response_to_questions.pdf
PDF 110 KB Posted
- Attached to
- Replace snow melt ramp Federal contract opportunity
- Solicitation number
- 47PJ0019R0085
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Price_Breakdown_template.xls | XLS spreadsheet | |
| SBU_Information_Request_Form.pdf | ||
| 100__Final_Submittal_Specs_24-JAN-2019.pdf | ||
| Reference_Form.pdf | ||
| SOW_BMK37_Ramp_Hydronic_Replacement_V2_2018.pdf | ||
| ND_12____2_15_19.pdf | ||
| USR_v2.1_6.8.18.pdf | ||
| solicitation-BismarckRamp.pdf | ||
| SBU_Information_Request_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RESPONSE TO QUESTIONS
Q1. What type of loop detection system is in place?
A1. An inlayed loop detection is in place. Delta recommends a saw cut loop with XLPE 16Ga. or THA-10 or better for loop detection. POC Glenn 703-300-2148.
Q2. Will there be any new heat trace cable in this project. I noticed it was referenced in Division 22 and Division 23, but not Division 26.
A2. No, the existing storm inlet is to remain along with the heat tracing. Contractor is to be careful not to damage this, for it is to be re-used. Refer to SOW.
Q3. On sheet E1.3 Key Note #2 “…replace any sensors removed during demolition.” Is the existing system being put back in place?
A3. No, the controller will require the installation of an in-slab snow sensor, humidity sensor, and temperature sensor. Refer to SOW.
Q4. Where is the location of the existing controller for the sensors?
A4. Sheet ED1.2 shows the location of the existing controller.
Q5. Is the existing controller being reused?
A5. No, the new snowmelt controller will be located in room 006 and fed from 120V circuit from panel LB3.
Q6. Will there be any new heat trace cable in this project. I noticed it was referenced in Division 22 and Division 23, but not Division 26.
A6. No, the existing storm inlet is to remain along with the heat tracing. Contractor is to be careful not to damage this, for it is to be re-used. Refer to SOW.
Q7. Are there new temp sensors being installed on this project?
A7. Yes, the controller will require the installation of an in-slab snow sensor, humidity sensor, and temperature sensor.
Q8. Who is furnishing?
A8. The General Contractor.
Q9. Please consider additional Pipe Specifications for Section 232113-3.2 A.2.
Hydronic Piping Applications NPS 2-1/2 and Larger. Please allow Specification “ A “ and Specification “ F “. This would align with the materials & methods currently used in the project locale providing quality and value to the Owner.
A9. Please use the design as stated.
Q10. Is a price breakdown required?
A10. Yes, see Statement of Work, page 5, Section 6. Also attached is optional price breakdown spreadsheet.
Q11. Is bid guarantee required?
A11. Yes, use form SF 24 to submit bid guarantee.