About this file

Drawings 1, 2, 3

View the file

Other files for this federal contract opportunity

Other files attached to Replace water main, newest first.
File Type Posted
Water_Project_Responses.pdf PDF
Asbestos_Report.pdf PDF
Solicitation-FargoWaterMain.pdf PDF
Drinking_Water_Desk_Guide_Final_9.13.16.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M

EXCAVATE AS REQUIRED FOR CONNECTION OF

NEW 6" WATER SERVICE TO EXISTING USING

BORING/BURST-FRACTURING INTO BUILDING.

VERIFY ALL UTILITIES PRIOR TO EXCAVATION.

PROVIDE LANE CONTROL AND COSTRUCTION

PARTITIONS AS REQUIRED TO MAINTAIN SAFETY

OF ALL PEOPLE IN THE AREA.

CORE DRILL OR OTHERWISE ENLARGE OPENING

AT WALL FOR CLEARANCE TO REPLACE WATER

PIPE TO SPRINKLER RISER. DISCONNECT AND

VERIFY BUILDING GROUND AS OUTLINED IN THE

SCOPE OF WORK. PROVIDE MECHANICAL SEAL

AND WATER STOP COLLAR, GROUT AS

NECESSARY. PROVIDE 6x6 ELBOW TO

SPRINKLER RISER.

REMOVE &

REPLACE 4"

GALVANIZED

WATER SERVICE

TO VALVE "A"

SIDEWALK

ELEVATION

905.0

BASEMENT FLOOR

ELEVATION 892.0

EXISTING 6" DUCTILE IRON WATER

SERVICE UNDER SIDEWALK, TO BE

REPLACED. BREAK LOCATION

SUSPECTED BETWEEN SLEEVE AND

FOUNDATION WALL.

APPROX. ELEVATION AT WALL PENETRATION 894.5EXISTING DOOR ACTUATOR BUTTON

PEDESTAL. DE-ENERGIZE PRIOR TO ANY

BORING ACTION AND VERIFY CIRCUIT

CLEARANCE FROM BORING AREA.

IRON

PVC

POINT OF SLEEVE CONNECTION OF C-900 TO

DUCTILE IRON. REPLACE IRON FROM THIS POINT

INTO BUILDING WITH NEW 6" C-900

COORDINATE BORE WITH FOOTING UNDER

EXISTING BARRICADE - BENCHES. CLEARANCE

UNDER FOOTING 36" (VERFIY)

EXISTING WATER STOPS IN STREET APPROX. 50'

SOUTH OF BUILDING WALL.

M

"A"

SIDEWALK

ELEVATION

905.0

1-1/4" CW &

1/2" HW

1/2" CW &

HW

1-1/2" CW

4" CW

3/4" CW

& HW

3/4" CW & HW

4" CW

4" CW, 2-1/2"

HW, 1" RHW

1-1/4" CW

S

WAP

OS S

JJ

OS

4" CW, 1-1/2" HW, 1"

RHW RISERS UP TO

INTERSTITIAL SPACE,

APPROX. 40' ABOVE.

1/2" CW & HW

4" CW, 2-1/2"

HW, 1" RHW

2" HW

REMOVE PLASTER CEILING, AND DEVICES FOR ACCESS TO CEILING IN

CROSSHATCHED AREA. REMOVE INSULATION FROM COLD (CW) HOT (HW) AND

CIRCULATING HOT WATER (CHW) IN SPACE. FULLY REMOVE 4" DOMESTIC

WATER PIPING IN IDENTIFIED AREA. PROVIDE DIELECTRIC ISOLATION AT POINT

OF CONNECTION TO DISSIMILAR METALS. HW AND CHW TO REMAIN. ELBOW

AND TEE INSULATION IS LIKELY TO BE ASBESTOS CONTAINING AND MUST BE

ABATED. REINSULATE COLD, HOT AND CIRCULATING WATER LINES UPON

COMPLETION OF NEW PIPING. REPLACE CEILING WITH LAY-IN TILE AND GRID.

REINSTALL OR REPLACE DEVICES AS NOTED.

GENERAL OBJECTIVE: INTENT IS TO REPLACE BROKEN 6" UNDERGROUND WATER SERVICE, AND GALVANIZED 4" COLD WATER (CW) PIPING IN AREAS INDICATED; REMOVE INSULATION FROM HOT WATER (HW) AND CIRCULATING HOT WATER (CHW) SYSTEMS THAT SHALL REMAIN, AND REINSULATE ALL WATER SYSTEMS AFFECTED. ACCESS REQUIRES REMOVING OF CEILING AND CEILING MOUNTED DEVICES IN SOME AREAS, AS WELL AS ASBESTOS ABATEMENT. FIRE SPRINKLER SYSTEMS EXIST BELOW CEILING IN THIS AREA, AND SHALL REMAIN IN PLACE. HARD DECK CEILING SHALL BE REPLACED WITH NEW 24"X48" LAY-IN ACOUSTICAL TILE AND GRID. SHUTDOWNS SHALL BE SCHEDULED EVENINGS AND WEEKENDS OUTSIDE OF OPERATING

HOURS.

OCCUPANCY SENSOR. REMOVE AND REINSTALL UPON COMPLETION OF WORK.

HVAC DIFFUSER. REMOVE AND REINSTALL UPON COMPLETION OF WORK.

CEILING MOUNTED LIGHT. REMOVE AND REPLACE WITH NEW 24"x48" LED LIGHT FIXTURE IN LAY-IN CEILING.

FIXTURE EQUAL TO METALUX 24GR LED TROFFER 277V/1Ph. 4000K

EXIT LIGHT. REMOVE AND REINSTALL UPON COMPLETION OF WORK.

SMOKE DETECTOR. REMOVE AND REINSTALL UPON COMPLETION OF WORK.

EXISTING SURFACE MOUNTED J-BOX. REMOVE AND REINSTALL UPON COMPLETION OF WORK.

EXISTING WIRELESS ACCESS POINT. GOVERNMENT WILL REMOVE AND SECURE, CON TRACTOR TO ENSURE

DEVICE CAN BE REINSTALLED UPON COMPLETION OF NEW WORK.

KEY NOTES

BREAK ROOM

CEILING AT 8'-10"

ABOVE FLOOR

CORRIDOR CEILING

AT 8'-6" ABOVE

FLOOR

CUSTODIAL

CLOSET

CEILING AT

7'-4" ABOVE

FLOOR

(Typical of 2 In Room)

(Typical of 5 In Room)

(Typical of 11 In Corridor)

(Typical of 4 In Corridor)

4" CW, 2-1/2"

HW, 1" RHW

REMOVE PLASTER CEILING, AND DEVICES FOR

ACCESS TO CEILING IN CROSSHATCHED AREA.

REMOVE INSULATION FROM COLD (CW) HOT

(HW) AND CIRCULATING HOT WATER (CHW) IN

SPACE. FULLY REMOVE 4" DOMESTIC WATER

PIPING IN IDENTIFIED AREA. PROVIDE

DIELECTRIC ISOLATION AT POINT OF

CONNECTION TO DISSIMILAR METALS. HW AND

CHW TO REMAIN. ELBOW AND TEE INSULATION

IS LIKELY TO BE ASBESTOS CONTAINING AND

MUST BE ABATED. REINSULATE COLD, HOT AND

CIRCULATING WATER LINES UPON COMPLETION

OF NEW PIPING. REPLACE CEILING WITH LAY-IN

TILE AND GRID. REINSTALL OR REPLACE

DEVICES AS NOTED.

OS

1 2

(Typical of 6 In Corridor)

98' TO OPPOSITE ALL. SEE DRAWING 2

0'

DRAWING 1 - WATER LINE REPLACEMENT AREA 1 (BASEMENT)-

8' 16' 32'

AREA 2

AREA 1

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

INTERNAL LOADING DOCK

REMOVE INSULATION FROM COLD (CW) HOT (HW) AND

CIRCULATING HOT WATER (CHW) IN SPACE. FULLY REMOVE 4"

DOMESTIC WATER PIPING IN IDENTIFIED AREA. PROVIDE

DIELECTRIC ISOLATION AT POINT OF CONNECTION OF DISSIMILAR

METALS. HW AND CHW TO REMAIN. ELBOW AND TEE INSULATION

IS LIKELY TO BE ASBESTOS CONTAINING AND MUST BE ABATED.

REINSULATE COLD, HOT AND CIRCULATING WATER LINES UPON

COMPLETION OF NEW PIPING. PIPING IN BOILER ROOMS IS

EXPOSED OVERHEAD, APPROX. 15'-0" ABOVE FLOOR

REPLACE 4" COLD WATER RISER UP TO

INTERSTITIAL SPACE. APPROX. 40' ABOVE.

ELBOW AND TEE IS LIKELY TO BE

ASBESTOS CONTAINING AND MUST BE

ABATED.

4" CW, 2-1/2"

HW, 1" RHW

4" CW, 2-1/2"

HW, 1" RHW

4" CW, 2-1/2"

HW, 1" RHW REMOVE PLASTER CEILING, AND DEVICES FOR ACCESS TO CEILING IN

CROSSHATCHED AREA. REMOVE INSULATION FROM COLD (CW) HOT (HW) AND

CIRCULATING HOT WATER (CHW) IN SPACE. FULLY REMOVE 4" DOMESTIC

WATER PIPING IN IDENTIFIED AREA. PROVIDE DIELECTRIC ISOLATION AT POINT

OF CONNECTION TO DISSIMILAR METALS. HW AND CHW TO REMAIN. ELBOW

AND TEE INSULATION IS LIKELY TO BE ASBESTOS CONTAINING AND MUST BE

ABATED. REINSULATE COLD, HOT AND CIRCULATING WATER LINES UPON

COMPLETION OF NEW PIPING. REPLACE CEILING WITH LAY-IN TILE AND GRID.

REINSTALL OR REPLACE DEVICES AS NOTED.

EXISTING HARD

DECK CEILING

TO REMAIN

4" CW, 2-1/2"

HW, 1" RHW

(Typical of 11 In Corridor 6 shown, 5 more not shown)

OS

GENERAL OBJECTIVE: INTENT IS TO REPLACE BROKEN 6" UNDERGROUND WATER SERVICE, AND GALVANIZED 4" COLD WATER (CW) PIPING IN AREAS INDICATED; REMOVE INSULATION FROM HOT WATER (HW) AND CIRCULATING HOT WATER (CHW) SYSTEMS THAT SHALL REMAIN, AND REINSULATE ALL WATER SYSTEMS AFFECTED. ACCESS REQUIRES REMOVING OF CEILING AND CEILING MOUNTED DEVICES IN SOME AREAS, AS WELL AS ASBESTOS ABATEMENT. FIRE SPRINKLER SYSTEMS EXIST BELOW CEILING IN THIS AREA, AND SHALL REMAIN IN PLACE. HARD DECK CEILING SHALL BE REPLACED WITH NEW 24"X48" LAY-IN ACOUSTICAL TILE AND GRID. SHUTDOWNS SHALL BE SCHEDULED EVENINGS AND WEEKENDS OUTSIDE OF OPERATING

HOURS.

OCCUPANCY SENSOR. REMOVE AND REINSTALL UPON COMPLETION OF WORK.

HVAC DIFFUSER. REMOVE AND REINSTALL UPON COMPLETION OF WORK.

CEILING MOUNTED LIGHT. REMOVE AND REPLACE WITH NEW 24"x48" LED LIGHT FIXTURE IN LAY-IN CEILING.

FIXTURE EQUAL TO METALUX 24GR LED TROFFER 277V/1Ph. 4000K

EXIT LIGHT. REMOVE AND REINSTALL UPON COMPLETION OF WORK.

SMOKE DETECTOR. REMOVE AND REINSTALL UPON COMPLETION OF WORK.

EXISTING SURFACE MOUNTED J-BOX. REMOVE AND REINSTALL UPON COMPLETION OF WORK.

EXISTING WIRELESS ACCESS POINT. GOVERNMENT WILL REMOVE AND SECURE, CON TRACTOR TO ENSURE

DEVICE CAN BE REINSTALLED UPON COMPLETION OF NEW WORK.

KEY NOTES

98' TO OPPOSITE ALL. SEE DRAWING 1

0'

DRAWING 2 WATER LINE REPLACEMENT AREA 2 (BASEMENT)-

8' 16' 32'

AREA 2

AREA 1

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

RAMP UP

REPLACE NEW 4" COPPER DOWN

TO BASEMENT THROUGH 1ST

FLOOR. REPLACE CW TO POINT OF

3" RISER & REINSULATE

3" RISER

EXISTING HW AND RHW RISERS TO

REMAIN. EXISTING INSULATION TO

REMAIN ON THESE SYSTEMS.

REPLACE NEW 4" COPPER DOWN

TO BASEMENT THROUGH 1ST

FLOOR. CONNECT TO NEWER

COPPER AT HORIZONTAL RUN IN

INTERSTITIAL SPACE

ALL PIPING IN INTERSTITIAL SPACE.

CW PIPING IN SHADED AREA IS

NEWER COPPER AND MAY REMAIN

CW PIPING IN SHADED AREA IS

NEWER COPPER AND MAY REMAIN

REPLACE EIXSTING IRON CW PIPE

FROM ELBOW UP WITH NEW 4"

COPPER UP AT ELBOW TO SECOND

AND THIRD FLOOR RISERS IN

CHASE. CONNECT TO NEWER

COPPER AT HORIZONTAL RUN IN

INTERSTITIAL SPACE

AREA 3

AREA 4

0'

DRAWING 3 WATER LINE REPLACEMENT AREAS 3 & 4 (MEZZANINE)-

8' 16' 32'

AREA 3

AREA 4

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

DN

Water Service Plan-Drawing 1
Sheets and Views
Drawing 1
Water Service Plan-Drawing 2
Sheets and Views
Drawing 2
Water Service Plan-Drawing 3
Sheets and Views
Drawing 3

File details come from the government source that posted it.