RESPONSE_TO_QUESTIONS_11_9_18.pdf

PDF 104 KB Posted

Attached to
Infill floor openings Federal contract opportunity
Solicitation number
47PJ0019Q0001
Issued by
General Services Administration Public Buildings Service Region 8

About this file

Response to Questions This concludes the question period.

View the file

Other files for this federal contract opportunity

Other files attached to Infill floor openings, newest first.
File Type Posted
solicitation_-_USPS_floor_infill.pdf PDF
USR_v2.1_6.8.18.pdf PDF
Fargo_PO_Floor_Infill_100__Specs.pdf PDF
Fargo_PO_Floor_Infill_100__Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESPONSE TO QUESTIONS

11/9/18

Q1. The floor infill details do not show a deck pan underneath the infills. However in the SOW Page 6, Section4, Bullet Point B they call out Floor pan erection. Are the expectations to have floor pan decking at both locations or are to form it in place and then remove the forms afterward?

A1: Form in place and remove the forms.

Q2. If I remember correctly during the pre-bid walk through it was discussed that the contractor is responsible for supplying the Asphaltic tile material. However in the specifications it specifies that the owner is supplying the material and the contractor is responsible for the grout & Labor.

The replacement tile material is government-furnished.

Q3. If we are to provide a steel decking substrate are we going to be able to achieve a 4” minimum slab thickness while using the existing Ledger Angle? I was at the pre-bid meeting but didn’t even think about taking a measurement at this location.

Not applicable, see answer to question #1.