NDDOT_Supporting_Electrical_Document.pdf

PDF 2 MB Posted

Attached to
pre-fabricated booth Federal contract opportunity
Solicitation number
47PJ0018Q0037
Issued by
General Services Administration Public Buildings Service Region 8

About this file

NDDOT supporting electrical

View the file

Other files for this federal contract opportunity

Other files attached to pre-fabricated booth, newest first.
File Type Posted
Solicitation_Amendment_47PJ0018Q0037_0001.pdf PDF
solicitation_-_booth.pdf PDF
Foundation_Plan.pdf PDF
Statement_of_Work.pdf PDF
Booth_Design_Standards.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRCOMBYPASS

Sta 227+17.13 - 11.2' LT

Light L20

Sta 228+00.98 - 12.1' LT

Light L19

Sta 228+85.71 - 11.6' LT

Light L18

Sta 11465+01.4 - 52.8' RT (EX29)

Light L13

Sta 11466+70.03 - 64.6' RT (EX29)

Light L14

Existing Booth

11474 +32.83

- 521.

1' LT (

EX29)

Existin g High

Mast T2 to Re main

MH LED 140' - 6 Luminaires

Sta 11470+15.00 - 56.3' RT (EX29)

New High Mast T9

Building

CBP Inspection

PRCOMBYPASS

Sta 229+27' LT

Pull Box 3 F16 (S ee she et 160

-6)Communicat ions P ull Box transformer

Relocate existing

264.6' Lt

Sta 11 475+1

4.06Pull Bo x 1

264.6' Lt

Sta 11 475+0

9.06Pull Bo x 8

Sta 11472+85.81 - 116.0' LT

Existing High Mast T6 to Remain

Sta 11471+66.68 - 37.9' RT (EX29)

Light L15

Sta 11472+47.65 - 40.6' RT (EX29)

Light L16

Sta 11473+01.84 - 45.1' RT (EX29)

Light L17

Sta 11470+49.82 - 62.7' RT

Pull Box 2

Overhea d DMS Sign

#4

R-51-W

T-164-N

Sec 28

Southb ound I

-29

Exst R/W

Exst R /W

Exst R /W

Exst R/W

Ppsd R/W

120'

175'

Northbound I-29

Sheet Location

Zone

Outbound Inspection

16'

T o L ig h t L

T o L ig h t L

BollardsBollards

BollardsBollards under building.

in crawlspace

Install conduits

See note 3.

Temporary wood post.

pull box #F18

Communication with NEMA 3R enclosure circuit breaker disconnect

New 50A, 3-Pole

See note 1.

conduit and cable by Contractor.

208V panel by others. Underground by others. Future 100 Amp, 3-Ph, Future CBP Inspection Building transformer

Relocated 30 kVA

METERED) (NDDOT SCHEDULE STANDARDLIGHT

NUMBERLIGHT TYPE

IES-Type

OPTICS STANDARDS

REMARKS

TYPE HT.MTG. LG.ARM

L14L13, 3000K -LED

Conventional III Davit 42' 12'

° 0 at tilted 240V, at operatedLuminaire base. transformerbreakaway foundation, concrete on standard lightInstall

LIGHT STANDARD SCHEDULE (FEDERAL GSA METERED)

LIGHT NUMBER TYPE

IES-Type

OPTICS STANDARDS

REMARKS

TYPE MTG. HT. ARM LG.

L15 - L20 Lumen LED

(1) - High III Davit 40' 6'

Inspection lighting only on when needed per note 1.

Luminaire operated at 240V, tilted at 0°.

breakaway transformer base.

Install light standard on concrete foundation, T9 Mast LED

(6)* - High

Symmetrical

V

Assembly

High Mast 140' N/A luminaires are required, refer to plan notes.

luminaires. *If Holophane HMLED3 is used then (8) aimed away from pole, assuming Philips HFL

(6) - Full cut-off LED luminaires, tilted at 0°, all temporary equipment once building is in place and relocating equpiment into building.

in outdoor rated enclosures. Connect breaker to transformer. Contractor is responsible for removing provide a wood post with toggle switch, photocell, 50 Amp 2-pole breaker, and 60 Amp 2-pole contactor all

3. If CBP inspection building is not installed at time of Lights L15-L20 completion, then

2.Refer to Section 160 for ITS cable and conduit electrical quantities.

