539-21-202_Dwgs_CD_2020-1028.pdf
PDF 18 MB Posted
- Attached to
- Z1DA--Provide Interior Cooling 539-21-202 Federal contract opportunity
- Solicitation number
- 36C25021B0006
About this file
This solicitation is for project #539-21-202 entitled "Provide Interior Cooling in the Hospital" to be issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The project scope involves providing interior cooling and is estimated between $500,000 to $1,000,000. The NAICS code is 238220 with a business size standard of $16.5 million. The performance period is 365 calendar days from notice to proceed. Bonds will be required. This is a 100% set-aside for small business with a preference for service-disabled veteran-owned small businesses, which must be registered and verified in VIP and SAM databases. Offerors must ensure their registrations are accurate and not expired prior to award. Safety and environmental violations history as well as experience modification rate must be provided prior to construction contract award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit.pdf | ||
| 539-21-202 addendum 1 interior cooling.pdf | ||
| 36C25021B0006 0001.docx | DOCX document | |
| Wage Determination.pdf | ||
| S02 RFI Form.docx | DOCX document | |
| S02 Contractor EMR Certification Form.docx | DOCX document | |
| 36C25021B0006_2.docx | DOCX document | |
| 539-21-202_CD_SPECS_2020.1112-revised.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10/28/2020
ARCHITECT/ENGINEER OF RECORDCONSULTANT
M001
INDEX, LEGEND, AND GENERAL
NOTES -
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROVIDE INTERIOR COOLING IN
THE HOSPITAL
CINCINNATI, OH
539-21-202
Project Director
10/28/2020Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 03-09-2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020
CD SUBMITTAL 10-28-2020
JAC GEH
DUCT THERMOSTAT WITH AVERAGING ELEMENT
DUCT STATIC PRESSURE SENSOR
DUCT HUMIDITY SENSOR
ROOM SENSOR: TEMPERATURE, HUMIDITY
LENGTH IN DUCT WHEN SPACE PERMITS)
REMOTE BULB THERMOSTAT
ROOM CONTROL: THERMOSTAT, HUMIDISTAT
DIFFERENTIAL PRESSURE SWITCH
DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT
SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)
DUCT OR PIPE TEMP. SENSOR
DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.
AFTER FILTER
CURRENT SENSING RELAY
AIR FOIL WHEEL (FAN)
AIR HANDLING UNIT
ANALOG INPUT
AIR PRESSURE DROP
ANALOG OUTPUT
AUTOMATIC TEMPERATURE CONTROLS
BACKWARD INCLINED WHEEL (FAN)
AIR FLOW MEASURING DEVICE
ABOVE FINISHED FLOOR
DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER
CLEAN OUT
CEILING GRILLE
CEILING DIFFUSER
CEILING REGISTER
COLD WATER (POTABLE)
DIGITAL OUTPUT
DIGITAL INPUT
DIRECT DIGITAL CONTROLS
DRY BULB TEMPERATURE, DEG. F
AUTOMATIC CONTROL DAMPER
EXHAUST FAN
ENGINEERING CONTROL CENTER
DOUBLE WIDTH DOUBLE INLET (FAN)
DOOR UNDERCUT BY GENERAL CONTRACTOR
ITEM. (TO BE USED AS AN AID IN COORDINATING THE
LISTED SIZE OF DUCT, PIPE, DEVICE OR EQUIPMENT
APPROXIMATE ELEVATION FROM FLOOR TO CENTER OF
MANUAL VOLUME DAMPER
U/C
VARIOUS TRADES.)
FIRE DAMPER
BUTTERFLY VALVE
CIRCUIT SETTER
BALL VALVE
COMBINATION BALANCING/SHUT-OFF VALVE
MANUAL AIR VENT
AUTOMATIC FLOW CONTROL VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
STRAIGHT-THRU TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
STRAIGHT-THRU MODULATING CONTROL VALVE
EX.
EF
EXISTING
DWDI
ECC
DI
DO
DB
DDC
D
Db
DECIBELS
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO.3 IN BUILDING NO.1
SHEET NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
RETURN DUCT (UP & DOWN)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
EXHAUST OR RETURN TOP REGISTER OR GRILLE,
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
SUPPLY DUCT (UP & DOWN)
INCLINED RISE, IN DIRECTION OF AIR FLOW
NEW DUCT - WIDTH X DEPTH
RECTANGULAR ELBOWS WITH VANES EVEN IF
VANED ELBOW (PROVIDE ALL SQUARE OR
INCLINED DROP, IN DIRECTION OF AIR FLOW
ACOUSTICAL DUCT LINING
STANDARD RADIUS ELBOW
R
10/8
FC
D
SYMBOL IS MISSING)
FLEXIBLE CONNECTION
UP
(WALL TYPE)
(WALL TYPE)
DN
UP
1-01
1-SF3
AIR HANDLING UNIT NUMBER
TERMINAL UNIT DESIGNATION
TYPICAL UNIT NO.
DN
SECTION LETTER
ECCENTRIC REDUCER
DIRECTION OF FLOW
CAPPED OUTLET
SIDE CONNECTION
EXISTING WORK.
ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING PIPING
POINT OF CONNECTION BETWEEN NEW AND
RISE OR DROP IN PIPE
BOTTOM CONNECTION, 45 DEG. OR 90 DEG.
TOP CONNECTION, 45 DEG. OR 90 DEG.
REDUCER OR INCREASER
DIRECTION OF PIPE PITCH (DOWN)
THERMOMETER
UNIVERSAL (2-BOLT) INVERTED BUCKET TRAP STATION
STRAINER
GATE VALVE
PRESSURE GAGE
CHECK VALVE
GLOBE VALVE
PIPING ACCESSORIES
FLOAT AND THERMOSTATIC TRAP SET INCLUDING
GATE VALVE WITH 3/4" HOSE END ADAPTER
EXISTING PIPE TO BE REMOVED
DRAIN LINE
UNION
D
CW
CR
CO
CG
CD
BIW
ATC
AFW
AI
APD
AO
AHU
AFM
AFF
AF
VENT LINE
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG & BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
NUMBER INDICATES STEAM PRESSURE
NUMBER INDICATES STEAM PRESSURE
LPR
V
HWS
HWR
LPS (5)
MPS (30)
MPR
HEATING
SP
S
F
T
H
T
T H
WET BULB TEMPERATURE, DEG. FWb
MAXIMUM
OUTSIDE AIR
PRE-FILTER
PUMPED CONDENSATE
PREHEAT COIL
RELATIVE HUMIDITY
SUPPLY FAN
STEAM HUMIDIFIER
TRANSFER GRILLE
UNIT HEATER
STATIC PRESSURE (INCHES OF WATER)
PRESSURE REDUCING VALVE
PRESSURE DROP (FEET OF WATER)
TOP REGISTER (WALL TYPE)
VARIABLE FREQUENCY DRIVE
STATIC PRESSURE SENSOR
DOOR UNDERCUT BY GENERAL CONTRACTOR
SPS
TR
U/C
VFD
UH
V
TG
VALVE
S.P.
SH
SF
Rh
PD
PF
PH
PRV
MAX
O.A.
NOM
MIN
PC
NOMINAL
MINIMUM
HEATING COIL
HORSEPOWER
FLR.
HC
HP
FLOOR
BLOW UNLESS OTHERWISE NOTED)
CEILING DIFFUSERS (FOUR WAY
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHS
CHR
AIR CONDITIONING
CONTROL CIRCUIT CONN.
H1 N
ETCHED CLEAR LACQUER
E.C.L.
WHITE BAKED ENAMELW.B.E.
BRAKE HORSEPOWER
BHP
BRITISH THERMAL UNIT
BTU
BRITISH THERMAL UNIT PER HOUR
BTUH
CUBIC FEET PER MINUTE
CFM
DEGREE
DEG
DIAMETER
DIA
DIFFERENTIAL PRESSURE SENSOR
DPS
ENTERING
ENT
F
FAHRENHEIT
FPM
FEET PER MINUTE
FT
FEET
GALLONS PER MINUTE
GPM
HEAD
HD
CHILLED WATER RETURN
CHR
CHILLED WATER SUPPLY
CHS
INCHES
IN
INCHES WATER COLUMN
IN WC
INCHES WATER GAUGE
IN WG
LEAVING AIR TEMPERATURE
LAT
LEAVING
LVG
MBH
1000 BTUH
MERV
MINIMUM EFFICIENCY REPORTING VALUE
NC
NOISE CRITERIA
REVOLUTIONS PER MINUTE
RPM
SMOKE DAMPER (SUPPLY)
SDS
SMOKE DAMPER (RETURN)
SDR
STEAM PRESSURE REDUCING VALVE
SPRV
VOLUME DAMPERVD
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
NUMBER INDICATES STEAM PRESSURE
HPS (125)
HPR
PIPE UP
PIPE DOWN
IN-LINE CENTRIFUGAL FAN
ICF
T
T
T
T
H dP
CS
DP SP
1-MS4
A
H7
9'-6"
MV
MANUAL AIR VENT
ABBREVIATIONS
CONTROLSPIPING SYMBOLS
DRAWING SYMBOLS
DUCTWORK SYMBOLS
GENERAL NOTES
GENERAL
VALVES
ABBREVIATIONS
EXHAUST DUCT (UP & DOWN)
UP DN
PUMPED CONDENSATE RETURNPC
EXPANSION TANK PIPE
ET
FCU
FAN COIL UNIT
PUMP
P
PROPELLER UNIT HEATER
PUH
RETURN FAN
RF
WATER FILTERWF
POWER TYPE ROOF VENTILATOR
RV
POWER TYPE WALL VENTILATORWV
COR
PROPELLER TYPE EXHAUST FAN
PEF
RETURN AIR
R.A.
SUPPLY AIR
S.A.
SINGLE WIDTH SINGLE INLET (FAN)
SWSI
SPECIFIC GRAVITY
SP. GR.
ACCESS DOOR
AD
FCW
FOWARD CURVED WHEEL (FAN)
FC
FLEXIBLE CONNECTION
ENERGY EFFICIENCY RATIO
EER
EXHAUST AIR
E.A.
CONTRACTING OFFICER'S REPRESENTATIVE
AIR SEPARATOR
AS
ANGLE GLOBE VALVE
PIPE GUIDE
PIPE ANCHOR
ORIFICE UNION
STAINLESS STEEL DUCT
DOMESTIC HOT WATER SUPPLYDHW
DOMESTIC HOT WATER RECIRCULATIONDHWR
COMBINATION AXIAL/BACKWARD CURVED WHEEL
A/BCW
UTILITY SET FANUSF
T
GENERAL
DOMESTIC COLD WATER
W
FLOW METER
PIPE MOUNTED DDC TEMPERATURE SENSOR
TOP GRILLE (WALL TYPE)TG
WATER GAUGEWG
WATTSW
VARIABLE AIR VOLUMEVAV
THERMOSTATTSTAT
TOTAL STATIC PRESSURETSP
SMOKE DETECTOR
SD
SUPPLY AIR TEMPERATURE
SAT
OUTSIDE DIAMETER
OD
N.C.
NORMALLY CLOSED
N.O.
NORMALLY OPEN
MCA
MINIMUM BRANCH CIRCUIT AMPACITY
LEAVING WATER TEMPERATURE
LWT
ENTERING WATER TEMPERATURE
EWT
EXTERNAL STATIC PRESSURE
ESP
DIRECT EXPANSION
DX
ENTERING AIR TEMPERATURE
EAT
1 ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
2 ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC.
3 FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING
SCHEMATICS.
4 PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN HEATING
MEDIUM AND AIR.
5 WHERE DUCTS OR PIPES ARE REMOVED THRU BUILDING ELEMENT THAT IS TO REMAIN, PATCH BUILDING OPENING TO MATCH
EXISTING WHERE OPENING IS NOT RE-USED.
6 ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
7 ALL CUTTING AND PATCHING REQUIRED FOR THE PROJECT WORK SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE
DISTURBED UNDER THIS WORK TO MATCH EXISTING.
8 WHERE WORK IS REQUIRED ABOVE EXISTING SUSPENDED CEILINGS, CONTRACTOR SHALL CAREFULLY REMOVE SUSPENDED
CEILING COMPONENTS AS REQUIRED TO PERFORM THE SPECIFIED WORK. UPON COMPLETION, REINSTALL CEILING AND
COMPONENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO CEILING COMPONENTS.
9 ALL WALL & FLOOR PENETRATIONS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.
10 UNLESS NOTED OTHERWISE, ALL WORK IN OCCUPIED AREAS OF THE BUILDING, OR WORK THAT REQUIRES SHUTDOWN OF
SYSTEMS, SHALL TAKE PLACE AT NIGHT (GENERALLY BETWEEN 7PM AND 5AM) OR ON WEEKENDS - COORDINATE WITH COR.
11 EXISTING TAGS FOR ALL REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE COR, FOR VA INVENTORY PURPOSES. IF THE
EQUIPMENT IS NOT DESIRED BY THE VA, IT SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF PROPERLY BY THE
CONTRACTOR.
12 REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
13 THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY
TO INSTALL THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY
ANTICIPATED INSTALLATION ISSUES.
14 FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO
PERFORMING WORK.
15 HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS.
COORDINATE WITH COR.
16 WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO ACTIVE MAIN AND CAPPED, AND
CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.
17 ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE
EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT
THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS
AND STRAINERS, TRANSMITTERS, CONTROL DEVICES.
18 CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS
SHALL BE COORDINATED WITH THE COR.
19 ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK
TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL ABANDONED UTILITY ITEMS THAT MAY NOT BE SHOWN BUT ARE
ASSOCIATED WITH THE REMOVAL WORK.
20 INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO GENERAL REQUIREMENTS SECTION 01 00 00.
21 WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK
SHALL BE PERFORMED ON WEEKENDS OR WEEK NIGHTS, IF REQUIRED BY THE COR. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED WELL IN ADVANCE (MINIMUM 3 WEEKS) WITH THE COR.
22 RE-INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED OR REMOVED IN THE PERFORMANCE OF
WORK IN THIS PROJECT, INCLUDING INSULATION REMOVAL FOR ASBESTOS ABATEMENT.
23 ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING
FACILITY.
24 EXISTING CONDITIONS SHOWN ARE BASED UPON AVAILABLE EXISTING DRAWINGS, AND MAY DIFFER FROM ACTUAL WORK IN PLACE.
THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE
EXECUTION OF THE WORK. ANY VARIATION BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT
DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING
OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.
25 IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE
CONTRACTOR SHALL IMMEDIATELY INFORM THE COR. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION OF ASBESTOS
PARTICLES SHALL BE TERMINATED. WORK MAY BE RESUMED ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE
MATERIALS HAVE BEEN REMOVED OR ENCAPSULATED AND THE AREA DECLARED SAFE.
26 CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS
SHALL BE COORDINATED WITH THE COR.
27 AHU CHILLED WATER DOWNTIME FOR TIE-IN OF RUNAROUND PUMPS FOR THE FOLLOWING AHU'S SHALL OCCUR AT NIGHT: AHU-8, 11, 14, 15, 19, 28, 29, 30, 60. AHU CHILLED WATER DOWNTIME FOR TIE-IN OF RUNAROUND PUMPS FOR THE FOLLOWING AHU'S MAY
TAKE PLACE DURING THE DAY BUT SHALL OCCUR DURING THE WINTER MONTHS (I.E. WHEN AHU IS IN HEATING MODE OR IN
ECONOMIZER COOLING MODE WITH NO CHILLED WATER DEMAND): AHU-1, 2, 3, 4, 5, 7, 9, 13, 23, 41, 44. AHU CHILLED WATER
DOWNTIME FOR TIE-IN OF RUNAROUND PUMP FOR THE FOLLOWING AHU SHALL OCCUR AT NIGHT DURING THE WINTER MONTHS:
AHU-10.
28 PROVIDE IDENTIFICATION LABELS/SIGNS ON ALL MECHANICAL EQUIPMENT, VALVES, PIPES, DUCTS, CONTROL DEVICES, ETC., AS
WELL AS CEILING GRID LABELS FOR CONCEALED ITEMS - REFER TO 23 05 11 FOR DETAILED REQUIREMENTS. COORDINATE
NUMBER/DESIGNATION OF ALL ITEMS WITH THE COR PRIOR TO ORDERING LABELS.
DOMESTIC HOT WATER SUPPLY
DHW
DOMESTIC HOT WATER RECIRCULATION
DHWR
FREE STEAM (LOW PRESSURE STEAM)
FS(5)
M
VALVE ON RISE/DROP (LOCATED IN VERTICAL PIPE)
(REFER TO DETAIL FOR ADDITIONAL SPECIALTIES)
SST
CS
PT
SP
AFMS
AIRFLOW MEASURING STATION
CURRENT SWITCH (FAN STATUS INDICATION)
START-STOP RELAY FOR FAN
FAN SPEED CONTROL SIGNAL
PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER
OS ROOM OCCUPANCY SENSOR(S)
DPT DIFFERENTIAL PRESSURE TRANSMITTER
PS PRESSURE SWITCH
DUPLEX PLUME EXHAUST FAN PACKAGE
DPF
CONSTANT VOLUME REHEAT TERMINAL UNIT
CVR
VARIABLE VOLUME REHEAT TERMINAL UNITVVR
SIMPLEX PLUME EXHAUST FANSPF
INDEX OF DRAWINGS
SHEET DESCRIPTION
1-M103
THIRD FLOOR PLAN
1-M104
FOURTH AND FIFTH PARTIAL FLOOR PLANS
1-M109
NINTH FLOOR PLAN
1-M108
EIGHTH FLOOR PLAN
15-M102
BUILDING 15 SECOND FLOOR PLAN
13-M102
BUILDING 13 ROOF PLAN
1-M110
TENTH FLOOR PLAN
14-M102
BUILDING 14 SECOND FLOOR PLAN
BASEMENT, FIRST, AND SECOND PARTIAL FLOOR PLANS1-M100
M501
DETAILS
M502
DETAILS
M503
DETAILS
M601
SCHEDULES, CONTROLS AND AUTOMATION
INDEX, LEGEND AND GENERAL NOTESM001
M602
CONTROLS AND AUTOMATION
M603
CENTRAL PLANT PIPING SCHEMATIC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROVIDE INTERIOR COOLING IN
THE HOSPITAL
CINCINNATI, OH
539-21-202
Project Director
10/28/2020Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 03-09-2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020
CD SUBMITTAL 10-28-2020
1-M100
BASEMENT, FIRST AND SECOND
PARTIAL FLOOR PLANS 01
SCALE: 1/16" = 1'-0"
PARTIAL BASEMENT FLOOR PLAN
JAC GEH
SCALE: 1/16" = 1'-0"
PARTIAL FIRST FLOOR PLAN
SCALE: 1/16" = 1'-0"
PARTIAL SECOND FLOOR PLAN
1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M503.
2. AHU HAS EXISTING CHILLED WATER BOOSTER PUMP. DISABLE
EXISTING BOOSTER PUMP PRIOR TO PERFORMING WORK
ASSOCIATED WITH THIS AHU, AND RETURN BOOSTER PUMP TO
NORMAL OPERATION UPON COMPLETION OF THIS WORK.
3. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M502.
4. NEW RUNAROUND PUMP SHALL BE LOCATED ABOVE CEILING IN
THIS ROOM.
5. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE AHU
PENTHOUSE ON ROOF.
6. EXISTING AIR HANDLING UNIT TO REMAIN. REFER TO PARTIAL
FIRST FLOOR PLAN ON THIS SHEET FOR WORK ASSOCIATED WITH
THIS UNIT.
7. REMOVE EXISTING PIPING TO THIS POINT FOR RECONNECTION IN
NEW WORK.
8. APPROXIMATE LOCATION OF NEW TIE IN POINTS FOR
RECIRCULATION PIPE TEES ABOVE CEILING. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP FOR AHU-9 - REFER TO COIL
CONNECTION DETAIL ON SHEET M502.
9. REMOVE EXISTING PIPING TO THIS POINT AND CAP.
10. RELOCATE EXISTING AHU-9 CHILLED WATER COIL PIPING
SPECIALTIES (CONTROL VALVE, SHUTOFF VALVES, STRAINER,
BALANCE VALVES, ETC.) FROM PIPING ON ROOF TO INSIDE
BUILDING, ABOVE CEILING IN THIS LOCATION - REFER TO COIL
CONNECTION DETAIL ON SHEET M502.
11. EXISTING AIR HANDLING UNIT TO REMAIN. REFER TO PARTIAL
SECOND FLOOR PLAN ON THIS SHEET FOR WORK ASSOCIATED
WITH THIS UNIT.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
UP
UP
DN
UP
UP
UP
DN
UP
UP
DN
UP
UP
UP
Electrical
Closet
A0004
Electric
Closet
A0005
Autopsy
A004B
M. Tlt.
A004C
HAC
A004D
F. Tlt.
A004E
Storage
A004F
Gross
Specimen
Storage
A004G
Transfer
Room
A004A
Viewing
Room
A004
Gas Stor.
A005A
Gas Stor.
A005B
Pest
Control
A005C
Corridor
C*B*13
Stor.
A007A
Hazard
Chem. Stor.
A007B
Elec.
A003
Soil Linen
A002
Drug Stor.
A001A
Alc. Vault
A001B
Narc. Vault
A001C
Elec.
A001D
Mech.
Room
A005D
Stair 2
S*B*2
Mech. Stor.
A013
Ref. Equip.
Rm.
A013A
Mech. Rm
A013B
Forms Rm.
A013D
Shred Rm.
Loading
Dock
A017
Supply
Receiving
A014
Stor.
A014A
Office
A014B
Canteen
Stor.
A014C
Warehouse
A014D
Mail Rm.
B022
Clerk Office
B022A
Receiving &
Breakout
A021
Stor.
A021A
Elec.
A022A
Supply
Storage
A020
Emergency
Generator
B013
Transformer
Room
B013B
Electric
Room
B013A
Elec. Shop
B001
Elec. Office
B001A
Elec. Shop
B001B
BioMed
Chief
B001C
BioMed
Rep. Shop
B004
Biomedical
Engineering
B005
Stair 4
S*B*4
Biomedical
Eng.
B005A
BioMed
Work Area
B006
BioMed
Stor.
B006A
Super. Fee
Service
B006B
Stor.
B007B
Authoriz.
Clerk
B007A
Lock smith
B021A
Locksmith
B021
Elec.
B001D
Freezer
A0007
Freezer
A0008
Office
A0001
Male Toilet
A0003
Female
Toilet
A0002
Break
Room
A0006
Supply
Warehouse
A001
Stair
A017A
Gas Meter
Room
A001e
Stair 11
S*B*11
Mechanical
Room
A001f
AHU-19 1 2
UP
UP
DN
DN
Dir.
Conference
Room
A102
Office
A103
Office
A104
Secretary
Office
A105
Associate
Dir. Office
A106
Director's
Office
A107
Chief of
Staff
A108
Sec. Chief of Staff
A109
Adm Asst.
A110
HAC
A111
Adm Asst.
A112
QA
Manager
A113
Sec. &
Waiting
A114
Risk
Management
A115
Asst Chief
Social Work
A116
S.W. Off.
A117
S.W. Off.
A118
Staff Dir.
Asst.
A119
Stor
A120
Public
Affairs
A118A
Adm. Asst.
A114A
Chief Soc.
Work
A115A
Tele
A119A
Director
Public
Affairs
Office
A113A
Med Staff
Coor.
A112A
Staff Dir.
Asst.
A119C
Clos
A105A
Elec.
A111A
Clos
A102A
Office
B105
Office
B106
Exam
B107
SCI
Pharmacy
B108
SCI Social
Worker
B109
Office
B110
Toilet
B111
Exam
B112
Stor
B113
Storage
B114
Exam
B115
Stair 4
S*1*4
Exam
B117
Waiting
Area
B118
Corridor
C*1*7
Stor
B114A
Tele Clos
B107A
Secretary
B119
Men's
Restroom
A121
Stair 2
S*1*2
Quality
Assurance
A123
AACOS
A124
F. Tlt.
A125
KIT.
A127
Food
Service
A128
Walk-In
Ref.
A127C
Walk-In
Ref.
A127D
Corridor
C*1*2
Pizza Shop
A131
Canteen
Dining
A130
HAC
A133
Office
B103
Elec.
B103A
Vending
A134
Audiology
Clinic
B123
Corridor
C*1*3
Stair 11
S*1*11
Corridor
A1012
Womens
Locker
A1013
Mens
Locker
A1014
Electric
Room
A1015
Signal
Closet
A1016
Staff Toilet
Staff
Lounge
A1018
Mech.
B101B
AHU-14
(ON ROOF
ABOVE)
AHU-15
(ON ROOF
ABOVE)
DN
UP
DN UP
Lab
B211
Digital
Chest Rm.
A203
Dressing
Rm.
A203A
Speech
Pathlgy.
A204
Rehab Care
Line
A205
Man Rehab
Care Line
A206
Staff
A207
Occupational
Therapy
A208
EMG Lab
A209
Rehab
Exam
A210
Rehab
Exam
A211
Elec.
A212
HAC
A213
Staff Tlt.
A214
PT Storage
A215
Hydrotheraphy
A216
Exam/Treatment
/ Exercise
Room
A217
Physical
Ther.
Supervisor
A218
Adl. Clinic
A208A
EMG Lab
A209A
Elec.
A217A
Corridor
C*2*2
Light Box
Room
A215B
SCI Exam
A215A
Stor.
A218A
Stair 2
S*2*2
Oxygen
Storage
A221
Therapy
Supervisor
A222
Ante Room
A223
Stor.
A210A
Dirty Room
A222A
Equip Wash
A222B
Mechanical
Room
A222C
Compressor
Room
A222D
Soiled
Receiving &
Decontamination
A222E
Equipment
Storage and Testing
A228A
Storage
A228B
Eto. Room
B208A
Training
Room
A224
Stair 4
S*2*4
Ana
Path
Gross
Room
B215
Office
B216
Cytology
B217
Hist
Proces/
Special
Staining?
B218
Supervisor
B219
TB/ MYC
Lab
B210B
TB/ MYC.
Lab
B210C
ISO
B210D
ISO
B210E
Tele.
B210A
Lab
B211A
Cold Rm.
B211B
Dir. Off.
B205Off.
B207A
Elec.
B206
Corr
C*2*17
Off.
B207B
Off.
B207C
Pathology
Off.
B209
Micro
Reading
B208
Break
Room
B210
Corridor
C*2*5
Storage
B208B
Stair 11
S*2*11
Clean
Supply
A2011
Storage
A2010
PACS Read
A2008
Elec.
