This pre-solicitation announcement describes an upcoming Invitation for Bid for construction services. The Department of Veterans Affairs will seek a contractor to repair parking structures at the Ann Arbor VA Medical Center in Michigan, including concrete repair, fall protection installation, lighting replacement, tuckpointing, expansion joint replacement, parking marking repaint, signage replacement, storm piping repair, ceiling painting, entrance renovation, stairwell roof leak repair, and ventilation addition. The project value is between $2-5 million. The contractor must complete work within 380 days of award. The North American Industry Classification code is 238990. The government intends to award a firm fixed-price contract within 120 days of bid receipt. Interested parties should monitor beta.SAM.gov on or after June 10, 2020 for solicitation details.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25020B0044 0006.docx | DOCX document | |
| The project is not tax exempt.docx | DOCX document | |
| 36C25020B0044 0005.docx | DOCX document | |
| RFI Combine answers.docx | DOCX document | |
| Addendum - 01 GI104 r1.pdf | ||
| 36C25020B0044 0004.docx | DOCX document | |
| Addendum - 01 Elevator Pit Ladder detail.pdf | ||
| Addendum - 01 EP001 r1.pdf | ||
| 055000 Metal Fabrications r01.pdf | ||
| Addendum - 01 EP401 r1.pdf | ||
| 36C25020B0044 0003.docx | DOCX document | |
| 36C25020B0044 0001.docx | DOCX document | |
| 506-19-102 Elevators - Pre-Bid attendance.pdf | ||
| 36C25020B0044 0002.docx | DOCX document | |
| Contractor EMR Certification Form 2020.docx | DOCX document | |
| 36C25020B0044_2.docx | DOCX document | |
| MI20200100 01-24-2020.pdf | ||
| 506-19-102 - Bid Docs Specs .pdf | ||
| S02 - RFI Form 506-19-102.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GHAFARI ASSOCIATES
8606 ALLISONVILLE ROAD
INDIANAPOLIS, IN 46250
313-441-3000
MICHAEL DURAND
C U s e rs \e b ro w n \D o c u m e n ts
\1 .1
.0
A n n A rb o r
E le v a to r
U p g ra d e s e b ro w n
M
S K
.r v t
/2 /2
:0
:1
P M
GI000
COVER SHEET
GUIDON DESIGN
1221 N PENNSYLVANIA ST.
INDIANAPOLIS, IN 46204
317-800-6388
JAMES GOODEN
LERCH BATES
950 BOSTON STREET SE
GRAND RAPIDS, MI 49507
312-339-4595
MICHAEL HANSON
Elevator Upgrades Ann Arbor VA
Medical Center
2215 Fuller Road
506-19-102
1E, 1W, 22, 28, 29
JEFF MEANS, COR
11/27/19 JLG ELB
BID DOCUMENTS
FULLY SPRINKLERED
ANN ARBOR VA MEDICAL CENTER
2215 FULLER ROAD, ANN ARBOR, MI 48105
ANN ARBOR ELEVATOR
UPGRADES
GDI PROJECT NO : 18.1008.03
VA PROJECT NO: 506-19-102
Contact:Contact: Contact
TRI-TECH
Name : Jeff Pedersen
Project Manager
MECHANICAL,
ELECTRICAL,
PLUMBING & FIRE
PROTECTIONANN ARBOR VA MEDICAL CENTER
Name: Jeff Means
COR
2215 Fuller Road Ann Arbor, MI 48105 p: 734.222.4345 e: Jeff.Means@va.gov
OWNER
GUIDON DESIGN INC.
Name : James Gooden
Project Manager
1221 N. Pennsylvania St.
Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 145 e: jgooden@guidondesign.com
ARCHITECT
17101 Michigan Ave.
Dearborn, MI 48126 p: 313.436.8656 e: jpedersen@ghafari.com
VICINITY MAP
LOCATION MAP
Contact:
LERCH BATES
Name : Michael Hanson
Regional Manager
VERTICAL
TRANSPORTATION
950 Boston Street SE, Grand Rapids, MI 49507 p: 312.339.4595 e: michael.hanson@lerchbates.com
GHAFARI ASSOCIATES
BID DOCUMENTS
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 OVERALL BASEMENT INFECTION CONTROL / PHASING PLAN
GI102 ENLARGED INFECTION CONTROL / PHASING PLAN- FLOORS BASEMENT THROUGH 8
GI103 OVERALL BASEMENT LIFE SAFETY PLAN
GI104 BASEMENT ENLARGED LIFE SAFETY PLANS
GI105 OVERALL FIRST FLOOR LIFE SAFETY PLAN
GI106 FIRST FLOOR ENLARGED LIFE SAFETY PLANS
GI107 OVERALL SECOND FLOOR LIFE SAFETY PLAN
GI108 SECOND FLOOR ENLARGED LIFE SAFETY PLANS
GI109 OVERALL THIRD FLOOR LIFE SAFETY PLAN
GI110 THIRD FLOOR ENLARGED LIFE SAFETY PLAN
GI111 OVERALL FOURTH FLOOR LIFE SAFETY PLAN
GI112 FOURTH FLOOR ENLARGED LIFE SAFETY PLAN
GI113 OVERALL FIFTH & SIXTH FLOOR LIFE SAFETY PLAN
GI114 FIFTH FLOOR AND SIXTH FLOOR ENLARGED LIFE SAFETY PLAN
GI115 OVERALL SEVENTH & EIGHTH FLOOR LIFE SAFETY PLAN
GI116 SEVENTH FLOOR AND EIGHTH FLOOR ENLARGED LIFE SAFETY PLANS
ARCHITECTURAL
AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AD100 OVERALL BASEMENT DEMO FLOOR PLAN
AD101 ENLARGED DEMOLITION PLANS - FLOORS BASEMENT THROUGH 8
AS100 OVERALL BASEMENT FLOOR PLAN - NEW CONSTRUCTION
AS101 ENLARGED FLOOR PLANS - NEW CONSTRUCTION FLOORS BASEMENT THROUGH 8
AF601 ELEVATOR CAB ELEVATIONS & FINISH SCHEDULE
ELECTRICAL
EE001 ELECTRICAL SYMBOLS LIST
EE002 ELECTRICAL GENERAL NOTES AND ABBREVIATIONS
EP001 ELECTRICAL COMPOSITE PLAN
EP401 ELECTRICAL LARGE SCALE VIEWS
NOTE: THE GENERAL CONTRCTOR IS RESPONSIBLE
FOR HOSTING PRIMAVERA SUBMITTAL EXCHANGE
FOR THE CONTRACT ADMINISTRATION OF THIS
PROJECT.
Revisions: Date:
1 EAST1 WEST
BUILDINGBUILDING
BUILDING 1 BUILDING 28
WEST
FIRE
ALARM
ROOM
STAIR #1
STAIR #5
STAIR #1
STAIR #9
STAIR #3
STAIR #6
STAIR #7
STAIR #2
STAIR #8
STAIR #3
STAIR #2
GROUND FLOOR
LAB
CG04
G07
G07A
G16
G15
G14
G13
G08
G17A
G01
CG02
G02
G03
G04
G04A
G05
G08A
G12
G08B
G09
G11
G10
G13A
G19 C
G22
G21
G19 B
G19 E
G20 D
G20 C
G20
G20 A
G19 D
CG03
G20 E
G20 B
G19
G18
G23
G01B
G01A
G19 A
CG01
G18B
G05A
G17
G18A
CG05
OFFIC
E
OFFIC
E
OFFIC
E
OFFIC
E
OPEN O
FFIC
E
CONFE
RENCE R
OOM
STORAGE
OPEN O
FFIC
E
OFFIC
E
OFFIC
E
LAB
ANIM
AL B
EH
AVIO
RAL
G06
COLD R
OOM
FLAMM
ABLE
STORAGE
LAB
OFFIC
E
OFFIC
E
STORAGE
LAB
CELL
GLASS W
ASH
LAB
CULTURE
ULTRA L
OW
F
REEZER R
O
OM
GAS C
YLI
NDER
STORAGE
M
EN'S
T
OIL
ET
W
OM
EN'S
T
OILET
LAB
LAB
LABANIM
AL B
EH
AVIO
RAL
STORAGE
EQUIP
M
ENT C
O
RE
ELEVATOR
HAC
TOIL
ET
OPEN O
FFIC
E
LINEN ROOM
EXPANSION
WASHER
DRYER
DIRTY LINEN
HOLDING
CORRIDOR
HAC
RECEIVING /
DOCK
BOTTLED
GAS
ROOM
EXIT
STAIR
EXIST
DOCK
BB51BB50B
BB50A
BB52
BNA90
BB18
BB19
SCALE ALCOVE
CL-3
SD38
S D
S D
SD40
ELECTRICAL
MECHANICAL
CORRIDOR
CORRIDOR
OFFICE
CLERICAL
OFFICE
SUPERVISORINVEST
DRUGS/ADMIN
WORK
DRUG INFO
SERV
FEMALE
LOCKERS
MALE
LOCKERS
LLTS
LOUNGE
CONF/
CLASSROOM
STUDY
CHRONICLES
PHAR
LAB
CORRIDOR
OFFICE
CLIN
TEACHING
OFFICE
ASSIST
CHIEF
OFFICE
CHIEF
OFFICE
WAITING
OFFICE
MAN.
ASSIST
CHIEF
ELECTRIC
SHOP
GARDEN
COURTYARD
HEALING
GARDEN
ELECTRICAL
ELEC.SOILED
UTILITY
HAC
ELEVATOR
MECHANICAL
DIETICIAN
STORAGE
RECREATIONAL
THERAPY
FEMALE
TOILET
MALE
TOILET
PATIENT
LOUNGE
PASSAGE
DINING
ROOM
ELECTRICAL
SHOP
STORAGE
ELECTRICAL
SHOP
HACELEC.
STAFF
OFFICE
SOILED
UTILITY
CLEAN
LINEN
STORAGE
STAFF
OFFICE
STAFF
OFFICE
PANTRYTOILET
GROUND &
TRANSPORTATION
EQUIPMENT
STRUCTUREPASSAGE
EMERFENCY
GENERATORS
EMERGENCY
SWITCHGEAR
PAINT
SHOP
EMS
STORAGE
CLEAN
LINEN
FACILITIES
SIGN SHOP
SHOP
STORAGE
MECH
MORGUE
REFRIGERATOR
AUTOPSY
OFFICE
AUTOPSY
ROOM
NUCLEAR
MEDICINE WASTE
HOLDING
MECHANICAL
CANTEEN
FREEZER
FM
STORAGE
CORRIDOR
ELECTRICAL
EQUIPMENT
CANTEEN
SERVICE
STORAGE
BOTTLED
STORAGE
N & FS
STORAGE
N & FS
FREEZER
CARDIOLOGY
RECORDS
MECHANICAL
NUTRITION
& FOOD
SERVICE
STORAGE
NUTRITION
& FOOD
SERVICE
FREEZER
LINEN
CARTS
NUTRITION
& FOOD
SERVICE
STORAGE
HOLDING
ROOM
FOR
SHREDDING
MATERIAL
MANAGEMENT
OFFICE
SPD
STORAGE
TEL
CLOS
COMM
CLOS
HIMS/
DATA
QUALITY
MEDICAL
RECORDS
AREAWAY
CHIEF OF
HIMS
POLICE
STORAGE
FEMALE
TOILET
CHIEF
POLICE
CORRIDOR
CANTEEN
STORAGE
STORAGE
STAFF
OFFICE
PATIENT
LOUNGE
STORAGESTORAGE
LAUNDRY
SUPERVISOR
OFFICE
STAFF
BREAKROOM
KITCHEN STAFF
CONFRENCE
TOILET
TOILET
TOILET
TOILET
TOILET TOILET TOILET
TOILET
TOILET
TOILET
TOILET TOILET TOILET
TOILETTOILETTOILET
TOILETTOILET
TOILET
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
CIRC
SPACE
OPEN
OFFICES
HAC
CIRC
SPACE
VEST.
ANTE ROOM
SUPPLIES
ONCOLOGY
MIXING
IV
ADMIXTURE
PRIMARY
PICK
RECEIVING/
UNPACKING
EXIST.
VAULT
VEST. EXTEMP.
COMP.
CORRIDOR
CORRIDOR CORRIDOR
REPRODUCTIONMAILROOM/
DISTRIBUTION
PAPER/RIBBON
DISTRIBUTION
REPRODUCTION
STAFF
TOILET
TELEPHONE
SWITCH
ROOM
LLTSSTAFF
TOILET
STORAGE
WHEELCHAIR
STORAGE/REPAIR
SERVICE
ELEVATOR
LOBBY
CORRIDOR
DETERGENT
& WATER
CLEAN
CASE CART
STAGING
SPD RME
COORD
OFFICE
SPD ASSIST
CHIEF
OFFICE
SPD CHIEF
OFFICE
FEMALE
STAFF
SHOWER
FEMALE
STAFF
LOCKER
LOCKER
ANTE RM
CORRIDOR
DISPATCH
ANTE RM
FEMALE
STAFF
SHOWER
FEMALE
STAFF
LOCKER
LOCKER
ANTE ROOM
MALE
STAFF
LOCKER
MALE STAFF
SHOWER
CHEMICAL &
SOLVENT STORAGE
DECONTAM
ANTE RM
HAC
SOILED
RECEIVING
DECONTAM
HAC
CLEAN PREP
ASSEMBLY &
STERILIZATION
STERILIZERS
SURGERY STERILE
& NON-STERILE
STORAGE
DISPATCH
BREAK OUT
& CLEAN
RECEIVING
BULK
STORAGE
MALE
STAFF
TOILET RM
FEMALE
STAFF
TOILET RM
STAFF
TRAINING
STAFF
LOUNGE
CONFERENCE
CENTRAL
SUPPLY
PURCHASING
GIP
PURCHASING
CHIEF
INVENTORY
MANAGEMENT
CLEAN
STAFF
PASSAGE
CHIEF
CENTRAL
SUPPLY
SUPERVISOR
CENTRAL
SUPPLY
CLEAN
SUPPLY
ANTE ROOM
DISPATCH
BULK
STORAGE
BREAK OUT
CLEAN
RECEIVING
NURSING
UNITS
NON-STERILE
STORAGE
CORRIDOR
MECHANICAL
CORRIDOR
CORRIDOR
ELEC.
OFFICE
OFFICE
OFFICE
STORAGE
PASSAGE
STAFF
MECHANICAL
CORRIDOR
MENS
TOILET
CORRIDOR
EMERGENCY
OPERATION
CENTER
POLICE
CORRIDOR
LOCKERS
AUDITORIUM LOBBY
PATIENT
TOILET
RECEPTION
EXAM
EXAM
PASSAGE
CORRIDOR
STAFF
TOILET
CORRIDOR
VENDING
STAFF WORK
AREA
PHARMACY
X-RAY
OFFICE
OFFICE
RECEPTION
STORAGE
CORRIDOR
CORRIDOR
MENS
LOCKERS
TOILET
MENS
TOILET
EQUIP.
STOR.
EVS
BREALK
ROOM
CORRIDOR
ELEC
CLOSET
SERVICE
ELEV. LOBBY
MORGUE
SCAN/
EQUIP. PREP
OFFICESOILED
LINEN
WAITING
VOLUNTEER
STORAGE
ELECTRICAL
OFFICE
RAMP
CONF./
LOUNGE
VALVE
ROOM
VESTIBULE
BLOCK/
STORAGE
DOSIMETRYPASSAGE
C.T.
CONTROL
ROOM
TOILET
CLOSET
OFFICE OFFICE
TOILETTOILET
SECONDARY
WAITING
CONTROL
ROOM 1
OFFICE
RAMP
OFFICE
CONSULT
PASSAGE
EXAM
ELEVATOR
MECH
UNASSIGNED
FUTURE
ELEVATOR
FUTURE
STAIR
PASSAGE
WOMENS
TOILET
MENS
TOILET
SPRINKLER
RISER RM
ELECTRICAL
MODULATOR
CONTROL
ROOM 2
PASSAGE MODULATOR
EXISTING
PASSAGE
MEGA
VOLTAGELINAC
VAULT
LOBBY
WAITING
VESTIBULE
WC
A.O.D.
STORAGE
POLICE
OFFICE
CORRIDOR
MENS
TOILET
WOMENS
TOILET
MENTAL
HEALTH
DIRECTOR
CHIEF
ER NURSE
EDUCATION
TOILET
EXAM 4
EXAM 3
EXAM 2
EXAM 1
TRIAGE 2
TRAUMA 2
TRIAGE 1
EMERGENCY
WAITING
CORRIDOR
REGISTRATION
RECEPTION
TRIAGE
RECEPTION
TRIAGE
LOUNGE
TRAUMA 1
CORRIDOR
NURSE
OBSERVATION 5OBSERVATION 4OBSERVATION 3OBSERVATION 2
CORRIDORCORRIDORCORRIDORCORRIDORCORRIDORCORRIDOR
TREATMENT 5
TREATMENT 4
TREATMENT 3
TREATMENT 2
NOUR PASSAGE
CORRIDOR
MENTOR
MEDS
CHARTING
PATIENT
TOILET
WORK
MD. WORK
NURSE
ANTE-ROOM
SOILED
UTILITY
CORRIDOR
HSKGSTORAGE
I.T.
OBSERVATION 1
ELECTRICAL
ELECTRICAL
CORRIDOR
WOMENS
LOCKERWOMENS
TOILET
EVS
STORAGE
CLEAN UTILITY
TREATMENT 1
DECON/
PROCESSINGDECON
VESTIBULE
ISOLATION
1EFREEDOM BUILDING
1WLIBERTY BUILDING
MALE STAFF LOCKER
MALE STAFF SHOWER
OFFICE CHIEF OFFICE CONFERENCE
RECEPTION OFFICE OFFICE OFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE
OFFICE
IT STORAGE
MECHANICAL
NURSE STATION
ELECTRICAL
CLOSET
MED
ROOM
SOCIAL
WORKER
OFFICE
OFFICEEQUIP STORAGE
HAC
TELEPHONE
SWITCH BOARD
TELE SUPERVISOR
IT
STORAGE/WORKROOM
GENERAL
MAINTENANCE
FLEET OFF.
OFFICE TECH FOREMAN
EQUIP STORAGE
COMPRESSOR
STORAGE
ELECTRICAL
TESTING STATION CHIEF OFFICE OFFICE VOLUNTEER SERVICES
OFFICE
OFFICE
OFFICEOFFICEOFFICEOFFICE
EQUIP STORAGE BIOMED
AUDITORIUM
OFFICE
ELECTRICAL
COMM CLOS
AB02
VOLUNTARY SERVICE STORAGE
(CACHE)
ELECTRICAL EQUIPMENT
AB00
COM. ELECTRICAL
MECHANICAL
MECHANICAL ELECTRICAL
COM.
