About this file

This document is a Florida Department of Transportation (FDOT) Program Management LAP Certification of Current Capacity form, a confidential document used for pre-qualified contractors bidding on transportation projects. The two-page form is designed to certify a firm's current contracting capacity by requiring contractors to disclose their total uncompleted work and ensure that any proposal submitted does not exceed their maximum capacity rating. The certification requires specific timing considerations, such as reporting uncompleted work as of the 15th day of the month preceding the letting date, and including all new contracts and subcontracts awarded within five days of the letting date.

The form includes a "Status of Contracts on Hand" section where contractors must provide detailed information about all current contracts, including owner, location, contract amounts, subcontracted amounts, and balance of contract amounts. The document emphasizes transparency by requiring disclosure of both prime and subcontracts, whether in progress or awarded but not yet begun. Contractors are instructed to consolidate smaller contracts that individually do not exceed 3% of the total and collectively amount to less than 20% of the total. In this specific document, all monetary amounts are listed as $0.00, indicating an empty or sample form.

View the file

Other files for this state and local contract opportunity

Other files attached to Meter Changeout Supplies, newest first.
File Type Posted
Meter_Changeout_Supplies.pdf PDF
Meter_Changeout_Supplies.pdf PDF
Human_Trafficking_Affidavit_.pdf PDF
287.138_Affidavit.pdf PDF
Human_Trafficking_Affidavit_.pdf PDF
287.138_Affidavit.pdf PDF
BABA_Form.pdf PDF
Local_Preference_Affidavit.pdf PDF
Supplies_for_12_Year_Changeou_Bid.xlsx XLSX spreadsheet
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
CDBG-DR_Contract_Supplemental_Conditions_v20240521.pdf PDF
Local_MBE_Form.pdf PDF
Local_Preference_Affidavit.pdf PDF
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
FHWA-1273_(10_23)_.pdf PDF
Notice_of_Award.docx DOCX document
Supplies_for_12_Year_Changeou_Bid.xlsx XLSX spreadsheet
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
Byrd_Anti-LobbyingCertification.pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
Local_MBE_Form.pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
BABA_Form.pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
w37503083_(3).docx DOCX document
525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf PDF
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
CDBG-DR_Contract_Supplemental_Conditions_v20240521.pdf PDF
FHWA-1273_(10_23)_.pdf PDF
Notice_of_Award.docx DOCX document
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
w37503083_(3).docx DOCX document
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
Byrd_Anti-LobbyingCertification.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

525-010-46

09/20

STATE OF FLOR DA DEPARTMENT OF TRANSPORTATION

PROGRAM MANAGEMENT LAP CERTIFICATION OF CURRENT CAPACITY

CONFIDENTIAL per Ch 337.14(1) F.S.

Fill in your FDOT Vendor Number For bids to be received on

(Letting Date) VF

(Only applicable to FDOT pre-qualified contractors)

CERTIFICATE

I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).

The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $

I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:

1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.

2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.

3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.

I certify that the information above is correct. NAME OF FIRM

Sworn to and subscribed this of , 20 day By:

Title

525-010-46

PROGRAM MANAGEMENT

STATUS OF CONTRACTS ON HAND 09/20

(Furnish complete information about all your contracts, whether prime or subcontracts;

whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)

1 2 3 4 5 6

PROJECTS

OWNER, LOCATION AND DESCRIPTION

CONTRACT (OR

SUBCONTRACT)

AMOUNT

AMOUNT

SUBLET

TO OTHERS

BALANCE OF

CONTRACT

AMOUNT

UNCOMPLETED AMOUNT TO BE DONE

BY YOU

AS PRIME

CONTRACTOR

AS

SUBCONTRACTOR

NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.

TOTALS $0.00 $0.00

TOTAL UNCOMPLETED WORK ON

HAND TO BE DONE BY YOU

(TOTAL COLUMNS 5 AND 6)

$0.00