A2006
Signal
A2005
Men Staff
A2004
Women
Staff
A2003
Office
A208A
A/C Shaft
AHU-15
AHU-14
C H
S
C H
R
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROVIDE INTERIOR COOLING IN
THE HOSPITAL
CINCINNATI, OH
539-21-202
Project Director
10/28/2020Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 03-09-2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020
CD SUBMITTAL 10-28-2020
1-M103
THIRD FLOOR PLAN
SCALE: 1/16" = 1'-0"
THIRD FLOOR PLAN
JAC GEH
1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M501.
2. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE SERVICE
CORRIDOR OF CUSTOM AHU ON ROOF.
3. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M502.
4. NEW RUNAROUND PUMP SHALL BE LOCATED ABOVE CEILING IN
THIS ROOM.
5. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M503.
6. APPROXIMATE LOCATION OF SHUT OFF VALVES FOR CHILLED
WATER SUPPLY AND RETURN BRANCHES THAT SERVE AHU-28 AND
AHU-29.
7. NEW PIPE TEE IN CHILLED WATER SUPPLY PIPE FOR TIE-IN OF
AHU-29 RUNAROUND PUMP LOOP SHALL BE LOCATED BELOW ROOF
DECK/ABOVE THIRD FLOOR CEILING AS REQUIRED DUE TO LIMITED
SPACE INSIDE AHU PIPE CHASE ON ROOF. REFER TO COIL
CONNECTION DETAIL ON SHEET M503.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
AHU-4
AHU-5
UP
UP
UP
UP
UP
UP
UP
UP
DN
DN
DN
DNUP
DN UP
DN
UP
UPDN
DN
Isolation
Procedure
Rm.
C3024
Fluoro
Procedure
Rm.
C3023
Corridor
C*3*14
Procedure
Rm.
C3021
Wash
Room
C3020
Physician
Work Room
C3019
Scope
Storage
C3017
Ante Rm.
C3016
Scope
Cleaning
C3016A
Procedure
Rm.
C3025
Procedure
Rm.
C3026
Prep/Recovery
C3027
Clean
Supply
C3014
Isolation
Prep/Recovery
C3013
Prep/Recovery
C3028
Prep/Recovery
C3029
Isolation
Prep/Recovery
C3012
Prep/Recovery
C3011
Prep/Recovery
Rm.
C3030
Prep/Recovery
Rm.
C3010
Staff Break
Rm.
C3009
Staff Toilet
C3009A
Patient
Toilet Rm.
C3008
Storage
C3007A
Signal Clos.
C3035
Patient
Toilet Rm.
C3037
Prep/Recovery
Rm.
C3038
Prep/Recovery
Rm.
C3039
Post-Op
C3040
Elec.
C3036A
Supplies /
Equipment
C3006
Consult.
C3005
Lobby
C3001
Waiting
C3002
Staff
Lounge
C326
Stair 10
S*3*10
Staff Work
Rm.
C3007
SPD Case
Cart
C3034
O.R. #7
C329
O.R.
Storage
C339
Anesthesia
Work Rm.
C337
Men's
Locker
C324B
O.R. 1
C354
O.R. 2
C353
O.R. Alcove
C352
O.R. Alcove
C352A
O.R. Alcove
C352B
Light Rm.
C352C
O.R. 3
C351
O.R. 4
C350
Clean Core
C340
Elec.
C338A
O.R. 5
C349
O.R. 6
C348
Mech.
C345
Corridor
C*3*7
Women's
Locker
C322
HAC
C346
Office
C330
Cysto O.R.
C332
Cysto O.R.
C347
M. Shower
C324A
W. Shower
C322A
Sub-Waiting
C3036
Work Rm.
C3004A
Nurse
Station
C3031
Sterile Core
C347A
Frozen
Section
C316
Cysto.
Stor.
C320
Office
C318
Elec.
C335
Tele.
C333
Corridor
C*3*9
Entry
C324
A/C Shaft
C337A
Soiled
Utility
C3032
Men's
C3002A
Women's
C3002B
Pat. Tlt.
C3022
Reception
C3004
Dr. Office
C315
Office
C317
Office
C319
Office
C321
Office
C323
Office
C325
Stair 6
S*3*6
Anesthesia
Tech.
C328
Cleaning
Supply
C3016B
Temp.
Control
C3005A
Oxygen
Storage
C369
Vestibule
C322B
Vestibule
C324C
HAC
C3033
Pat. Rm.
Neg.
Pressure
A387A
Patient
Room
A387B
Patient
Room
A387C
Patient
Room
A387D
Patient
Room
A387E
Patient
Room
A387F
Patient
Room
A387G
Shower
A387H
Patient
Room
A387I
Patient
Room
A387J
A387K
Nurse
Station
A387
Service
Lobby
A338
M. Locker
A339
F. Locker
A340
Corridor
C*3*19
RO DI
Water
A343
De-Gown
A342
Gowning
Rm.
A341
De-Con
B303
Prep/Pack
B307C
HAC
B303A
HAC
B307D
Office
B305B
Office
B305A
Storage
B308A
Office
B305C
Conf Rm.
B305D
Vendor
Drop Off
B304
Cool Down
Cart
B307B
Steam
Equip Rm.
B307A
Open Office
B305
Ante Rm/
Clean Exit
B307
Elec
B306
F. Tlt.
A306A
Waiting
Exam
A308
Exam
A309
Storage
A310
Lab
A311
Machine
A311A
Plaster
A312
CAD/CAM
A313
Off.
A314
Elec.
A315
M. Tlt.
A316
Stor.
A317
HAC
A318
Asst. Chief
A319
Pros. Adm.
Asst.
A320
Clos.
A320A
Chief Off.
A321
Ward Adm.
Off.
A323
Adm. Asst.
A324
Office
A324A
Office
A324B
Office
A324C
Chief PBS
A324D
Office
A324E
Office
A324G
Stor.
A324F
Stor.
A324H
Elec.
A331A
Pros. Stor.
A330
Pros. Off.
A332
Stair 2
S*3*2
Stor.
A335
Stor.
A336
Asst. Chief
Diet.
A337
Corridor
C*3*2
F. Tlt.
A341
M. Tlt.
A342
Stair 1
S*3*1
Stor.
A344
Sig.
A345
Stor.
A344A
Tlt.
Vasc. Lab
A347
Elec.
A350
Mech.
A351
Adm. Asst.
A352
Off.
A353
Conf.
A354
Chief of
Surgery
A355
Off.
A356
Off.
A357
Off.
A358
Off.
A359
Off.
A360
Off.
A361
Corridor
C*3*3
Off.
A355A
Physician
Review
A355B
Linen Clos.
A389
Nurse Off.
A390
Soil Utility
A391
Equip. Stor.
A392
HVAC
A394
Elec.
A395
Sig.
A396
Clean
Supply
A397
HAC
A380
Lounge
A382
Tlt.
A382A
M. Lock.
A382B
Female
Locker
A382C
Soc. Wrk.
A383
Respiratory
Therapy
A384
Conference
Room
A385
Pharm.
A386
On Call
A381
Tlt.
A381A
Patient
Advocate
A348
Off.
A349
Stair 5
S*3*5
Off.
A350B
Off.
A350D
Off.
A350A
Off.
A350C
Corridor
C*3*1
Elect.
A346
Classroom
B308
Nurse
Educator
B309
Stor.
B310
Office
B311
Office
B310A
Conf.
B310B
Off.
B311A
Off.
B311B
Lounge
B311C
Asst. Ch.
B311D
Asst. Ch.
B311E
Adm. Off.
B311F
Word Proc.
B311G
Off.
B311H
Chief Nurse
B311I
Research
Off.
B312
Off.
B312A
Sig.
B312B
Elec.
B312C
Stair 3
S*3*3
Nursing
Conf.
B314
F. Tlt.
B315
Stor.
B316
Eq. Stor.
B317
Res. Stor.
B318
Stor.
B319
Classroom
B320
Office
B321
Off.
B319A
Off.
B319B
Off.
B319C
Off.
B319D
Stor.
B321A
Classroom
B321B
Work Area
B320A Stor.
B320B
Stor.
B319E
Stair 4
S*3*4
Stor.
B311M
Corridor
C*3*5
Learning
Exchange
B322
Work Area
B322A
Work Area
B322B
Elec.
B322C
Pat. Dining
B325
Family
Waiting
B326
Reception
B327
Office
C300
Consult
C301
Break Rm.
C302
Patient Tlt.
C303
PACU
C304
Ophthamology
Optometry
C305
Office
C306
Acute Care
C307
Storage
C308
Corridor
C*3*6
Patient Rm.
C304A
Patient Rm
C304B
Patiet Rm
C304C
Meds.
C304D
Clean
Supp.
C304E
Patient Rm.
C304F
Patient Rm.
C304G
Patient Rm.
C304H
Patient Rm.
C304I
Patient Tlt.
C304J
Patient Rm.
C304K
Patient Rm.
C304L
Patient Rm.
C304M
Patient Rm.
C304N
Patient Rm.
C304O
Off.
C360
EMS/
Lockers
C361
Clean
Stretcher
Stor.
C355
Anaesthetics
C356
Soil
C357
Storage
C358
HAC
C359
Electrical
C309
Family
Wtng.
C310
Tele
C311
Lactation
C312
Grieve
Consult
C313
ICU Dir.
Off.
C314
Tlt.
C313B
Corridor
C*3*17
Adm. Asst.
A307A
Stor.
A324I
Tlt.
A388
Stair 9
S*3*9
HAC
B301
Db. Wtr
B302
Tlt.
C302A
Tr. Ch.
A338A
Stair 8
S*3*8
A/C Shaft
A/C Shaft
A/C Shaft
Elec
A338B
Linen Clost.
C3015
Corridor
C*3*11
Corridor
C*3*12
Corridor
C*3*13
Corridor
C*3*16
Corridor
C*3*15
Corridor
C*3*18
Room
B303B
Room
B307E
A378
HAC
A379
Vasc. Lab
A347A
A307
A305
Diet Off.
A303
Diet Sec.
A302
Chief Diet.
A301
Vascular
Lab
A300
Vasc. Lab
Pat. Rm.
Neg.
Pressure
AHU-10
(ON ROOF
ABOVE)
AHU-29
(ON ROOF
ABOVE)
AHU-28
(ON ROOF ABOVE)
AHU-41
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROVIDE INTERIOR COOLING IN
THE HOSPITAL
CINCINNATI, OH
539-21-202
Project Director
10/28/2020Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 03-09-2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020
CD SUBMITTAL 10-28-2020
1-M104
FOURTH AND FIFTH PARTIAL
FLOOR PLANS 01
SCALE: 1/16" = 1'-0"
PARTIAL FOURTH FLOOR PLAN
JAC GEH
SCALE: 1/16" = 1'-0"
PARTIAL FIFTH FLOOR PLAN
1. EXISTING AIR HANDLING UNIT TO REMAIN.
2. APPROXIMATE LOCATION OF NEW TIE IN POINTS FOR
RECIRCULATION PIPE TEES ABOVE CEILING. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M502.
3. EXISTING AIR HANDLING UNIT TO REMAIN. REFER TO SHEET 1-M103
FOR WORK ASSOCIATED WITH THIS UNIT.
4. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M503.
5. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE AHU COIL
PIPING ENCLOSURE ON ROOF.
6. EXISTING AIR HANDLING UNIT TO REMAIN. REFER TO SHEET 1-M100
FOR WORK ASSOCIATED WITH THIS UNIT.
7. RELOCATE EXISTING AHU-13 CHILLED WATER COIL PIPING
SPECIALTIES (CONTROL VALVE, SHUTOFF VALVES, STRAINER,
BALANCE VALVES, ETC.) FROM PIPING ON ROOF TO INSIDE
BUILDING, ABOVE CEILING IN THIS LOCATION - REFER TO COIL
CONNECTION DETAIL ON SHEET M502.
8. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M502.
9. CAREFULLY DETACH HEAT TRACE CABLE FROM EXISTING PIPING
AS REQUIRED TO ACCOMPLISH THIS WORK. UPON COMPLETION OF
WORK, REINSTALL HEAT TRACE CABLE PER MANUFACTURER'S
RECOMMENDATIONS AND VERIFY FUNCTIONALITY.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
DN
DN
UP
DN
UP
DN
UP
DN
UP
UP
DN
Reception
A400
Interview
A401
Interview
A401A
Reception
A401B
Interview
A402A
HAC
A403
Stor.
A404
Med Room
A405
Exam Rm. 2
A406
Exam Rm.
A407
Exam Rm.
A408
Exam Rm.
A409
Exam Rm.
A410
Exam Rm.
A411
Exam Rm.
A412
Exam Rm.
A413
Exam Rm.
A414
Exam Rm.
A415
Exam Rm.
A416
Exam Rm.
A417
Stor.
A418
Elec.
A418A
Stor.
A420 Staff Tlt.
A421
HSRD
Office
A422
Dr's
Off.
A423
HSRD
Off.
A424
Oncology
Pharmacy
Sattelite
A425
Chemo
Prep.
A425A
IRM Office
A427
Stair 2
S*4*2
HSRD
Off.
A424A
Comp.
Training
A430
Comp.
Specialist
Off.
A431
Service
Lobby
A436
IRM
Network
Operation
Center
A437
Comp.
Programmer
Off.
A439
Computer
Off.
A440
Chief Rm.
A441
Res. Off.
A442
Stair 1
S*4*1
IRM
Storage
(Hdwr)
A444
Elec.
A445
Toilet
A446
Toilet
A446A
IRM
Storage
(Comm)
A445A
Infusion
A449
Tlt.
A449A
Stair 5
S*4*5
Sub. Lab.
A453
Pharm.
A454
Exam
A455
Elec.
A456
Stor.
A457A
S.B.
A457B
Tlt.
A457C
D.B.
A457D
Proc.
A457E
Nurse
Station
A457F
Lab.
A457G
Exam
A458
Exam
A458A
Exam
A458B
Exam
A458C
Elec.
A459 Stor.
A460
Soil. Util.
A461
CL. Lin.
A462
Exam
A463
Exam 2
A464
Exam 4
A465
Exam 6
A466
Exam 8
A467
Exam 10
A468
Exam 9
A469
Exam 7
A470
Exam 5
A471
Exam 3
A472
Exam 1
A473
Exam
A474
KIT.
A475
Supp.
A476
HAC
A477
Waiting
A478
GCRC
Corridor
A457
Tlt.
A457H
Tlt.
A474A
Waiting
A402B
Trash
Chute
A435
Stor.
A436A
Elec.
A436B
Comp. Rm.
A437C
Stor.
A444A
Tlt.
A464A
Tlt.
A473A
Tlt.
A465A
Tlt.
A471A
Tlt.
A467A
Tlt.
A470A
Corridor
C*4*2
HSRD
Off.
A424E
HSRD
Off.
A424D
Common
Area
A424C
Dir.
Off.
A424B
Dr's
Off.
A423A
Social
Worker
A422A
HSRD
Off.
A424F
HSRD
Off.
A424G
Neuro.
Res.
A442A
Corridor
C*4*1
Elec.
A424H
Stor.
A416A
Stor.
A414A
Stor. A413A
Stor.
A410A
Stor.A408A
Stor.A407A
Tlt.
A439A
Staff
Physician
B403A
Neuro
Office
B439
Regular
E.E.G
B403B
E.E.G.
Control &
Observation
B403
F. Tlt.
B406
M. Tlt.
B407
Auto-Clave
Dishwasher
B408
HAC
B409
Elec.
B410
LAB.
Procedure
Rm
B411
W. Lab.
B412
Ram Lab.
B412A
Tissue
Culture
B412B
Office
B412C
Stair 4
S*4*4
Electrophoresis
Core
B413A
RAM Lab.
B413B
Corridor
C*4*5
Infectious
Disease
Lab
B414
Rm.
B415A
Freez.
B415B
Sig. Clos.
B416
Elec.
B417
Stair 3
S*4*3
Research
Adm. Off.
B420
Adm. Off.
B420B
CFBRE Off.
B421
Conf.
B425
Clos.
B425A
Office
B426A
Associate
Chief of
Staff/Research
B426
Office
B427
Office
B428
HAC
B429
Refrig.
B430
Elec.
B431
Lab
B432
Tissue
Culture
B433A
Mic Rotomy
B435
Microscope
Core
B436
Office
B437
Evoked
Potential
Lab
B438
Copier
Room
B437A
Corridor
B429A
Director's
Office
B429B
A/C Shaft
A/C Shaft
A/C Shaft
Mech Room
A456E
Hazardous
Compounding
B414B
Non-Hazardous
Compounding
B414D
Ante Room
B414C
Work Station
Area
B414
Hazardous
Storage
B414A
A406A
Stor.
C o r r i d o r
C
Corridor
C*4*4
Cold
AHU-13
AHU-9
AHU-10
AHU-29
AHU-28
AHU-23
CHS
CHR
DN
UP
DN
A/C Shaft
Storage
B506
Conference
Rm.
B507
Office
B508
Office
B509
Office
B510
Office
B511
Office
B512
Office
B513
Office
B514
Office
B515
Office
B516
Office
B517
Storage
B515A
Closet
B507A
Stair 3
S*5*3
Storage
B505H
Sig. Clos.
B505G
Office
B518
Office
B505
Tlt.
B505A
Elec.
B505B
Stor.
B518A
Stor.
B521D
Narc. Vault
B521A
Unit Dose
B535A
MICU
Penthouse
B505D
Fan Room
B505E
Stair 4
S*5*4
HAC
B521E
Staff Tlt.
B535B
Elec.
Cart Stor.
B535
Compound
Picking
B527
AHU-44
AHU-11
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROVIDE INTERIOR COOLING IN
THE HOSPITAL
CINCINNATI, OH
539-21-202
Project Director
10/28/2020Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 03-09-2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020
CD SUBMITTAL 10-28-2020
1-M108
EIGHTH FLOOR PLAN
SCALE: 1/8" = 1'-0"
PARTIAL EIGHTH FLOOR PLAN
JAC GEH
SCALE: 1/8" = 1'-0"
PARTIAL EIGHTH FLOOR PLAN
8TH FLOOR KEY PLAN
NO SCALE
UP
UP
DN UP
DN
UP
DN UP
DN
A/C Shaft
A/C Shaft
DN UP
DNUP
DN UP
Group
Room #1
A821
Stor.
A800A
Charting
Room
A800B
Staff Tlt.
A800C
Phys. Off.
A801
Exam
A802
Off.
A803
Psych. Off.
A804
Off.
A805
Off.
A806
Off.
A807
Stor.
A808
Off.
A809
Off.
A810
Group Rm.
A811
QI
Research
Director
A812
Off.
A813
Bath
A814
Off.
A815
ANT
A817
Elec.
A818
Counsel
Off.
A819
Group
Room #2
A820
Stair 2
S*8*2
HAC
A823
Stor.
A824
Off.
A825
Direc. Off.
A826
Coor. Off.
A827
Off.
A821A
Off.
A821B
Clos.
A825A
Tlt.
A825B
Clos.
A826A
Stor.
A828
Lin. Chute
A816
Tlt.
A809A
Tlt.
A810A
Tlt.
A811A
Tlt.
A811B
Tlt.
A812A
Corridor
C*8*2
Tlt.
A801A
Trash
Chute
A829A
Nurses
Station
A800
Stor.
A846A
Stor.
A846B
Off.
A846C
Kit.
A846D
Day Room /
Dining
A846
Stair 5
S*8*5
Lndry
A848
Clos.A849
Addict.
Ther.
A850
Shower /
Tlt.
A851
Music /
Quiet Room
A852
Group
Room
A853
Thera Off.
A854
Thera. Off.
A855
Head Nurse
Office
A856
Off.
A857
Elec.
A858
Elec.
A859
HAC
A860
Cl. Lin.
A861
Off.
A862
3 Bed
Room
A863
6 Bed Rm.
A864
6 Bed Rm.
A865
3 Bed Rm
A866
Hndcap
S.R.
A867
Group
Room
A868
Women
Bath
A867A
Restroom
A869
Sig. Clos.
A844
Stor.
A841
HAC
A842
Stor.
A840
Tech. Off.
A829B
Service
Lobby
A829
Off.
A830
Elec.
A830A
Omnicell
A857A
Elec.
A845
Stair 1
S*8*1
A/C Shaft
A/C Shaft
AHU-8
(ON ROOF
ABOVE)
AHU-7
(ON ROOF
ABOVE)
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M501
2. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE SERVICE
CORRIDOR OF CUSTOM AHU ON ROOF, ALONG WALL AS SHOWN.
3. AHU-1 ACCESSIBLE FROM 9TH FLOOR LEVEL (8TH FLOOR ROOF) -
REFER TO SHEET 1-M109.
4. EXISTING AIR HANDLING UNIT TO REMAIN. REFER TO SHEET 1-M109
FOR WORK ASSOCIATED WITH THIS UNIT.
5. RELOCATE EXISTING COIL RETURN PIPE TEES AND ASSOCIATED
PIPING SPECIALTIES (MANUAL BALANCE VALVES, ETC.) AS
REQUIRED FOR INSTALLATION OF NEW RUNAROUND LOOP RETURN
PIPE TEE.
UP
UP
AHU-1
CHR
CHS
1-CCP1
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROVIDE INTERIOR COOLING IN
THE HOSPITAL
CINCINNATI, OH
539-21-202
Project Director
10/28/2020Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 03-09-2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020
CD SUBMITTAL 10-28-2020
1-M109
NINTH FLOOR PLAN
SCALE: 1/16" = 1'-0"
NINTH FLOOR PLAN
JAC GEH
DN
DN
DN UP
Psych. Off
A903
Psych. Lab.
A903A
Psych. Lab.
A903B
AFGE
A904
Psych.
A904A
Clos.
A904B
Elec.
A904C
Vol. Serv.
Office
A905
AFGE
A905A
AFGE
A906
Entry
A906A
Clos.
A906B
Bath
A906C
Clos.
A907
Office
A908
Break
Room
A909
Stair 2
S*9*2
Vol. Serv.
Storage
A911
Office
A912 Office
A913
Office
A914
Office
A915
Serv. Lobby
A916
Tlt.
A909A
ONA Local
A911A
Clos.
A912A
Storage
A915B
Trash
Chute
A915A
Stor. Rm.
A916A
Psych. Off.
A919
Psych. Off.
A919A
Psych. Off.
A919B
Clos.
A919C
Adm. Asst.
A920
Chief
Psych.
A921
Psych. Off.
A922
D. Wtr.
Mech. Area
A923
Clerk
A924
Sdm. Off.
A925
Adm. Asst.
A926
Chief
Psych. Off.
A927
Stair 1
S*9*1
Sig. Clos.
A929
Lin.
A918
Electrical
Closet
A931A
Off.
A945
F. Tlt.
A946
M. Tlt.
A901
Dir. Off.
A946A
Psych. Off.
A901A
Psych. Off.
A902
HAC
A917
Stor.
A918A
Stor.
A918B
Office
B901
Psych. Off.
B902
Psych.
Conf. Rm.
B903
Fan Rm.
B904
Copy Room
B905
Psych. Off.
B906
Psych. Off.
B907
Corridor
C*9*1
Corridor
C*9*2
Elec.
A916D
Res.
B905A
Sleep 6
A938C
Sleep 4
A939A
Tlt.
A939B
Sleep 3
A939C
Tlt.
A939D
Control Rm.
A940
Shower
A939E
Clst.
A941C
Break
Room
A941
Soiled
Utility
A941A
Elec.
A941B
Clean
Supply
A942
Exam 2
A943
Chief Office
A944
Waiting
A932
Exam 1
A933
Sleep Phy.
A934
Sleep
Nurses/Fellows
A935
Stair 5
S*9*5
Sleep 1
A937A
Tlt.
A937B
Sleep 2
A937C
Tlt.
A937D
Lead
Tech./2nd
Tech.
A935A
Crash Cart
C-9-3A
Sleep 5
A938A
Toilet
A938B
Toilet
A938D
Entry
A938
A/C Shaft
A/C Shaft
AHU-8
AHU-7
1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M502.
2. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE AHU COIL
PIPING ENCLOSURE ON ROOF.
3. AHU-1 ACCESSIBLE FROM THIS LOCATION - REFER TO SHEET
1-M108.
4. AHU HAS EXISTING CHILLED WATER BOOSTER PUMP. DISABLE
EXISTING BOOSTER PUMP PRIOR TO PERFORMING WORK
ASSOCIATED WITH THIS AHU, AND RETURN BOOSTER PUMP TO
NORMAL OPERATION UPON COMPLETION OF THIS WORK.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROVIDE INTERIOR COOLING IN
THE HOSPITAL
CINCINNATI, OH
539-21-202
Project Director
10/28/2020Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 03-09-2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020
CD SUBMITTAL 10-28-2020
1-M110
TENTH FLOOR PLAN
SCALE: 1/8" = 1'-0"
TENTH FLOOR PLAN
JAC GEH
UP
UP
UP
UP
UP
DN
Room
A10002
Stair 1
S*10*1
Fan Room
A10001
Mezzanine
A10003
AHU-3
AHU-2
1-CCP3
1-CCP2
1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M501.
2. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE SERVICE
CORRIDOR OF CUSTOM AHU ON ROOF, ALONG WALL AS SHOWN.
3. RELOCATE EXISTING AIR FLOW MEASURING SYSTEM TRANSMITTER
AS REQUIRED TO ENSURE IT IS NOT OBSTRUCTED BY NEW
RUNAROUND PIPING.
4. LOWER EXISTING STEAM CONDENSATE LINES (QTY. 2) AS
REQUIRED TO ACCOMMODATE NEW RUNAROUND LOOP PIPING.
CONDENSATE PIPES DRAIN BY GRAVITY AND SHALL NOT RISE IN
DIRECTION OF FLOW.
5. RELOCATE EXISTING PIPE TEMPERATURE SENSOR IN THIS
LOCATION AS REQUIRED TO ACCOMMODATE NEW RUNAROUND
LOOP SUPPLY PIPE TEE - REFER TO COIL CONNECTION DETAIL ON
SHEET M501 FOR NEW LOCATION.
6. CAREFULLY REMOVE AND REINSTALL EXISTING BYPASS PIPE,
BYPASS CONTROL VALVE AND OTHER PIPING SPECIALTIES AS
SHOWN, TO ROTATE ORIENTATION 180 DEGREES IN ORDER TO
ACCOMMODATE NEW RUNAROUND LOOP SUPPLY PIPE TEE.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
SCALE: 1/8" = 1'-0"
BUILDING 13 - ROOF PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROVIDE INTERIOR COOLING IN
THE HOSPITAL
CINCINNATI, OH
539-21-202
Project Director
10/28/2020Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 03-09-2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020
CD SUBMITTAL 10-28-2020
13-M102
BUILDING 13 ROOF PLAN
JAC GEH
UP
UP
UP
UP
UP
Kitchen
Storage
Office
Toilet
Office
Upper Level of Catwalk
Corridor
C-2-1
Stairs
S-2-1
Lift Platform
COOLING TOWER 1
COOLING TOWER 21
COOLING TOWER 3
COOLING TOWER 4
1 32
1. EXISTING COOLING TOWER TO REMAIN. REMOVE EXISTING
COOLING TOWER FILL AND REPLACE WITH NEW. NEW FILL SHALL
BE 15 MIL PVC FILM WITH INTEGRAL LOUVERS AND DRIFT
ELIMINATORS, DESIGNED AND MANUFACTURED BY THE EXISTING
TOWER MANUFACTURER.
2. EACH COOLING TOWER HAS APPROXIMATELY 96 EXISTING NOZZLE
CUPS IN THE WARM/UPPER BASIN (48 PER SIDE) - CONTRACTOR TO
VERIFY EXISTING QUANTITY PRIOR TO BIDDING. PROVIDE
ADDITIONAL NOZZLE CUPS, SO THAT EACH TOWER HAS A TOTAL OF
160 NOZZLE CUPS IN THE WARM BASIN (80 EACH SIDE). NOZZLE
CUPS SHALL MATCH EXISTING CUPS AND SHALL BE DESIGNED AND
MANUFACTURED BY THE EXISTING TOWER MANUFACTURER.
3. REPLACEMENT OF FILL FOR COOLING TOWER #1 SHALL BE
DELETED FROM THE PROJECT SCOPE UNDER DEDUCT ALTERNATE
#1.
4. REPLACEMENT OF FILL FOR COOLING TOWER #2 SHALL BE
DELETED FROM THE PROJECT SCOPE UNDER DEDUCT ALTERNATE
#2.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
SCALE: 1/4" = 1'-0"
BUILDING 14 - SECOND FLOOR PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROVIDE INTERIOR COOLING IN
THE HOSPITAL
CINCINNATI, OH
539-21-202
Project Director
10/28/2020Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 03-09-2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020
CD SUBMITTAL 10-28-2020
14-M102
BUILDING 14 SECOND FLOOR PLAN
JAC GEH
AHU-60
Main
Electric
Em.
Electric
Mechanical
Elev. 1
EL-1
Passage
Signals
1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M503.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
SCALE: 1/4" = 1'-0"
BUILDING 15 - SECOND FLOOR PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROVIDE INTERIOR COOLING IN
THE HOSPITAL
CINCINNATI, OH
539-21-202
Project Director
10/28/2020Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 03-09-2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020
CD SUBMITTAL 10-28-2020
15-M102
BUILDING 15 SECOND FLOOR PLAN
JAC GEH
DN
UP
UP
DN
Lab
Office
209A
Corridor
C*2*4
Stair #1
S*2*1
Elec.
Lobby
Corridor
C*2*215
H.A.C.
Toilet
Office
Control
Room
Office
Lab
Sterile
Surgery
210B
Scrub
210C
Stair #2
S*2*2
Office
Office
Corridor
C*2*3
Office
Office
Storage
207A
Closet
201A
Closet
204A
Closet
205A
Electric
Storage
AHU-30
1. EXISTING AIR HANDLING UNIT TO REMAIN. PROVIDE CHILLED
WATER COIL RUNAROUND PUMP - REFER TO COIL CONNECTION
DETAIL ON SHEET M503.
2. NEW RUNAROUND PUMP SHALL BE LOCATED INSIDE SERVICE
CORRIDOR OF CUSTOM AHU ON ROOF.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
M501
DETAILS
GEH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROVIDE INTERIOR COOLING IN
THE HOSPITAL
CINCINNATI, OH
539-21-202
Project Director
10/28/2020Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 03-09-2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020
CD SUBMITTAL 10-28-2020
JAC
COIL
AHU-1 CHILLED WATER COIL PIPING CONNECTION
DRAIN WITH HOSE
CONNECTION
COIL
TEST PLUG (TYP.)
COIL
WATER RETURN
MANUAL AIR VENT
AHU-2 CHILLED WATER COIL PIPING CONNECTION
MANUAL BALANCE VALVE
1-CCP2
COIL CIRCULATING PUMP
CHECK VALVE
COIL
DRAIN WITH HOSE
CONNECTION
COIL
TEST PLUG (TYP.)
AHU-3 CHILLED WATER COIL PIPING CONNECTION
COIL
AHU-4 CHILLED WATER COIL PIPING CONNECTION
AUTOMATIC AIR VENT
WATER RETURN
SHUT OFF VALVE
WATER SUPPLY
STRAINER WITH BLOW DOWN
SHUT OFF VALVE
DRAIN WITH HOSE
CONNECTION
DDC TEMPERATURE
SENSOR (TYP)
COIL
AHU-5 CHILLED WATER COIL PIPING CONNECTION
AUTOMATIC AIR VENT
WATER RETURN
SHUT OFF VALVE
WATER SUPPLY
STRAINER WITH BLOW DOWN
SHUT OFF VALVE
DRAIN WITH HOSE
CONNECTION
T
DDC TEMPERATURE
SENSOR (TYP)
T
1-CCP5
COIL CIRCULATING PUMP
CHECK VALVE
1-CCP4
COIL CIRCULATING PUMP
CHECK VALVE
COIL
CIRCUIT SETTER (TYP.)
MANUAL AIR VENT
SHUT OFF VALVE
MODULATING 2-WAY CONTROL VALVE
WATER RETURN
WATER SUPPLY
STRAINER WITH BLOW DOWN
MANUAL AIR VENT
MODULATING 2-WAY CONTROL VALVE
SHUT OFF VALVE (TYP.)
MODULATING 2-WAY CONTROL VALVE
MODULATING 2-WAY CONTROL VALVE
SHUT OFF VALVE (TYP.)
SHUT OFF VALVE (TYP.)
A. LIGHT LINEWEIGHTS INDICATE EXISTING WORK IN PLACE; HEAVY
LINEWEIGHTS INDICATE NEW WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
C. NEW PIPING ASSOCIATED WITH THE COIL RUNAROUND PUMPS
SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK
THE SWING OR USE OF ACCESS DOORS OR PANELS; NEITHER
SHALL IT BLOCK THE SERVICING OF FILTERS, VALVES, OR
EQUIPMENT. INSTALLATION SHALL ALSO MAINTAIN SUFFICIENT
OVERHEAD CLEARANCE FOR NORMAL FOOT TRAFFIC, AND SHALL
BE EASILY MAINTAINABLE BY VA PERSONNEL.
GENERAL NOTES
APPROXIMATE LOCATIONS OF
NEW PIPE TEE FOR COIL
RECIRCULATION PIPE
APPROXIMATE LOCATIONS OF
NEW PIPE TEE FOR COIL
RECIRCULATION PIPE
APPROXIMATE LOCATIONS OF
NEW PIPE TEE FOR COIL
RECIRCULATION PIPE
APPROXIMATE LOCATIONS OF
NEW PIPE TEE FOR COIL
RECIRCULATION PIPE
APPROXIMATE LOCATIONS OF
NEW PIPE TEE FOR COIL
RECIRCULATION PIPE
MANUAL AIR VENT
1-CCP3
COIL CIRCULATING PUMP
CHECK VALVE
SHUT OFF VALVE (TYP.)
WATER SUPPLY
STRAINER WITH BLOW DOWN
SHUT OFF VALVE (TYP.)
COIL
COIL
COIL
COIL
COIL
DRAIN WITH HOSE
CONNECTION
COIL
TEST PLUG (TYP.)
DDC TEMPERATURE
SENSOR (TYP.)
T
T
WATER SUPPLY
STRAINER WITH BLOW DOWN
DDC TEMPERATURE
SENSOR (TYP.)
T
WATER RETURN
SHUT OFF VALVE (TYP.)
MODULATING 2-WAY CONTROL VALVE
T
DP
DP TRANSMITTER
DP
DP TRANSMITTER
T
T
DP
DP TRANSMITTER
RELOCATE EXISTING COIL RETURN PIPE TEES AS
REQUIRED FOR INSTALLATION OF NEW RUNAROUND
LOOP RETURN PIPE TEE - REFER TO SHEET 1-M108
T
PROVIDE NEW DDC TEMPERATURE SENSOR -
REFER TO SHEET M601 FOR CONTROL SEQUENCE
T
PROVIDE NEW DDC TEMPERATURE SENSOR -
REFER TO SHEET M601 FOR CONTROL SEQUENCE
T
PROVIDE NEW DDC TEMPERATURE SENSOR -
REFER TO SHEET M601 FOR CONTROL SEQUENCE
T
PROVIDE NEW DDC TEMPERATURE SENSOR -
REFER TO SHEET M601 FOR CONTROL SEQUENCE
T
PROVIDE NEW DDC TEMPERATURE
SENSOR - REFER TO SHEET M601 FOR
CONTROL SEQUENCE
T
T
RELOCATED DDC TEMPERATURE
SENSOR - REFER TO FLOOR PLAN
FM
FLOW
METER
RELOCATED BYPASS -
REFER TO FLOOR PLAN
FM
FLOW METER
T
MANUAL BALANCE VALVE
T
RELOCATED BYPASS -
REFER TO FLOOR PLAN
DDC TEMPERATURE
SENSOR
DDC TEMPERATURE
SENSOR
1-CCP1
COIL CIRCULATING PUMP
CHECK VALVE
SHUT OFF VALVE (TYP.)
5"
6"
6"
5"
4"
5"
4"
5"
5"
3"
3"
M502
GEH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROVIDE INTERIOR COOLING IN
THE HOSPITAL
CINCINNATI, OH
539-21-202
Project Director
10/28/2020Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 03-09-2020
65% DESIGN DEVELOPMENT (DD1) SUBMITTAL 06-08-2020
95% DESIGN DEVELOPMENT (DD2) SUBMITTAL 07-27-2020
CD SUBMITTAL 10-28-2020
JAC
COIL
WATER RETURN
MANUAL AIR VENT
UNION CONNECTIONS (TYP.)
WATER SUPPLY
SHUT OFF VALVE
AHU-11 CHILLED WATER COIL PIPING CONNECTION
AUTOMATIC FLOW
CONTROL VALVE
STRAINER WITH BLOW DOWN
1-CCP11
COIL CIRCULATING PUMP
CHECK VALVE
SHUT OFF VALVE
DRAIN WITH HOSE
CONNECTION
AHU-14 CHILLED WATER COIL PIPING CONNECTION
COIL
AHU-15 CHILLED WATER COIL PIPING CONNECTION
AUTOMATIC AIR VENT
WATER RETURN
SHUT OFF VALVE
WATER SUPPLY
STRAINER WITH BLOW DOWN
SHUT OFF VALVE
DDC TEMPERATURE
SENSOR (TYP)
T
1-CCP15
COIL CIRCULATING PUMP
CHECK VALVE
DRAIN WITH HOSE
CONNECTION
COIL
WATER RETURN
MANUAL AIR VENT
UNION CONNECTIONS (TYP.)
WATER SUPPLY
AHU-13 CHILLED WATER COIL PIPING CONNECTION
RELOCATED AUTOMATIC
FLOW CONTROL VALVE
RELOCATED
STRAINER WITH
BLOW DOWN
1-CCP13
COIL CIRCULATING PUMP
CHECK VALVE
RELOCATED
SHUT OFF VALVE
DRAIN WITH HOSE
CONNECTION
COIL
WATER RETURN
MANUAL AIR VENT
UNION CONNECTIONS (TYP.)
WATER SUPPLY
SHUT OFF VALVE
AHU-7 CHILLED WATER COIL PIPING CONNECTION
CIRCUIT SETTER
STRAINER WITH BLOW DOWN
1-CCP7
COIL CIRCULATING PUMP
CHECK VALVE
SHUT OFF VALVE
AHU-8 CHILLED WATER COIL PIPING CONNECTION
COIL
WATER RETURN
UNION CONNECTIONS (TYP.)
WATER SUPPLY
RELOCATED SHUT OFF VALVE
AHU-9 CHILLED WATER COIL PIPING CONNECTION
RELOCATED AUTOMATIC FLOW CONTROL VALVE
RELOCATED STRAINER WITH BLOW DOWN
1-CCP9
COIL CIRCULATING PUMP
CHECK VALVE
DRAIN WITH HOSE
CONNECTION
COIL
AHU-10 CHILLED WATER COIL PIPING CONNECTION
WATER RETURN
SHUT OFF VALVE
AUTOMATIC FLOW
CONTROL VALVE
WATER SUPPLY
SHUT OFF VALVE
STRAINER WITH BLOW DOWN
1-CCP10
COIL CIRCULATING PUMP
CHECK VALVE
T
DDC TEMPERATURE SENSOR
RELOCATED MODULATING 2-WAY CONTROL VALVE
MODULATING 3-WAY
CONTROL VALVE
MODULATING 3-WAY CONTROL VALVE
RELOCATED MODULATING
2-WAY CONTROL VALVE
MODULATING 3-WAY CONTROL VALVE
SHUT OFF VALVE (TYP.)
UNION CONNECTIONS (TYP.)
SHUT OFF VALVE
SHUT OFF VALVE (TYP.)
UNION CONNECTIONS (TYP.)
SHUT OFF VALVE (TYP.)
UNION CONNECTIONS (TYP.)
SHUT OFF VALVE (TYP.)
UNION CONNECTIONS (TYP.)
SHUT OFF VALVE (TYP.)
UNION CONNECTIONS (TYP.)
APPROXIMATE LOCATIONS OF
NEW PIPE TEE FOR COIL
RECIRCULATION PIPE
APPROXIMATE LOCATIONS OF
NEW PIPE TEE FOR COIL
RECIRCULATION PIPE
APPROXIMATE LOCATIONS OF
NEW PIPE TEE FOR COIL
RECIRCULATION PIPE
APPROXIMATE LOCATIONS OF
NEW PIPE TEE FOR COIL
RECIRCULATION PIPE
APPROXIMATE LOCATION OF
NEW PIPE TEE FOR COIL
RECIRCULATION PIPE -
RELOCATE EXISTING VENT
VALVE TO NEW PIPE
APPROXIMATE LOCATIONS OF
NEW PIPE TEE FOR COIL
RECIRCULATION PIPE
NOTE: THIS AHU HAS AN EXISTING CHILLED WATER BOOSTER PUMP (NOT SHOWN IN THIS DETAIL).
DISABLE EXISTING BOOSTER PUMP PRIOR TO PERFORMING WORK ASSOCIATED WITH THIS AHU,
AND RETURN BOOSTER PUMP TO NORMAL OPERATION UPON COMPLETION OF THIS WORK.
NOTE: THIS AHU HAS AN EXISTING CHILLED WATER BOOSTER PUMP (NOT SHOWN IN THIS DETAIL).
DISABLE EXISTING BOOSTER PUMP PRIOR TO PERFORMING WORK ASSOCIATED WITH THIS AHU,
AND RETURN BOOSTER PUMP TO NORMAL OPERATION UPON COMPLETION OF THIS WORK.
COIL
WATER RETURN
SHUT OFF VALVE
AUTOMATIC FLOW
CONTROL VALVE
WATER SUPPLY
SHUT OFF VALVE
STRAINER WITH BLOW DOWN
1-CCP14
COIL CIRCULATING PUMP
CHECK VALVE
MODULATING 3-WAY CONTROL VALVE
SHUT OFF VALVE (TYP.)
UNION CONNECTIONS (TYP.)
8TH FLOOR ROOF
COIL
MANUAL AIR VENT
UNION CONNECTIONS (TYP.)
SHUT OFF VALVE
CIRCUIT SETTER
1-CCP8
COIL CIRCULATING PUMP
CHECK VALVE
SHUT OFF VALVE
T
DDC TEMPERATURE SENSOR
MODULATING 2-WAY CONTROL VALVE
SHUT OFF VALVE (TYP.)
UNION CONNECTIONS (TYP.)
8TH FLOOR ROOF
EXTERIOR WALL
3RD FLOOR ROOF
1ST FLOOR ROOF
EXTERIOR WALL
MODULATING 2-WAY CONTROL VALVE
WATER RETURN
WATER SUPPLY
STRAINER WITH BLOW DOWN
NOTE: CAREFULLY DETACH HEAT TRACE CABLE FROM EXISTING PIPING AS REQUIRED
TO ACCOMPLISH THIS WORK. UPON COMPLETION OF WORK, REINSTALL HEAT TRACE
CABLE PER MANUFACTURER'S RECOMMENDATIONS AND VERIFY FUNCTIONALITY.
CAREFULLY REMOVE AND
REINSTALL EXISTING BOLTED
SHEET METAL SHROUD AS
REQUIRED TO ACCESS CHILLED
WATER SUPPLY PIPE TIE IN POINT
APPROXIMATE LOCATION OF
NEW PIPE TEE FOR COIL
RECIRCULATION PIPE
CAREFULLY REMOVE AND
REINSTALL EXISTING BOLTED
SHEET METAL SHROUD AS
REQUIRED TO ACCESS CHILLED
WATER SUPPLY PIPE TIE IN POINT
T
PROVIDE NEW DDC TEMPERATURE SENSOR -
REFER TO SHEET M601 FOR CONTROL SEQUENCE
T
PROVIDE NEW DDC TEMPERATURE SENSOR -
REFER TO SHEET M601 FOR CONTROL SEQUENCE
T
PROVIDE NEW DDC TEMPERATURE SENSOR -
REFER TO SHEET M601 FOR CONTROL SEQUENCE
T
PROVIDE NEW DDC TEMPERATURE SENSOR -
REFER TO SHEET M601 FOR CONTROL SEQUENCE
T
PROVIDE NEW DDC TEMPERATURE SENSOR -
REFER TO SHEET M601 FOR CONTROL SEQUENCE
T
PROVIDE NEW DDC TEMPERATURE SENSOR -
REFER TO SHEET M601 FOR CONTROL SEQUENCE
T
PROVIDE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .