402-21-724 AE Supplement B.doc
DOC document 82 KB Posted
- Attached to
- C1DA--402-21-724 Boiler Plant Stack Pad Repairs Design Federal contract opportunity
- Solicitation number
- 36C24122R0032
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 402-21-724 AE Supplement A (rev1).doc | DOC document | |
| 402-21-724 Location on Campus Map.pdf | ||
| 402-21-724 Dual Wall Stack Elevation and Details Boiler Plant.pdf | ||
| 402-21-724 AE Supplement C.doc | DOC document | |
| 402-21-724 TMD and Misc Details Boiler Plant.pdf | ||
| 402-21-724 Boiler plant stack design cal.pdf | ||
| 402-21-724 SOW.pdf | ||
| 36C24122R0032_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLEMENT “B”
A/E SUBMISSIONS
OF DESIGN REVIEW MATERIAL
FIRST REVIEW
(Conceptual – Preliminary User Group Meetings & Field Surveys)
2 Sets of reduced size and PDF preliminary layout plans with proposed alternates per meeting
2 Sets of conceptual estimates with proposed alternates per meeting
SECOND REVIEW
(30% Submittal – Schematics)
2 Sets of AutoCAD & PDF schematic drawings in accordance with Supplement “A” Item 6 2 Sets of reduced size bound schematic layout plans/details
2 Sets of MS Word draft specifications in accordance with Supplement “A” Item 6 2 Sets of spiral bound draft specifications
2 Sets of schematic estimates
2 Sets of draft phasing plans
THIRD REVIEW
(60% Submittal – “DD” Design Development)
2 Sets of AutoCAD & PDF design drawings in accordance with Supplement “A” Item 6 2 Sets of reduced size bound design development layout plans/details
2 Sets of MS Word design specifications in accordance with Supplement “A” Item 6 2 Sets of spiral bound design specifications 2 Sets of design development estimates
2 Sets of design development phasing plans
FOURTH REVIEW
(90% Submittal – “CD” Construction Documents)
2 Sets of AutoCAD & PDF construction drawings in accordance with Supplement “A” Item 6 2 Sets of full size bound construction documents plans/details – 36 inches by 24 inches 2 Sets of reduced size bound construction documents plans/details
2 Sets of Adobe PDF construction specifications in accordance with Supplement “A” Item 6 2 Sets of spiral bound construction specifications
2 Sets of construction documents estimates
2 Sets of construction documents phasing schedules
FIFTH REVIEW
(100% Submittal – Bid [Final] Documents)
2 Sets of AutoCAD & PDF bid drawings in accordance with Supplement “A” Item 6 2 Sets of full size bound construction documents plans/details with PE stamps– 36 inches by 24 inches
2 Sets of approved reduced size bound bid plans/details with PE stamps
2 Sets of MS Word final specification sections in accordance with Supplement “A” Item 6 2 Sets of Adobe PDF final specification sections merged in accordance with Supplement “A”
2 Sets of 3-ring bound final specifications paginated front to back with Mylar front/back cover 2Sets of final estimates
2 Sets of final phasing schedules
SIXTH REVIEW
(Project Close Out Submittal – “As-Built” Construction Documents)
2 Sets of AutoCAD & PDF As-Built drawings in accordance with Supplement “A” Item 6 2 Sets of full size bound construction documents plans/details with PE stamps– 36 inches by 24 inches
2Sets of approved reduced size As-Built plans/details with PE stamps
| ID |
| Milestone Task Description |
| Duration |
| Schedule |
Date Actual
Date
| 1 |
| User Group Preliminary Mtg (Review Scope, Site Survey Investigation) |
| 1 Day |
| NTP + 10 |
| 2 |
| Preliminary Investigation of Existing Conditions |
| As Needed |
| 3 |
| Submit Conceptual Layout Schemes with Proposed Alternates |
| --- |
| NTP + 20 |
| 4 |
| User Group Mtg (Review Proposed Schemes) |
| 1 Day |
| 5 |
| Submit Revised Conceptual Layout Plans with Proposed Alternates |
| --- |
| 6 |
| User Group Mtg (Review Conceptual Plans) |
| 1 Day |
| 7 |
| Submit Revised Conceptual Layout Design for Approval |
| --- |
| NTP + 30 |
| 8 |
| User Group Mtg (Review/Approve Conceptual Plans) |
| 1 Day |
| 9 |
| Prepare 30% Schematic Design Submissions |
| --- |
| Survey Existing Conditions, Coordinate Design with Consultants & VA Comments |
| As Needed |
| 10 |
| Submit 30% Schematic Design Package |
| --- |
| NTP +40 |
| VA Engineering 30% Review |
| 7 Days (Min) |
| 11 |
| User Group 30% Schematic Design Review Meeting |
| 1 Day |
| 12 |
| Prepare 60% “DD” Design Development Submissions |
| --- |
| Confirm Existing Conditions, Coordinate Design with Consultants & VA Comments |
| As Needed |
| 13 |
| Submit 60% “DD” Design Development Package |
| --- |
| NTP + 80 |
| VA Engineering 60% Review |
| 14 Days (Min) |
| 14 |
| User Group 60% “DD” Review Meeting |
| 1 Day |
| 15 |
| Prepare 90% “CD” Construction Document Submissions |
| --- |
| Coordinate Design with Consultants, Existing Conditions & VA Comments |
| As Needed |
| 16 |
| Submit 90% “CD” Construction Documents Package |
| --- |
| NTP + 100 |
| VA Engineering 90% Review |
| 14 Days (Min) |
| 17 |
| User Group 90% “CD” Review Meeting |
| 1 Day |
| 18 |
| Prepare 100% Bid Final Documents |
| --- |
| Finalize Coordination with Consultants, Existing Conditions & VA Comments |
| As Needed |
| 19 |
| Submit 100% Bid Final Documents with PE Stamps |
| --- |
| NTP + 120 |
| 20 |
| Bid Opening Date and/or Negotiate with SBA 8a Contractor |
| --- |