MECHANICAL ELECTRICAL MECHANICAL
MAINTENANCE
FLAMMABLE
WASTE
INDUSTRIAL
HYGIENE
STORAGE
GAS
DRY
STAIR 4
S-17
PAINT
BOOTH
CLEAN LINEN
EMS STORAGE
PASSAGE
VIEWING
ROOM
STAIR 1
EPS
C1-12
EPS-1
AB15A
AB11
AB10A AB10
AB09E
AB08
AB01
AB03A
AB03
C1
A8B
AB23
AB09Z
AB33J
AB16 AB33I
CB33
AB17
AB15
AB09
AB09H
AB09F
AB09A
AB09I
AB09K
AB09L
CB30
CB36AB09N
AB09D
AB09C
AB09B
AB09A
C1 C1 C1 C1 C1 C1
AB09Y AB09X AB09W AB14
AB09M
CB29
AB09A AB09B
AB12
AB12A AB12B
CB31
AB13
AB09Q
AB09R
AB09S
AB09T
AB09U
AB09V
AB15A
AB18
AB20
AB22
AB24
AB30
AB32
CB32
AB26
AB33B
AB28
AB29
AB33F
AB33A
AB33
AB80
AB79
AB95
AB78AB95A
AB65
AB66
AB33E
AB33DAB33C
CB35A
ST10
ST10E
AB36B
ST10E-A
AB56
AB90
AB53
AB59
AB91
AB64
AB63
AB61 AB63A
AB68AB66
AB70
AB71
AB74
AB75
AB92 AB73
AB76
AB96
AB77
AB69
AB94
AB67
AB58
AB34
AB51
AB32
AB38
AB72
AB67
AB45
AB27
AB29
AB25
C2
AB92
AB92C
AB94A
AB92A
AB94
C2
C3
BB49A
BB49
BB49B
BB49C
AB36
AB36A
AB19
AB33A
CB34
AB119A
CB35
CB37
AB54
AB52
AB50
AB49
BB87
C3
C3
BB43
C4
A12G
AB55
AB57
AB93
AB60
AB62
AB41
AB40
AB31
AB37 AB37A
AB39
CB28
BB46
BB57BB55BB53
BB45
C4 C4
EB11
EB01EB02
EB03
EB04
EB05
EB06
EB07
EB09
EB10
DB11
DB13
DB14
DB19
DB20
DB21
DB22
DB23
DB37
DB34A
DB34
DB47
DB32A
DB35 DB36 DB49
DB48B DB48A
DB48 DB48C
DB48D
DB24
DB25B
DB25A
CB20
DB25
DB25C
DB25D
DB40
DB41
DB42
DB43
CB22B
CB-3
S-1
S-2
CB-12
CB12B
CB12D
CB12C
CB07
CB08B
CB06A
CB04
CB05
CB06
CB-7CB-2
CB-6
DB12
CB07A
DB23
DB12A
DB12
DB21B
DB21C
DB12
DB35
DB21A
DB12 DB21D
DB12DB12
FG62
FG64
FG66 FG68 FG70 FG72 FG74
FG76
FG78
FG80
FG82
FG84
FG88
FG86
FG88A
FG34
FG38 FG40 FG42 FG44 FG46
FG47FG45FG43
FG41
FG39FG37FG35
FG33FG31
FG29FG27
FG25
FG23
FG52
FG54
FG56
FG58
FG60
FG36
FG63
FG63A
FG71
FG49
FG51
FG53
FG55
FG85FG57
FG59
FG83
FG81FG61
FG65
FG67 FG69
BB80
BB78
BB74
BB72
BB24
BB22
AB91
AB90
BB42
BB44
BB05B
BB05C
BB05A
BB07B
BB07
BB03
BB02
BB08
BB09C
BB09A
BB13
BB10
BB06
BB12
BB13B
A21A
AB46
AB48
AB47
AB42
AB41
BB26C
BB26B
BB26A BB80
FG01
FG02
FG10
FG10D
FG16
FG17
FG14 FG12
FG10C
FG10B
FG10A
FG09FG11
FG08 FG06
FG07
FG01A
FG00
FG01
FG04
FG02
FG05
DB00
DB02
DB03
DB04
DB05
CB-12
DB06
DB07
DB08
DB09
DB16
DB16A
DB16C
DB06D
DB06B
DB10
DB15
DB17
DB18
CB-12
CB-13
EB60
EB60B EB60A
COM.
EB02E EB02F
EB02G EB02H
EB04D EB04E EB04F EB04G
EB04H EB04J EB04K EB04L EB04M
EB02K
DB60
DB39
DB50
DB50
CB08
CB08A
CB10
CB10A
CB11 CB12A
DB50
CB13
CB15
CB16
BB85
BB70
BB68
BB24
BB24a
BB26
BB30
BB30c
BB36 BB30a
BB30b
EB60a DB60b
DB61
A22c
DB60 DB60b
EB60a
DB61 EB60B
EB60A
COM.
EB60
AB33
AB37B
BB50
BB54
BB58
BB56
BB09B
A37C
BB84
MENS
BB86
WOMENS
BB88
JC
BB89
BB100
HALLWAY
BB99
HALLWAY
BB98
HALLWAY
BB97
HALLWAY
BB86
WOMENS
BB103
STORAGE
BB96
IT ROOM
BB102
STORAGE
BB95
STORAGE
BB101
VESTIBULE
C
B
A
D
A
B
A
B
A
A
B
A
0"
28'-0"
40 S F
26 S F
18 S F
3 S F
0 S F
03 S F
XEROX 6204
HP
Z
SAF
ET
Y
BRIA
N
STO
R
STO
R
ELE
C
STO
R
M
ECH
M
ECH
IN
T D
ES
/P
RIN
T/
PLA
N R
M
JO
E
ELE
C
B
AS
EM
EN
T
SC
AL
E:
/8 1' 0"
O d
O c
O b
O a
O a
O c
O
O b
O C
U P b
U P
EL
EV
AT
O R
M
AC
H
IN
E
R O O M
EL
EV
7 6 112
HVAC SHOP
112a
OFFICE
MEZZANINE ABOVE
PIT ACCESS
TO
STEAM
TUNNEL
STAIR
PLUMBING SHOP
OFFICE
110a
OFFICE
111a
STAIR 6
FG29
2 BED ROOM
107 1Q7a104
ELECTRICAL
CONTROL RM
BOILER ROOM
CHILLER ROOM
STAFF LOUNGECONTROL ROOM
OFFICE
FG29
2 BED ROOM
MALE TOILETFEMALE TOILET STAIR 7
CARPENTER/ MASON SHOP
STAIR 4
MAIN ELECTRIC ROOM
DTE
A
B
C
D
E
F
G
SD30
N
GI102
GI102
GI102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GHAFARI ASSOCIATES
8606 ALLISONVILLE ROAD
INDIANAPOLIS, IN 46250
313-441-3000
MICHAEL DURAND
C U s e rs \e b ro w n \D o c u m e n ts
\1 .1
.0
A n n A rb o r
E le v a to r
U p g ra d e s e b ro w n
M
S K
.r v t
/2 /2
:0
:1
P M
GI101
OVERALL BASEMENT INFECTION CONTROL /
PHASING PLAN
GUIDON DESIGN
1221 N PENNSYLVANIA ST.
INDIANAPOLIS, IN 46204
317-800-6388
JAMES GOODEN
LERCH BATES
950 BOSTON STREET SE
GRAND RAPIDS, MI 49507
312-339-4595
MICHAEL HANSON
Elevator Upgrades Ann Arbor VA
Medical Center
2215 Fuller Road
506-19-102
1E, 1W, 22, 28, 29
JEFF MEANS, COR
11/27/19 JLG ELB
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1" = 40'-0"GI101
1 OVERALL BASEMENT INFECTION CONTROL / PHASING FLOOR PLAN
P5
P6
P3
P4
8' - 0"
2' - 1" 8' - 0" 1' - 11"
8'
8'
3' - 6" 3' - 6"
P2 P1
4'
11' - 3 3/4" 12' - 4"
E1
E2
7'
5' - 0"
7'
INFECTION CONTROL PLAN NOTES #
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241, ON EACH FLOOR. REFER TO SHEET GI102
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS, REFER TO SHEET GI102
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
PROJECT SHALL BE COMPLETED IN MULTIPLE PHASES.
REFER TO SPECIFICATION SECTION 01 00 00.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS ON DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION
FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED CMP SCHEDULE
FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN
A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND
BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH
4 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART WITH A LID, DESIGNED FOR SUCH
PURPOSE
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
INFECTION CONTROL GENERAL NOTES
PHASING GENERAL NOTES
A
B
C
PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
CONTRACTOR SHALL PLAN PHASING AS TO HAVE ONLY (1) ELEVATOR
INOPERABLE AT A TIME PER EACH BANK OF ELEVATORS. CONTRACTOR HAS
CAPABILITY TO WORK ON MULTIPLE ELEVATORS PER BUILIDNG LOCATION AS
LONG AS ONLY (1) ELEVATOR IS INOPERABLE PER BANK PER BUILDING.
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND
PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
PHASE 1: DURING THIS PHASE, THIS
ELEVATOR WILL BE UNDER CONSTRUCTION
AND INOPERABLE. THE REMAINING
ELEVATORS WILL BE OPERATIONAL
PHASE 2: DURING THIS PHASE, THIS ELEVATOR
WILL BE UNDER CONSTRUCTION AND
INOPERABLE. THE CONSTRUCTION OF THE
ELEVATORS IN PHASE 1 WILL BE COMPLETED.
THE REMAINING ELEVATORS WILL BE
OPERATIONAL
PHASE 3: DURING THIS PHASE, THIS ELEVATOR
WILL BE UNDER CONSTRUCTION AND
INOPERABLE. THE CONSTRUCTION OF THE
ELEVATORS IN PHASE 2 WILL BE COMPLETED.
THE REMAINING ELEVATORS WILL BE
OPERATIONAL
PHASE 4: DURING THIS PHASE, THIS ELEVATOR
WILL BE UNDER CONSTRUCTION AND
INOPERABLE. THE CONSTRUCTION OF THE
ELEVATORS IN PHASE 3 WILL BE COMPLETED.
THE REMAINING ELEVATORS WILL BE
OPERATIONAL
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION
BATT.
5/8" TYPE X GYPSUM BOARD, BOTH
SIDES
3 5/8" METAL STUD @ 16" O.C.
WITH RUNNER CHANNELS ALONG
TOP AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. CONTINUOUSLY
ADHERE TO THE STRUCTURAL DECK
ABOVE AND TO THE FLOOR BELOW
WITH TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING:
U465
COORDINATE WITH EXISTING
CEILING
NFPA CONSTRUCTION:
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER,
HARDWARE AND CLOSER
BLUE CORE KEY
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE
FOR REQUIRED CONDITION TO
STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
24"x36" STICKY WALK OFF MAT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GHAFARI ASSOCIATES
8606 ALLISONVILLE ROAD
INDIANAPOLIS, IN 46250
313-441-3000
MICHAEL DURAND
C U s e rs \e b ro w n \D o c u m e n ts
\1 .1
.0
A n n A rb o r
E le v a to r
U p g ra d e s e b ro w n
M
S K
.r v t
/2 /2
:0
:2
P M
GI102
ENLARGED INFECTION CONTROL / PHASING
PLAN- FLOORS BASEMENT THROUGH 8
GUIDON DESIGN
1221 N PENNSYLVANIA ST.
INDIANAPOLIS, IN 46204
317-800-6388
JAMES GOODEN
LERCH BATES
950 BOSTON STREET SE
GRAND RAPIDS, MI 49507
312-339-4595
MICHAEL HANSON
Elevator Upgrades Ann Arbor VA
Medical Center
2215 Fuller Road
506-19-102
1E, 1W, 22, 28, 29
JEFF MEANS, COR
11/27/19 JLG ELB
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"GI102
3 CENTRAL BUILDING BASEMENT TO EIGHTH FLOOR PHASING PLAN
SCALE: 1/4" = 1'-0"GI102
2 FREEDOM BUILDING BASEMENT TO EIGHTH FLOOR PHASING PLAN
SCALE: 1/4" = 1'-0"GI102
1 PARKING STRUCTURE BASEMENT TO EIGHTH FLOOR PHASING PLAN NNN
TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
SCALE: 1 1/2" = 1'-0"
TEMPORARY WALL CONSTRUCTION ELEVATION
SCALE: 1/4" = 1'-0"GI102
GI102
1 EAST1 WEST
BUILDINGBUILDING
BUILDING 1 BUILDING 28
WEST
FIRE
ALARM
ROOM
STAIR #1
STAIR #5
STAIR #1
STAIR #9
STAIR #3
STAIR #6
STAIR #7
STAIR #2
STAIR #8
STAIR #3
STAIR #2
GROUND FLOOR
LAB
CG04
G07
G07A
G16
G15
G14
G13
G08
G17A
G01
CG02
G02
G03
G04
G04A
G05
G08A
G12
G08B
G09
G11
G10
G13A
G19 C
G22
G21
G19 B
G19 E
G20 D
G20 C
G20
G20 A
G19 D
CG03
G20 E
G20 B
G19
G18
G23
G01B
G01A
G19 A
CG01
G18B
G05A
G17
G18A
CG05
OFFIC
E
OFFIC
E
OFFIC
E
OFFIC
E
OPEN O
FFIC
E
CONFE
RENCE R
OOM
STORAGE
OPEN O
FFIC
E
OFFIC
E
OFFIC
E
LAB
ANIM
AL B
EH
AVIO
RAL
G06
COLD R
OOM
FLAMM
ABLE
STORAGE
LAB
OFFIC
E
OFFIC
E
STORAGE
LAB
CELL
GLASS W
ASH
LAB
CULTURE
ULTRA L
OW
F
REEZER R
O
OM
GAS C
YLI
NDER
STORAGE
M
EN'S
T
OIL
ET
W
OM
EN'S
T
OILET
LAB
LAB
LABANIM
AL B
EH
AVIO
RAL
STORAGE
EQUIP
M
ENT C
O
RE
ELEVATOR
HAC
TOIL
ET
OPEN O
FFIC
E
LINEN ROOM
EXPANSION
WASHER
DRYER
DIRTY LINEN
HOLDING
CORRIDOR
HAC
RECEIVING /
DOCK
BOTTLED
GAS
ROOM
EXIT
STAIR
EXIST
DOCK
BB51BB50B
BB50A
BB52
BNA90
BB18
BB19
SCALE ALCOVE
CL-3
SD38
S D
S D
SD40
ELECTRICAL
MECHANICAL
CORRIDOR
CORRIDOR
OFFICE
CLERICAL
OFFICE
SUPERVISORINVEST
DRUGS/ADMIN
WORK
DRUG INFO
SERV
FEMALE
LOCKERS
MALE
LOCKERS
LLTS
LOUNGE
CONF/
CLASSROOM
STUDY
CHRONICLES
PHAR
LAB
CORRIDOR
OFFICE
CLIN
TEACHING
OFFICE
ASSIST
CHIEF
OFFICE
CHIEF
OFFICE
WAITING
OFFICE
MAN.
ASSIST
CHIEF
ELECTRIC
SHOP
GARDEN
COURTYARD
HEALING
GARDEN
ELECTRICAL
ELEC.SOILED
UTILITY
HAC
ELEVATOR
MECHANICAL
DIETICIAN
STORAGE
RECREATIONAL
THERAPY
FEMALE
TOILET
MALE
TOILET
PATIENT
LOUNGE
PASSAGE
DINING
ROOM
ELECTRICAL
SHOP
STORAGE
ELECTRICAL
SHOP
HACELEC.
STAFF
OFFICE
SOILED
UTILITY
CLEAN
LINEN
STORAGE
STAFF
OFFICE
STAFF
OFFICE
PANTRYTOILET
GROUND &
TRANSPORTATION
EQUIPMENT
STRUCTUREPASSAGE
EMERFENCY
GENERATORS
EMERGENCY
SWITCHGEAR
PAINT
SHOP
EMS
STORAGE
CLEAN
LINEN
FACILITIES
SIGN SHOP
SHOP
STORAGE
MECH
MORGUE
REFRIGERATOR
AUTOPSY
OFFICE
AUTOPSY
ROOM
NUCLEAR
MEDICINE WASTE
HOLDING
MECHANICAL
CANTEEN
FREEZER
FM
STORAGE
CORRIDOR
ELECTRICAL
EQUIPMENT
CANTEEN
SERVICE
STORAGE
BOTTLED
STORAGE
N & FS
STORAGE
N & FS
FREEZER
CARDIOLOGY
RECORDS
MECHANICAL
NUTRITION
& FOOD
SERVICE
STORAGE
NUTRITION
& FOOD
SERVICE
FREEZER
LINEN
CARTS
NUTRITION
& FOOD
SERVICE
STORAGE
HOLDING
ROOM
FOR
SHREDDING
MATERIAL
MANAGEMENT
OFFICE
SPD
STORAGE
TEL
CLOS
COMM
CLOS
HIMS/
DATA
QUALITY
MEDICAL
RECORDS
AREAWAY
CHIEF OF
HIMS
POLICE
STORAGE
FEMALE
TOILET
CHIEF
POLICE
CORRIDOR
CANTEEN
STORAGE
STORAGE
STAFF
OFFICE
PATIENT
LOUNGE
STORAGESTORAGE
LAUNDRY
SUPERVISOR
OFFICE
STAFF
BREAKROOM
KITCHEN STAFF
CONFRENCE
TOILET
TOILET
TOILET
TOILET
TOILET TOILET TOILET
TOILET
TOILET
TOILET
TOILET TOILET TOILET
TOILETTOILETTOILET
TOILETTOILET
TOILET
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
CIRC
SPACE
OPEN
OFFICES
HAC
CIRC
SPACE
VEST.
ANTE ROOM
SUPPLIES
ONCOLOGY
MIXING
IV
ADMIXTURE
PRIMARY
PICK
RECEIVING/
UNPACKING
EXIST.
VAULT
VEST. EXTEMP.
COMP.
CORRIDOR
CORRIDOR CORRIDOR
REPRODUCTIONMAILROOM/
DISTRIBUTION
PAPER/RIBBON
DISTRIBUTION
REPRODUCTION
STAFF
TOILET
TELEPHONE
SWITCH
ROOM
LLTSSTAFF
TOILET
STORAGE
WHEELCHAIR
STORAGE/REPAIR
SERVICE
ELEVATOR
LOBBY
CORRIDOR
DETERGENT
& WATER
CLEAN
CASE CART
STAGING
SPD RME
COORD
OFFICE
SPD ASSIST
CHIEF
OFFICE
SPD CHIEF
OFFICE
FEMALE
STAFF
SHOWER
FEMALE
STAFF
LOCKER
LOCKER
ANTE RM
CORRIDOR
DISPATCH
ANTE RM
FEMALE
STAFF
SHOWER
FEMALE
STAFF
LOCKER
LOCKER
ANTE ROOM
MALE
STAFF
LOCKER
MALE STAFF
SHOWER
CHEMICAL &
SOLVENT STORAGE
DECONTAM
ANTE RM
HAC
SOILED
RECEIVING
DECONTAM
HAC
CLEAN PREP
ASSEMBLY &
STERILIZATION
STERILIZERS
SURGERY STERILE
& NON-STERILE
STORAGE
DISPATCH
BREAK OUT
& CLEAN
RECEIVING
BULK
STORAGE
MALE
STAFF
TOILET RM
FEMALE
STAFF
TOILET RM
STAFF
TRAINING
STAFF
LOUNGE
CONFERENCE
CENTRAL
SUPPLY
PURCHASING
GIP
PURCHASING
CHIEF
INVENTORY
MANAGEMENT
CLEAN
STAFF
PASSAGE
CHIEF
CENTRAL
SUPPLY
SUPERVISOR
CENTRAL
SUPPLY
CLEAN
SUPPLY
ANTE ROOM
DISPATCH
BULK
STORAGE
BREAK OUT
CLEAN
RECEIVING
NURSING
UNITS
NON-STERILE
STORAGE
CORRIDOR
MECHANICAL
CORRIDOR
CORRIDOR
ELEC.
OFFICE
OFFICE
OFFICE
STORAGE
PASSAGE
STAFF
MECHANICAL
CORRIDOR
MENS
TOILET
CORRIDOR
EMERGENCY
OPERATION
CENTER
POLICE
CORRIDOR
LOCKERS
AUDITORIUM LOBBY
PATIENT
TOILET
RECEPTION
EXAM
EXAM
PASSAGE
CORRIDOR
STAFF
TOILET
CORRIDOR
VENDING
STAFF WORK
AREA
PHARMACY
X-RAY
OFFICE
OFFICE
RECEPTION
STORAGE
CORRIDOR
CORRIDOR
MENS
LOCKERS
TOILET
MENS
TOILET
EQUIP.
STOR.
EVS
BREALK
ROOM
CORRIDOR
ELEC
CLOSET
SERVICE
ELEV. LOBBY
MORGUE
SCAN/
EQUIP. PREP
OFFICESOILED
LINEN
WAITING
VOLUNTEER
STORAGE
ELECTRICAL
OFFICE
RAMP
CONF./
LOUNGE
VALVE
ROOM
VESTIBULE
BLOCK/
STORAGE
DOSIMETRYPASSAGE
C.T.
CONTROL
ROOM
TOILET
CLOSET
OFFICE OFFICE
TOILETTOILET
SECONDARY
WAITING
CONTROL
ROOM 1
OFFICE
RAMP
OFFICE
CONSULT
PASSAGE
EXAM
ELEVATOR
MECH
UNASSIGNED
FUTURE
ELEVATOR
FUTURE
STAIR
PASSAGE
WOMENS
TOILET
MENS
TOILET
SPRINKLER
RISER RM
ELECTRICAL
MODULATOR
CONTROL
ROOM 2
PASSAGE MODULATOR
EXISTING
PASSAGE
MEGA
VOLTAGELINAC
VAULT
LOBBY
WAITING
VESTIBULE
WC
A.O.D.
STORAGE
POLICE
OFFICE
CORRIDOR
MENS
TOILET
WOMENS
TOILET
MENTAL
HEALTH
DIRECTOR
CHIEF
ER NURSE
EDUCATION
TOILET
EXAM 4
EXAM 3
EXAM 2
EXAM 1
TRIAGE 2
TRAUMA 2
TRIAGE 1
EMERGENCY
WAITING
CORRIDOR
REGISTRATION
RECEPTION
TRIAGE
RECEPTION
TRIAGE
LOUNGE
TRAUMA 1
CORRIDOR
NURSE
OBSERVATION 5OBSERVATION 4OBSERVATION 3OBSERVATION 2
CORRIDORCORRIDORCORRIDORCORRIDORCORRIDORCORRIDOR
TREATMENT 5
TREATMENT 4
TREATMENT 3
TREATMENT 2
NOUR PASSAGE
CORRIDOR
MENTOR
MEDS
CHARTING
PATIENT
TOILET
WORK
MD. WORK
NURSE
ANTE-ROOM
SOILED
UTILITY
CORRIDOR
HSKGSTORAGE
I.T.
OBSERVATION 1
ELECTRICAL
ELECTRICAL
CORRIDOR
WOMENS
LOCKERWOMENS
TOILET
EVS
STORAGE
CLEAN UTILITY
TREATMENT 1
DECON/
PROCESSINGDECON
VESTIBULE
ISOLATION
1EFREEDOM BUILDING
1WLIBERTY BUILDING
MALE STAFF LOCKER
MALE STAFF SHOWER
OFFICE CHIEF OFFICE CONFERENCE
RECEPTION OFFICE OFFICE OFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE
OFFICE
IT STORAGE
MECHANICAL
NURSE STATION
ELECTRICAL
CLOSET
MED
ROOM
SOCIAL
WORKER
OFFICE
OFFICEEQUIP STORAGE
HAC
TELEPHONE
SWITCH BOARD
TELE SUPERVISOR
IT
STORAGE/WORKROOM
GENERAL
MAINTENANCE
FLEET OFF.
OFFICE TECH FOREMAN
EQUIP STORAGE
COMPRESSOR
STORAGE
ELECTRICAL
TESTING STATION CHIEF OFFICE OFFICE VOLUNTEER SERVICES
OFFICE
OFFICE
OFFICEOFFICEOFFICEOFFICE
EQUIP STORAGE BIOMED
AUDITORIUM
OFFICE
ELECTRICAL
COMM CLOS
AB02
VOLUNTARY SERVICE STORAGE
(CACHE)
ELECTRICAL EQUIPMENT
AB00
COM. ELECTRICAL
MECHANICAL
MECHANICAL ELECTRICAL
COM.
MECHANICAL ELECTRICAL MECHANICAL
MAINTENANCE
FLAMMABLE
WASTE
INDUSTRIAL
HYGIENE
STORAGE
GAS
DRY
STAIR 4
S-17
PAINT
BOOTH
CLEAN LINEN
EMS STORAGE
PASSAGE
VIEWING
ROOM
STAIR 1
EPS
C1-12
EPS-1
AB15A
AB11
AB10A AB10
AB09E
AB08
AB01
AB03A
AB03
C1
A8B
AB23
AB09Z
AB33J
AB16 AB33I
CB33
AB17
AB15
AB09
AB09H
AB09F
AB09A
AB09I
AB09K
AB09L
CB30
CB36AB09N
AB09D
AB09C
AB09B
AB09A
C1 C1 C1 C1 C1 C1
AB09Y AB09X AB09W AB14
AB09M
CB29
AB09A AB09B
AB12
AB12A AB12B
CB31
AB13
AB09Q
AB09R
AB09S
AB09T
AB09U
AB09V
AB15A
AB18
AB20
AB22
AB24
AB30
AB32
CB32
AB26
AB33B
AB28
AB29
AB33F
AB33A
AB33
AB80
AB79
AB95
AB78AB95A
AB65AB66
AB33E
AB33DAB33C
CB35A
ST10
ST10E
AB36B
ST10E-A
AB56
AB90
AB53
AB59
AB91
AB64
AB63
AB61 AB63A
AB68AB66
AB70
AB71
AB74
AB75
AB92 AB73
AB76
AB96
AB77
AB69
AB94
AB67
AB58
AB34
AB51
AB32
AB38
AB72
AB67
AB45
AB27
AB29
AB25
C2
AB92
AB92C
AB94A
AB92A
AB94
C2
C3
BB49A
BB49
BB49B
BB49C
AB36
AB36A
AB19
AB33A
CB34
AB119A
CB35
CB37
AB54
AB52
AB50
AB49
BB87
C3
C3
BB43
C4
A12G
AB55
AB57
AB93
AB60
AB62
AB41
AB40
AB31
AB37 AB37A
AB39
CB28
BB46
BB57BB55BB53
BB45
C4 C4
EB11
EB01EB02
EB03
EB04
EB05
EB06
EB07
EB09
EB10
DB11
DB13
DB14
DB19
DB20
DB21
DB22
DB23
DB37
DB34A
DB34
DB47
DB32A
DB35 DB36 DB49
DB48B DB48A
DB48 DB48C
DB48D
DB24
DB25B
DB25A
CB20
DB25
DB25C
DB25D
DB40
DB41
DB42
DB43
CB22B
CB-3
S-1
S-2
CB-12
CB12B
CB12D
CB12C
CB07
CB08B
CB06A
CB04
CB05
CB06
CB-7CB-2
CB-6
DB12
CB07A
DB23
DB12A
DB12
DB21B
DB21C
DB12
DB35
DB21A
DB12 DB21D
DB12DB12
FG62
FG64
FG66 FG68 FG70 FG72 FG74
FG76
FG78
FG80
FG82
FG84
FG88
FG86
FG88A
FG34
FG38 FG40 FG42 FG44 FG46
FG47FG45FG43
FG41
FG39FG37FG35
FG33FG31
FG29FG27
FG25
FG23
FG52
FG54
FG56
FG58
FG60
FG36
FG63
FG63A
FG71
FG49
FG51
FG53
FG55
FG85FG57
FG59
FG83
FG81FG61
FG65
FG67 FG69
BB80
BB78
BB74
BB72
BB24
BB22
AB91
AB90
BB42
BB44
BB05B
BB05C
BB05A
BB07B
BB07
BB03
BB02
BB08
BB09C
BB09A
BB13
BB10
BB06
BB12
BB13B
A21A
AB46
AB48
AB47
AB42
AB41
BB26C
BB26B
BB26A BB80
FG01
FG02
FG10
FG10D
FG16
FG17
FG14 FG12
FG10C
FG10B
FG10A
FG09FG11
FG08 FG06
FG07
FG01A
FG00
FG01
FG04
FG02
FG05
DB00
DB02
DB03
DB04
DB05
CB-12
DB06
DB07
DB08
DB09
DB16
DB16A
DB16C
DB06D
DB06B
DB10
DB15
DB17
DB18
CB-12
CB-13
EB60
EB60B EB60A
COM.
EB02E EB02F
EB02G EB02H
EB04D EB04E EB04F EB04G
EB04H EB04J EB04K EB04L EB04M
EB02K
DB60
DB39
DB50
DB50
CB08
CB08A
CB10
CB10A
CB11 CB12A
DB50
CB13
CB15
CB16
BB85
BB70
BB68
BB24
BB24a
BB26
BB30
BB30c
BB36 BB30a
BB30b
EB60a DB60b
DB61
A22c
DB60 DB60b
EB60a
DB61 EB60B
EB60A
COM.
EB60
AB33
AB37B
BB50
BB54
BB58
BB56
BB09B
A37C
BB84
MENS
BB86
WOMENS
BB88
JC
BB89
BB100
HALLWAY
BB99
HALLWAY
BB98
HALLWAY
BB97
HALLWAY
BB86
WOMENS
BB103
STORAGE
BB96
IT ROOM
BB102
STORAGE
BB95
STORAGE
BB101
VESTIBULE
C
B
A
D
A
B
A
B
A
A
B
A
0"
28'-0"
40 S F
26 S F
18 S F
3 S F
0 S F
03 S F
XEROX 6204
HP
Z
SAF
ET
Y
BRIA
N
STO
R
STO
R
ELE
C
STO
R
M
ECH
M
ECH
IN
T D
ES
/P
RIN
T/
PLA
N R
M
JO
E
ELE
C
B
AS
EM
EN
T
SC
AL
E:
/8 1' 0"
O d
O c
O b
O a
O a
O c
O
O b
O C
U P b
U P
EL
EV
AT
O R
M
AC
H
IN
E
R O O M
EL
EV
7 6 112
HVAC SHOP
112a
OFFICE
MEZZANINE ABOVE
PIT ACCESS
TO
STEAM
TUNNEL
STAIR
PLUMBING SHOP
OFFICE
110a
OFFICE
111a
STAIR 6
FG29
2 BED ROOM
107 1Q7a104
ELECTRICAL
CONTROL RM
BOILER ROOM
CHILLER ROOM
STAFF LOUNGECONTROL ROOM
OFFICE
FG29
2 BED ROOM
MALE TOILETFEMALE TOILET STAIR 7
CARPENTER/ MASON SHOP
STAIR 4
MAIN ELECTRIC ROOM
DTE
A
B
C
D
E
F
G
SD30
N
GI104
GI104
GI104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GHAFARI ASSOCIATES
8606 ALLISONVILLE ROAD
INDIANAPOLIS, IN 46250
313-441-3000
MICHAEL DURAND
C U s e rs \e b ro w n \D o c u m e n ts
\1 .1
.0
A n n A rb o r
E le v a to r
U p g ra d e s e b ro w n
M
S K
.r v t
/2 /2
:0
:2
P M
GI103
OVERALL BASEMENT LIFE SAFETY PLAN
GUIDON DESIGN
1221 N PENNSYLVANIA ST.
INDIANAPOLIS, IN 46204
317-800-6388
JAMES GOODEN
LERCH BATES
950 BOSTON STREET SE
GRAND RAPIDS, MI 49507
312-339-4595
MICHAEL HANSON
Elevator Upgrades Ann Arbor VA
Medical Center
2215 Fuller Road
506-19-102
1E, 1W, 22, 28, 29
JEFF MEANS, COR
11/27/19 JLG ELB
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1" = 40'-0"GI103
1 BASEMENT LIFE SAFETY PLAN
STAIR #9
CORRIDOR
CODE CRITERIA
GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.
NOTES:
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
CODE REVIEW
THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS. FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2015 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN USED.
PROJECT SCOPE
THE PROJECT SCOPE INCLUDES REPLACING THE ELEVATOR CONTROLS, DOOR AND HARDWARE. REPLACE THE ELEVATOR CAB FINISHES.
CODE ANALYSIS
1. THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2018 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE
II-B CONSTRUCTION AS FOLLOWS:
2. OCCUPANCY TYPE: I-2 INSTITUTIONAL, IBC CHAPTER 3/LSC CHAPTER 18 HEALTHCARE
3. FIRE RESISTIVE RATINGS TYPE II-B/II(000) CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:
STRUCTURAL FRAME: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE
BEARING WALLS
EXTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE
NON-BEARING WALLS AND PARTITIONS
EXTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE
FLOOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE
ROOF: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE
SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)
SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)
4. STRUCTURAL DESIGN EXISTING TO REMAIN.
5. ALLOWABLE HEIGHT: EXISTING TO REMAIN.
6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: EXISTING TO REMAIN.
7. ALLOWABLE AREA: BASED UPON B OCCUPANCY, II-B CONSTRUCTION TYPE, AND FULLY SPRINKLED: EXISTING TO REMAIN.
8. BUILDING SEPARATION: BASED ON A >30 FIRE SEPARATION DISTANCE A 0-HOUR FIRE RESISTANCE WALL RATING IS REQUIRED. EXISTING NOT TO BE CHANGED. (IBC, TABLE 602)
9. INTERIOR FINISH
• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 10.2 OF THE NFPA 101 TO CLASS A MATERIALS. (LSC 18.4.3.6.2)
• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.
• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I.
10. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10.
11. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS. EXISTING TO REMAIN.
12. FIRE SUPPRESSION: EXISTING O REMAIN.
13. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS SHALL BE CONSTRUCTED AND MAINTAINED PER NFPA 241.
CODE ANALYSIS - NFPA 101, INSTITUTIONAL HEALTHCARE CHAPTER 18
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND
REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.
ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)
NFPA 13, 220, 780
AISC
ACI 318-11
AISC 341-10
AISC 360-10
Ventilation - Per VA guidelines, ICC International Mechanical Code, and ASHRAE 62.1 -2007 Energy Efficiency - Per VA guidelines, all new mechanical equipment installed per the project shall meet the minimum requirements of ASHRAE 90.1-2007.
Building Automation System Control - The selected system will offer temperature monitoring with the ability to connect to the campus network. It is expected that the current system will have sufficient capacity to accommodate the required controls.
Electrical Codes NFPA 70 2011 NEC (National Electric Code) NFPA 70E Standard for Electrical Safety in the Workplace 2012 NFPA 72 2013 National Fire Alarm and Signaling Code NFPA 780 Standard for the Installation of Lightning Protection Systems 2011 Edition Maintenance - Equipment layouts will be reviewed for access and ease of maintenance.
ASME - A17.1 Safety Code for ELevators and Escalators ANSI A117.1-2009 Standard on Accessible & Usable Buildings and Facilities and 2010 ADA Standards for Accessible Design NFPA 101, Life Safety Code, 2012 edition (LSC) NFPA 13, Standard for the Installation of Sprinkler Systems, 2013 edition NFPA 14, Standard for the Installation of Standpipe and Hose System, 2013 edition NFPS 10, Standard for Portable Fire Extinguishers, 2013 edition NFPA 24, Standard for the Installation of Private Fire Service Mains and their Appurtenance, 2013 edition NFPA 80, Standard for Fire Doors and Other Opening Protectives, 2013 edition NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems, 2012 edition ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace, 2009b edition NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems, 2013 edition ASTM E2072-04, Specification for Photoluminescence (Phosphorescent) Safety Markings, 2004 edition IASME A17.1 Elevator Code
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS
ARCHITECTURAL, AUGUST 1, 2014
ASBESTOS ABATEMENT, JULY 2011
CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012
ELECTRICAL, DECEMBER 2015
EQUIPMENT, JUNE 2006
ESTIMATING, MARCH 8, 2011
NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010
FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015
HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011
INTERIOR DESIGN, MAY 2008
PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015
PLUMBING, NOVEMBER 2014
STRUCTURAL, FEBRUARY 1, 2014
WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012
SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013
ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR
PROJECTS SEPTEMBER 30, 2010
ELEVATOR DESIGN MANUAL, AUGUST 2016
EPA GUIDELINES CHECKLIST
VA DESIGN MANUALS PG-18-10:
GOVERNING CODES:
P5
P6
P3
P4
EXIT
74 LF
2' - 1" 8' - 0" 1' - 11"
7'
3/ 8"
7'
3/ 4"
3' - 6" 3' - 6"4' - 2 1/4"
P2 P1
EXIT
L
F
4'
L
F
11' - 3 3/4" 12' - 4"
E1
E2
EXIT
L
F
5' - 0"
7'
7'
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND
PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
PHASE 1: DURING THIS PHASE, THIS
ELEVATOR WILL BE UNDER CONSTRUCTION
AND INOPERABLE. THE REMAINING
ELEVATORS WILL BE OPERATIONAL
PHASE 2: DURING THIS PHASE, THIS ELEVATOR
WILL BE UNDER CONSTRUCTION AND
INOPERABLE. THE CONSTRUCTION OF THE
ELEVATORS IN PHASE 1 WILL BE COMPLETED.
THE REMAINING ELEVATORS WILL BE
OPERATIONAL
PHASE 3: DURING THIS PHASE, THIS ELEVATOR
WILL BE UNDER CONSTRUCTION AND
INOPERABLE. THE CONSTRUCTION OF THE
ELEVATORS IN PHASE 2 WILL BE COMPLETED.
THE REMAINING ELEVATORS WILL BE
OPERATIONAL
PHASE 4: DURING THIS PHASE, THIS ELEVATOR
WILL BE UNDER CONSTRUCTION AND
INOPERABLE. THE CONSTRUCTION OF THE
ELEVATORS IN PHASE 3 WILL BE COMPLETED.
THE REMAINING ELEVATORS WILL BE
OPERATIONAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GHAFARI ASSOCIATES
8606 ALLISONVILLE ROAD
INDIANAPOLIS, IN 46250
313-441-3000
MICHAEL DURAND
C U s e rs \e b ro w n \D o c u m e n ts
\1 .1
.0
A n n A rb o r
E le v a to r
U p g ra d e s e b ro w n
M
S K
.r v t
/2 /2
:0
:2
P M
GI104
BASEMENT ENLARGED LIFE SAFETY PLANS
GUIDON DESIGN
1221 N PENNSYLVANIA ST.
INDIANAPOLIS, IN 46204
317-800-6388
JAMES GOODEN
LERCH BATES
950 BOSTON STREET SE
GRAND RAPIDS, MI 49507
312-339-4595
MICHAEL HANSON
Elevator Upgrades Ann Arbor VA
Medical Center
2215 Fuller Road
506-19-102
1E, 1W, 22, 28, 29
JEFF MEANS, COR
11/27/19 JLG ELB
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"GI104
3 CENTRAL BUILDING BASEMENT LIFE SAFETY PLAN (P3-P6, S3-S4) N
SCALE: 1/4" = 1'-0"GI104
1 FREEDOM BUILDING BASEMENT LIFE SAFETY PLAN (P1-P2, S1-S2)
SCALE: 1/4" = 1'-0"GI104
2 PARKING STRUCTURE BASEMENT LIFE SAFETY PLAN (E1-E2) NN
STAIR #1STAIR #2
STAIR #5
STAIR #9
STAIR #6
STAIR #7
STAIR #8
STAIR #1
STAIR #3
STAIR #2
STAIR #3
EXAM 1
EXAM 2
EXAM 3
EXAM 4
EXAM 5
EXAM 6
EQ ALCOVE
CORRIDOR
HAC
WAITING ROOM
EXAM 16CHECK INCHECK IN
EXAM 8EXAM 7 EXAM 15
EXAM 13
EXAM 14
EXAM 12
EXAM 11
CHECK INCHECK IN
CORRIDOR EXAM 10
MEDS / FUTURE
CORRIDOR
CLEAN
HOLDING
PATIENT
TOILET
PATIENT
TOILET
SOILED
UTILITY
CLEAN
SUPPLY
MENTORS
ROOM
EXAM 9
CORRIDOR
CORRIDOR
ENTRY
ALCOVE
SOILED
HOLDING
CORRIDOR
B170B
B170H
B170J
B164B
B164A
B162H B165A B168F B170E B171G
B170C
B171H
B164DB164C
B162G
B162F
B162E
B162C
B170A
B165B B168E
B165C
B162B
B165D B168D
B162A B170D
ALCOVE
B170G
B165F B168B
B165E B168C
B171A
B171B
B171C
B171D
B171E
B171F
4 2.0000
STAFF
NURSING / CLERICAL &
ADMINISTRATIVE SUPPORT
UTILITY
CLEAN
CARE
AMBUL.
