Drawings 1, 2, 3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Water_Project_Responses.pdf | ||
| Asbestos_Report.pdf | ||
| Solicitation-FargoWaterMain.pdf | ||
| Drinking_Water_Desk_Guide_Final_9.13.16.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
EXCAVATE AS REQUIRED FOR CONNECTION OF
NEW 6" WATER SERVICE TO EXISTING USING
BORING/BURST-FRACTURING INTO BUILDING.
VERIFY ALL UTILITIES PRIOR TO EXCAVATION.
PROVIDE LANE CONTROL AND COSTRUCTION
PARTITIONS AS REQUIRED TO MAINTAIN SAFETY
OF ALL PEOPLE IN THE AREA.
CORE DRILL OR OTHERWISE ENLARGE OPENING
AT WALL FOR CLEARANCE TO REPLACE WATER
PIPE TO SPRINKLER RISER. DISCONNECT AND
VERIFY BUILDING GROUND AS OUTLINED IN THE
SCOPE OF WORK. PROVIDE MECHANICAL SEAL
AND WATER STOP COLLAR, GROUT AS
NECESSARY. PROVIDE 6x6 ELBOW TO
SPRINKLER RISER.
REMOVE &
REPLACE 4"
GALVANIZED
WATER SERVICE
TO VALVE "A"
SIDEWALK
ELEVATION
905.0
BASEMENT FLOOR
ELEVATION 892.0
EXISTING 6" DUCTILE IRON WATER
SERVICE UNDER SIDEWALK, TO BE
REPLACED. BREAK LOCATION
SUSPECTED BETWEEN SLEEVE AND
FOUNDATION WALL.
APPROX. ELEVATION AT WALL PENETRATION 894.5EXISTING DOOR ACTUATOR BUTTON
PEDESTAL. DE-ENERGIZE PRIOR TO ANY
BORING ACTION AND VERIFY CIRCUIT
CLEARANCE FROM BORING AREA.
IRON
PVC
POINT OF SLEEVE CONNECTION OF C-900 TO
DUCTILE IRON. REPLACE IRON FROM THIS POINT
INTO BUILDING WITH NEW 6" C-900
COORDINATE BORE WITH FOOTING UNDER
EXISTING BARRICADE - BENCHES. CLEARANCE
UNDER FOOTING 36" (VERFIY)
EXISTING WATER STOPS IN STREET APPROX. 50'
SOUTH OF BUILDING WALL.
M
"A"
SIDEWALK
ELEVATION
905.0
1-1/4" CW &
1/2" HW
1/2" CW &
HW
1-1/2" CW
4" CW
3/4" CW
& HW
3/4" CW & HW
4" CW
4" CW, 2-1/2"
HW, 1" RHW
1-1/4" CW
S
WAP
OS S
JJ
OS
4" CW, 1-1/2" HW, 1"
RHW RISERS UP TO
INTERSTITIAL SPACE,
APPROX. 40' ABOVE.
1/2" CW & HW
4" CW, 2-1/2"
HW, 1" RHW
2" HW
REMOVE PLASTER CEILING, AND DEVICES FOR ACCESS TO CEILING IN
CROSSHATCHED AREA. REMOVE INSULATION FROM COLD (CW) HOT (HW) AND
CIRCULATING HOT WATER (CHW) IN SPACE. FULLY REMOVE 4" DOMESTIC
WATER PIPING IN IDENTIFIED AREA. PROVIDE DIELECTRIC ISOLATION AT POINT
OF CONNECTION TO DISSIMILAR METALS. HW AND CHW TO REMAIN. ELBOW
AND TEE INSULATION IS LIKELY TO BE ASBESTOS CONTAINING AND MUST BE
ABATED. REINSULATE COLD, HOT AND CIRCULATING WATER LINES UPON
COMPLETION OF NEW PIPING. REPLACE CEILING WITH LAY-IN TILE AND GRID.
REINSTALL OR REPLACE DEVICES AS NOTED.
GENERAL OBJECTIVE: INTENT IS TO REPLACE BROKEN 6" UNDERGROUND WATER SERVICE, AND GALVANIZED 4" COLD WATER (CW) PIPING IN AREAS INDICATED; REMOVE INSULATION FROM HOT WATER (HW) AND CIRCULATING HOT WATER (CHW) SYSTEMS THAT SHALL REMAIN, AND REINSULATE ALL WATER SYSTEMS AFFECTED. ACCESS REQUIRES REMOVING OF CEILING AND CEILING MOUNTED DEVICES IN SOME AREAS, AS WELL AS ASBESTOS ABATEMENT. FIRE SPRINKLER SYSTEMS EXIST BELOW CEILING IN THIS AREA, AND SHALL REMAIN IN PLACE. HARD DECK CEILING SHALL BE REPLACED WITH NEW 24"X48" LAY-IN ACOUSTICAL TILE AND GRID. SHUTDOWNS SHALL BE SCHEDULED EVENINGS AND WEEKENDS OUTSIDE OF OPERATING
HOURS.
OCCUPANCY SENSOR. REMOVE AND REINSTALL UPON COMPLETION OF WORK.
HVAC DIFFUSER. REMOVE AND REINSTALL UPON COMPLETION OF WORK.
CEILING MOUNTED LIGHT. REMOVE AND REPLACE WITH NEW 24"x48" LED LIGHT FIXTURE IN LAY-IN CEILING.
FIXTURE EQUAL TO METALUX 24GR LED TROFFER 277V/1Ph. 4000K
EXIT LIGHT. REMOVE AND REINSTALL UPON COMPLETION OF WORK.
SMOKE DETECTOR. REMOVE AND REINSTALL UPON COMPLETION OF WORK.
EXISTING SURFACE MOUNTED J-BOX. REMOVE AND REINSTALL UPON COMPLETION OF WORK.
EXISTING WIRELESS ACCESS POINT. GOVERNMENT WILL REMOVE AND SECURE, CON TRACTOR TO ENSURE
DEVICE CAN BE REINSTALLED UPON COMPLETION OF NEW WORK.
KEY NOTES
BREAK ROOM
CEILING AT 8'-10"
ABOVE FLOOR
CORRIDOR CEILING
AT 8'-6" ABOVE
FLOOR
CUSTODIAL
CLOSET
CEILING AT
7'-4" ABOVE
FLOOR
(Typical of 2 In Room)
(Typical of 5 In Room)
(Typical of 11 In Corridor)
(Typical of 4 In Corridor)
4" CW, 2-1/2"
HW, 1" RHW
REMOVE PLASTER CEILING, AND DEVICES FOR
ACCESS TO CEILING IN CROSSHATCHED AREA.
REMOVE INSULATION FROM COLD (CW) HOT
(HW) AND CIRCULATING HOT WATER (CHW) IN
SPACE. FULLY REMOVE 4" DOMESTIC WATER
PIPING IN IDENTIFIED AREA. PROVIDE
DIELECTRIC ISOLATION AT POINT OF
CONNECTION TO DISSIMILAR METALS. HW AND
CHW TO REMAIN. ELBOW AND TEE INSULATION
IS LIKELY TO BE ASBESTOS CONTAINING AND
MUST BE ABATED. REINSULATE COLD, HOT AND
CIRCULATING WATER LINES UPON COMPLETION
OF NEW PIPING. REPLACE CEILING WITH LAY-IN
TILE AND GRID. REINSTALL OR REPLACE
DEVICES AS NOTED.
OS
1 2
(Typical of 6 In Corridor)
98' TO OPPOSITE ALL. SEE DRAWING 2
0'
DRAWING 1 - WATER LINE REPLACEMENT AREA 1 (BASEMENT)-
8' 16' 32'
AREA 2
AREA 1
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
MECH.
AutoCAD SHX Text
INTERNAL LOADING DOCK
REMOVE INSULATION FROM COLD (CW) HOT (HW) AND
CIRCULATING HOT WATER (CHW) IN SPACE. FULLY REMOVE 4"
DOMESTIC WATER PIPING IN IDENTIFIED AREA. PROVIDE
DIELECTRIC ISOLATION AT POINT OF CONNECTION OF DISSIMILAR
METALS. HW AND CHW TO REMAIN. ELBOW AND TEE INSULATION
IS LIKELY TO BE ASBESTOS CONTAINING AND MUST BE ABATED.
REINSULATE COLD, HOT AND CIRCULATING WATER LINES UPON
COMPLETION OF NEW PIPING. PIPING IN BOILER ROOMS IS
EXPOSED OVERHEAD, APPROX. 15'-0" ABOVE FLOOR
REPLACE 4" COLD WATER RISER UP TO
INTERSTITIAL SPACE. APPROX. 40' ABOVE.
ELBOW AND TEE IS LIKELY TO BE
ASBESTOS CONTAINING AND MUST BE
ABATED.
4" CW, 2-1/2"
HW, 1" RHW
4" CW, 2-1/2"
HW, 1" RHW
4" CW, 2-1/2"
HW, 1" RHW REMOVE PLASTER CEILING, AND DEVICES FOR ACCESS TO CEILING IN
CROSSHATCHED AREA. REMOVE INSULATION FROM COLD (CW) HOT (HW) AND
CIRCULATING HOT WATER (CHW) IN SPACE. FULLY REMOVE 4" DOMESTIC
WATER PIPING IN IDENTIFIED AREA. PROVIDE DIELECTRIC ISOLATION AT POINT
OF CONNECTION TO DISSIMILAR METALS. HW AND CHW TO REMAIN. ELBOW
AND TEE INSULATION IS LIKELY TO BE ASBESTOS CONTAINING AND MUST BE
ABATED. REINSULATE COLD, HOT AND CIRCULATING WATER LINES UPON
COMPLETION OF NEW PIPING. REPLACE CEILING WITH LAY-IN TILE AND GRID.
REINSTALL OR REPLACE DEVICES AS NOTED.
EXISTING HARD
DECK CEILING
TO REMAIN
4" CW, 2-1/2"
HW, 1" RHW
(Typical of 11 In Corridor 6 shown, 5 more not shown)
OS
GENERAL OBJECTIVE: INTENT IS TO REPLACE BROKEN 6" UNDERGROUND WATER SERVICE, AND GALVANIZED 4" COLD WATER (CW) PIPING IN AREAS INDICATED; REMOVE INSULATION FROM HOT WATER (HW) AND CIRCULATING HOT WATER (CHW) SYSTEMS THAT SHALL REMAIN, AND REINSULATE ALL WATER SYSTEMS AFFECTED. ACCESS REQUIRES REMOVING OF CEILING AND CEILING MOUNTED DEVICES IN SOME AREAS, AS WELL AS ASBESTOS ABATEMENT. FIRE SPRINKLER SYSTEMS EXIST BELOW CEILING IN THIS AREA, AND SHALL REMAIN IN PLACE. HARD DECK CEILING SHALL BE REPLACED WITH NEW 24"X48" LAY-IN ACOUSTICAL TILE AND GRID. SHUTDOWNS SHALL BE SCHEDULED EVENINGS AND WEEKENDS OUTSIDE OF OPERATING
HOURS.
OCCUPANCY SENSOR. REMOVE AND REINSTALL UPON COMPLETION OF WORK.
HVAC DIFFUSER. REMOVE AND REINSTALL UPON COMPLETION OF WORK.
CEILING MOUNTED LIGHT. REMOVE AND REPLACE WITH NEW 24"x48" LED LIGHT FIXTURE IN LAY-IN CEILING.
FIXTURE EQUAL TO METALUX 24GR LED TROFFER 277V/1Ph. 4000K
EXIT LIGHT. REMOVE AND REINSTALL UPON COMPLETION OF WORK.
SMOKE DETECTOR. REMOVE AND REINSTALL UPON COMPLETION OF WORK.
EXISTING SURFACE MOUNTED J-BOX. REMOVE AND REINSTALL UPON COMPLETION OF WORK.
EXISTING WIRELESS ACCESS POINT. GOVERNMENT WILL REMOVE AND SECURE, CON TRACTOR TO ENSURE
DEVICE CAN BE REINSTALLED UPON COMPLETION OF NEW WORK.
KEY NOTES
98' TO OPPOSITE ALL. SEE DRAWING 1
0'
DRAWING 2 WATER LINE REPLACEMENT AREA 2 (BASEMENT)-
8' 16' 32'
AREA 2
AREA 1
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
RAMP UP
REPLACE NEW 4" COPPER DOWN
TO BASEMENT THROUGH 1ST
FLOOR. REPLACE CW TO POINT OF
3" RISER & REINSULATE
3" RISER
EXISTING HW AND RHW RISERS TO
REMAIN. EXISTING INSULATION TO
REMAIN ON THESE SYSTEMS.
REPLACE NEW 4" COPPER DOWN
TO BASEMENT THROUGH 1ST
FLOOR. CONNECT TO NEWER
COPPER AT HORIZONTAL RUN IN
INTERSTITIAL SPACE
ALL PIPING IN INTERSTITIAL SPACE.
CW PIPING IN SHADED AREA IS
NEWER COPPER AND MAY REMAIN
CW PIPING IN SHADED AREA IS
NEWER COPPER AND MAY REMAIN
REPLACE EIXSTING IRON CW PIPE
FROM ELBOW UP WITH NEW 4"
COPPER UP AT ELBOW TO SECOND
AND THIRD FLOOR RISERS IN
CHASE. CONNECT TO NEWER
COPPER AT HORIZONTAL RUN IN
INTERSTITIAL SPACE
AREA 3
AREA 4
0'
DRAWING 3 WATER LINE REPLACEMENT AREAS 3 & 4 (MEZZANINE)-
8' 16' 32'
AREA 3
AREA 4
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
DN
| Water Service Plan-Drawing 1 |
| Sheets and Views |
| Drawing 1 |
| Water Service Plan-Drawing 2 |
| Sheets and Views |
| Drawing 2 |
| Water Service Plan-Drawing 3 |
| Sheets and Views |
| Drawing 3 |
File details come from the government source that posted it.