This document package includes a federal solicitation and related questions and answers log for a chiller replacement project at the Nakamura U.S. Courthouse in Seattle, Washington. The General Services Administration is seeking design-build services to add a variable-speed jockey chiller to satisfy shoulder season and early morning cooling loads. Interested small businesses must submit a completed proposal by July 30, 2020. The solicitation is set aside for total small business and includes limitations on subcontracting. A pre-proposal site visit was held on July 14. The questions and answers log provides additional project details and clarifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 47PL0120R0015-A0001.pdf | ||
| 4 Agreement 47PL0120R0015.pdf | ||
| 2 SF1442.pdf | ||
| 3 Offeror Representations and Certifications 47PL0120R0015.pdf | ||
| Attachment 1 GACA - GSA Affiliated Customer Accounts May 2014.docx | DOCX document | |
| 5 Statement of Work NCH Pony Chiller 20200316.pdf | ||
| Exhibit 0 Read Me First - SBU Document.docx | DOCX document | |
| 1 Solicitation 47PL0120R0015.pdf | ||
| 6 Wage Determination WA20200011 dated 2020 05 29.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Item
Date
Submitted
Question Response
Date Response
Responded
By
Responded in
Amendment
1 7/13/20
The SF 1442 states the period of performance is 330 days after
NTP. However, page 4 of the “Agreement” states the contract must be complete within 210 days of NTP. Please confirm the period of performance is 330 days after NTP.
7/13/20
Design NTP
Design - Day1 -- Day 120 (4Mo)
Construction NTP
Construction - Day 121 -- Day 300 (180 Days)
Closeout: Day 301 -- 330 (30 Days)
CS A0001
2 7/22/20
Please clarify number of volume pumps to be included in section 3.1.3.k
7/24/20
As this site is primary secondary with parallel (headered) pumps.
As the intent is a design build award:
A single new variable speed Primary pump be installed and ensure that the new pump can serve either the existing 200 ton York machine and the new chiller (redundancy)
Design team can propose variable primary flow, and add a minimum flow bypass to accomplish that approach (in-lieu of a new single pump).
SME A0001
3 7/22/20
Please specify the upgrades needed in the chiller room emergency ventilation section 3.6.1.2 This design build award must meet the ASHRAE Standard 15-2004 when completed. Field verification of existing conditions falls on the installing contractor.
SME A0001
4 7/22/20
Please clarify how many tube bundles in chiller need slow action isolation valves section 3.6
7/24/20
I believe the bullet referenced in this question is misunderstood.
The intent of this statement isn't to say there will be 4 bundles on the new chiller.
Design build contractor to deliver that all condenser/evaporator isolation valves are automated with slow-acting actuators (including the water side economizer).
SME A0001
5 7/22/20
Please confirm if the existing heat exchanger is piped in series to the chiller.
7/24/20
Existing plate heat exchanger shown on sheet M703 of 2007 Flack and
Kurtz drawing shows this clearly as a sidecar configuration, CHWR would go into the HX and back into the supply header that feeds CH-1 and CH-2.
The intent would be to either run WS economizer or mechanical cooling not a combination of the two.
The existing piping to this HX on both the condenser and chilled water piping lacks automatic isolation and will be required from the contractor.
SME A0001
6 7/22/20
Please provide Electrical sheet with relative location of chillers and main electrical room/main switchboard and location of main electrical room and switchboard.
7/24/20
See attached drawings in Google Drive, Contractor Solicitation
Documents / Technical Questions and Resposese (PPI Log)
EP-601-VWA00358.pdf
EP-602-VWA00358.pdf PM A0001
7 7/22/20
Please provide Schedule of switchboard, panel, or MCC that feeds the Chiller and HVAC components.
7/24/20
Contractor to field verify panel schedule
SME A0001
8 7/22/20
Please provide mechanical sheet that indicates location of Heat
Exchanger.
7/24/20
SEE DWG MP101S from 2007 drawing set.
Grid Lines C9 on the First Floor. SME A0001
9 7/22/20
Please confirm that existing Chiller VSD needs to be demolished and removed
7/24/20 Confirmed, the old chiller will be replaced with a new chiller. SME A0001
10 7/22/20
Please confirm that the BAS modifications will require new graphics
7/24/20
"Not sure what you are asking, the graphics should reflect any changes made to the physical configuration.
Editing existing graphics is an acceptable approach to match the new design build install."
SME A0001
11 7/22/20
Please confirm that a revision of the entire chiller plant sequence of operation is needed in order to provide the design intent 7/24/20 This is a design build project. The SOO is a deliverable prior to the install is performed.
SME A0001
12 7/22/20
Please advise if the chiller plant is currently being operated in auto
7/24/20 The existing chiller plant SOO is available. Upon install of this project the plant will be functional in an automatic sequence.
SME A0001
13 7/22/20
Please advise if we need to replace any sensor or device found defective
7/24/20
This question is vague.
The existing chiller that remains is under an O&M service contract to repair failed sensors/devices.
In your proposal include any exclusions to align with your design/build solution proposed.
SME A0001
14 7/22/20
Please advise if TAB on the AHUs chilled water is included
7/24/20
TAB work should be limited to flows to/from the chiller room to include both the plate HX and two chillers both condenser and chilled water flows under various modes of operation.
SME A0001
15 7/23/20
The RFP requires a turndown of 15% of its rated capacity.
Many chillers cannot meet this requirement. Is a 35% turndown acceptable? Based on the system volume this will still minimize chiller cycling and will allow more competitive options for chiller manufacturers.
7/24/20
There is a need for a chiller that can operate at low loads down to 19 tons.
Variable speed screw chillers have performance characteristics that show performance much lower than 35% turndown.
SME A0001
\oq
I E o
E
O c
O N
J r o z a E a t (-r T
O z
N N o o o
\i o or i o
U) o q) lo o o o o o
E s
I t!
z
I
c) o J
'ii o N o'6 o u)
G c a o_
0) o c G o'd o_ a o o c o
E o a
E q) o X
U g
0) 5'= a o O
U' 0) o
. c o c uJ q) o'5 o U) E f o'-o
E
0)
.E O .g o-
N(o N (o
N o,-
E O o
E .E o_ c .o f c
Y-t
N o o N (o
N o r
N (o o N o r r N
N o c 0)
C) c c c b o
N
N
N
N
(o O r f.-r o o o N e o
N N
O() N o.
I llo t'\aJ o
.E O
'c
[t c., z E o
N o o
o) G
.c o- 3o
C
E o c c€) )a c o co o o o E F
UJ
t!
lt o oz tr o E
| NPS Furniture - Questions and Responses (running log) 04052017.pdf |
| Sheet1 |
| QA Running Log for IRS.pdf |
| Sheet1 |
| ADP1E91.tmp |
| Sheet1 |
| ADP2C9B.tmp |
| Sheet1 |
| 1Point Roberts Roofing PPI Log - Technical Questions and Responses.xlsx.pdf |
| Point Roberts Roofing DB |
| 1QA Running Log for NCH Chiller Replacement as of 2020 07 27.xlsx.pdf |
| Sheet1 |
| 2QA Running Log for NCH Chiller Replacement as of 2020 07 27.xlsx.pdf |
| Sheet1 |
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: A0002 |
| Code[0]: 10PQCB |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: KIMBERLY M. JOHNSON, Contracting Officer |
| Description[0]: A. The purpose of this amendment is to provide a PPI Log with a complete Q&As as of 7/29/2020, and a site visit attendee list. |
B. The RFP due remain as Tuesday, August 4, 2020 at 1:00pm PDT.
C. All other terms and conditions of this RFP remain unchanged.
| FacilityCode[0]: |
| Code[2]: 10PQCB |
| IssuedBy[0]: Acquisition Management Division |
400 15th St. SW Auburn, WA 98001
| NameandAddress[0]: |
| AdministeredBy[0]: Same as Block 6 |
| ContractIDCode[0]: |
| ReqNumber[0]: EQ10PCPB2-20-0003 |
| AmendmentNo[1]: 47PL0120R0015 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 4 |
| EffectiveDate[0]: 7/29/2020 |
| Dated9B[0]: 6/26/2020 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: |
File details come from the government source that posted it. Updated .