CARE
EXAM
DIETITIANS
DIETITIANS
ELEC ELEC COMM
E178A E178A
E108x
INFORMATION DESK
AMBULATORY CARE
ROOM
TREATMENT
OFFICE
CORRIDOR
C1-17A
CORRIDORCORRIDOR
CORRIDOR
CORRIDOR
CORR
CORRIDOR
CORRIDOR
TOILETTOILET
ELECTRICAL EQUIPMENT EQUIPMENT
CORRIDOR
CORRIDOR
CORRIDOR
UPPER PART OF ELECTRICAL SWITCHGEAR ROOM
NURSE
MECHANICAL EQUIPMENT ROOM
MECHANICAL EQUIPMENT ROOM
CORRIDOPR C1-35
CORRIDOR C1-22
CORRIDOR C1-18
CORRIDOR C1-20
CORRIDOR C1-30
CORRIDOR C1-32
CORRIDOR C1-31
ONCOLOGY
HEMATOLOGY/
CLOS
B114
COMM
C1-2
STAIRWELL
CLERK
DETAILSEMS SUPPLY
STORAGE
CB12E
BB26A
PASSAGE
UPPER PART OF
UPPER PART OF GROUNDS STORAGE GARAGE
UPPER PART OF
C1-8
UPPER PART OF EMERGENCY GENERATOR ENCLOSURE
UPPER PART OF GROUNDS & MAINTENANCE GARAGE
CORRIDOR
FEMALE
TOILET TOILET
MALE
EAST
LOBBY
SERVICE ELEVATOR
EAST ELEVATOR LOBBY
IV / CHEMO
PHARMACY
CONSULTATION
STAFF
TOILETOFFICE
MED PREP
TOILET
UNISEXEXAM
WAITING RECEPTION
EMPLOYEE HEALTH
TOILET
UNISEXOFFICE
OFFICE
WAITING AREA
VESTIBULE
CLERK
CARE
AMBULATORY
NUC MED
STORAGE
EQUIP
AGENT CASHIER
STATION 2
STATION 1
TRAVEL
BENEFICIARY
EDUCATION
PATIENTSUPPLY STORAGE
VOLUNTARY SVC
CLERKS
CARE
AMBULATORY
STATION 4
STATION 5
PRESCRIPTIONS
MAIL-OUT
CONSULTATION
PHARMACY
IV PREP
PICK UP
PHARMACY
VAULT
SUBSTANCE
CONTROLLED
MANAGER
PHARMACY STAFF
TOILET
EXAM
EXAM
EXAM
EXAMEXAM
EXAM
SUPPLIES
EXAM
EXAM
ICETOILET
UNISEX TREATMENT ROOM
TREATMENT ROOMTOILET
UNISEX
OFFICE
OFFICER
ADMINISTRATIVE
SUPERVISOR
MIS CLERKS
SOCIAL WORK
STAFF LOUNGE
TOILET
STAFF
TOILET
UNISEX
EXAM
EXAMHAC TREATMENT ROOM
EXAM
EXAM
MENTOR ROOM
NURSING
NURSINGNURSING
EXAMEXAMEXAMEXAMEXAMEXAMEXAM
STATION 6
EXAM EXAMTOILET TOILET EXAM EXAM EXAM EXAM EXAM
EXAM EXAM
EXAM
EXAM
EXAM
EXAM
TREATMENT ROOM
EXAM TREATMENT ROOM
TREATMENT ROOM
TREATMENT ROOM
EXAM
TREATMENT ROOMEXAM
EXAM
SUPPLIES
UTILITY
CLEAN
LAB
ANCILARY
TOILET
UNISEX
TOILET
TOILET
TOILET
UNISEX
MANAGERS
NURSING
CASE
NURSING
BLOOD DRAWING
STATION 7
NURSING
CHECK IN
NURSING
MENTOR ROOM
HAC
TOILET
STAFF
STAFF LOUNGE
PRACTITIONER
NURSE
PRACTITIONER
NURSE
PRACTITIONER
NURSE
SUPPLIES
PHYSICIANS
ASSISTANT
PHYSICIANS
ASSISTANT
PHYSICIANS
ASSISTANT
ASSISTANT
PHYSICIANS
TOILET
STAFFORTHOPEDICS
WOMENS HEALTH
UROLOGY
EXAM
UROLOGY
STATION 8
MANAGER
CASE
NURSING UROLOGY
OFFICE
UTILITY
PROCEDURE 2
UROLOGYPROCEDURE 1
UROLOGY
RESEARCH
SERVICE
PASSENGER
LOBBY
ELEVATORLOBBY
ELEVATOR
CORRIDORWAITING ROOM
EMERGENCY/URGENT CAREEMERGENCY/URGENT CAREEMERGENCY/URGENT CARE
HALLOFHEROES
EMERGENCY/URGENT CARE
C100
CAST ROOM
IS
OUTPATIENT PHARMACY
INFORMATION SYSTEMS
PATIENT EDUCATION
LIBRARY
E178
POLICE
ACCESS POINT
HRLINKS
TOIL TOILETSOILEDTOILTOIL
C1-15
P-1P-2
C1-25
E190
E123
E178AD178A
STORAGE
D178
D179
C1-24
C116
D196
C1-21
CORRIDOR
MENTOR'S ROOM
STAFF LOUNGE
WAITING
MAIN COMPUTER ROOM
ABOVE DRIVE
WPS BRIDGE
CLOS
COMM
NHCU BRIDGE
ENTRANCE
AMBULANCE
1 EAST1 WEST
BUILDINGBUILDING
WEST
CORRIDOR
FEC
CLOS
COMM
ELEC
COURTYARD
BELOW
RAMP UP
FEC
CORRIDOR
C1-102aCORRIDOR
CORRIDOR
AUDIO
BUILDING 1 BUILDING 28
WEST
VESTIBULE
CHECK IN/OUT
URGENT CARE
TREATMENT
B111
B118
CHECK IN/OUT
URGENT CARE
TREATMENT
B111
B118
CHECK IN/OUT
URGENT CARE
TREATMENT
B111
B118
CHECK IN/OUT
URGENT CARE
TREATMENT
B111
BREAK ROOM
CHECK IN/OUT
TRIAGE
URGENT CARE
URGENT CARE
EXAM ROOM
REM?
AUDITORIUM ROOF
AMBULANCE GARAGE
ELEC
VESTIBULE
PATIENT SHOWER
EMERGENCY
AUDIO
CLIN FELLOWS
AUDIOLOGIST
SPEECH PATH
CHIEF AUDIO/
CHIEF ENT
ENT NURSE
AUDIOLOGIST
NURSE
PRACTITIONER
PREP
REPAIR
HEARING AID
FABRICATION/
EAR MOLD
EXAM
PROCEDURE RM.
SCREENING
MENTORING
EXAM
TREATMENT
LOBBY
ELEVATOR
MALE
TOILET
FEMALE
TOILET
ELECT
WEST ENTRY PASSAGE
FEMALE
TOILET
FILESA.O.D.
OPTI TESTING
PASSAGE
LASER
CORRIDOR
PASSAGE
CLINIC
EYE
RME
WAITING RECEPTION
CHECKOUT
PASSAGE
SCREENING
EXAM RM
CONTROLCONTROL
ROOMROOM
A102
AUDIO
EXAM RM
AUDIO CONTROLCONTROL
ROOMROOM
A103 AID FIT
HEARING
RAMP UP
THERAPY
GROUP
COCHLEAR IMPLANT
HEARING AID FIT/
AID FIT
STORAGE
STORAGE
HEARING
EXAM RM
AUDIO
AUDIOLOGIST
AUDIO
TECHNICIAN
HEALTH
AUDIOLOGIST
COPY ROOM
TECHS
ENT
EXAM
ENT
EXAM
ENT
EXAM
VOICE EXAM
ELEC
S-2
S-1
CORRIDOR
ENT/AUDIO
TREATMENT
ENT
HAC
ENT
NURSE
CORRIDOR
LOBBY
ELEVATOR
SERVICE
SACRISTY
CHAPEL
PRACTIT.
A175
A175a
A173
A152A150
A177
A178
EXTENDED CARE CENTER
AND
NURSING HOME
MEDITATION ROOM
STARBUCKS
C1-11
C1-11A C1-11B
1-1
STAIR 1
RAMP TO EPS
VENDING
VESTIBULE
FRONT LOBBY
VESTIBULE
E-2
E-1
WAITING AREA
WAITING AREA
EPS
ELEV. LOBBY
C1-12
EPS-1
S-7
S-11
S-8
S-10
ADMIN
PRACT.
EXAM
28INDEPENDENCE BUILDING
T2
LASER
LANE
NURSE
EXAMEXAM
LANE
EXAMEXAM
LANE
EXAMEXAM
LANE
EXAMEXAM
LANE
EXAMEXAM
LANE
EXAM
LANE
EXAMEXAM
LANE
EXAMEXAM
LANE
EXAMEXAM
LANE
EXAMEXAM
LANE
EXAMEXAM
LANE
EXAM
LANE
DILATION WAITING
EXAMEXAM
LANE
PHONE
CENTERE
TRIAGE
EXAM ROOM
EXAM ROOM
EXAM ROOM
TRIAGE
URGENT CARE
TRIAGE STAY
SLEEP
EXAM ROOM
RESTROOM
CHECK IN
CHECK IN
GEORGE OFFICE
SANDY OFFICE
OFFICE OFFICE
HEARING AID
REPAIR
A146B
AUDIOLOGY
WAITING RM.
RECEPTION
STAFF WORKROOM
STAFF WORKROOM WOMEN
MEN
TRTMNT.
CORR
EXIST
CORR
INFUSION
A155
CLOSET
WAITING
A180
EXIST.
CORR.
RESIDENT
CHIEF/ON-CALL
RESIDENT STAFF
INTERVIEW
SALLY PORT
COPY
OFFICE
SOCIAL WORKER EXAM
INTERVIEW
OFFICE
OFFICE
OFFICE
CORR.
OFFICE
STAFF
ELECT.
OFFICE
OFFICE
PSYCHIATRIST
CORRIDOR
CORRIDOR
STOR.
CORR.
CORR.
STORAGE
PHONE
LOUNGE
AQUARIUM
LAUNDRY
CORRIDOR
ELEC. J.C.
CHARTING
CORRIDOR
PASSAGE
TOILET
OBSERV.
NURSE
MANAGER
PATIENT
ED./
NURSE
PRACT.
ELEC.
ROOM.
EXIST.
ELEC..
EXIST.