System."

center by others. Include contactor, breaker, switch, and photocell in the unit price bid item, "Lighting conjuction with photocell so that lights will only turn on at night. Building interior boxes, conduit, and load new CBP inspection building and controlled by light switch in building per wiring diagram. Wire in

1. Provide and connect a contactor to the inspection lighting (L15 - L20). Contactors is to be located in the

Notes:

IM-6-029(120)216 140 3

Pembina Border Crossing

Lighting

Sta 11465+00 to Sta 11474+00

(EX29)

Thomas K Conlin

10389

11/30/17

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/30/2017 brianmoser P:\State\NDDOT\13213100\Project\60029216.120\Design\Plans\140\140LL_003.dgn10:52:30 AM of Transportation

North Dakota Department document is stored at the on and the original

PE- ,

Registration Number issued and sealed by

This document was originally

METERED) GSA (FEDERAL SCHEDULE STANDARDLIGHT

NUMBERLIGHT TYPE

IES-Type

OPTICS STANDARDS

REMARKS

TYPE HT.MTG. LG.ARM

T10 LEDMast

High -(10)*

Asymmetrical

III

Assembly

MastHigh 140' N/A shown.as direction in pointed/aimed be to optics luminaires' All notes. plan to refer required, are luminaires (12) then used is HMLED3

Holophane *If luminaires. HFL Philips assuming

°, 0 at tilted luminaires, LED cut-off Full -(10)

T11 LEDMast

High -(10)*

Asymmetrical

III

Assembly

MastHigh 140' N/A lanes.car west towards pointed 3 bypass, commercial toward pointed

7 shown, as directions in pointed/aimed be to optics Luminaires' notes. plan to refer required, are luminaires (12) then used is HMLED3

Holophane *If luminaires. HFL Philips assuming

°, 0 at tilted luminaires, LED cut-off Full -(10)

T12 LEDMast

High -(10)

Asymmetrical

III

Assembly

MastHigh 140' N/A shown.as direction in pointed/aimed be to optics luminaires' All notes. plan to refer required, are luminaires (10) then used is HMLED3

Holophane If luminaires. HFL Philips assuming

°, 0 at tilted luminaires, LED cut-off Full -(10)

P1

P3

P2

P4

Sta 228+85.71 - 11.6' LT

Light L18

Building B

Do Not Trench

Existing Pavement

Bore Under

Sta 11477+08.73 - 108.0' LT (EX29)

Existing High Mast T8 to Remain

11481+66.99 - 123.6' LT (EX29)

Existing High Mast T7 to Remain

11474+32.83 - 521.1' LT (EX29)

Existing High Mast T2 to Remain

Sta 11476+20.68 - 429.7' LT (EX29)

Existing High Mast T3 to Remain

Sta 11480+01.61 - 537.3' LT (EX29)

Existing High Mast T1 to Remain sta 11482+11.90 - 336.8' LT (EX29)

Existing High Mast T5 to Remain

PRCOMBYPASS

Sta 231+25.32 - 50.7' LT

New High Mast T10

PRCOMBYPASS

Sta 236+89.95 - 79.0' LT

New High Mast T11

PRCOMBYPASS

Sta 241+27.32 - 65.5' LT

New High Mast T12

Controller (A)

Traffic Signal

See note 4.

Do Not Trench

Existing Pavement

Bore Under

Pull Box

Existing Communications

EX29

Sta 11475+20.94 - 85.3' RT

Pull Box 6

EX29

Sta 11475+10.16 - 83.6' RT

Pull Box 7

F16 (See sheet 160-6)

Communications Pull Box

264.6' Lt

Sta 11475+14.06

Pull Box 1

264.6' Lt

Sta 11475+09.06

Pull Box 8

See Section 150

Signal Standard

PRCOMBYPASS

Sta 236+78.44 - 57.7' LT

Pull Box 4

PRCOMBYPASS

Sta 241+27.33 - 73.6' LT

Pull Box 5 readers (by others) system license plate with Canadian FAST

Overhead Static Sign

Overhead DMS Sign #4

See Sheet 150-6.

New Feed Point FP2

R-51-W

T-164-N

Sec 28

C a n a d a

U n ite d S ta te s

Exst R/W

Exst R/W

Exst R/W Northbound I-29

North boun d I-2

Exst R/W

Exs t R/

W

Exst R/W

Sheet Location

Commercial Bypass optical focus

Direction of 3 luminaires optical focus

Direction of 7 luminaires optical focus

Direction of 10 luminaires

Existing Utility Pole

Existing 1-ph Power PoleExisting 3-ph Power Pole primary cable by utility.

from final grade. Permanent

Install 4" conduit 48" deep

Building

DFA

PRCOMBYPASS

Sta 236+21.61 - 56.0' RT

Pull Box 9

Oct. 1, 2018 power installation by by others. Complete for controller cabinet power and disconnect

Contractor to provide line relocation. Primary cable by others.

from existing grade for overhead at start of project 48" deep

Install 2" bored conduit foundations for future cameras.

5. Provide spare 2" conduit sweep in high mast south interior wall.

Mount new panelboard and contactors per detail at the and #8 into the building at the generator room south wall.

4. Provide cable and rigid steel conduit from pull boxes #1 conduit electrical quantities

3. Refer to Section 150 for Traffic Signal cable and electrical quantities

2. Refer to Section 160 for ITS cable and conduit the presence of the engineer and owner (GSA)

1. Stadium lights shall be aimed and adjusted at night in

IM-6-029(120)216 140 4

Lighting

Sta 11474+00 to Sta 11485+00

(EX29)

Thomas K Conlin

10389

11/30/17

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/30/2017 brianmoser P:\State\NDDOT\13213100\Project\60029216.120\Design\Plans\140\140LL_004.dgn10:01:54 AM of Transportation

North Dakota Department document is stored at the on and the original

PE- ,

Registration Number

PIPE BOLLARD DETAIL

ENCASE IN CONCRETE

E Q

U

IP

M E

N T L

IN

E

16'' 6''

8'' 9''

48''

48''

WITH CONCRETE ROUND TOP

6" STD STEEL PIPE

OWNER'S REPRESENTATIVE

AS APPROVED BY

PRIME AND PAINT COLOR

SLOPE CONCRETE TO DRAIN

LIGHTING CABLE & CONDUIT SCHEDULE (INTERSTATE)

ITEM STATION OFFSET

CONDUIT RUN CABLE RUN

TOTAL LF SIZE (IN) TOTAL LF SIZE/TYPE

Light L13 Sta 11465+01.40, 52.8' Rt 354 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 169 2" 177 UNDERGROUND CONDUCTOR NO. 6 THW

Light L14 Sta 11466+70.03, 64.6' Rt

LIGHTING CABLE & CONDUIT SCHEDULE (BORDER SITE)

ITEM STATION OFFSET

CONDUIT RUN CABLE RUN

TOTAL LF SIZE (IN) TOTAL LF SIZE/TYPE

CBP Inspection Building Sta 227+04, 49' Lt 154 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 63 2" 77 UNDERGROUND CONDUCTOR NO. 6 THW

Light L15 Sta 11471+66.68, 37.9' Rt

Light L17 Sta 11473+01.84, 45.1' Rt 126 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 55 2" 63 UNDERGROUND CONDUCTOR NO. 6 THW

Light L16 Sta 11472+47.65, 40.6' Rt

Light L16 Sta 11472+47.65, 40.6' Rt 180 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 82 2" 90 UNDERGROUND CONDUCTOR NO. 6 THW

Light L15 Sta 11471+66.68, 37.9' Rt

CBP Inspection Building Sta 227+04, 49' Lt 112 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 42 2" 56 UNDERGROUND CONDUCTOR NO. 6 THW

Light L20 Sta 227+17.13, 11.2' Lt

Light L18 Sta 228+85.71, 11.6' Lt 182 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 83 2" 91 UNDERGROUND CONDUCTOR NO. 6 THW

Light L19 Sta 228+00.98, 12.1' Lt

Light L19 Sta 228+00.98, 12.1' Lt 184 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 84 2" 92 UNDERGROUND CONDUCTOR NO. 6 THW

Light L20 Sta 227+17.13, 11.2' Lt

Highmast Light T9 Sta 11470+15.00, 56.3' Rt 80 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 33 2" 40 UNDERGROUND CONDUCTOR NO. 6 THW

Pull Box #2 Sta 11470+49.82, 62.7' Rt

Pull Box #2 Sta 11470+49.82, 62.7' Rt 598 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 293 2" 299 UNDERGROUND CONDUCTOR NO. 6 THW

Pull Box #3 Sta 229+27.46, 113.50' Rt

CBP Insp. Building Transformer Sta 227+18.04, 52.1' Lt 699 (3) UNDERGROUND CONDUCTOR NO. 2 RHW/USE to to 220 2" 233 UNDERGROUND CONDUCTOR NO. 6 THW

Pull Box #3 Sta 229+27.46, 113.50' Rt

Pull Box #3 Sta 229+27.46, 113.50' Rt 531 (3) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (CBP Building) to to 342 2- 2" 177 UNDERGROUND CONDUCTOR NO. 6 THW

Pull Box #7 Sta 11475+110.16, 83.6' Rt 354 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE (T9)

177 UNDERGROUND CONDUCTOR NO. 6 THW

Pull Box #7 Sta 11475+110.16, 83.6' Rt 194 (2) UNDERGROUND CONDUCTOR NO. 6 RHW to to 90 2" 97 UNDERGROUND CONDUCTOR NO. 6 THW

Highmast Light T10 Sta 231+25.32, 50.7' Lt

543 (3) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (CBP Building)

Pull Box #7 Sta 11475+110.16, 83.6' Rt 181 UNDERGROUND CONDUCTOR NO. 6 THW to to 350 (2) - 2" 362 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE (T9)

Pull Box #8 Sta 11475+09.06, 264.6' Lt 362 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE (T10)

181 UNDERGROUND CONDUCTOR NO. 6 THW

48 (3) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (CBP Building)

Pull Box #8 Sta 11475+09.06, 264.6' Lt 16 UNDERGROUND CONDUCTOR NO. 6 THW to to 6 (2) - 2" 32 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE (T9)

Building B Sta 11475+01.80, 270.5' Lt Rigid Steel 32 (2) UNDERGROUND CONDUCTOR NO. 6 RHW/USE (T10)

16 UNDERGROUND CONDUCTOR NO. 6 THW

Building B Sta 11475+01.80, 270.5' Lt

Rigid Steel

2"

38 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (T11)

to to 6 38 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (T12)

Pull Box #1 Sta 11475+14.06, 264.6' Lt 19 UNDERGROUND CONDUCTOR NO. 4 THW

Pull Box #1 Sta 11475+14.06, 264.6' Lt 718 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (T11) to to 353 2" 718 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (T12)

Pull Box #6 Sta 11475+20.94, 85.3' Rt 359 UNDERGROUND CONDUCTOR NO. 4 THW

Pull Box #6 Sta 11475+20.94, 85.3' Rt 1108 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (T11) to to 548 2" 1108 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE (T12)

Pull Box #4 Sta 236+78.44, 57.7' Lt 554 UNDERGROUND CONDUCTOR NO. 4 THW

Pull Box #4 Sta 236+78.44, 57.7' Lt 48 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE to to 17 2" 24 UNDERGROUND CONDUCTOR NO. 4 THW

Highmast Light T11 Sta 236+89.95, 79.0' LT

Pull Box #4 Sta 236+78.44, 57.7' Lt 854 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE to to 421 2" 427 UNDERGROUND CONDUCTOR NO. 4 THW

Pull Box #5 Sta 241+27.33, 73.6' Lt

Pull Box #5 Sta 241+27.33, 73.6' Lt 30 (2) UNDERGROUND CONDUCTOR NO. 2 RHW/USE to to 8 2" 15 UNDERGROUND CONDUCTOR NO. 4 THW

Highmast Light T12 Sta 241+27.32, 65.5' Lt

LIGHTING CABLE & CONDUIT SCHEDULE (BORDER SITE)

ITEM STATION OFFSET

CONDUIT RUN CABLE RUN

TOTAL LF SIZE (IN) TOTAL LF SIZE/TYPE

CBP Insp. Building Transformer Sta 227+18.04, 52.1' Lt 160 (4) UNDERGROUND CONDUCTOR NO. 2 RHW/USE to to 20 2" 40 UNDERGROUND CONDUCTOR NO. 6 THW

CBP Inspection Building Sta 227+04, 49' Lt

CBP Insp. Building Foundation Sta 226+99.31, 48.3' Lt 100 (4) UNDERGROUND CONDUCTOR NO. 6 RHW/USE to to 5 2" 25 UNDERGROUND CONDUCTOR NO. 6 THW

Temporary Wood Post Sta 227+17.04, 49.8' Lt (Temporary Connections Only)

Existing Communication PB Sta 11475+27.25, 160.0' Lt 241 Pull String to to 241 2"

Comm. Pull Box F16 Sta 11475+107.16, 78.6' Rt

Comm. Pull Box F16 Sta 11475+107.16, 78.6' Rt 367 Pull String to to 367 2"

Comm. Pull Box F18 Sta 227+18.00, 54.4' Lt

Comm. Pull Box F18 Sta 227+18.00, 54.4' Lt 18 Pull String to to 18 2"

CBP Inspection Building Sta 227+04, 49' Lt

Existing Utility Pole Sta 241+25.06, 141.8' Lt 333 Pull String to to 333 2"

Existing 1-ph Utility Pole Sta 240+65.55, 185.8' Rt

Feed Point FP2 Sta 236+30.03, 134.9' Lt 413 Pull String to to 413 4"

Existing 3-ph Utility Pole Sta 234+59.47, 189.2' Rt

Feed Point FP2 Sta 236+30.03, 134.9' Lt 408 (2) UNDERGROUND CONDUCTOR NO. 6 RHW to to 191 2" 204 UNDERGROUND CONDUCTOR NO. 6 THW

Pull Box #9 Sta 236+21.61, 56.0' Rt

Pull Box #9 Sta 236+21.61, 56.0' Rt 408 (2) UNDERGROUND CONDUCTOR NO. 6 RHW to to 192 2" 204 UNDERGROUND CONDUCTOR NO. 6 THW

FAST system Controller Sta 234+27.79, 52.5' Rt orange, yellow, and black with yellow tape.

blue, and black. Neutral is white. 480V wires to be brown, All ground wires to be green. 240V or 208V wires to be red,

2. Conductors shall have integral color coded insulation.

what each conductor is used for.

1. Label all conductors with tags in pull boxes designating

Lighting System

Thomas K Conlin

10389

IM-6-029(120)216 5

Cable & Conduit Schedule

11/30/17

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/30/2017 brianmoser P:\State\NDDOT\13213100\Project\60029216.120\Design\Plans\140\140LT_005.dgn10:01:55 AM of Transportation

North Dakota Department document is stored at the on and the original

PE- ,

Registration Number

CBP Inspection Building One-Line Diagram

Inspection Area Lighting Control Schematic

Building B

Distribution Panel in

Existing Main responsible for any damages caused by construction.

Preserve existing wiring and equipment. Contractor is 8.

that are easy to identify.

Neatly train and lace all wiring. Provide color coded wires7.

switch, and panelboard.

Provide wiring in conduit between contactor enclosures,6.

Provide circuit breakers as shown on panel schedule.5.

Provide equipment grounding not shown per NEC.4.

be used.

unless mounted outside then a NEMA 3R enclosure shall

Provide contactors in NEMA 1 enclosures as shown, 3.

enclosures describing functionality.

contactor and how each contactor works. Label contactor of the lighting control. Make clear which lights are on each

Provide wiring diagram to owner showing the operation 2.

exterior.

as to use. Provide etched labeling for contactor enclosure permanent typed labeling. Internal contactors shall be labeled

Contactors and individual wires shall be labeled with 1.

GENERAL NOTES

shall the lights turn on during the day.

and off only at night, when the lighting is needed. In no case

The toggle switch shall allow the lights to be turned on 2.

when the toggle switch is turned on by personnel .

Lights shall turn on at night and turn off in the morning, only

Master photocell shall close at dusk and open at dawn. 1.

SEQUENCE OF OPERATIONS

LIGHTING CONTROL REQUIREMENTS

LEGEND

facing north.

or equal per specs. Provide with outdoor rated box and cover

Note: Photocell to be Intermatic K4000 series, button type have 2 poles. Mounted in NEMA 1 enclosure.

contactor. 120V control coil. Lighting rated contactor shall

Provide 1 new separate 60 Amp, 208V rated, normally open junction box and cover.

20 Amp toggle switch. 1-way type.Provide with separate

Circuit breaker (or disconnect) as shown.

inside building switch toggle on/off

Provide new

50A

2-pole new inspection building located near

120/208Y : 480V

30 kVA Transformer

Reuse existing

100A

3-pole existing

CBP INSPECTION BOOTH BUILDING

TO NEW INSPECTION AREA LIGHTING

NEUTRALL1

in Panel 'DP1'

Provide new 15 Amp

DAY

NIGHT

ON

OFF

C3 toggle switch

NEW 1-way, 20A

L15-L20

LIGHTING

AREA

INSPECTION

NEW

C3

L3

L2

C3

2-Pole

50A photocell on building

Provide new 120V exterior building photocell on

Provide new

C3 by others inside building enclosure

NEMA 1

contactor.

60 Amp, 2-Pole

Provide new by Contractor.

50 Amp breaker by others.

load center

Building 100 Amp stand transformer on pipe mount adjacent to enclosure with NEMA 3R breaker disconnect

50 Amp 3-P circuit

Provide New

IM-6-029(120)216

Lighting System

Wiring Schematic

Thomas K Conlin

10389

11/30/17

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/30/2017 brianmoser P:\State\NDDOT\13213100\Project\60029216.120\Design\Plans\140\140LT_009.dgn10:01:59 AM of Transportation

North Dakota Department document is stored at the on and the original

PE- ,

Registration Number

File details come from the government source that posted it.