402-21-724 SOW.pdf

PDF 2 MB Posted

Attached to
C1DA--402-21-724 Boiler Plant Stack Pad Repairs Design Federal contract opportunity
Solicitation number
36C24122R0032
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

View the file

Other files for this federal contract opportunity

Other files attached to C1DA--402-21-724 Boiler Plant Stack Pad Repairs Design, newest first.
File Type Posted
402-21-724 AE Supplement A (rev1).doc DOC document
402-21-724 Boiler plant stack design cal.pdf PDF
402-21-724 AE Supplement B.doc DOC document
36C24122R0032_1.docx DOCX document
402-21-724 Location on Campus Map.pdf PDF
402-21-724 Dual Wall Stack Elevation and Details Boiler Plant.pdf PDF
402-21-724 AE Supplement C.doc DOC document
402-21-724 TMD and Misc Details Boiler Plant.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

402‐21‐724 Boiler Plant Stack Pad Repair

Work to be completed for the VA Maine Healthcare System Campus located at 1 VA Center, Augusta, ME 04330. Architect/Engineer to provide a complete construction design package including plans and specifications to repair the existing boiler plant stack pad. This scope is comprised of Type A, B and C services which will include concept, design and support through the construction phase of this work.

This project addresses the cracked and spalling concrete that is supporting the 125ft boiler plant stack.

This will include structural analysis of the existing pad, testing of the existing materials and any other means of determining required repairs. Any work requiring coordination with the boiler plant should be clearly identified.

This project will improve the structural integrity of the existing boiler plant stack pad and will prevent further deterioration of the concrete and reinforcing steel.

All design work shall be certified by professionals licensed to practice in the State of Maine. The design firm must follow all required building codes, standards, and guidelines. This is to include but is not limited to, VA Master Specifications, VA Barrier free design guide, VA Physical Security & Resiliency

Design Manual (October 1, 2020), and the VA Sustainability Design book, as well as and applicable trade design manuals. After the A/E design is completed it is expected to be construction ready, and include all necessary details, drawings, specifications, construction scope, and cost estimate. The period of performance for this work to be completed is 120 days from the issuance of the Notice to Proceed by the contracting officer.

Period of performance is 120 calendar days.