402-22-750 AE Supplement B.doc

DOC document 87 KB Posted

Attached to
C1DA--402-22-750 A/E Renovate Sterile Processing Federal contract opportunity
Solicitation number
36C24122R0077
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document outlines the submission requirements for architectural and engineering design review materials for a renovation project at the Veterans Affairs Medical Center in Togus, Maine. The scope of work involves upgrading all areas and systems within an 8,400 square foot Sterile Processing Department located in Building 200E on the first floor, including two dumbwaiters connecting to the third floor surgical services. The design must meet all VA requirements for SPD facilities. Submission requirements include providing AutoCAD drawings, bound layout plans and details, specifications, estimates, renderings, and other documents at 30%, 60%, 90%, and 100% design stages. A quality control plan is due within 17 days of the notice to proceed and final bid documents with professional engineering stamps are due 240 days from the notice to proceed. The project includes surveying existing conditions, coordinating with consultants, and obtaining VA comments throughout design development.

View the file

Other files for this federal contract opportunity

Other files attached to C1DA--402-22-750 A/E Renovate Sterile Processing, newest first.
File Type Posted
402-22-750 AE SOW.pdf PDF
36C24122R0077_1.docx DOCX document
402-22-750 AE Supplement C.doc DOC document
402-22-750 AE Supplement A.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLEMENT “B”

A/E SUBMISSIONS

OF DESIGN REVIEW MATERIAL

FIRST REVIEW

(Conceptual – Preliminary User Group Meetings & Field Surveys)

2 Sets of reduced size and PDF preliminary layout plans with proposed alternates per meeting

2 Sets of conceptual estimates with proposed alternates per meeting

SECOND REVIEW

(30% Submittal – Schematics)

2 Sets of AutoCAD & PDF schematic drawings in accordance with Supplement “A” Item 6 2 Sets of full size bound schematic layout plans/details – 36 inches by 24 inches 2 Sets of reduced size bound schematic layout plans/details

2 Sets of MS Word draft specifications in accordance with Supplement “A” Item 6 2 Sets of spiral bound draft specifications

2 Sets of schematic estimates

2 Sets of draft phasing plans 0 Sets of artist’s 3D mounted renderings for project area

THIRD REVIEW

(60% Submittal – “DD” Design Development)

2 Sets of AutoCAD & PDF design drawings in accordance with Supplement “A” Item 6 2 Sets of full-size bound design development layout plans/details – 36 inches by 24 inches 2 Sets of reduced size bound design development layout plans/details

2 Sets of MS Word design specifications in accordance with Supplement “A” Item 6 2 Sets of spiral bound design specifications

2 Sets of design development estimates

2 Sets of design development phasing plans

0 Sets of artist’s 3D colorized mounted renderings of project area

FOURTH REVIEW

(90% Submittal – “CD” Construction Documents)

2 Sets of AutoCAD & PDF construction drawings in accordance with Supplement “A” Item 6 2 Sets of full-size bound construction documents plans/details – 36 inches by 24 inches 2 Sets of reduced size bound construction documents plans/details

2 Sets of Adobe PDF construction specifications in accordance with Supplement “A” Item 6 2 Sets of spiral bound construction specifications

2 Sets of construction documents estimates

2 Sets of construction documents phasing schedules

0 Sets of architectural 3D colorized mounted renderings of project area

FIFTH REVIEW

(100% Submittal – Bid [Final] Documents)

2 Sets of AutoCAD 2014 & PDF bid drawings in accordance with Supplement “A” Item 6 0 Sets of approved full size bid documents Mylar drawings with PE stamps

0 Sets of reproducible full size bid drawings on vellum with PE stamps

2 Sets of approved reduced size bound bid plans/details with PE stamps

0 Sets of full-size Mylar bound bid plans/details with PE stamps rolled in individual mailing tubes 2 Sets of MS Word final specification sections in accordance with Supplement “A” Item 6 2 Sets of Adobe PDF final specification sections merged in accordance with Supplement “A”

2 Sets of final specifications boxed on single sided sheets

0 Sets of 3-ring bound final specifications paginated front to back with Mylar front/back cover 2 Sets of final estimates

2 Sets of final phasing schedules

0 Sets of architectural 3D colorized mounted and framed renderings of project area

SIXTH REVIEW

(Project Close Out Submittal – “As-Built” Construction Documents)

2 Sets of AutoCAD & PDF As-Built drawings in accordance with Supplement “A” Item 6 0Set of approved full size As-Built Mylar drawings with PE stamps

2 Sets of approved reduced size As-Built plans/details with PE stamps

ID
Milestone Task Description
Duration
Schedule

Date Actual

Date

1
User Group Preliminary Mtg (Review Scope, Site Survey Investigation)
1 Day
NTP + 10
2
Preliminary Investigation of Existing Conditions
As Needed
3
Submit Detailed QA/QC Plan
---
NTP + 17
4
Submit Conceptual Layout Schemes with Proposed Alternates
---
NTP + 21
5
User Group Mtg (Review Proposed Schemes)
1 Day
6
Submit Revised Conceptual Layout Plans with Proposed Alternates
---
7
User Group Mtg (Review Conceptual Plans)
1 Day
8
Submit Revised Conceptual Layout Design for Approval
---
NTP + 49
9
User Group Mtg (Review/Approve Conceptual Plans)
1 Day
10
Prepare 30% Schematic Design Submissions
---
11
Survey Existing Conditions, Coordinate Design with Consultants & VA Comments
As Needed
12
Submit 30% Schematic Design Package
---
NTP + 105
13
VA Engineering 30% Review
7 Days (Min)
14
User Group 30% Schematic Design Review Meeting
1 Day
12
Prepare 60% “DD” Design Development Submissions
---
13
Confirm Existing Conditions, Coordinate Design with Consultants & VA Comments
As Needed
14
Submit 60% “DD” Design Development Package
---
NTP + 147
15
VA Engineering 60% Review
14 Days (Min)
16
User Group 60% “DD” Review Meeting
1 Day
17
Prepare 90% “CD” Construction Document Submissions
---
18
Coordinate Design with Consultants, Existing Conditions & VA Comments
As Needed
19
Submit 90% “CD” Construction Documents Package
---
NTP + 203
20
VA Engineering 90% Review
14 Days (Min)
21
User Group 90% “CD” Review Meeting
1 Day
22
Prepare 100% Bid Final Documents
---
23
Finalize Coordination with Consultants, Existing Conditions & VA Comments
As Needed
24
Submit 100% Bid Final Documents with PE Stamps
---
NTP + 240
25
Bid Opening Date and/or Negotiate with SBA 8a Contractor
---

File details come from the government source that posted it. Updated .