HVAC
MECHANICAL ROOM
SOILED
UTILITY
OT
STORAGE
ELECTRICAL
OT
OT OFFICE
OT OFFICE
PHYSICAL THERAPY
CLC
EXAM ROOM 7
EXAM ROOM 6
EXAM ROOM 5
EXAM ROOM 4
EXAM ROOM 1
EXAM ROOM 2
CHECK IN
CHECK OUT
WAITING
EXAM ROOM 3
EXAM/SLEEP
STUDY
ROOM
EXAM/SLEEP
STUDY
ROOM
EXAM/SLEEP
STUDY
ROOM
LOUNGE
JANITOR
STORAGE
TEL CLOSET
MEN
WOMEN
MECH
EXAM ROOM
WAITING AREA
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
NURSE STATION
RECEPTION
EXAM ROOM
EXAM ROOM
BREAK RM
NURSE STATION
NURSE STATION
NURSE STATION
WAITING AREA
EXAM ROOM
EXAM ROOM
MENTORS
ROOM
EXAM
EXAM
PV
LAB
BREAK
ROOM
UNISEX
TOILET
CLEAN
UTILITY
EXAM
ROOM
STAFF OFFICE
STAFF OFFICE
STAFF OFFICE
STAFF OFFICESTAFF OFFICE
EXAM ROOMEXAM
ROOM
EXAM
ROOM
STAFF OFFICE
EXAM
ROOM
PV LAB
BEDS
EXAMEXAM
EXAM
EXAMEXAMEXAMEXAMEXAM
CHECK-IN
EXAM
EXAM
EXAM WAITING
NURSES & ADMIN SUPPORT
DERM
MENTORS
MENTORS
CHECK-IN
RECEPTION
TELE
DERM
EXAM
BREAK
ROOM
1EFREEDOM BUILDING
1WLIBERTY BUILDING
AMBUL.
STAFF WORK
ROOM
PSYCH.
OFFICE
PRIVATE
PATIENT ROOM
PRIVATE
PATIENT ROOM
PRIVATE
PATIENT ROOM
PRIVATE
PATIENT ROOM
PRIVATE
PATIENT ROOM
PRIVATE
PATIENT ROOM
PRIVATE
PATIENT ROOM
SEMI-PRIVATE
PATIENT ROOM
SEMI-PRIVATE
PATIENT ROOM
SOILED
LINEN
SEMI-PRIVATE
PATIENT ROOM
EMERG.
ASSESS.
ROOM
DAY
ROOM
ICE
MAKER
GROUP/DINING
ROOM
SEMI-PRIVATE
PATIENT ROOM
SEMI-PRIVATE
PATIENT ROOM
PRIVATE
PATIENT ROOM
HOT
GROUP/LOUNGE
NURSE &
STUDENT
P.T. NURSE
SOCIAL
WORKER
MSW
INTERNS
TEAM
LEADER
GROUP
ROOM
PSY. RESIDENT &
MED. RESIDENT
GROUP
ROOM
PHYS./RECOVERY
COORD.
OCCUPATIONAL
OFFICE
TESTING
TLT
GROUP
ROOM
CLEAN
STORAGE
MED
ROOM
PHARMACIST
OFFICE
HIOT
RECEPTION
NURSE
STATION
NURSE
MANAGER
NURSE
STATION
NURSE
STATION
CHAPLAIN
MENS BATHROOM OFFICE
LOCKER
ROOM &
BATHROOM
ALTER
R.O.ICPAC
ELIGIBILITY
UROLOGY
UROLOGY
UROLOGY
NURSE
MANAGER
ROOM
MENTOR ROOM
CHECK-IN CHECK-IN OFFICE
NURSING CASE MANAGER
PROCEDURE ROOM 1PROCEDURE ROOM 2
EXAM
PROCEDURE ROOM 3
EXAM
MECHANICAL RM.
C1-17C
C1-17B
C1-17A C1-17F
C1-34
S-6
CORRIDOR
C1-5
C1-3A
C1-2A
CORRIDOR C1-19
CORRIDOR C1-33
C1-3
C1-4 C103C102
BB26B
BB26C
C125 C126
C1-9
D100A
C107 C111B
C111A
C111
C122C
C122B
D196E
D196A
D154D185
D184
D183
D177
D142
D159 D160
D140
E160
E147
E180
E103E101 E105
S-1
C106
C1-7A
P-4
P-3 S-5 S-4
C105A
C122F
D196B
C1-1
S-3
E114E108
E106
E104
E108AE106AE104A
C121
DW-2
E141
S-2
E173
E120
E187
E113
E188
E111
E130
E109
E128
E100 E112
E110
E191
E124 E122
E183
E184
E185
E186
E181
E125
E142
E127 E129
E131A
E131
E150
E150AE148
E146
E189
E174
E182
E177 E175E171E169
E172
E151E149
E170
E145E143
E162E159
E165E163 E161
C1-8C
C1-10
C122E C122D
C122 C122A
C118
C120
E102
E192
E121
E155
D101
D196D
D101A
C1-6
C110C108 C105
C104
D100
D186
D123
D149
D126 D128
D163D165
E156
D196C
D125A
C1-7
D181
D180
E156DE156CE156B
D120
D141D143
D121D122
D145
D124
D151 D152
D187
E156EE156AE157D161
D144
D162
D148D150 D182
D146
D170D172D174
D169D171D173D175
A118x
B198
B102
A180
B188b
P-4
P-3
P-2
P-1
S-1
S-2
C1-104
A141
A141
A142
A125
C1-101
C1-102
C-107
B112
B113 B114 B115 B116
B112
B113 B114 B115 B116
B112
B113 B114 B115 B116
B112
B113 B114 B115 B116 B118
B186
B192
B188a
B195
B187
B189
B191
B188
B194
S-15
B140
B184
B193
B196
A138
B119
A143
B101
B130c
A145
A144
A142c B100
S-13
B110
B105B106
B103
B100a
B104
B112
B113 B114
B111
B115 B116 B117
B109 B120
B132a S-12
B107 B123
B121 B122
B124
B125B126
B131
B130
B130aB130b
B133
B132b
B130d B130e B129
B127
A104A100
A105A101 A111
A109
A111a A109a
A110 A112 A106
A107
A128
A137
A135
A139
A133
A136
A134
A132
A130
A131
A129
A117 A121A119
S-3
A114
A115
A113
A124
A116
A123
C1-43
C1-29A
A113a
A149
A158
A160
A162
A164
A168 A169
A167
A163
A161
A159
D125BD125CD125D
E126 E126A E126B
E121a
E121b
F110
S-9
B133
B120A
B188
S-16
B185a
B185
B185b
C1-3
A146D A146C 146A
A156
A158 A157
A154 A170 A172 A174 A176
A159
A120
F101 F111
F105
F111a
F107
F107
F100
F100a
F102
F116a
D192a
D191
D190
D193
D192
D194
D195
D195a
F118 F119 F121 F124
F126
F117 F120
F130F115
F116T F123
F114
F112
F109
F107
F105
F103
F110
F102
F101
F149A
F149B
F149
F149C
F147G
F151 F153
F150A
F155
F150
F156
F154
F152
F150
F150A
F161
F163
F148F147F F147E
F165 F167
F169 F171 F173
F177 F179A
F175
F180
F172
F176
F170
F162
F160
F164 F166 F168 F170 F174 F176A
F176B
F176T
F160A
F147
F157
F158A
F159
F147B
F147B
F147C
F147D
F147
F164A F166A F168A F168A F168A
F179AF177A
F173AF171AF169A
F154A
F156A
F157A
F158A
F127
F122
F125
F113
F111T
F127
F106
F123
115a
117d
117a
117b
117c
A146E
A127
S-14
B139a
B152 B152a B154 B154a B159 B159a B160 B166
B157
B158
B156
B155
B153B137 B139
B166
B175 B176 B177
B174 B178
B179
B180B182
B173B172
B167B
B173
S-4
S-5
S-6
B118A
A140
111111
0"
28'-0"
9'-2"
4'-0"
12'-0"
0"
7' -3
9' -5
7"
8' -1 1"
0"
7' -2
3"
4"
8' -1 0"
8"
13'-8" 11'-11"
9'-5"
8'-10"
13'-2"
12'-4"
3'-11"
0"
S F
S F
8 S F
S F
6 S F
S F
8 S F
3 S F
S F
S F
3 S F
AM
Y/
L
IZ
M
EAG
HAN
KURT
DAN
DO
M
PRASA
D
BIO
M
ED
ENG
. C
O
NF. R
M
BIO
M
ED
LA
V
LA
V
S
T FL
O O R
SC
AL
E:
/8 1' 0" b c a d a
AH
U
AH
U
U P
U P
D N
D U C T S
U P
P
IP
E S
U P b
U P
D N
EL
EV
AT
O R
M
AC
H
IN
E
R O O M
EL
EV
HVAC SHOP
112a
OFFICE
MEZZANINE ABOVE
PIT ACCESS
TO
STEAM
TUNNEL
STAIR
PLUMBING SHOP
OFFICE
110a
OFFICE
111a
C O
R R
ID
O
R
STAIR 5
STAIR 6
FG29
2 BED ROOM
107 1Q7a104
ELECTRICAL
CONTROL RM
CORRIDOR
BOILER ROOM
CHILLER ROOM
STAFF LOUNGECONTROL ROOM
OFFICE
FG29
2 BED ROOM
MALE TOILETFEMALE TOILET
HAC
STAIR 7
STAIR 2
CARPENTER/ MASON SHOP
VEST
STAIR 4
MAIN ELECTRIC ROOM
FG29
DTE
ROOM
EMERGENCY GENERATOR
A
B
C
D
E
F
G
S D
N
GI106
GI106
GI106
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GHAFARI ASSOCIATES
8606 ALLISONVILLE ROAD
INDIANAPOLIS, IN 46250
313-441-3000
MICHAEL DURAND
C U s e rs \e b ro w n \D o c u m e n ts
\1 .1
.0
A n n A rb o r
E le v a to r
U p g ra d e s e b ro w n
M
S K
.r v t
/2 /2
:0
:2
P M
GI105
OVERALL FIRST FLOOR LIFE SAFETY PLAN
GUIDON DESIGN
1221 N PENNSYLVANIA ST.
INDIANAPOLIS, IN 46204
317-800-6388
JAMES GOODEN
LERCH BATES
950 BOSTON STREET SE
GRAND RAPIDS, MI 49507
312-339-4595
MICHAEL HANSON
Elevator Upgrades Ann Arbor VA
Medical Center
2215 Fuller Road
506-19-102
1E, 1W, 22, 28, 29
JEFF MEANS, COR
11/27/19 JLG ELB
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1" = 40'-0"GI105
1 FIRST FLOOR LIFE SAFETY PLAN
CODE CRITERIA
GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD
PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.
NOTES:
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA.