6 Minimum Specs.docx

DOCX document 22 KB Posted

Attached to
Monaco D-21 Upgrade Federal contract opportunity
Solicitation number
W50S71-20-Q-8060
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Monaco D-21 Upgrade, newest first.
File Type Posted
2 Full Text Provision and Clauses.docx DOCX document
1 Combined Synopsis -Solicitation.docx DOCX document
3 Contractor Information and Pricing Schedule.docx DOCX document
4 Provision 52.204-24 Representation.pdf PDF
5 Solicitation JA 20-007 Monaco D-21 Replacement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

MONACO D-21 TECHNOLOGY UPGRADE WIN10, DIACAP-ABLE, CLIENT MAP UPGRADE, POINT REPORTING

THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERALS, TOOLS AND EQUIPEMENT NECESSARY FOR A TECHNOLOGY UPGRADE D21 SYSTEM, WIN10, DIACAP-ABLE, CLIENT MAP UPGRADE, POINT REPORTING. PARTS MUST MEET OR EXCEED ALL INDUSTRIAL STANDARDS, WORK INCLUDES, BUT NOT LIMITED TO:

Scope:

1. Project Details:

· Provide , Install one repair by replace D-21 Primary S1 CPU (TOWER) at BDOC

· Provide , Install one D-21 Redundant S2 CPU (TOWER) at CE/Electric shop

· Preconfigure the CPU’S with Des Moines current D-21 database

· Transfer existing licenses to the new CPU’S

· Existing CPU’S will be de-commissioned by base

· Provide, Install existing D-21 equipment at BDOC into new 24U Rack

· Provide, Install existing D-21 equipment at CE Electric shop into new 24U Rack

· Provide, Install Client Workstation (C1) (tower) at Fire Department to include:

· Fire Client w/Maps software

· Security Client w/ Software

· Two (2) 21.5” monitors

· Keyboard Mouse, UPS

· 12 Port DoDIN Ethernet Switch

· Provide fiber media converters for communications between D-21 installation locations

· Configure the D-21 System with Point to Point Upgrade

· Includes Point Reporting Software Key Option

· One (1) MAAP+ Planner

· Four (4) RFM-X IC Chips

· Update the D-21 System with RMF-Ready upgrade

· D-21 Primary S1 at BDOC

· D-21 Redundant S2 at Electrical Office

· D-21 Client C1 at Electrical Office

· Test and verify the D-21 computers in the systems are synchronized

· Validate the system performance after installation

· Provide operator and administrator training, to include point reporting training to maintenance personnel

· At the conclusion of the project provide SCAP reports, system drawings, and documentation to detail the work that has been completed

· Provide a copy of the DIACAP-able scan results once the DISA STIG’S are applied for the new C1 Client workstation

· Verify network connectivity at all installation facilities

· Warranty

· Manufacture agrees to repair or replace any defect of material or workmanship within specified warranty at the substantial completion of project.

· Warranty Period:

· All new equipment provided by Monaco Enterprises Inc. includes one year limited warranty

2. Gov’t Responsibilities:

· Provide site and facility access for Monaco personal performing installation work and training

· Provide the Monaco Project Manager with a single point of contact for the duration of the contract

· Provide and test a dedicated fiber communication method between the D21 Equipment locations

· Dedicated dark, single-mode fiber pair (1-tx, 1-Rx) connections between installations Facilities with a total link loss of -15dB or less and within 5 feet of proposed D-21 installation locations

· Complete and return connectivity verification form Monaco

Environmental responsibility:

· Contractor to protect existing conditions to remain and repair.

· All submittals will be submitted to the BCE and DBCE for approval.

· The contactor shall recycle, reclaim or reuse materials to avoid, to the greatest extent

· Practical, disposing of waste generated as part of the project in landfills or incinerators.

· Construction debris shall be recycled or reused to the greatest extent practical.

· Solid waste (the typical items found in municipal waste streams) such as paper, metal, glass, plastic, etc. shall be recycled, to the greatest extent practical.

· Industrial type wastes such as tires, motor oil, batteries, etc., generated as a result of contractor project operations shall be recycled.

· The contractor shall report quantity of all waste generated and quantity recycled or reused to the CO on a quarterly basis. The contractor shall also provide costs or proceeds associated with the disposal or diversion of wastes generated from projects.

· Site visit required.

· All work will be coordinated through the Contracting officer and assigned COR. No changes or deviations from contract will be permitted.

· Work hours of operation are Monday – Friday 7:30am to 4:30pm.

File details come from the government source that posted it. Updated .