NDDOT_Supporting_Electrical_Document.pdf
PDF 2 MB Posted
- Attached to
- pre-fabricated booth Federal contract opportunity
- Solicitation number
- 47PJ0018Q0037
About this file
NDDOT supporting electrical
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_47PJ0018Q0037_0001.pdf | ||
| solicitation_-_booth.pdf | ||
| Foundation_Plan.pdf | ||
| Statement_of_Work.pdf | ||
| Booth_Design_Standards.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRCOMBYPASS
Sta 227+17.13 - 11.2' LT
Light L20
Sta 228+00.98 - 12.1' LT
Light L19
Sta 228+85.71 - 11.6' LT
Light L18
Sta 11465+01.4 - 52.8' RT (EX29)
Light L13
Sta 11466+70.03 - 64.6' RT (EX29)
Light L14
Existing Booth
11474 +32.83
- 521.
1' LT (
EX29)
Existin g High
Mast T2 to Re main
MH LED 140' - 6 Luminaires
Sta 11470+15.00 - 56.3' RT (EX29)
New High Mast T9
Building
CBP Inspection
PRCOMBYPASS
Sta 229+27' LT
Pull Box 3 F16 (S ee she et 160
-6)Communicat ions P ull Box transformer
Relocate existing
264.6' Lt
Sta 11 475+1
4.06Pull Bo x 1
264.6' Lt
Sta 11 475+0
9.06Pull Bo x 8
Sta 11472+85.81 - 116.0' LT
Existing High Mast T6 to Remain
Sta 11471+66.68 - 37.9' RT (EX29)
Light L15
Sta 11472+47.65 - 40.6' RT (EX29)
Light L16
Sta 11473+01.84 - 45.1' RT (EX29)
Light L17
Sta 11470+49.82 - 62.7' RT
Pull Box 2
Overhea d DMS Sign
#4
R-51-W
T-164-N
Sec 28
Southb ound I
-29
Exst R/W
Exst R /W
Exst R /W
Exst R/W
Ppsd R/W
120'
175'
Northbound I-29
Sheet Location
Zone
Outbound Inspection
16'
T o L ig h t L
T o L ig h t L
BollardsBollards
BollardsBollards under building.
in crawlspace
Install conduits
See note 3.
Temporary wood post.
pull box #F18
Communication with NEMA 3R enclosure circuit breaker disconnect
New 50A, 3-Pole
See note 1.
conduit and cable by Contractor.
208V panel by others. Underground by others. Future 100 Amp, 3-Ph, Future CBP Inspection Building transformer
Relocated 30 kVA
METERED) (NDDOT SCHEDULE STANDARDLIGHT
NUMBERLIGHT TYPE
IES-Type
OPTICS STANDARDS
REMARKS
TYPE HT.MTG. LG.ARM
L14L13, 3000K -LED
Conventional III Davit 42' 12'
° 0 at tilted 240V, at operatedLuminaire base. transformerbreakaway foundation, concrete on standard lightInstall
LIGHT STANDARD SCHEDULE (FEDERAL GSA METERED)
LIGHT NUMBER TYPE
IES-Type
OPTICS STANDARDS
REMARKS
TYPE MTG. HT. ARM LG.
L15 - L20 Lumen LED
(1) - High III Davit 40' 6'
Inspection lighting only on when needed per note 1.
Luminaire operated at 240V, tilted at 0°.
breakaway transformer base.
Install light standard on concrete foundation, T9 Mast LED
(6)* - High
Symmetrical
V
Assembly
High Mast 140' N/A luminaires are required, refer to plan notes.
luminaires. *If Holophane HMLED3 is used then (8) aimed away from pole, assuming Philips HFL
(6) - Full cut-off LED luminaires, tilted at 0°, all temporary equipment once building is in place and relocating equpiment into building.
in outdoor rated enclosures. Connect breaker to transformer. Contractor is responsible for removing provide a wood post with toggle switch, photocell, 50 Amp 2-pole breaker, and 60 Amp 2-pole contactor all
3. If CBP inspection building is not installed at time of Lights L15-L20 completion, then
2.Refer to Section 160 for ITS cable and conduit electrical quantities.
System."
center by others. Include contactor, breaker, switch, and photocell in the unit price bid item, "Lighting conjuction with photocell so that lights will only turn on at night. Building interior boxes, conduit, and load new CBP inspection building and controlled by light switch in building per wiring diagram. Wire in
1. Provide and connect a contactor to the inspection lighting (L15 - L20). Contactors is to be located in the
Notes:
IM-6-029(120)216 140 3
Pembina Border Crossing
Lighting
Sta 11465+00 to Sta 11474+00
(EX29)
Thomas K Conlin
10389
11/30/17
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
11/30/2017 brianmoser P:\State\NDDOT\13213100\Project\60029216.120\Design\Plans\140\140LL_003.dgn10:52:30 AM of Transportation
North Dakota Department document is stored at the on and the original
PE- ,
Registration Number issued and sealed by
This document was originally
METERED) GSA (FEDERAL SCHEDULE STANDARDLIGHT
NUMBERLIGHT TYPE
IES-Type
OPTICS STANDARDS
REMARKS
TYPE HT.MTG. LG.ARM
T10 LEDMast
High -(10)*
Asymmetrical
III
Assembly
MastHigh 140' N/A shown.as direction in pointed/aimed be to optics luminaires' All notes. plan to refer required, are luminaires (12) then used is HMLED3
Holophane *If luminaires. HFL Philips assuming
°, 0 at tilted luminaires, LED cut-off Full -(10)
T11 LEDMast
High -(10)*
Asymmetrical
III
Assembly
MastHigh 140' N/A lanes.car west towards pointed 3 bypass, commercial toward pointed
7 shown, as directions in pointed/aimed be to optics Luminaires' notes. plan to refer required, are luminaires (12) then used is HMLED3
Holophane *If luminaires. HFL Philips assuming
°, 0 at tilted luminaires, LED cut-off Full -(10)
T12 LEDMast
High -(10)
Asymmetrical
III
Assembly
MastHigh 140' N/A shown.as direction in pointed/aimed be to optics luminaires' All notes. plan to refer required, are luminaires (10) then used is HMLED3
Holophane If luminaires. HFL Philips assuming
°, 0 at tilted luminaires, LED cut-off Full -(10)
P1
P3
P2
P4
Sta 228+85.71 - 11.6' LT
Light L18
Building B
Do Not Trench
Existing Pavement
Bore Under
Sta 11477+08.73 - 108.0' LT (EX29)
Existing High Mast T8 to Remain
11481+66.99 - 123.6' LT (EX29)
Existing High Mast T7 to Remain
11474+32.83 - 521.1' LT (EX29)
Existing High Mast T2 to Remain
Sta 11476+20.68 - 429.7' LT (EX29)
Existing High Mast T3 to Remain
Sta 11480+01.61 - 537.3' LT (EX29)
Existing High Mast T1 to Remain sta 11482+11.90 - 336.8' LT (EX29)
Existing High Mast T5 to Remain
PRCOMBYPASS
Sta 231+25.32 - 50.7' LT
New High Mast T10
PRCOMBYPASS
Sta 236+89.95 - 79.0' LT
New High Mast T11
PRCOMBYPASS
Sta 241+27.32 - 65.5' LT
New High Mast T12
Controller (A)
Traffic Signal
See note 4.
Do Not Trench
Existing Pavement
Bore Under
Pull Box
Existing Communications
EX29
Sta 11475+20.94 - 85.3' RT
Pull Box 6
EX29
Sta 11475+10.16 - 83.6' RT
Pull Box 7
F16 (See sheet 160-6)
Communications Pull Box
264.6' Lt
Sta 11475+14.06
Pull Box 1
264.6' Lt
Sta 11475+09.06
Pull Box 8
See Section 150
Signal Standard
PRCOMBYPASS
Sta 236+78.44 - 57.7' LT
Pull Box 4
PRCOMBYPASS
Sta 241+27.33 - 73.6' LT
Pull Box 5 readers (by others) system license plate with Canadian FAST
Overhead Static Sign
Overhead DMS Sign #4
See Sheet 150-6.
New Feed Point FP2
R-51-W
T-164-N
Sec 28
C a n a d a
U n ite d S ta te s
Exst R/W
Exst R/W
Exst R/W Northbound I-29
North boun d I-2
Exst R/W
Exs t R/
W
Exst R/W
Sheet Location
Commercial Bypass optical focus
Direction of 3 luminaires optical focus
Direction of 7 luminaires optical focus
Direction of 10 luminaires
Existing Utility Pole
Existing 1-ph Power PoleExisting 3-ph Power Pole primary cable by utility.
from final grade. Permanent
Install 4" conduit 48" deep
Building
DFA
PRCOMBYPASS
Sta 236+21.61 - 56.0' RT
Pull Box 9
Oct. 1, 2018 power installation by by others. Complete for controller cabinet power and disconnect
Contractor to provide line relocation. Primary cable by others.
from existing grade for overhead at start of project 48" deep
Install 2" bored conduit foundations for future cameras.
5. Provide spare 2" conduit sweep in high mast south interior wall.
Mount new panelboard and contactors per detail at the and #8 into the building at the generator room south wall.
4. Provide cable and rigid steel conduit from pull boxes #1 conduit electrical quantities
3. Refer to Section 150 for Traffic Signal cable and electrical quantities
2. Refer to Section 160 for ITS cable and conduit the presence of the engineer and owner (GSA)
1. Stadium lights shall be aimed and adjusted at night in
IM-6-029(120)216 140 4
Lighting
Sta 11474+00 to Sta 11485+00
(EX29)
Thomas K Conlin
10389
11/30/17
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
11/30/2017 brianmoser P:\State\NDDOT\13213100\Project\60029216.120\Design\Plans\140\140LL_004.dgn10:01:54 AM of Transportation
North Dakota Department document is stored at the on and the original
PE- ,
Registration Number
PIPE BOLLARD DETAIL
ENCASE IN CONCRETE
E Q
U
IP
M E
N T L
IN
E
16'' 6''
8'' 9''
48''
48''
WITH CONCRETE ROUND TOP
6" STD STEEL PIPE
OWNER'S REPRESENTATIVE
AS APPROVED BY
PRIME AND PAINT COLOR
SLOPE CONCRETE TO DRAIN
LIGHTING CABLE & CONDUIT SCHEDULE (INTERSTATE)
ITEM STATION OFFSET
CONDUIT RUN CABLE RUN
TOTAL LF SIZE (IN) TOTAL LF SIZE/TYPE
Light L13 Sta 11465+01.40, 52.8' Rt 354 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 169 2" 177 UNDERGROUND CONDUCTOR NO. 6 THW
Light L14 Sta 11466+70.03, 64.6' Rt
LIGHTING CABLE & CONDUIT SCHEDULE (BORDER SITE)
ITEM STATION OFFSET
CONDUIT RUN CABLE RUN
TOTAL LF SIZE (IN) TOTAL LF SIZE/TYPE
CBP Inspection Building Sta 227+04, 49' Lt 154 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 63 2" 77 UNDERGROUND CONDUCTOR NO. 6 THW
Light L15 Sta 11471+66.68, 37.9' Rt
Light L17 Sta 11473+01.84, 45.1' Rt 126 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 55 2" 63 UNDERGROUND CONDUCTOR NO. 6 THW
Light L16 Sta 11472+47.65, 40.6' Rt
Light L16 Sta 11472+47.65, 40.6' Rt 180 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 82 2" 90 UNDERGROUND CONDUCTOR NO. 6 THW
Light L15 Sta 11471+66.68, 37.9' Rt
CBP Inspection Building Sta 227+04, 49' Lt 112 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 42 2" 56 UNDERGROUND CONDUCTOR NO. 6 THW
Light L20 Sta 227+17.13, 11.2' Lt
Light L18 Sta 228+85.71, 11.6' Lt 182 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 83 2" 91 UNDERGROUND CONDUCTOR NO. 6 THW
Light L19 Sta 228+00.98, 12.1' Lt
Light L19 Sta 228+00.98, 12.1' Lt 184 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 84 2" 92 UNDERGROUND CONDUCTOR NO. 6 THW
Light L20 Sta 227+17.13, 11.2' Lt
Highmast Light T9 Sta 11470+15.00, 56.3' Rt 80 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 33 2" 40 UNDERGROUND CONDUCTOR NO. 6 THW
Pull Box #2 Sta 11470+49.82, 62.7' Rt
Pull Box #2 Sta 11470+49.82, 62.7' Rt 598 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 293 2" 299 UNDERGROUND CONDUCTOR NO. 6 THW
Pull Box #3 Sta 229+27.46, 113.50' Rt
CBP Insp. Building Transformer Sta 227+18.04, 52.1' Lt 699 (3) UNDERGROUND CONDUCTOR NO. 2 RHW/USE to to 220 2" 233 UNDERGROUND CONDUCTOR NO. 6 THW
Pull Box #3 Sta 229+27.46, 113.50' Rt
Pull Box #3 Sta 229+27.46, 113.50' Rt 531 (3) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (CBP Building) to to 342 2- 2" 177 UNDERGROUND CONDUCTOR NO. 6 THW
Pull Box #7 Sta 11475+110.16, 83.6' Rt 354 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE (T9)
177 UNDERGROUND CONDUCTOR NO. 6 THW
Pull Box #7 Sta 11475+110.16, 83.6' Rt 194 (2) UNDERGROUND CONDUCTOR NO. 6 RHW to to 90 2" 97 UNDERGROUND CONDUCTOR NO. 6 THW
Highmast Light T10 Sta 231+25.32, 50.7' Lt
543 (3) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (CBP Building)
Pull Box #7 Sta 11475+110.16, 83.6' Rt 181 UNDERGROUND CONDUCTOR NO. 6 THW to to 350 (2) - 2" 362 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE (T9)
Pull Box #8 Sta 11475+09.06, 264.6' Lt 362 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE (T10)
181 UNDERGROUND CONDUCTOR NO. 6 THW
48 (3) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (CBP Building)
Pull Box #8 Sta 11475+09.06, 264.6' Lt 16 UNDERGROUND CONDUCTOR NO. 6 THW to to 6 (2) - 2" 32 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE (T9)
Building B Sta 11475+01.80, 270.5' Lt Rigid Steel 32 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE (T10)
16 UNDERGROUND CONDUCTOR NO. 6 THW
Building B Sta 11475+01.80, 270.5' Lt
Rigid Steel
2"
38 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (T11)
to to 6 38 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (T12)
Pull Box #1 Sta 11475+14.06, 264.6' Lt 19 UNDERGROUND CONDUCTOR NO. 4 THW
Pull Box #1 Sta 11475+14.06, 264.6' Lt 718 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (T11) to to 353 2" 718 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (T12)
Pull Box #6 Sta 11475+20.94, 85.3' Rt 359 UNDERGROUND CONDUCTOR NO. 4 THW
Pull Box #6 Sta 11475+20.94, 85.3' Rt 1108 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (T11) to to 548 2" 1108 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (T12)
Pull Box #4 Sta 236+78.44, 57.7' Lt 554 UNDERGROUND CONDUCTOR NO. 4 THW
Pull Box #4 Sta 236+78.44, 57.7' Lt 48 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE to to 17 2" 24 UNDERGROUND CONDUCTOR NO. 4 THW
Highmast Light T11 Sta 236+89.95, 79.0' LT
Pull Box #4 Sta 236+78.44, 57.7' Lt 854 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE to to 421 2" 427 UNDERGROUND CONDUCTOR NO. 4 THW
Pull Box #5 Sta 241+27.33, 73.6' Lt
Pull Box #5 Sta 241+27.33, 73.6' Lt 30 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE to to 8 2" 15 UNDERGROUND CONDUCTOR NO. 4 THW
Highmast Light T12 Sta 241+27.32, 65.5' Lt
LIGHTING CABLE & CONDUIT SCHEDULE (BORDER SITE)
ITEM STATION OFFSET
CONDUIT RUN CABLE RUN
TOTAL LF SIZE (IN) TOTAL LF SIZE/TYPE
CBP Insp. Building Transformer Sta 227+18.04, 52.1' Lt 160 (4) UNDERGROUND CONDUCTOR NO. 2 RHW/USE to to 20 2" 40 UNDERGROUND CONDUCTOR NO. 6 THW
CBP Inspection Building Sta 227+04, 49' Lt
CBP Insp. Building Foundation Sta 226+99.31, 48.3' Lt 100 (4) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 5 2" 25 UNDERGROUND CONDUCTOR NO. 6 THW
Temporary Wood Post Sta 227+17.04, 49.8' Lt (Temporary Connections Only)
Existing Communication PB Sta 11475+27.25, 160.0' Lt 241 Pull String to to 241 2"
Comm. Pull Box F16 Sta 11475+107.16, 78.6' Rt
Comm. Pull Box F16 Sta 11475+107.16, 78.6' Rt 367 Pull String to to 367 2"
Comm. Pull Box F18 Sta 227+18.00, 54.4' Lt
Comm. Pull Box F18 Sta 227+18.00, 54.4' Lt 18 Pull String to to 18 2"
CBP Inspection Building Sta 227+04, 49' Lt
Existing Utility Pole Sta 241+25.06, 141.8' Lt 333 Pull String to to 333 2"
Existing 1-ph Utility Pole Sta 240+65.55, 185.8' Rt
Feed Point FP2 Sta 236+30.03, 134.9' Lt 413 Pull String to to 413 4"
Existing 3-ph Utility Pole Sta 234+59.47, 189.2' Rt
Feed Point FP2 Sta 236+30.03, 134.9' Lt 408 (2) UNDERGROUND CONDUCTOR NO. 6 RHW to to 191 2" 204 UNDERGROUND CONDUCTOR NO. 6 THW
Pull Box #9 Sta 236+21.61, 56.0' Rt
Pull Box #9 Sta 236+21.61, 56.0' Rt 408 (2) UNDERGROUND CONDUCTOR NO. 6 RHW to to 192 2" 204 UNDERGROUND CONDUCTOR NO. 6 THW
FAST system Controller Sta 234+27.79, 52.5' Rt orange, yellow, and black with yellow tape.
blue, and black. Neutral is white. 480V wires to be brown, All ground wires to be green. 240V or 208V wires to be red,
2. Conductors shall have integral color coded insulation.
what each conductor is used for.
1. Label all conductors with tags in pull boxes designating
Lighting System
Thomas K Conlin
10389
IM-6-029(120)216 5
Cable & Conduit Schedule
11/30/17
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
11/30/2017 brianmoser P:\State\NDDOT\13213100\Project\60029216.120\Design\Plans\140\140LT_005.dgn10:01:55 AM of Transportation
North Dakota Department document is stored at the on and the original
PE- ,
Registration Number
CBP Inspection Building One-Line Diagram
Inspection Area Lighting Control Schematic
Building B
Distribution Panel in
Existing Main responsible for any damages caused by construction.
Preserve existing wiring and equipment. Contractor is 8.
that are easy to identify.
Neatly train and lace all wiring. Provide color coded wires7.
switch, and panelboard.
Provide wiring in conduit between contactor enclosures,6.
Provide circuit breakers as shown on panel schedule.5.
Provide equipment grounding not shown per NEC.4.
be used.
unless mounted outside then a NEMA 3R enclosure shall
Provide contactors in NEMA 1 enclosures as shown, 3.
enclosures describing functionality.
contactor and how each contactor works. Label contactor of the lighting control. Make clear which lights are on each
Provide wiring diagram to owner showing the operation 2.
exterior.
as to use. Provide etched labeling for contactor enclosure permanent typed labeling. Internal contactors shall be labeled
Contactors and individual wires shall be labeled with 1.
GENERAL NOTES
shall the lights turn on during the day.
and off only at night, when the lighting is needed. In no case
The toggle switch shall allow the lights to be turned on 2.
when the toggle switch is turned on by personnel .
Lights shall turn on at night and turn off in the morning, only
Master photocell shall close at dusk and open at dawn. 1.
SEQUENCE OF OPERATIONS
LIGHTING CONTROL REQUIREMENTS
LEGEND
facing north.
or equal per specs. Provide with outdoor rated box and cover
Note: Photocell to be Intermatic K4000 series, button type have 2 poles. Mounted in NEMA 1 enclosure.
contactor. 120V control coil. Lighting rated contactor shall
Provide 1 new separate 60 Amp, 208V rated, normally open junction box and cover.
20 Amp toggle switch. 1-way type.Provide with separate
Circuit breaker (or disconnect) as shown.
inside building switch toggle on/off
Provide new
50A
2-pole new inspection building located near
120/208Y : 480V
30 kVA Transformer
Reuse existing
100A
3-pole existing
CBP INSPECTION BOOTH BUILDING
TO NEW INSPECTION AREA LIGHTING
NEUTRALL1
in Panel 'DP1'
Provide new 15 Amp
DAY
NIGHT
ON
OFF
C3 toggle switch
NEW 1-way, 20A
L15-L20
LIGHTING
AREA
INSPECTION
NEW
C3
L3
L2
C3
2-Pole
50A photocell on building
Provide new 120V exterior building photocell on
Provide new
C3 by others inside building enclosure
NEMA 1
contactor.
60 Amp, 2-Pole
Provide new by Contractor.
50 Amp breaker by others.
load center
Building 100 Amp stand transformer on pipe mount adjacent to enclosure with NEMA 3R breaker disconnect
50 Amp 3-P circuit
Provide New
IM-6-029(120)216
Lighting System
Wiring Schematic
Thomas K Conlin
10389
11/30/17
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
11/30/2017 brianmoser P:\State\NDDOT\13213100\Project\60029216.120\Design\Plans\140\140LT_009.dgn10:01:59 AM of Transportation
North Dakota Department document is stored at the on and the original
PE- ,