE PRIOR TO RETURNING TOWER TO

SERVICE. SEE SPECIFICATIONS FOR

INSPECTION REQUIREMENTS, ETC.

76, 172, 174, 175, AND 185

UP

1 1/2" DCWS

3/4" DHWS

3/4" DHWR

1 1/2" DCWS

3/4" DHWS

3/4" DHWR

3/4" DHWR

3/4" DHWS

3/4" DCWS

3/4" DCWS

3/4" DHWS

3/4" DHWR

/1 PD106/1 PD105

/1 PD105 /1 PD106

D-UNIT SOILED UTILITY

B019A

TRASH

B019B

STORAGE

B019

CORRIDOR

CB2-2

MECHANICAL

B018 Room

B002

TRASH

B004A

C-UNIT SOILED UTILITY

B004B

STORAGE

B004

CORRIDOR

CB2-9

ELEVATOR LOBBY

CB2-1

ELEVATOR

PS-3

ELEVATOR

ELEVATOR

Room

B003

EQUIPMENT ROOM

B017 STAIRS

S1-B

EQUIPMENT ROOM

B005

ELECTRICAL ROOM

B015

CORRIDOR

CB2-2

CORRIDOR

CB2-9

P-501

DCWS

DHWS

DHWR

D C W S

D H W S

D H W R

DCWS

DHWS

DHWR

D H W R

D H W S

D C W S

D H W R

D H W S

D C W S

DCWS

DHWS

DHWR

D C W S

D H W S

D H W R

D C W S

D H W S

D H W R

DCWS

DHWS

P-501

1 1/4" DCWS

3/4" DHWS

3/4" DHWR

D H W R

D H W S

D C W S

DHWR

4-3

DHWS

4-2

DCWS

4-1

P-606*

CAPPED-OFF REDUCED PRESSURE BACKFLOW PREVENTOR

ISOLATION VALVES IN VERTICAL PIPES

1" DCWS

1/2" DCWS

P-103*

P-403*

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

DL

DL

DL

DL

P-501

DL

DL

P-803*

P-803*P-803* P-803*

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4 :3

P

M

PD101

BASEMENT PLUMBING DEMOLITION

PLAN - AREA 172-4

4 95JT

Correct Legionella Deficiencies (Marion)

VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953

September 25, 2020

BID DOCUMENTS

610-18-10317-279

DJR

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-4

01 DCWS, DHWS, AND DHWR RISER UP TO 1ST

FLOOR. SEE 1/PP124 FOR CONTINUATION.

02 REMOVE EXISTING PIPE AND CAP BRANCH AS

CLOSE AS POSSIBLE TO THE ACTIVE MAIN.

03 REMOVE EXISTING PIPE BACK TO LIMIT OF

DEMOLITION AND MAKE READY FOR NEW

CONNECTION TO DHWR.

04 REMOVE EXISTING FIXTURE AND RELATED

PIPING.

0 2 4 8

NORTH

PLAN

KEY PLAN

SCALE: NO SCALE

185-8

BASEMENT

185-7185-6

185-4

185-2 185-3

172-20

172-17

172-14

172-10

172-13

172-4

172-12

172-16

172-19

172-18

172-15

172-11

172-7

A

A

B

B C

B

CD

E

C

N

PLAN

NORTH

N

T R

U E

N O

R T

H

PIPE TUNNEL

B026

PIPE TUNNEL

B026

CORRIDOR

CB2-4

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

6" RCW 04

6" RCW

HOSE BIBB DRAIN VALVE

R C W

R C W

R C W

R C W

RC

W

OUTLINE OF BUILDING ABOVE, TYP. /3 PD102

/3 PD102

CORRIDOR

CB2-5

CORRIDOR

CB2-5

BUILDING SERVICE ISOLATION VALVE IN VERTICAL PIPE

/2 PD102

/2 PD102

BUILDING 172 CORRIDOR

CB2-6

CORRIDOR

CB2-5

SOILED UTILITY

B027

ELEVATOR

PS-8

ELEVATOR

PS-7

BUILDING 138 CORRIDOR

C002

LIGHT WELL

BUILDING 138 Room

R C W

R C W

6" RCW

4" RCW

4" RCW

BUILDING 138

WATER SERVICE

FLOW METER

SYSTEM

BUILDING 138 MECHANICAL

3/4" DHWS

3/4" DCWS

3/4" DCWS

3/4" DHWS

TRAP PRIMER

01 02

DL

DL

DL

1/2" DCWS

BUILDING SERVICE ISOLATION VALVE IN VERTICAL PIPE

A. THERE IS NO NEW DOMESTIC WATER PIPING

WORK IN SOME OF THE AREAS SHOWN ON THIS

SHEET.

B. THIS SHEET IS INCLUDED IN THE PLAN SET SO

ALL AREAS OF BUILDINGS 172 AND 185 ARE

SHOWN TO INDICATE ANY EXISTING PIPING AND

AREAS WITH NO DOMESTIC WATER PIPING.

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4 :4

P

M

PD102

BASEMENT PLUMBING DEMOLITION

PLANS - AREAS 172-7, 15, AND 18

5 95WLF

Correct Legionella Deficiencies (Marion)

VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953

September 25, 2020

BID DOCUMENTS

610-18-10317-279

DJR

0 2 4 8

NORTH

PLAN

0 2 4 8

NORTH

PLAN

0 2 4 8

NORTH

PLAN

01 REMOVE EXISTING PIPE FROM CAPPED FAUCET

ROUGH-IN UP IN CHASE TO FIRST FLOOR. SEE

1/PD136 FOR CONTINUATION.

02 REMOVE EXISTING TRAP PRIMER AND PIPING

FROM 6" AFF UP TO MAIN. CAP PIPE THAT RUNS

DOWN THRU THE FLOOR AT 6" AFF.

03 BUILDING 138 WATER SERVICE ENTRANCE.

04 RCW DOWN FROM 1ST FLOOR. SEE 1/PD123 FOR

CONTINUATION.

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-7

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-15

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-18

KEY PLAN

SCALE: NO SCALE

185-8

BASEMENT

185-7185-6

185-4

185-2 185-3

172-20

172-17

172-14

172-10

172-13

172-4

172-12

172-16

172-19

172-18

172-15

172-11

172-7

A

A

B

B C

B

CD

E

C

N

PLAN

NORTH

N

T R

R T

H

/1 PD101

P D

/1 PD101

/1 PD106

ELECTRICAL ROOM

B015

CORRIDOR

CB2-2

P-803*

P-803*

P-502*

P-502*

6" RCW

RCW RCW RCW

RCW RCW

RCW RCW

PIPE TUNNEL

B024

CORRIDOR

CB2-4

PIPE TUNNEL

B024

H.A.C.

B023

TRASH

B022

E-UNIT SOILED UTILITY

B021

EMS STORAGE

B020

Room

B016

CLEAN LINEN

B014

CORRIDOR

CB2-3

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

DHWS

D H W S

D C W S

DCWS

DHWS

D C W S

P-501

6" RCW

D C W S

D H W S

D H W R

D C W S

D H W S

D H W R

DHWR

DHWS

RCW

DCWS

1 1/4" DCWS

3/4" DHWS

3/4" DHWR

1 1/4" DCWS

DL

OUTLINE OF BUILDING ABOVE, TYP.

3/4" DCWS

3/4" DHWS

DHWS

6-2

DCWS

6-1

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4 :5

P

M

PD105

BASEMENT PLUMBING DEMOLITION

PLAN - AREA 172-12

6 95AD

Correct Legionella Deficiencies (Marion)

VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953

September 25, 2020

BID DOCUMENTS

610-18-10317-279

DJR

KEY PLAN

SCALE: NO SCALE

185-8

BASEMENT

185-7185-6

185-4

185-2 185-3

172-20

172-17

172-14

172-10

172-13

172-4

172-12

172-16

172-19

172-18

172-15

172-11

172-7

A

A

B

B C

B

CD

E

C

N

T R

R T

H

N

PLAN

NORTH

01 REMOVE EXISTING PIPE AND CAP BRANCH AS

CLOSE AS POSSIBLE TO THE ACTIVE MAIN.

02 DCWS AND DHWS RISERS DOWN FROM 1ST

FLOOR. SEE 1/PD130 FOR CONTINUATION.

03 REMOVE EXISTING FIXTURE AND RELATED

PIPING.

04 REMOVE EXISTING PIPE AND TEMPORARILY CAP

FOR CONNECTION FOR NEW WORK.

0 2 4 8

NORTH

PLAN

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-12

/1 PD101

P D

/1 PD101

/1 PD105

EQUIPMENT ROOM

B005

CORRIDOR

CB2-9

CLEAN LINEN

B014

CORRIDOR

CB2-3

RCW RCW RCW

DCWS

D C W S

D H W S

6" RCW

6" RCW

STAFF LOUNGE

B013

B-UNIT SOILED UTILITY

B012

TRASH

B011

H.A.C.

B010

BUILDING 172 CORRIDOR

CB2-8

CORRIDOR

CB2-7

CORRIDOR

CB2-7

BUILDING 172 CORRIDOR

CB2-8

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

OUTLINE OF BUILDING ABOVE, TYP.

P-803*

P-803*

DHWS

7-2

DCWS

7-1

3/4" DHWS

3/4" DCWS

3/4" DCWS

P-501

6" RCW

DL

DL

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4 :5

P

M

PD106

BASEMENT PLUMBING DEMOLITION

PLAN - AREA 172-13

7 95AD

Correct Legionella Deficiencies (Marion)

VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953

September 25, 2020

BID DOCUMENTS

610-18-10317-279

DJR

KEY PLAN

SCALE: NO SCALE

185-8

BASEMENT

185-7185-6

185-4

185-2 185-3

172-20

172-17

172-14

172-10

172-13

172-4

172-12

172-16

172-19

172-18

172-15

172-11

172-7

A

A

B

B C

B

CD

E

C

N

T R

R T

H

N

PLAN

NORTH

01 REMOVE EXISTING PIPE AND CAP BRANCH AS

CLOSE AS POSSIBLE TO THE ACTIVE MAIN.

02 DCWS AND DHWS RISERS DOWN FROM 1ST

FLOOR. SEE 1/PD131 FOR CONTINUATION.

03 REMOVE EXISTING FIXTURE AND RELATED

PIPING.

04 DCWS TO TRAP PRIMER.

05 REMOVE EXISTING PIPE AND TEMPORARILY CAP

FOR CONNECTION FOR NEW WORK.

0 2 4 8

NORTH

PLAN

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA 172-13

/1 PP111

P P

P P

/1 PP111

P-521*

M

4" RCW01 3/4" DHWR

1" DHWS

1 1/2" DCWS

BRINE TANK

DOMESTIC

WATER

SOFTENER

DOMESTIC

WATER

SOFTENER

DOMESTIC

WATER

HEATER

DOMESTIC

WATER

HEATER

1" DCWS 03

D C W S

D H W S

DCWS

RCW

D C W S

R C W

D H W S

D C W S

D H W S

D C W S

D C W S

D H W S

D H W R

RCW

DHWS

RCW

DHWR

DHWS

DCWS

DHWR

DHWR

DHWS

DCWS

RCW

DCWS

RCW

R C W

RCW

DCWS

DHWS

D C W S

D H W R

2" RCW

4" DCWS

3" DHWS

1" DHWR

1" DCWS

1" DCWS

AREAWAY

#3

TUNNEL

UNEXCAVATED

UNEXCAVATED

BUILDING 124 CRAWL SPACE

MECHANICAL ROOM

B6

CORRIDOR

CB2

CORRIDOR

CB2

Room

B5

Room

B4

CORRIDOR

CB2

P-501

R C W

OUTLINE OF BUILDING ABOVE, TYP.

RCW

DHWS

DCWS

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4 :0

P

M

PD109

BASEMENT PLUMBING DEMOLITION

PLAN - AREA 185-2

8 95WLF

Correct Legionella Deficiencies (Marion)

VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953

September 25, 2020

BID DOCUMENTS

610-18-10317-279

DJR

0 2 4 8

NORTH

PLAN

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA 185-2

01 BUILDING WATER SERVICE ENTRANCE.

02 DCWS, DHWS, AND DHWR UP TO FIRST FLOOR.

SEE 1/PP141 FOR CONTINUATION.

03 REMOVE EXISTING PIPE AND CAP BRANCH AS

CLOSE AS POSSIBLE TO THE ACTIVE MAIN.

04 EXISTING PIPE TO HVAC SYSTEM.

KEY PLAN

SCALE: NO SCALE

185-8

BASEMENT

185-7185-6

185-4

185-2 185-3

172-20

172-17

172-14

172-10

172-13

172-4

172-12

172-16

172-19

172-18

172-15

172-11

172-7

A

A

B

B C

B

CD

E

C

N

PLAN

NORTH

N

T R

R T

H

P

P D

P D

PATIENT ROOM

1D-128

PATIENT ROOM

1D-129

BATHROOM

1D-129A

CORRIDOR

C1-24

MECHANICAL ROOM

1D-122

PATIENT ROOM

1D-123

PATIENT ROOM

1D-125

PATIENT ROOM

1D-127

BATHROOM

1D-123A

BATHROOM

1D-125A

BATHROOM

1D-127A

CORRIDOR

C1-24

STAIR

S7-1

PATIENT ROOM

1D-124

PATIENT ROOM

1D-126

TOILET

1D-124A

CHASE

1D-130

P-111* P-414* P-414*

P-111* P-111* P-414*

P-701*P-701*

P-805*

P-403*

P-415*

P-111*

P-403*

P-701*

D H W S

D C W S

D H W S

D C W S

D H W S

D C W S

DCWS

DHWS

DCWS

DHWS

DHWR

DCWS

DHWS

DHWR

D H W S

D C W S

1" DHWR

1" DHWS

2" DCWS

2 1/2" DCWS

1 1/2" DHWS

1" DHWR

D H W S

D C W S

6" RCW

0405 6" RCW

6" FS

6" FS

R C W

R C W

RCW

01 01 01

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4 :0

P

M

PD123

FIRST FLOOR PLUMBING DEMOLITION

PLAN - AREA 172-3

9 95WLF

Correct Legionella Deficiencies (Marion)

VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953

September 25, 2020

BID DOCUMENTS

610-18-10317-279

DJR

0 2 4 8

NORTH

PLAN

Scale: 1/4" = 1'-0"

FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 172-3

01 DCWS AND DHWS RISERS UP TO 2ND FLOOR. SEE

1/PP163 FOR CONTINUATION.

02 REMOVE EXISTING PIPE AND TEMPORARILY CAP

FOR CONNECTION FOR NEW WORK.

03 FIRE SUPPRESSION WATER SERVICE ENTRANCE.

SEE 1/PS101 FOR CONTINUATION.

04 FIRE SUPPRESSION SERVICE BACKFLOW

PREVENTOR.

05 WET FIRE SUPPRESSION SERVICE TO BUILDING.

06 RCW DOWN TO BASEMENT. SEE 1/PD102 FOR

CONTINUATION.

07 EXISTING EMERGENCY RAW DOMESTIC COLD

WATER SERVICE OFF OF FIRE SUPPRESSION

WATER SERVICE WITH NORMALLY CLOSED VALVE

IN VERTICAL PIPE.

KEY PLAN

SCALE: NO SCALE

185-8 185-9

185-7185-6

185-4 185-5

185-2

172-18

172-20

172-21

172-15 172-16

172-17

172-11 172-14 172-12 172-13

172-8 172-9

172-4 172-5

172-1 172-2

172-3 172-6

FIRST

FLOOR

A

B

CD

E

A

B C

B C

172-19

A

A

B

B C

N

PLAN

NORTH

N

T R

R T

H

P D

P D

2 1/2" DCWS

1 1/2" DHWS

2" DHWS

1 1/2" DHWR

2 1/2" DCWS

1 1/2" DHWS

1" DHWR

3/4" DHWR

DCWS

DHWS

DHWR

D C W S

D H W S

D H W R

PATIENT ROOM

1D-128

Room

1D-113

CORRIDOR

C1-23

SHOWER

1D-114

SHOWERS

1D-114A

Room

1D-112

CLEAN UTILITY

1D-111

CLEAN LINENS

1D-110

Room

1D-109

ELECTRICAL ROOM

1D-132

TOILET

1D-128A

CORRIDOR

C1-22

NURSES STATION

1D-105

SOILED UTILITY

1D-108

H.A.C.

1D-107

Room

1D-106

ATRIUM

1A-109

Room

1D-104

Room

1D-102

Room

1D-100

CORRIDOR

C1-21

CORRIDOR

C1-22

Room

1D-101

Room

1D-139

Room

1E-147

Room

1D-138

Room

1D-137

Room

1D-103

Room

1D-105A

Room

1D-105B

RESTROOM

1D-136

Room

1D-135

LAUNDRY

1D-134

BATHROOM

1D-133A

PATIENT ROOM

1D-133

PATIENT ROOM

1D-131

PATIENT ROOM

1D-129

BATHROOM

1D-129A

BATHROOM

1D-131A

CORRIDOR

C1-24

PATIENT ROOM

1D-115

TOILET

1D-116A

PATIENT ROOM

1D-116

P D

P D

1" DHWR

DCWS

DHWS

3" DCWS

D C W S

D H W S

D H W R

D C W S

D H W S

D H W R

3" DCWS

2" DHWS

1 1/2" DHWR

DHWS

DCWS

D C W S

D H W S

D C W S

D H W S

D H W S

D C W S

D C W S

D H W S

D C W S

D H W S

D C W S

D C W S

D H W S

D H W R

DCWS

DHWS

DHWR

DHWS

DCWS

D C W S

D H W S

D H W R

D C W S

D H W S

D H W R

DCWS

DHWS

DHWR

DCWS

DHWS

DHWR

P-403*

P-415* P-104*

P-604*

P-414* P-104* P-111*

P-414*

P-701*P-701*

P-701*

P-103* P-403*

P-104* P-415*

P-808*

2 1/2" DCWS

1 1/2" DHWS

1" DHWR

2 1/2" DCWS

1 1/2" DHWS

1" DHWR

P-415*

P-201

P-103*

P-701*

P-701* P-701*

P-701*

SINK

TUB

P-403*

1" DHWS

1 1/2" DCWS

P-403*

P-505*

P-802*

P-502*

3/4" DHWS

3/4" DCWS01

3/4" DCWS

3/4" DHWS

02 04

DHWS

DCWS

DHWS

DCWS

SINK

P-501

P-501

P-501

DCWS

4-1

DHWS

4-2

DHWR

4-3

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4 :1

P

M

PD124

FIRST FLOOR PLUMBING DEMOLITION

PLAN - AREA 172-4

10 95AD

Correct Legionella Deficiencies (Marion)

VA Northern Indiana Health Care System 1700 E. 38th Street, Marion, Indiana 46953

September 25, 2020

BID DOCUMENTS

610-18-10317-279

DJR

01 REMOVE EXISTING PIPE AND CAP BRANCH AS

CLOSE AS POSSIBLE TO THE ACTIVE MAIN.

02 REMOVE EXISTING PIPE UP AND DOWN IN WALL

TO FIXTURE AND TO SECOND FLOOR. SEE

1/PD164 FOR CONTINUATION.

03 REMOVE EXISTING FIXTURE AND RELATED

PIPING.

04 REMOVE EXISTING…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .