PDF 18 MB Posted

Attached to
Z1DA--Provide Interior Cooling 539-21-202 Federal contract opportunity
Solicitation number
36C25021B0006
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This solicitation is for project #539-21-202 entitled "Provide Interior Cooling in the Hospital" to be issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The project scope involves providing interior cooling and is estimated between $500,000 to $1,000,000. The NAICS code is 238220 with a business size standard of $16.5 million. The performance period is 365 calendar days from notice to proceed. Bonds will be required. This is a 100% set-aside for small business with a preference for service-disabled veteran-owned small businesses, which must be registered and verified in VIP and SAM databases. Offerors must ensure their registrations are accurate and not expired prior to award. Safety and environmental violations history as well as experience modification rate must be provided prior to construction contract award.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Provide Interior Cooling 539-21-202, newest first.
File Type Posted
Site Visit.pdf PDF
539-21-202 addendum 1 interior cooling.pdf PDF
36C25021B0006 0001.docx DOCX document
Wage Determination.pdf PDF
S02 RFI Form.docx DOCX document
S02 Contractor EMR Certification Form.docx DOCX document
36C25021B0006_2.docx DOCX document
539-21-202_CD_SPECS_2020.1112-revised.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/28/2020

ARCHITECT/ENGINEER OF RECORDCONSULTANT

M001

INDEX, LEGEND, AND GENERAL

NOTES -

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROVIDE INTERIOR COOLING IN

THE HOSPITAL

CINCINNATI, OH

539-21-202

Project Director

10/28/2020Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 03-09-2020

65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020

95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020

CD SUBMITTAL 10-28-2020

JAC GEH

DUCT THERMOSTAT WITH AVERAGING ELEMENT

DUCT STATIC PRESSURE SENSOR

DUCT HUMIDITY SENSOR

ROOM SENSOR: TEMPERATURE, HUMIDITY

LENGTH IN DUCT WHEN SPACE PERMITS)

REMOTE BULB THERMOSTAT

ROOM CONTROL: THERMOSTAT, HUMIDISTAT

DIFFERENTIAL PRESSURE SWITCH

DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT

SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)

DUCT OR PIPE TEMP. SENSOR

DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.

AFTER FILTER

CURRENT SENSING RELAY

AIR FOIL WHEEL (FAN)

AIR HANDLING UNIT

ANALOG INPUT

AIR PRESSURE DROP

ANALOG OUTPUT

AUTOMATIC TEMPERATURE CONTROLS

BACKWARD INCLINED WHEEL (FAN)

AIR FLOW MEASURING DEVICE

ABOVE FINISHED FLOOR

DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER

CLEAN OUT

CEILING GRILLE

CEILING DIFFUSER

CEILING REGISTER

COLD WATER (POTABLE)

DIGITAL OUTPUT

DIGITAL INPUT

DIRECT DIGITAL CONTROLS

DRY BULB TEMPERATURE, DEG. F

AUTOMATIC CONTROL DAMPER

EXHAUST FAN

ENGINEERING CONTROL CENTER

DOUBLE WIDTH DOUBLE INLET (FAN)

DOOR UNDERCUT BY GENERAL CONTRACTOR

ITEM. (TO BE USED AS AN AID IN COORDINATING THE

LISTED SIZE OF DUCT, PIPE, DEVICE OR EQUIPMENT

APPROXIMATE ELEVATION FROM FLOOR TO CENTER OF

MANUAL VOLUME DAMPER

U/C

VARIOUS TRADES.)

FIRE DAMPER

BUTTERFLY VALVE

CIRCUIT SETTER

BALL VALVE

COMBINATION BALANCING/SHUT-OFF VALVE

MANUAL AIR VENT

AUTOMATIC FLOW CONTROL VALVE

TEST PLUG (PRESSURE/TEMPERATURE)

SAFETY VALVE OR PRESSURE RELIEF

PRESSURE REDUCING VALVE

STRAIGHT-THRU TWO-POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

STRAIGHT-THRU MODULATING CONTROL VALVE

EX.

EF

EXISTING

DWDI

ECC

DI

DO

DB

DDC

D

Db

DECIBELS

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

EQUIPMENT ABBREVIATION (SUPPLY FAN)

SUPPLY FAN NO.3 IN BUILDING NO.1

SHEET NUMBER WHERE DRAWN

DRAWING NUMBER WHERE DRAWN

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

RETURN DUCT (UP & DOWN)

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

EXHAUST OR RETURN TOP REGISTER OR GRILLE,

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

SUPPLY DUCT (UP & DOWN)

INCLINED RISE, IN DIRECTION OF AIR FLOW

NEW DUCT - WIDTH X DEPTH

RECTANGULAR ELBOWS WITH VANES EVEN IF

VANED ELBOW (PROVIDE ALL SQUARE OR

INCLINED DROP, IN DIRECTION OF AIR FLOW

ACOUSTICAL DUCT LINING

STANDARD RADIUS ELBOW

R

10/8

FC

D

SYMBOL IS MISSING)

FLEXIBLE CONNECTION

UP

(WALL TYPE)

(WALL TYPE)

DN

UP

1-01

1-SF3

AIR HANDLING UNIT NUMBER

TERMINAL UNIT DESIGNATION

TYPICAL UNIT NO.

DN

SECTION LETTER

ECCENTRIC REDUCER

DIRECTION OF FLOW

CAPPED OUTLET

SIDE CONNECTION

EXISTING WORK.

ACCESSORIES

INVERTED BUCKET TRAP SET INCLUDING PIPING

POINT OF CONNECTION BETWEEN NEW AND

RISE OR DROP IN PIPE

BOTTOM CONNECTION, 45 DEG. OR 90 DEG.

TOP CONNECTION, 45 DEG. OR 90 DEG.

REDUCER OR INCREASER

DIRECTION OF PIPE PITCH (DOWN)

THERMOMETER

UNIVERSAL (2-BOLT) INVERTED BUCKET TRAP STATION

STRAINER

GATE VALVE

PRESSURE GAGE

CHECK VALVE

GLOBE VALVE

PIPING ACCESSORIES

FLOAT AND THERMOSTATIC TRAP SET INCLUDING

GATE VALVE WITH 3/4" HOSE END ADAPTER

EXISTING PIPE TO BE REMOVED

DRAIN LINE

UNION

D

CW

CR

CO

CG

CD

BIW

ATC

AFW

AI

APD

AO

AHU

AFM

AFF

AF

VENT LINE

HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLY

LOW PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG & BELOW)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

NUMBER INDICATES STEAM PRESSURE

NUMBER INDICATES STEAM PRESSURE

LPR

V

HWS

HWR

LPS (5)

MPS (30)

MPR

HEATING

SP

S

F

T

H

T

T H

WET BULB TEMPERATURE, DEG. FWb

MAXIMUM

OUTSIDE AIR

PRE-FILTER

PUMPED CONDENSATE

PREHEAT COIL

RELATIVE HUMIDITY

SUPPLY FAN

STEAM HUMIDIFIER

TRANSFER GRILLE

UNIT HEATER

STATIC PRESSURE (INCHES OF WATER)

PRESSURE REDUCING VALVE

PRESSURE DROP (FEET OF WATER)

TOP REGISTER (WALL TYPE)

VARIABLE FREQUENCY DRIVE

STATIC PRESSURE SENSOR

DOOR UNDERCUT BY GENERAL CONTRACTOR

SPS

TR

U/C

VFD

UH

V

TG

VALVE

S.P.

SH

SF

Rh

PD

PF

PH

PRV

MAX

O.A.

NOM

MIN

PC

NOMINAL

MINIMUM

HEATING COIL

HORSEPOWER

FLR.

HC

HP

FLOOR

BLOW UNLESS OTHERWISE NOTED)

CEILING DIFFUSERS (FOUR WAY

CHILLED WATER RETURN

CHILLED WATER SUPPLY

CHS

CHR

AIR CONDITIONING

CONTROL CIRCUIT CONN.

H1 N

ETCHED CLEAR LACQUER

E.C.L.

WHITE BAKED ENAMELW.B.E.

BRAKE HORSEPOWER

BHP

BRITISH THERMAL UNIT

BTU

BRITISH THERMAL UNIT PER HOUR

BTUH

CUBIC FEET PER MINUTE

CFM

DEGREE

DEG

DIAMETER

DIA

DIFFERENTIAL PRESSURE SENSOR

DPS

ENTERING

ENT

F

FAHRENHEIT

FPM

FEET PER MINUTE

FT

FEET

GALLONS PER MINUTE

GPM

HEAD

HD

CHILLED WATER RETURN

CHR

CHILLED WATER SUPPLY

CHS

INCHES

IN

INCHES WATER COLUMN

IN WC

INCHES WATER GAUGE

IN WG

LEAVING AIR TEMPERATURE

LAT

LEAVING

LVG

MBH

1000 BTUH

MERV

MINIMUM EFFICIENCY REPORTING VALUE

NC

NOISE CRITERIA

REVOLUTIONS PER MINUTE

RPM

SMOKE DAMPER (SUPPLY)

SDS

SMOKE DAMPER (RETURN)

SDR

STEAM PRESSURE REDUCING VALVE

SPRV

VOLUME DAMPERVD

HIGH PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

NUMBER INDICATES STEAM PRESSURE

HPS (125)

HPR

PIPE UP

PIPE DOWN

IN-LINE CENTRIFUGAL FAN

ICF

T

T

T

T

H dP

CS

DP SP

1-MS4

A

H7

9'-6"

MV

MANUAL AIR VENT

ABBREVIATIONS

CONTROLSPIPING SYMBOLS

DRAWING SYMBOLS

DUCTWORK SYMBOLS

GENERAL NOTES

GENERAL

VALVES

ABBREVIATIONS

EXHAUST DUCT (UP & DOWN)

UP DN

PUMPED CONDENSATE RETURNPC

EXPANSION TANK PIPE

ET

FCU

FAN COIL UNIT

PUMP

P

PROPELLER UNIT HEATER

PUH

RETURN FAN

RF

WATER FILTERWF

POWER TYPE ROOF VENTILATOR

RV

POWER TYPE WALL VENTILATORWV

COR

PROPELLER TYPE EXHAUST FAN

PEF

RETURN AIR

R.A.

SUPPLY AIR

S.A.

SINGLE WIDTH SINGLE INLET (FAN)

SWSI

SPECIFIC GRAVITY

SP. GR.

ACCESS DOOR

AD

FCW

FOWARD CURVED WHEEL (FAN)

FC

FLEXIBLE CONNECTION

ENERGY EFFICIENCY RATIO

EER

EXHAUST AIR

E.A.

CONTRACTING OFFICER'S REPRESENTATIVE

AIR SEPARATOR

AS

ANGLE GLOBE VALVE

PIPE GUIDE

PIPE ANCHOR

ORIFICE UNION

STAINLESS STEEL DUCT

DOMESTIC HOT WATER SUPPLYDHW

DOMESTIC HOT WATER RECIRCULATIONDHWR

COMBINATION AXIAL/BACKWARD CURVED WHEEL

A/BCW

UTILITY SET FANUSF

T

GENERAL

DOMESTIC COLD WATER

W

FLOW METER

PIPE MOUNTED DDC TEMPERATURE SENSOR

TOP GRILLE (WALL TYPE)TG

WATER GAUGEWG

WATTSW

VARIABLE AIR VOLUMEVAV

THERMOSTATTSTAT

TOTAL STATIC PRESSURETSP

SMOKE DETECTOR

SD

SUPPLY AIR TEMPERATURE

SAT

OUTSIDE DIAMETER

OD

N.C.

NORMALLY CLOSED

N.O.

NORMALLY OPEN

MCA

MINIMUM BRANCH CIRCUIT AMPACITY

LEAVING WATER TEMPERATURE

LWT

ENTERING WATER TEMPERATURE

EWT

EXTERNAL STATIC PRESSURE

ESP

DIRECT EXPANSION

DX

ENTERING AIR TEMPERATURE

EAT

1 ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.

2 ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC.

3 FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING

SCHEMATICS.

4 PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN HEATING

MEDIUM AND AIR.

5 WHERE DUCTS OR PIPES ARE REMOVED THRU BUILDING ELEMENT THAT IS TO REMAIN, PATCH BUILDING OPENING TO MATCH

EXISTING WHERE OPENING IS NOT RE-USED.

6 ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.

7 ALL CUTTING AND PATCHING REQUIRED FOR THE PROJECT WORK SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE

DISTURBED UNDER THIS WORK TO MATCH EXISTING.

8 WHERE WORK IS REQUIRED ABOVE EXISTING SUSPENDED CEILINGS, CONTRACTOR SHALL CAREFULLY REMOVE SUSPENDED

CEILING COMPONENTS AS REQUIRED TO PERFORM THE SPECIFIED WORK. UPON COMPLETION, REINSTALL CEILING AND

COMPONENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO CEILING COMPONENTS.

9 ALL WALL & FLOOR PENETRATIONS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.

10 UNLESS NOTED OTHERWISE, ALL WORK IN OCCUPIED AREAS OF THE BUILDING, OR WORK THAT REQUIRES SHUTDOWN OF

SYSTEMS, SHALL TAKE PLACE AT NIGHT (GENERALLY BETWEEN 7PM AND 5AM) OR ON WEEKENDS - COORDINATE WITH COR.

11 EXISTING TAGS FOR ALL REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE COR, FOR VA INVENTORY PURPOSES. IF THE

EQUIPMENT IS NOT DESIRED BY THE VA, IT SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF PROPERLY BY THE

CONTRACTOR.

12 REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

13 THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY

TO INSTALL THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY

ANTICIPATED INSTALLATION ISSUES.

14 FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO

PERFORMING WORK.

15 HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS.

COORDINATE WITH COR.

16 WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO ACTIVE MAIN AND CAPPED, AND

CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.

17 ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE

EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT

THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS

AND STRAINERS, TRANSMITTERS, CONTROL DEVICES.

18 CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS

SHALL BE COORDINATED WITH THE COR.

19 ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK

TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL ABANDONED UTILITY ITEMS THAT MAY NOT BE SHOWN BUT ARE

ASSOCIATED WITH THE REMOVAL WORK.

20 INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO GENERAL REQUIREMENTS SECTION 01 00 00.

21 WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK

SHALL BE PERFORMED ON WEEKENDS OR WEEK NIGHTS, IF REQUIRED BY THE COR. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED WELL IN ADVANCE (MINIMUM 3 WEEKS) WITH THE COR.

22 RE-INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED OR REMOVED IN THE PERFORMANCE OF

WORK IN THIS PROJECT, INCLUDING INSULATION REMOVAL FOR ASBESTOS ABATEMENT.

23 ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING

FACILITY.

24 EXISTING CONDITIONS SHOWN ARE BASED UPON AVAILABLE EXISTING DRAWINGS, AND MAY DIFFER FROM ACTUAL WORK IN PLACE.

THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE

EXECUTION OF THE WORK. ANY VARIATION BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT

DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING

OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.

25 IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE

CONTRACTOR SHALL IMMEDIATELY INFORM THE COR. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION OF ASBESTOS

PARTICLES SHALL BE TERMINATED. WORK MAY BE RESUMED ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE

MATERIALS HAVE BEEN REMOVED OR ENCAPSULATED AND THE AREA DECLARED SAFE.

26 CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS

SHALL BE COORDINATED WITH THE COR.

27 AHU CHILLED WATER DOWNTIME FOR TIE-IN OF RUNAROUND PUMPS FOR THE FOLLOWING AHU'S SHALL OCCUR AT NIGHT: AHU-8, 11, 14, 15, 19, 28, 29, 30, 60. AHU CHILLED WATER DOWNTIME FOR TIE-IN OF RUNAROUND PUMPS FOR THE FOLLOWING AHU'S MAY

TAKE PLACE DURING THE DAY BUT SHALL OCCUR DURING THE WINTER MONTHS (I.E. WHEN AHU IS IN HEATING MODE OR IN

ECONOMIZER COOLING MODE WITH NO CHILLED WATER DEMAND): AHU-1, 2, 3, 4, 5, 7, 9, 13, 23, 41, 44. AHU CHILLED WATER

DOWNTIME FOR TIE-IN OF RUNAROUND PUMP FOR THE FOLLOWING AHU SHALL OCCUR AT NIGHT DURING THE WINTER MONTHS:

AHU-10.

28 PROVIDE IDENTIFICATION LABELS/SIGNS ON ALL MECHANICAL EQUIPMENT, VALVES, PIPES, DUCTS, CONTROL DEVICES, ETC., AS

WELL AS CEILING GRID LABELS FOR CONCEALED ITEMS - REFER TO 23 05 11 FOR DETAILED REQUIREMENTS. COORDINATE

NUMBER/DESIGNATION OF ALL ITEMS WITH THE COR PRIOR TO ORDERING LABELS.

DOMESTIC HOT WATER SUPPLY

DHW

DOMESTIC HOT WATER RECIRCULATION

DHWR

FREE STEAM (LOW PRESSURE STEAM)

FS(5)

M

VALVE ON RISE/DROP (LOCATED IN VERTICAL PIPE)

(REFER TO DETAIL FOR ADDITIONAL SPECIALTIES)

SST

CS

PT

SP

AFMS

AIRFLOW MEASURING STATION

CURRENT SWITCH (FAN STATUS INDICATION)

START-STOP RELAY FOR FAN

FAN SPEED CONTROL SIGNAL

PRESSURE TRANSMITTER

TT TEMPERATURE TRANSMITTER

OS ROOM OCCUPANCY SENSOR(S)

DPT DIFFERENTIAL PRESSURE TRANSMITTER

PS PRESSURE SWITCH

DUPLEX PLUME EXHAUST FAN PACKAGE

DPF

CONSTANT VOLUME REHEAT TERMINAL UNIT

CVR

VARIABLE VOLUME REHEAT TERMINAL UNITVVR

SIMPLEX PLUME EXHAUST FANSPF

INDEX OF DRAWINGS

SHEET DESCRIPTION

1-M103

THIRD FLOOR PLAN

1-M104

FOURTH AND FIFTH PARTIAL FLOOR PLANS

1-M109

NINTH FLOOR PLAN

1-M108

EIGHTH FLOOR PLAN

15-M102

BUILDING 15 SECOND FLOOR PLAN

13-M102

BUILDING 13 ROOF PLAN

1-M110

TENTH FLOOR PLAN

14-M102

BUILDING 14 SECOND FLOOR PLAN

BASEMENT, FIRST, AND SECOND PARTIAL FLOOR PLANS1-M100

M501

DETAILS

M502

DETAILS

M503

DETAILS

M601

SCHEDULES, CONTROLS AND AUTOMATION

INDEX, LEGEND AND GENERAL NOTESM001

M602

CONTROLS AND AUTOMATION

M603

CENTRAL PLANT PIPING SCHEMATIC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROVIDE INTERIOR COOLING IN

THE HOSPITAL

CINCINNATI, OH

539-21-202

Project Director

10/28/2020Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 03-09-2020

65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020

95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020

CD SUBMITTAL 10-28-2020

1-M100

BASEMENT, FIRST AND SECOND

PARTIAL FLOOR PLANS 01

SCALE: 1/16" = 1'-0"

PARTIAL BASEMENT FLOOR PLAN

JAC GEH

SCALE: 1/16" = 1'-0"

PARTIAL FIRST FLOOR PLAN

SCALE: 1/16" = 1'-0"

PARTIAL SECOND FLOOR PLAN

1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M503.

2. AHU HAS EXISTING CHILLED WATER BOOSTER PUMP. DISABLE

EXISTING BOOSTER PUMP PRIOR TO PERFORMING WORK

ASSOCIATED WITH THIS AHU, AND RETURN BOOSTER PUMP TO

NORMAL OPERATION UPON COMPLETION OF THIS WORK.

3. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M502.

4. NEW RUNAROUND PUMP SHALL BE LOCATED ABOVE CEILING IN

THIS ROOM.

5. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE AHU

PENTHOUSE ON ROOF.

6. EXISTING AIR HANDLING UNIT TO REMAIN. REFER TO PARTIAL

FIRST FLOOR PLAN ON THIS SHEET FOR WORK ASSOCIATED WITH

THIS UNIT.

7. REMOVE EXISTING PIPING TO THIS POINT FOR RECONNECTION IN

NEW WORK.

8. APPROXIMATE LOCATION OF NEW TIE IN POINTS FOR

RECIRCULATION PIPE TEES ABOVE CEILING. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP FOR AHU-9 - REFER TO COIL

CONNECTION DETAIL ON SHEET M502.

9. REMOVE EXISTING PIPING TO THIS POINT AND CAP.

10. RELOCATE EXISTING AHU-9 CHILLED WATER COIL PIPING

SPECIALTIES (CONTROL VALVE, SHUTOFF VALVES, STRAINER,

BALANCE VALVES, ETC.) FROM PIPING ON ROOF TO INSIDE

BUILDING, ABOVE CEILING IN THIS LOCATION - REFER TO COIL

CONNECTION DETAIL ON SHEET M502.

11. EXISTING AIR HANDLING UNIT TO REMAIN. REFER TO PARTIAL

SECOND FLOOR PLAN ON THIS SHEET FOR WORK ASSOCIATED

WITH THIS UNIT.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

GENERAL NOTES

UP

UP

DN

UP

UP

UP

DN

UP

UP

DN

UP

UP

UP

Electrical

Closet

A0004

Electric

Closet

A0005

Autopsy

A004B

M. Tlt.

A004C

HAC

A004D

F. Tlt.

A004E

Storage

A004F

Gross

Specimen

Storage

A004G

Transfer

Room

A004A

Viewing

Room

A004

Gas Stor.

A005A

Gas Stor.

A005B

Pest

Control

A005C

Corridor

C*B*13

Stor.

A007A

Hazard

Chem. Stor.

A007B

Elec.

A003

Soil Linen

A002

Drug Stor.

A001A

Alc. Vault

A001B

Narc. Vault

A001C

Elec.

A001D

Mech.

Room

A005D

Stair 2

S*B*2

Mech. Stor.

A013

Ref. Equip.

Rm.

A013A

Mech. Rm

A013B

Forms Rm.

A013D

Shred Rm.

Loading

Dock

A017

Supply

Receiving

A014

Stor.

A014A

Office

A014B

Canteen

Stor.

A014C

Warehouse

A014D

Mail Rm.

B022

Clerk Office

B022A

Receiving &

Breakout

A021

Stor.

A021A

Elec.

A022A

Supply

Storage

A020

Emergency

Generator

B013

Transformer

Room

B013B

Electric

Room

B013A

Elec. Shop

B001

Elec. Office

B001A

Elec. Shop

B001B

BioMed

Chief

B001C

BioMed

Rep. Shop

B004

Biomedical

Engineering

B005

Stair 4

S*B*4

Biomedical

Eng.

B005A

BioMed

Work Area

B006

BioMed

Stor.

B006A

Super. Fee

Service

B006B

Stor.

B007B

Authoriz.

Clerk

B007A

Lock smith

B021A

Locksmith

B021

Elec.

B001D

Freezer

A0007

Freezer

A0008

Office

A0001

Male Toilet

A0003

Female

Toilet

A0002

Break

Room

A0006

Supply

Warehouse

A001

Stair

A017A

Gas Meter

Room

A001e

Stair 11

S*B*11

Mechanical

Room

A001f

AHU-19 1 2

UP

UP

DN

DN

Dir.

Conference

Room

A102

Office

A103

Office

A104

Secretary

Office

A105

Associate

Dir. Office

A106

Director's

Office

A107

Chief of

Staff

A108

Sec. Chief of Staff

A109

Adm Asst.

A110

HAC

A111

Adm Asst.

A112

QA

Manager

A113

Sec. &

Waiting

A114

Risk

Management

A115

Asst Chief

Social Work

A116

S.W. Off.

A117

S.W. Off.

A118

Staff Dir.

Asst.

A119

Stor

A120

Public

Affairs

A118A

Adm. Asst.

A114A

Chief Soc.

Work

A115A

Tele

A119A

Director

Public

Affairs

Office

A113A

Med Staff

Coor.

A112A

Staff Dir.

Asst.

A119C

Clos

A105A

Elec.

A111A

Clos

A102A

Office

B105

Office

B106

Exam

B107

SCI

Pharmacy

B108

SCI Social

Worker

B109

Office

B110

Toilet

B111

Exam

B112

Stor

B113

Storage

B114

Exam

B115

Stair 4

S*1*4

Exam

B117

Waiting

Area

B118

Corridor

C*1*7

Stor

B114A

Tele Clos

B107A

Secretary

B119

Men's

Restroom

A121

Stair 2

S*1*2

Quality

Assurance

A123

AACOS

A124

F. Tlt.

A125

KIT.

A127

Food

Service

A128

Walk-In

Ref.

A127C

Walk-In

Ref.

A127D

Corridor

C*1*2

Pizza Shop

A131

Canteen

Dining

A130

HAC

A133

Office

B103

Elec.

B103A

Vending

A134

Audiology

Clinic

B123

Corridor

C*1*3

Stair 11

S*1*11

Corridor

A1012

Womens

Locker

A1013

Mens

Locker

A1014

Electric

Room

A1015

Signal

Closet

A1016

Staff Toilet

Staff

Lounge

A1018

Mech.

B101B

AHU-14

(ON ROOF

ABOVE)

AHU-15

(ON ROOF

ABOVE)

DN

UP

DN UP

Lab

B211

Digital

Chest Rm.

A203

Dressing

Rm.

A203A

Speech

Pathlgy.

A204

Rehab Care

Line

A205

Man Rehab

Care Line

A206

Staff

A207

Occupational

Therapy

A208

EMG Lab

A209

Rehab

Exam

A210

Rehab

Exam

A211

Elec.

A212

HAC

A213

Staff Tlt.

A214

PT Storage

A215

Hydrotheraphy

A216

Exam/Treatment

/ Exercise

Room

A217

Physical

Ther.

Supervisor

A218

Adl. Clinic

A208A

EMG Lab

A209A

Elec.

A217A

Corridor

C*2*2

Light Box

Room

A215B

SCI Exam

A215A

Stor.

A218A

Stair 2

S*2*2

Oxygen

Storage

A221

Therapy

Supervisor

A222

Ante Room

A223

Stor.

A210A

Dirty Room

A222A

Equip Wash

A222B

Mechanical

Room

A222C

Compressor

Room

A222D

Soiled

Receiving &

Decontamination

A222E

Equipment

Storage and Testing

A228A

Storage

A228B

Eto. Room

B208A

Training

Room

A224

Stair 4

S*2*4

Ana

Path

Gross

Room

B215

Office

B216

Cytology

B217

Hist

Proces/

Special

Staining?

B218

Supervisor

B219

TB/ MYC

Lab

B210B

TB/ MYC.

Lab

B210C

ISO

B210D

ISO

B210E

Tele.

B210A

Lab

B211A

Cold Rm.

B211B

Dir. Off.

B205Off.

B207A

Elec.

B206

Corr

C*2*17

Off.

B207B

Off.

B207C

Pathology

Off.

B209

Micro

Reading

B208

Break

Room

B210

Corridor

C*2*5

Storage

B208B

Stair 11

S*2*11

Clean

Supply

A2011

Storage

A2010

PACS Read

A2008

Elec.

A2006

Signal

A2005

Men Staff

A2004

Women

Staff

A2003

Office

A208A

A/C Shaft

AHU-15

AHU-14

C H

S

C H

R

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROVIDE INTERIOR COOLING IN

THE HOSPITAL

CINCINNATI, OH

539-21-202

Project Director

10/28/2020Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 03-09-2020

65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020

95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020

CD SUBMITTAL 10-28-2020

1-M103

THIRD FLOOR PLAN

SCALE: 1/16" = 1'-0"

THIRD FLOOR PLAN

JAC GEH

1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M501.

2. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE SERVICE

CORRIDOR OF CUSTOM AHU ON ROOF.

3. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M502.

4. NEW RUNAROUND PUMP SHALL BE LOCATED ABOVE CEILING IN

THIS ROOM.

5. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M503.

6. APPROXIMATE LOCATION OF SHUT OFF VALVES FOR CHILLED

WATER SUPPLY AND RETURN BRANCHES THAT SERVE AHU-28 AND

AHU-29.

7. NEW PIPE TEE IN CHILLED WATER SUPPLY PIPE FOR TIE-IN OF

AHU-29 RUNAROUND PUMP LOOP SHALL BE LOCATED BELOW ROOF

DECK/ABOVE THIRD FLOOR CEILING AS REQUIRED DUE TO LIMITED

SPACE INSIDE AHU PIPE CHASE ON ROOF. REFER TO COIL

CONNECTION DETAIL ON SHEET M503.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

GENERAL NOTES

AHU-4

AHU-5

UP

UP

UP

UP

UP

UP

UP

UP

DN

DN

DN

DNUP

DN UP

DN

UP

UPDN

DN

Isolation

Procedure

Rm.

C3024

Fluoro

Procedure

Rm.

C3023

Corridor

C*3*14

Procedure

Rm.

C3021

Wash

Room

C3020

Physician

Work Room

C3019

Scope

Storage

C3017

Ante Rm.

C3016

Scope

Cleaning

C3016A

Procedure

Rm.

C3025

Procedure

Rm.

C3026

Prep/Recovery

C3027

Clean

Supply

C3014

Isolation

Prep/Recovery

C3013

Prep/Recovery

C3028

Prep/Recovery

C3029

Isolation

Prep/Recovery

C3012

Prep/Recovery

C3011

Prep/Recovery

Rm.

C3030

Prep/Recovery

Rm.

C3010

Staff Break

Rm.

C3009

Staff Toilet

C3009A

Patient

Toilet Rm.

C3008

Storage

C3007A

Signal Clos.

C3035

Patient

Toilet Rm.

C3037

Prep/Recovery

Rm.

C3038

Prep/Recovery

Rm.

C3039

Post-Op

C3040

Elec.

C3036A

Supplies /

Equipment

C3006

Consult.

C3005

Lobby

C3001

Waiting

C3002

Staff

Lounge

C326

Stair 10

S*3*10

Staff Work

Rm.

C3007

SPD Case

Cart

C3034

O.R. #7

C329

O.R.

Storage

C339

Anesthesia

Work Rm.

C337

Men's

Locker

C324B

O.R. 1

C354

O.R. 2

C353

O.R. Alcove

C352

O.R. Alcove

C352A

O.R. Alcove

C352B

Light Rm.

C352C

O.R. 3

C351

O.R. 4

C350

Clean Core

C340

Elec.

C338A

O.R. 5

C349

O.R. 6

C348

Mech.

C345

Corridor

C*3*7

Women's

Locker

C322

HAC

C346

Office

C330

Cysto O.R.

C332

Cysto O.R.

C347

M. Shower

C324A

W. Shower

C322A

Sub-Waiting

C3036

Work Rm.

C3004A

Nurse

Station

C3031

Sterile Core

C347A

Frozen

Section

C316

Cysto.

Stor.

C320

Office

C318

Elec.

C335

Tele.

C333

Corridor

C*3*9

Entry

C324

A/C Shaft

C337A

Soiled

Utility

C3032

Men's

C3002A

Women's

C3002B

Pat. Tlt.

C3022

Reception

C3004

Dr. Office

C315

Office

C317

Office

C319

Office

C321

Office

C323

Office

C325

Stair 6

S*3*6

Anesthesia

Tech.

C328

Cleaning

Supply

C3016B

Temp.

Control

C3005A

Oxygen

Storage

C369

Vestibule

C322B

Vestibule

C324C

HAC

C3033

Pat. Rm.

Neg.

Pressure

A387A

Patient

Room

A387B

Patient

Room

A387C

Patient

Room

A387D

Patient

Room

A387E

Patient

Room

A387F

Patient

Room

A387G

Shower

A387H

Patient

Room

A387I

Patient

Room

A387J

A387K

Nurse

Station

A387

Service

Lobby

A338

M. Locker

A339

F. Locker

A340

Corridor

C*3*19

RO DI

Water

A343

De-Gown

A342

Gowning

Rm.

A341

De-Con

B303

Prep/Pack

B307C

HAC

B303A

HAC

B307D

Office

B305B

Office

B305A

Storage

B308A

Office

B305C

Conf Rm.

B305D

Vendor

Drop Off

B304

Cool Down

Cart

B307B

Steam

Equip Rm.

B307A

Open Office

B305

Ante Rm/

Clean Exit

B307

Elec

B306

F. Tlt.

A306A

Waiting

Exam

A308

Exam

A309

Storage

A310

Lab

A311

Machine

A311A

Plaster

A312

CAD/CAM

A313

Off.

A314

Elec.

A315

M. Tlt.

A316

Stor.

A317

HAC

A318

Asst. Chief

A319

Pros. Adm.

Asst.

A320

Clos.

A320A

Chief Off.

A321

Ward Adm.

Off.

A323

Adm. Asst.

A324

Office

A324A

Office

A324B

Office

A324C

Chief PBS

A324D

Office

A324E

Office

A324G

Stor.

A324F

Stor.

A324H

Elec.

A331A

Pros. Stor.

A330

Pros. Off.

A332

Stair 2

S*3*2

Stor.

A335

Stor.

A336

Asst. Chief

Diet.

A337

Corridor

C*3*2

F. Tlt.

A341

M. Tlt.

A342

Stair 1

S*3*1

Stor.

A344

Sig.

A345

Stor.

A344A

Tlt.

Vasc. Lab

A347

Elec.

A350

Mech.

A351

Adm. Asst.

A352

Off.

A353

Conf.

A354

Chief of

Surgery

A355

Off.

A356

Off.

A357

Off.

A358

Off.

A359

Off.

A360

Off.

A361

Corridor

C*3*3

Off.

A355A

Physician

Review

A355B

Linen Clos.

A389

Nurse Off.

A390

Soil Utility

A391

Equip. Stor.

A392

HVAC

A394

Elec.

A395

Sig.

A396

Clean

Supply

A397

HAC

A380

Lounge

A382

Tlt.

A382A

M. Lock.

A382B

Female

Locker

A382C

Soc. Wrk.

A383

Respiratory

Therapy

A384

Conference

Room

A385

Pharm.

A386

On Call

A381

Tlt.

A381A

Patient

Advocate

A348

Off.

A349

Stair 5

S*3*5

Off.

A350B

Off.

A350D

Off.

A350A

Off.

A350C

Corridor

C*3*1

Elect.

A346

Classroom

B308

Nurse

Educator

B309

Stor.

B310

Office

B311

Office

B310A

Conf.

B310B

Off.

B311A

Off.

B311B

Lounge

B311C

Asst. Ch.

B311D

Asst. Ch.

B311E

Adm. Off.

B311F

Word Proc.

B311G

Off.

B311H

Chief Nurse

B311I

Research

Off.

B312

Off.

B312A

Sig.

B312B

Elec.

B312C

Stair 3

S*3*3

Nursing

Conf.

B314

F. Tlt.

B315

Stor.

B316

Eq. Stor.

B317

Res. Stor.

B318

Stor.

B319

Classroom

B320

Office

B321

Off.

B319A

Off.

B319B

Off.

B319C

Off.

B319D

Stor.

B321A

Classroom

B321B

Work Area

B320A Stor.

B320B

Stor.

B319E

Stair 4

S*3*4

Stor.

B311M

Corridor

C*3*5

Learning

Exchange

B322

Work Area

B322A

Work Area

B322B

Elec.

B322C

Pat. Dining

B325

Family

Waiting

B326

Reception

B327

Office

C300

Consult

C301

Break Rm.

C302

Patient Tlt.

C303

PACU

C304

Ophthamology

Optometry

C305

Office

C306

Acute Care

C307

Storage

C308

Corridor

C*3*6

Patient Rm.

C304A

Patient Rm

C304B

Patiet Rm

C304C

Meds.

C304D

Clean

Supp.

C304E

Patient Rm.

C304F

Patient Rm.

C304G

Patient Rm.

C304H

Patient Rm.

C304I

Patient Tlt.

C304J

Patient Rm.

C304K

Patient Rm.

C304L

Patient Rm.

C304M

Patient Rm.

C304N

Patient Rm.

C304O

Off.

C360

EMS/

Lockers

C361

Clean

Stretcher

Stor.

C355

Anaesthetics

C356

Soil

C357

Storage

C358

HAC

C359

Electrical

C309

Family

Wtng.

C310

Tele

C311

Lactation

C312

Grieve

Consult

C313

ICU Dir.

Off.

C314

Tlt.

C313B

Corridor

C*3*17

Adm. Asst.

A307A

Stor.

A324I

Tlt.

A388

Stair 9

S*3*9

HAC

B301

Db. Wtr

B302

Tlt.

C302A

Tr. Ch.

A338A

Stair 8

S*3*8

A/C Shaft

A/C Shaft

A/C Shaft

Elec

A338B

Linen Clost.

C3015

Corridor

C*3*11

Corridor

C*3*12

Corridor

C*3*13

Corridor

C*3*16

Corridor

C*3*15

Corridor

C*3*18

Room

B303B

Room

B307E

A378

HAC

A379

Vasc. Lab

A347A

A307

A305

Diet Off.

A303

Diet Sec.

A302

Chief Diet.

A301

Vascular

Lab

A300

Vasc. Lab

Pat. Rm.

Neg.

Pressure

AHU-10

(ON ROOF

ABOVE)

AHU-29

(ON ROOF

ABOVE)

AHU-28

(ON ROOF ABOVE)

AHU-41

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROVIDE INTERIOR COOLING IN

THE HOSPITAL

CINCINNATI, OH

539-21-202

Project Director

10/28/2020Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 03-09-2020

65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020

95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020

CD SUBMITTAL 10-28-2020

1-M104

FOURTH AND FIFTH PARTIAL

FLOOR PLANS 01

SCALE: 1/16" = 1'-0"

PARTIAL FOURTH FLOOR PLAN

JAC GEH

SCALE: 1/16" = 1'-0"

PARTIAL FIFTH FLOOR PLAN

1. EXISTING AIR HANDLING UNIT TO REMAIN.

2. APPROXIMATE LOCATION OF NEW TIE IN POINTS FOR

RECIRCULATION PIPE TEES ABOVE CEILING. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M502.

3. EXISTING AIR HANDLING UNIT TO REMAIN. REFER TO SHEET 1-M103

FOR WORK ASSOCIATED WITH THIS UNIT.

4. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M503.

5. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE AHU COIL

PIPING ENCLOSURE ON ROOF.

6. EXISTING AIR HANDLING UNIT TO REMAIN. REFER TO SHEET 1-M100

FOR WORK ASSOCIATED WITH THIS UNIT.

7. RELOCATE EXISTING AHU-13 CHILLED WATER COIL PIPING

SPECIALTIES (CONTROL VALVE, SHUTOFF VALVES, STRAINER,

BALANCE VALVES, ETC.) FROM PIPING ON ROOF TO INSIDE

BUILDING, ABOVE CEILING IN THIS LOCATION - REFER TO COIL

CONNECTION DETAIL ON SHEET M502.

8. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M502.

9. CAREFULLY DETACH HEAT TRACE CABLE FROM EXISTING PIPING

AS REQUIRED TO ACCOMPLISH THIS WORK. UPON COMPLETION OF

WORK, REINSTALL HEAT TRACE CABLE PER MANUFACTURER'S

RECOMMENDATIONS AND VERIFY FUNCTIONALITY.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

GENERAL NOTES

DN

DN

UP

DN

UP

DN

UP

DN

UP

UP

DN

Reception

A400

Interview

A401

Interview

A401A

Reception

A401B

Interview

A402A

HAC

A403

Stor.

A404

Med Room

A405

Exam Rm. 2

A406

Exam Rm.

A407

Exam Rm.

A408

Exam Rm.

A409

Exam Rm.

A410

Exam Rm.

A411

Exam Rm.

A412

Exam Rm.

A413

Exam Rm.

A414

Exam Rm.

A415

Exam Rm.

A416

Exam Rm.

A417

Stor.

A418

Elec.

A418A

Stor.

A420 Staff Tlt.

A421

HSRD

Office

A422

Dr's

Off.

A423

HSRD

Off.

A424

Oncology

Pharmacy

Sattelite

A425

Chemo

Prep.

A425A

IRM Office

A427

Stair 2

S*4*2

HSRD

Off.

A424A

Comp.

Training

A430

Comp.

Specialist

Off.

A431

Service

Lobby

A436

IRM

Network

Operation

Center

A437

Comp.

Programmer

Off.

A439

Computer

Off.

A440

Chief Rm.

A441

Res. Off.

A442

Stair 1

S*4*1

IRM

Storage

(Hdwr)

A444

Elec.

A445

Toilet

A446

Toilet

A446A

IRM

Storage

(Comm)

A445A

Infusion

A449

Tlt.

A449A

Stair 5

S*4*5

Sub. Lab.

A453

Pharm.

A454

Exam

A455

Elec.

A456

Stor.

A457A

S.B.

A457B

Tlt.

A457C

D.B.

A457D

Proc.

A457E

Nurse

Station

A457F

Lab.

A457G

Exam

A458

Exam

A458A

Exam

A458B

Exam

A458C

Elec.

A459 Stor.

A460

Soil. Util.

A461

CL. Lin.

A462

Exam

A463

Exam 2

A464

Exam 4

A465

Exam 6

A466

Exam 8

A467

Exam 10

A468

Exam 9

A469

Exam 7

A470

Exam 5

A471

Exam 3

A472

Exam 1

A473

Exam

A474

KIT.

A475

Supp.

A476

HAC

A477

Waiting

A478

GCRC

Corridor

A457

Tlt.

A457H

Tlt.

A474A

Waiting

A402B

Trash

Chute

A435

Stor.

A436A

Elec.

A436B

Comp. Rm.

A437C

Stor.

A444A

Tlt.

A464A

Tlt.

A473A

Tlt.

A465A

Tlt.

A471A

Tlt.

A467A

Tlt.

A470A

Corridor

C*4*2

HSRD

Off.

A424E

HSRD

Off.

A424D

Common

Area

A424C

Dir.

Off.

A424B

Dr's

Off.

A423A

Social

Worker

A422A

HSRD

Off.

A424F

HSRD

Off.

A424G

Neuro.

Res.

A442A

Corridor

C*4*1

Elec.

A424H

Stor.

A416A

Stor.

A414A

Stor. A413A

Stor.

A410A

Stor.A408A

Stor.A407A

Tlt.

A439A

Staff

Physician

B403A

Neuro

Office

B439

Regular

E.E.G

B403B

E.E.G.

Control &

Observation

B403

F. Tlt.

B406

M. Tlt.

B407

Auto-Clave

Dishwasher

B408

HAC

B409

Elec.

B410

LAB.

Procedure

Rm

B411

W. Lab.

B412

Ram Lab.

B412A

Tissue

Culture

B412B

Office

B412C

Stair 4

S*4*4

Electrophoresis

Core

B413A

RAM Lab.

B413B

Corridor

C*4*5

Infectious

Disease

Lab

B414

Rm.

B415A

Freez.

B415B

Sig. Clos.

B416

Elec.

B417

Stair 3

S*4*3

Research

Adm. Off.

B420

Adm. Off.

B420B

CFBRE Off.

B421

Conf.

B425

Clos.

B425A

Office

B426A

Associate

Chief of

Staff/Research

B426

Office

B427

Office

B428

HAC

B429

Refrig.

B430

Elec.

B431

Lab

B432

Tissue

Culture

B433A

Mic Rotomy

B435

Microscope

Core

B436

Office

B437

Evoked

Potential

Lab

B438

Copier

Room

B437A

Corridor

B429A

Director's

Office

B429B

A/C Shaft

A/C Shaft

A/C Shaft

Mech Room

A456E

Hazardous

Compounding

B414B

Non-Hazardous

Compounding

B414D

Ante Room

B414C

Work Station

Area

B414

Hazardous

Storage

B414A

A406A

Stor.

C o r r i d o r

C

Corridor

C*4*4

Cold

AHU-13

AHU-9

AHU-10

AHU-29

AHU-28

AHU-23

CHS

CHR

DN

UP

DN

A/C Shaft

Storage

B506

Conference

Rm.

B507

Office

B508

Office

B509

Office

B510

Office

B511

Office

B512

Office

B513

Office

B514

Office

B515

Office

B516

Office

B517

Storage

B515A

Closet

B507A

Stair 3

S*5*3

Storage

B505H

Sig. Clos.

B505G

Office

B518

Office

B505

Tlt.

B505A

Elec.

B505B

Stor.

B518A

Stor.

B521D

Narc. Vault

B521A

Unit Dose

B535A

MICU

Penthouse

B505D

Fan Room

B505E

Stair 4

S*5*4

HAC

B521E

Staff Tlt.

B535B

Elec.

Cart Stor.

B535

Compound

Picking

B527

AHU-44

AHU-11

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROVIDE INTERIOR COOLING IN

THE HOSPITAL

CINCINNATI, OH

539-21-202

Project Director

10/28/2020Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 03-09-2020

65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020

95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020

CD SUBMITTAL 10-28-2020

1-M108

EIGHTH FLOOR PLAN

SCALE: 1/8" = 1'-0"

PARTIAL EIGHTH FLOOR PLAN

JAC GEH

SCALE: 1/8" = 1'-0"

PARTIAL EIGHTH FLOOR PLAN

8TH FLOOR KEY PLAN

NO SCALE

UP

UP

DN UP

DN

UP

DN UP

DN

A/C Shaft

A/C Shaft

DN UP

DNUP

DN UP

Group

Room #1

A821

Stor.

A800A

Charting

Room

A800B

Staff Tlt.

A800C

Phys. Off.

A801

Exam

A802

Off.

A803

Psych. Off.

A804

Off.

A805

Off.

A806

Off.

A807

Stor.

A808

Off.

A809

Off.

A810

Group Rm.

A811

QI

Research

Director

A812

Off.

A813

Bath

A814

Off.

A815

ANT

A817

Elec.

A818

Counsel

Off.

A819

Group

Room #2

A820

Stair 2

S*8*2

HAC

A823

Stor.

A824

Off.

A825

Direc. Off.

A826

Coor. Off.

A827

Off.

A821A

Off.

A821B

Clos.

A825A

Tlt.

A825B

Clos.

A826A

Stor.

A828

Lin. Chute

A816

Tlt.

A809A

Tlt.

A810A

Tlt.

A811A

Tlt.

A811B

Tlt.

A812A

Corridor

C*8*2

Tlt.

A801A

Trash

Chute

A829A

Nurses

Station

A800

Stor.

A846A

Stor.

A846B

Off.

A846C

Kit.

A846D

Day Room /

Dining

A846

Stair 5

S*8*5

Lndry

A848

Clos.A849

Addict.

Ther.

A850

Shower /

Tlt.

A851

Music /

Quiet Room

A852

Group

Room

A853

Thera Off.

A854

Thera. Off.

A855

Head Nurse

Office

A856

Off.

A857

Elec.

A858

Elec.

A859

HAC

A860

Cl. Lin.

A861

Off.

A862

3 Bed

Room

A863

6 Bed Rm.

A864

6 Bed Rm.

A865

3 Bed Rm

A866

Hndcap

S.R.

A867

Group

Room

A868

Women

Bath

A867A

Restroom

A869

Sig. Clos.

A844

Stor.

A841

HAC

A842

Stor.

A840

Tech. Off.

A829B

Service

Lobby

A829

Off.

A830

Elec.

A830A

Omnicell

A857A

Elec.

A845

Stair 1

S*8*1

A/C Shaft

A/C Shaft

AHU-8

(ON ROOF

ABOVE)

AHU-7

(ON ROOF

ABOVE)

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

GENERAL NOTES

1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M501

2. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE SERVICE

CORRIDOR OF CUSTOM AHU ON ROOF, ALONG WALL AS SHOWN.

3. AHU-1 ACCESSIBLE FROM 9TH FLOOR LEVEL (8TH FLOOR ROOF) -

REFER TO SHEET 1-M109.

4. EXISTING AIR HANDLING UNIT TO REMAIN. REFER TO SHEET 1-M109

FOR WORK ASSOCIATED WITH THIS UNIT.

5. RELOCATE EXISTING COIL RETURN PIPE TEES AND ASSOCIATED

PIPING SPECIALTIES (MANUAL BALANCE VALVES, ETC.) AS

REQUIRED FOR INSTALLATION OF NEW RUNAROUND LOOP RETURN

PIPE TEE.

UP

UP

AHU-1

CHR

CHS

1-CCP1

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROVIDE INTERIOR COOLING IN

THE HOSPITAL

CINCINNATI, OH

539-21-202

Project Director

10/28/2020Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 03-09-2020

65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020

95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020

CD SUBMITTAL 10-28-2020

1-M109

NINTH FLOOR PLAN

SCALE: 1/16" = 1'-0"

NINTH FLOOR PLAN

JAC GEH

DN

DN

DN UP

Psych. Off

A903

Psych. Lab.

A903A

Psych. Lab.

A903B

AFGE

A904

Psych.

A904A

Clos.

A904B

Elec.

A904C

Vol. Serv.

Office

A905

AFGE

A905A

AFGE

A906

Entry

A906A

Clos.

A906B

Bath

A906C

Clos.

A907

Office

A908

Break

Room

A909

Stair 2

S*9*2

Vol. Serv.

Storage

A911

Office

A912 Office

A913

Office

A914

Office

A915

Serv. Lobby

A916

Tlt.

A909A

ONA Local

A911A

Clos.

A912A

Storage

A915B

Trash

Chute

A915A

Stor. Rm.

A916A

Psych. Off.

A919

Psych. Off.

A919A

Psych. Off.

A919B

Clos.

A919C

Adm. Asst.

A920

Chief

Psych.

A921

Psych. Off.

A922

D. Wtr.

Mech. Area

A923

Clerk

A924

Sdm. Off.

A925

Adm. Asst.

A926

Chief

Psych. Off.

A927

Stair 1

S*9*1

Sig. Clos.

A929

Lin.

A918

Electrical

Closet

A931A

Off.

A945

F. Tlt.

A946

M. Tlt.

A901

Dir. Off.

A946A

Psych. Off.

A901A

Psych. Off.

A902

HAC

A917

Stor.

A918A

Stor.

A918B

Office

B901

Psych. Off.

B902

Psych.

Conf. Rm.

B903

Fan Rm.

B904

Copy Room

B905

Psych. Off.

B906

Psych. Off.

B907

Corridor

C*9*1

Corridor

C*9*2

Elec.

A916D

Res.

B905A

Sleep 6

A938C

Sleep 4

A939A

Tlt.

A939B

Sleep 3

A939C

Tlt.

A939D

Control Rm.

A940

Shower

A939E

Clst.

A941C

Break

Room

A941

Soiled

Utility

A941A

Elec.

A941B

Clean

Supply

A942

Exam 2

A943

Chief Office

A944

Waiting

A932

Exam 1

A933

Sleep Phy.

A934

Sleep

Nurses/Fellows

A935

Stair 5

S*9*5

Sleep 1

A937A

Tlt.

A937B

Sleep 2

A937C

Tlt.

A937D

Lead

Tech./2nd

Tech.

A935A

Crash Cart

C-9-3A

Sleep 5

A938A

Toilet

A938B

Toilet

A938D

Entry

A938

A/C Shaft

A/C Shaft

AHU-8

AHU-7

1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M502.

2. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE AHU COIL

PIPING ENCLOSURE ON ROOF.

3. AHU-1 ACCESSIBLE FROM THIS LOCATION - REFER TO SHEET

1-M108.

4. AHU HAS EXISTING CHILLED WATER BOOSTER PUMP. DISABLE

EXISTING BOOSTER PUMP PRIOR TO PERFORMING WORK

ASSOCIATED WITH THIS AHU, AND RETURN BOOSTER PUMP TO

NORMAL OPERATION UPON COMPLETION OF THIS WORK.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

GENERAL NOTES

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROVIDE INTERIOR COOLING IN

THE HOSPITAL

CINCINNATI, OH

539-21-202

Project Director

10/28/2020Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 03-09-2020

65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020

95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020

CD SUBMITTAL 10-28-2020

1-M110

TENTH FLOOR PLAN

SCALE: 1/8" = 1'-0"

TENTH FLOOR PLAN

JAC GEH

UP

UP

UP

UP

UP

DN

Room

A10002

Stair 1

S*10*1

Fan Room

A10001

Mezzanine

A10003

AHU-3

AHU-2

1-CCP3

1-CCP2

1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M501.

2. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE SERVICE

CORRIDOR OF CUSTOM AHU ON ROOF, ALONG WALL AS SHOWN.

3. RELOCATE EXISTING AIR FLOW MEASURING SYSTEM TRANSMITTER

AS REQUIRED TO ENSURE IT IS NOT OBSTRUCTED BY NEW

RUNAROUND PIPING.

4. LOWER EXISTING STEAM CONDENSATE LINES (QTY. 2) AS

REQUIRED TO ACCOMMODATE NEW RUNAROUND LOOP PIPING.

CONDENSATE PIPES DRAIN BY GRAVITY AND SHALL NOT RISE IN

DIRECTION OF FLOW.

5. RELOCATE EXISTING PIPE TEMPERATURE SENSOR IN THIS

LOCATION AS REQUIRED TO ACCOMMODATE NEW RUNAROUND

LOOP SUPPLY PIPE TEE - REFER TO COIL CONNECTION DETAIL ON

SHEET M501 FOR NEW LOCATION.

6. CAREFULLY REMOVE AND REINSTALL EXISTING BYPASS PIPE,

BYPASS CONTROL VALVE AND OTHER PIPING SPECIALTIES AS

SHOWN, TO ROTATE ORIENTATION 180 DEGREES IN ORDER TO

ACCOMMODATE NEW RUNAROUND LOOP SUPPLY PIPE TEE.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

SCALE: 1/8" = 1'-0"

BUILDING 13 - ROOF PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROVIDE INTERIOR COOLING IN

THE HOSPITAL

CINCINNATI, OH

539-21-202

Project Director

10/28/2020Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 03-09-2020

65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020

95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020

CD SUBMITTAL 10-28-2020

13-M102

BUILDING 13 ROOF PLAN

JAC GEH

UP

UP

UP

UP

UP

Kitchen

Storage

Office

Toilet

Office

Upper Level of Catwalk

Corridor

C-2-1

Stairs

S-2-1

Lift Platform

COOLING TOWER 1

COOLING TOWER 21

COOLING TOWER 3

COOLING TOWER 4

1 32

1. EXISTING COOLING TOWER TO REMAIN. REMOVE EXISTING

COOLING TOWER FILL AND REPLACE WITH NEW. NEW FILL SHALL

BE 15 MIL PVC FILM WITH INTEGRAL LOUVERS AND DRIFT

ELIMINATORS, DESIGNED AND MANUFACTURED BY THE EXISTING

TOWER MANUFACTURER.

2. EACH COOLING TOWER HAS APPROXIMATELY 96 EXISTING NOZZLE

CUPS IN THE WARM/UPPER BASIN (48 PER SIDE) - CONTRACTOR TO

VERIFY EXISTING QUANTITY PRIOR TO BIDDING. PROVIDE

ADDITIONAL NOZZLE CUPS, SO THAT EACH TOWER HAS A TOTAL OF

160 NOZZLE CUPS IN THE WARM BASIN (80 EACH SIDE). NOZZLE

CUPS SHALL MATCH EXISTING CUPS AND SHALL BE DESIGNED AND

MANUFACTURED BY THE EXISTING TOWER MANUFACTURER.

3. REPLACEMENT OF FILL FOR COOLING TOWER #1 SHALL BE

DELETED FROM THE PROJECT SCOPE UNDER DEDUCT ALTERNATE

#1.

4. REPLACEMENT OF FILL FOR COOLING TOWER #2 SHALL BE

DELETED FROM THE PROJECT SCOPE UNDER DEDUCT ALTERNATE

#2.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

SCALE: 1/4" = 1'-0"

BUILDING 14 - SECOND FLOOR PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROVIDE INTERIOR COOLING IN

THE HOSPITAL

CINCINNATI, OH

539-21-202

Project Director

10/28/2020Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 03-09-2020

65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020

95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020

CD SUBMITTAL 10-28-2020

14-M102

BUILDING 14 SECOND FLOOR PLAN

JAC GEH

AHU-60

Main

Electric

Em.

Electric

Mechanical

Elev. 1

EL-1

Passage

Signals

1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M503.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

SCALE: 1/4" = 1'-0"

BUILDING 15 - SECOND FLOOR PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROVIDE INTERIOR COOLING IN

THE HOSPITAL

CINCINNATI, OH

539-21-202

Project Director

10/28/2020Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 03-09-2020

65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020

95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020

CD SUBMITTAL 10-28-2020

15-M102

BUILDING 15 SECOND FLOOR PLAN

JAC GEH

DN

UP

UP

DN

Lab

Office

209A

Corridor

C*2*4

Stair #1

S*2*1

Elec.

Lobby

Corridor

C*2*215

H.A.C.

Toilet

Office

Control

Room

Office

Lab

Sterile

Surgery

210B

Scrub

210C

Stair #2

S*2*2

Office

Office

Corridor

C*2*3

Office

Office

Storage

207A

Closet

201A

Closet

204A

Closet

205A

Electric

Storage

AHU-30

1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED

WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION

DETAIL ON SHEET M503.

2. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE SERVICE

CORRIDOR OF CUSTOM AHU ON ROOF.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

M501

DETAILS

GEH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROVIDE INTERIOR COOLING IN

THE HOSPITAL

CINCINNATI, OH

539-21-202

Project Director

10/28/2020Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 03-09-2020

65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020

95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020

CD SUBMITTAL 10-28-2020

JAC

COIL

AHU-1 CHILLED WATER COIL PIPING CONNECTION

DRAIN WITH HOSE

CONNECTION

COIL

TEST PLUG (TYP.)

COIL

WATER RETURN

MANUAL AIR VENT

AHU-2 CHILLED WATER COIL PIPING CONNECTION

MANUAL BALANCE VALVE

1-CCP2

COIL CIRCULATING PUMP

CHECK VALVE

COIL

DRAIN WITH HOSE

CONNECTION

COIL

TEST PLUG (TYP.)

AHU-3 CHILLED WATER COIL PIPING CONNECTION

COIL

AHU-4 CHILLED WATER COIL PIPING CONNECTION

AUTOMATIC AIR VENT

WATER RETURN

SHUT OFF VALVE

WATER SUPPLY

STRAINER WITH BLOW DOWN

SHUT OFF VALVE

DRAIN WITH HOSE

CONNECTION

DDC TEMPERATURE

SENSOR (TYP)

COIL

AHU-5 CHILLED WATER COIL PIPING CONNECTION

AUTOMATIC AIR VENT

WATER RETURN

SHUT OFF VALVE

WATER SUPPLY

STRAINER WITH BLOW DOWN

SHUT OFF VALVE

DRAIN WITH HOSE

CONNECTION

T

DDC TEMPERATURE

SENSOR (TYP)

T

1-CCP5

COIL CIRCULATING PUMP

CHECK VALVE

1-CCP4

COIL CIRCULATING PUMP

CHECK VALVE

COIL

CIRCUIT SETTER (TYP.)

MANUAL AIR VENT

SHUT OFF VALVE

MODULATING 2-WAY CONTROL VALVE

WATER RETURN

WATER SUPPLY

STRAINER WITH BLOW DOWN

MANUAL AIR VENT

MODULATING 2-WAY CONTROL VALVE

SHUT OFF VALVE (TYP.)

MODULATING 2-WAY CONTROL VALVE

MODULATING 2-WAY CONTROL VALVE

SHUT OFF VALVE (TYP.)

SHUT OFF VALVE (TYP.)

A. LIGHT LINEWEIGHTS INDICATE EXISTING WORK IN PLACE; HEAVY

LINEWEIGHTS INDICATE NEW WORK.

B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

C. NEW PIPING ASSOCIATED WITH THE COIL RUNAROUND PUMPS

SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK

THE SWING OR USE OF ACCESS DOORS OR PANELS; NEITHER

SHALL IT BLOCK THE SERVICING OF FILTERS, VALVES, OR

EQUIPMENT. INSTALLATION SHALL ALSO MAINTAIN SUFFICIENT

OVERHEAD CLEARANCE FOR NORMAL FOOT TRAFFIC, AND SHALL

BE EASILY MAINTAINABLE BY VA PERSONNEL.

GENERAL NOTES

APPROXIMATE LOCATIONS OF

NEW PIPE TEE FOR COIL

RECIRCULATION PIPE

APPROXIMATE LOCATIONS OF

NEW PIPE TEE FOR COIL

RECIRCULATION PIPE

APPROXIMATE LOCATIONS OF

NEW PIPE TEE FOR COIL

RECIRCULATION PIPE

APPROXIMATE LOCATIONS OF

NEW PIPE TEE FOR COIL

RECIRCULATION PIPE

APPROXIMATE LOCATIONS OF

NEW PIPE TEE FOR COIL

RECIRCULATION PIPE

MANUAL AIR VENT

1-CCP3

COIL CIRCULATING PUMP

CHECK VALVE

SHUT OFF VALVE (TYP.)

WATER SUPPLY

STRAINER WITH BLOW DOWN

SHUT OFF VALVE (TYP.)

COIL

COIL

COIL

COIL

COIL

DRAIN WITH HOSE

CONNECTION

COIL

TEST PLUG (TYP.)

DDC TEMPERATURE

SENSOR (TYP.)

T

T

WATER SUPPLY

STRAINER WITH BLOW DOWN

DDC TEMPERATURE

SENSOR (TYP.)

T

WATER RETURN

SHUT OFF VALVE (TYP.)

MODULATING 2-WAY CONTROL VALVE

T

DP

DP TRANSMITTER

DP

DP TRANSMITTER

T

T

DP

DP TRANSMITTER

RELOCATE EXISTING COIL RETURN PIPE TEES AS

REQUIRED FOR INSTALLATION OF NEW RUNAROUND

LOOP RETURN PIPE TEE - REFER TO SHEET 1-M108

T

PROVIDE NEW DDC TEMPERATURE SENSOR -

REFER TO SHEET M601 FOR CONTROL SEQUENCE

T

PROVIDE NEW DDC TEMPERATURE SENSOR -

REFER TO SHEET M601 FOR CONTROL SEQUENCE

T

PROVIDE NEW DDC TEMPERATURE SENSOR -

REFER TO SHEET M601 FOR CONTROL SEQUENCE

T

PROVIDE NEW DDC TEMPERATURE SENSOR -

REFER TO SHEET M601 FOR CONTROL SEQUENCE

T

PROVIDE NEW DDC TEMPERATURE

SENSOR - REFER TO SHEET M601 FOR

CONTROL SEQUENCE

T

T

RELOCATED DDC TEMPERATURE

SENSOR - REFER TO FLOOR PLAN

FM

FLOW

METER

RELOCATED BYPASS -

REFER TO FLOOR PLAN

FM

FLOW METER

T

MANUAL BALANCE VALVE

T

RELOCATED BYPASS -

REFER TO FLOOR PLAN

DDC TEMPERATURE

SENSOR

DDC TEMPERATURE

SENSOR

1-CCP1

COIL CIRCULATING PUMP

CHECK VALVE

SHUT OFF VALVE (TYP.)

5"

6"

6"

5"

4"

5"

4"

5"

5"

3"

3"

M502

GEH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROVIDE INTERIOR COOLING IN

THE HOSPITAL

CINCINNATI, OH

539-21-202

Project Director

10/28/2020Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 03-09-2020

65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020

95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020

CD SUBMITTAL 10-28-2020

JAC

COIL

WATER RETURN

MANUAL AIR VENT

UNION CONNECTIONS (TYP.)

WATER SUPPLY

SHUT OFF VALVE

AHU-11 CHILLED WATER COIL PIPING CONNECTION

AUTOMATIC FLOW

CONTROL VALVE

STRAINER WITH BLOW DOWN

1-CCP11

COIL CIRCULATING PUMP

CHECK VALVE

SHUT OFF VALVE

DRAIN WITH HOSE

CONNECTION

AHU-14 CHILLED WATER COIL PIPING CONNECTION

COIL

AHU-15 CHILLED WATER COIL PIPING CONNECTION

AUTOMATIC AIR VENT

WATER RETURN

SHUT OFF VALVE

WATER SUPPLY

STRAINER WITH BLOW DOWN

SHUT OFF VALVE

DDC TEMPERATURE

SENSOR (TYP)

T

1-CCP15

COIL CIRCULATING PUMP

CHECK VALVE

DRAIN WITH HOSE

CONNECTION

COIL

WATER RETURN

MANUAL AIR VENT

UNION CONNECTIONS (TYP.)

WATER SUPPLY

AHU-13 CHILLED WATER COIL PIPING CONNECTION

RELOCATED AUTOMATIC

FLOW CONTROL VALVE

RELOCATED

STRAINER WITH

BLOW DOWN

1-CCP13

COIL CIRCULATING PUMP

CHECK VALVE

RELOCATED

SHUT OFF VALVE

DRAIN WITH HOSE

CONNECTION

COIL

WATER RETURN

MANUAL AIR VENT

UNION CONNECTIONS (TYP.)

WATER SUPPLY

SHUT OFF VALVE

AHU-7 CHILLED WATER COIL PIPING CONNECTION

CIRCUIT SETTER

STRAINER WITH BLOW DOWN

1-CCP7

COIL CIRCULATING PUMP

CHECK VALVE

SHUT OFF VALVE

AHU-8 CHILLED WATER COIL PIPING CONNECTION

COIL

WATER RETURN

UNION CONNECTIONS (TYP.)

WATER SUPPLY

RELOCATED SHUT OFF VALVE

AHU-9 CHILLED WATER COIL PIPING CONNECTION

RELOCATED AUTOMATIC FLOW CONTROL VALVE

RELOCATED STRAINER WITH BLOW DOWN

1-CCP9

COIL CIRCULATING PUMP

CHECK VALVE

DRAIN WITH HOSE

CONNECTION

COIL

AHU-10 CHILLED WATER COIL PIPING CONNECTION

WATER RETURN

SHUT OFF VALVE

AUTOMATIC FLOW

CONTROL VALVE

WATER SUPPLY

SHUT OFF VALVE

STRAINER WITH BLOW DOWN

1-CCP10

COIL CIRCULATING PUMP

CHECK VALVE

T

DDC TEMPERATURE SENSOR

RELOCATED MODULATING 2-WAY CONTROL VALVE

MODULATING 3-WAY

CONTROL VALVE

MODULATING 3-WAY CONTROL VALVE

RELOCATED MODULATING

2-WAY CONTROL VALVE

MODULATING 3-WAY CONTROL VALVE

SHUT OFF VALVE (TYP.)

UNION CONNECTIONS (TYP.)

SHUT OFF VALVE

SHUT OFF VALVE (TYP.)

UNION CONNECTIONS (TYP.)

SHUT OFF VALVE (TYP.)

UNION CONNECTIONS (TYP.)

SHUT OFF VALVE (TYP.)

UNION CONNECTIONS (TYP.)

SHUT OFF VALVE (TYP.)

UNION CONNECTIONS (TYP.)

APPROXIMATE LOCATIONS OF

NEW PIPE TEE FOR COIL

RECIRCULATION PIPE

APPROXIMATE LOCATIONS OF

NEW PIPE TEE FOR COIL

RECIRCULATION PIPE

APPROXIMATE LOCATIONS OF

NEW PIPE TEE FOR COIL

RECIRCULATION PIPE

APPROXIMATE LOCATIONS OF

NEW PIPE TEE FOR COIL

RECIRCULATION PIPE

APPROXIMATE LOCATION OF

NEW PIPE TEE FOR COIL

RECIRCULATION PIPE -

RELOCATE EXISTING VENT

VALVE TO NEW PIPE

APPROXIMATE LOCATIONS OF

NEW PIPE TEE FOR COIL

RECIRCULATION PIPE

NOTE: THIS AHU HAS AN EXISTING CHILLED WATER BOOSTER PUMP (NOT SHOWN IN THIS DETAIL).

DISABLE EXISTING BOOSTER PUMP PRIOR TO PERFORMING WORK ASSOCIATED WITH THIS AHU,

AND RETURN BOOSTER PUMP TO NORMAL OPERATION UPON COMPLETION OF THIS WORK.

NOTE: THIS AHU HAS AN EXISTING CHILLED WATER BOOSTER PUMP (NOT SHOWN IN THIS DETAIL).

DISABLE EXISTING BOOSTER PUMP PRIOR TO PERFORMING WORK ASSOCIATED WITH THIS AHU,

AND RETURN BOOSTER PUMP TO NORMAL OPERATION UPON COMPLETION OF THIS WORK.

COIL

WATER RETURN

SHUT OFF VALVE

AUTOMATIC FLOW

CONTROL VALVE

WATER SUPPLY

SHUT OFF VALVE

STRAINER WITH BLOW DOWN

1-CCP14

COIL CIRCULATING PUMP

CHECK VALVE

MODULATING 3-WAY CONTROL VALVE

SHUT OFF VALVE (TYP.)

UNION CONNECTIONS (TYP.)

8TH FLOOR ROOF

COIL

MANUAL AIR VENT

UNION CONNECTIONS (TYP.)

SHUT OFF VALVE

CIRCUIT SETTER

1-CCP8

COIL CIRCULATING PUMP

CHECK VALVE

SHUT OFF VALVE

T

DDC TEMPERATURE SENSOR

MODULATING 2-WAY CONTROL VALVE

SHUT OFF VALVE (TYP.)

UNION CONNECTIONS (TYP.)

8TH FLOOR ROOF

EXTERIOR WALL

3RD FLOOR ROOF

1ST FLOOR ROOF

EXTERIOR WALL

MODULATING 2-WAY CONTROL VALVE

WATER RETURN

WATER SUPPLY

STRAINER WITH BLOW DOWN

NOTE: CAREFULLY DETACH HEAT TRACE CABLE FROM EXISTING PIPING AS REQUIRED

TO ACCOMPLISH THIS WORK. UPON COMPLETION OF WORK, REINSTALL HEAT TRACE

CABLE PER MANUFACTURER'S RECOMMENDATIONS AND VERIFY FUNCTIONALITY.

CAREFULLY REMOVE AND

REINSTALL EXISTING BOLTED

SHEET METAL SHROUD AS

REQUIRED TO ACCESS CHILLED

WATER SUPPLY PIPE TIE IN POINT

APPROXIMATE LOCATION OF

NEW PIPE TEE FOR COIL

RECIRCULATION PIPE

CAREFULLY REMOVE AND

REINSTALL EXISTING BOLTED

SHEET METAL SHROUD AS

REQUIRED TO ACCESS CHILLED

WATER SUPPLY PIPE TIE IN POINT

T

PROVIDE NEW DDC TEMPERATURE SENSOR -

REFER TO SHEET M601 FOR CONTROL SEQUENCE

T

PROVIDE NEW DDC TEMPERATURE SENSOR -

REFER TO SHEET M601 FOR CONTROL SEQUENCE

T

PROVIDE NEW DDC TEMPERATURE SENSOR -

REFER TO SHEET M601 FOR CONTROL SEQUENCE

T

PROVIDE NEW DDC TEMPERATURE SENSOR -

REFER TO SHEET M601 FOR CONTROL SEQUENCE

T

PROVIDE NEW DDC TEMPERATURE SENSOR -

REFER TO SHEET M601 FOR CONTROL SEQUENCE

T

PROVIDE NEW DDC TEMPERATURE SENSOR -

REFER TO SHEET M601 FOR CONTROL SEQUENCE

T