About this file
This document is Addendum #1 for the City of Lewisville's #25-80-C Work Order Generated Concrete Repairs contract, a requirements contract for concrete repair services. The city intends to keep a primary contractor working full time throughout the contract term, with work orders continuing to be issued without significant pauses. Work order sizes will range from as small as 5x5 concrete repairs, with no set average size, and there is currently a significant backlog of work orders. The contract follows NCTCOG and City of Lewisville specification details, and concrete breaking for removal is allowed, with the contractor responsible for any damages to private or city property.
The estimated project spend is $1,433,191.45, though the budget is subject to change based on funds appropriated by the City Council each fiscal year. The contractor will be responsible for construction water usage and may be required to cover additional materials testing if initial tests reveal faulty compaction or materials failure. Bonds will be issued for the contract amount per term, with Bond Riders required for costs exceeding the estimated amount. There is no engineer's estimate for the project, and no plans have been developed. The subgrade for street paving will be a compacted flex base, with recycled flex base acceptable. Contractors can obtain previous contract pricing through open records requests.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 3-1 -Specifications.pdf | ||
| 7-As-Read Results - 25-80-A.pdf | ||
| 2-3 - Bond Requirements and Retainage.pdf | ||
| 1-4 - 2017 COG Specification Revisions.pdf | ||
| 4-2 - Procurement Required Documents.pdf | ||
| 5-Pre-Bid Sign In Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Generated on Jul 30, 2025 8:25 AM CDT - Kristi Byrd
ADDENDUM #1
#25-80-C Work Order Generated Concrete Repairs
What is the budget or estimate for this project?
The estimated spend is $1,433,191.45, based on the previously awarded contract. This is a requirements contract and the City may use more or less than this amount per term. All annual spend is subject to change based on funds appropriated for each fiscal year by our City Council.
What is the engineer's estimate for this project?
There is no engineer’s estimate for this project. There are also no plans for this project.
Who pays for construction water usage?
Construction water usage will be paid for by the contractor.
Who pays for construction materials testing?
Materials testing is done on an as needed basis. This is paid for by the City of Lewisville if required for the first test. If additional testing is required due to faulty compaction or materials failure, the responsibility will be on the contractor.
What is the retainage for this project?
Refer to file #3 – Bond Requirements and Retainage on Bonfire.
Who is responsible for the testing on the project?
Materials testing is done on an as needed basis. This is paid for by the City of Lewisville if required for the first test. If additional testing is required due to faulty compaction or materials failure, the responsibility will be on the contractor.
What is the estimated annual budget for the project?
See Question #1, Addendum #1.
Is it the city's intent to keep the primary contractor working on this project full time throughout the course of the term with work orders?
Yes, it is the city’s intent to keep the primary contractor working full time throughout the course of the term with work orders.
Will bonds be for a specific dollar value per year? Or will bonds be expected per location or work order?
Refer to file #3 – Bond Requirements and Retainage on Bonfire. Bonds will be issued for the contract amount per term, and Bond Riders are required for any cost exceeding the estimated amount per term.
What was the value of the project for the primary and secondary contractors in the previous year?
The City does not have this information available as only one vendor held the contract in the previous term. See Question #1, Addendum #1 for estimated annual spend.
Is concrete breaking for the removal items allowed? Or will all removal be required to be sawn into specific sized pieces?
Yes , concrete breaking for removal is allowed. Previous pre-construction videos or pictures are taken on these projects. If contractor damages private property or additional city property, (driveways, leadwalks, or mailboxes ) repairs will be the contractors responsibility
Can you share the previous contract or awarded pricing for contract 25-80-A? It would help us better align our proposal.
This information can be obtained through open records requests. Overall total is listed in Question #1, Addendum #1.
How much does the City of Lewisville plan on spending for this contract annually?
There is no set budget for this project. The budget for this is subject to change from year to year.
This depends on the dollar amount City Council approves each budget year. This is a requirements contract.
What will the subgrade be for the street paving?
Subgrade for street paving will be a compacted flex base. Recycled flex base is acceptable.
What would be the minimum and average work order size we could expect for this contract?
Sizes range from as small as 5x5 concrete repair minimum. There is no average size due to every work order being different.
Will the work orders be continuous or could we expect long pauses between work orders?
Work orders will continue to come in and be sent to the contractor. Inspectors will mark them out and they will be sent to the contractor for locates. There is normally no time lag between work orders.
Is there an anticipated number of work orders we could expect?
There is no anticipated number of work orders to be expected. There is a significant backlog of work orders.
Will an extra sack of cement be required for hand pours including sidewalk?
No this will not be required. Please refer to City of Lewisville Standard details.
Will the items follow NCTCOG spec details of City of Lewisville spec details?
Yes