4. Request for Technical Literature.pdf
PDF 173 KB Posted
- Attached to
- Overhead Cranes Federal contract opportunity
- Solicitation number
- W911KF-20-Q-0090
About this file
This document is a request for technical literature for overhead cranes at various buildings on an Army depot. The contractor shall provide literature describing how their proposed cranes meet requirements for buildings 128, 129, 131, 132, 108, and 400. Requirements covered include standard products, nameplates, dimensions, concrete work, electric hoists, hoist carriers, bridge systems, electrical systems, runways, and support columns. The literature must address each requirement by paragraph number and include page references. If preprinted literature is insufficient, a supplemental letter is required. Failure to demonstrate meeting requirements will result in bid rejection. Descriptive literature cannot include conditional language. Delivery of 120 days is required.
The related federal contract opportunity is solicitation number W911KF-20-Q-0090 for overhead cranes at Anniston Army Depot. The contractor shall install crane systems of various configurations at buildings 128, 131, 132, 129, and 108, and repair an existing hoist at building 400.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911KF-20-Q-0090-0001 Amendment.pdf | ||
| 5. Past Performance Questionnaire.pdf | ||
| 6. DD Form 1423 Contract Data Requirement List.pdf | ||
| 2. Evidence of Authority To Sign Offers.pdf | ||
| 7. DD Form 1664 Data Item Description.pdf | ||
| W911KF-20-Q-0090-Solicitation.pdf | ||
| 1. Statement of Work.pdf | ||
| 3. SioanForm380-2 Personal Data Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR TECHNICAL LITERATURE
a. The bidder shall provide, with its bid, descriptive literature that has previously been used to market the proposed crane. The literature will be used to technically evaluate the bid and shall describe how the crane meets requirements of the specification;
specifically the paragraphs: The below paragraphs are for all buildings listed, 128,129,131,132, 108 and 400.
Information Furnished Ref. Paragraph(s) Location In Your Literature? Page#
BUILDING 128 REQUIREMENTS 2.0
Standard Products 2.1 Nameplates 2.2 Verification of Dimensions 2.3 Concrete 2.4 Remove & Relocate Jib system, water fountain & 2” gas line 2.5
ELECTRIC HOIST 2.6
Hoists 2.6.1 Capacity 2.6.2 Lift and Profile 2.6.3 Lifting Speeds 2.6.4 Electrical Service 2.6.5 Control 2.6.6 Power Source 2.6.7 Limit Switches 2.6.8 Lift Height 2.6.9
HOIST CARRIER 2.7
Carrier 2.7.1 Speed 2.7.2
BRIDGE SYSTEM 2.8
Speed 2.8.1 Drive 2.8.2 Electrical Service 2.8.3 Bridge Girders 2.8.4 Stops and Bumpers 2.8.5 Bridge Rails 2.8.6
ELECTRICAL 2.9
All push-buttons or other manually operated controls 2.9.1 Bridge Electrification 2.9.2 Motors 2.9.3 Pendant Control Station/Remotes 2.9.4 Transformers 2.9.5
RUNWAY AND SUPPORT COLUMNS 2.10
SCE crane rail & Support Columns 2.10.1
BUILDING 131 REQUIREMENTS 3.0
Standard Products 3.1 Nameplates 3.2 Verification of Dimensions 3.3 Concrete 3.4
ELECTRIC HOIST 3.5
Hoists 3.5.1
Capacity 3.5.2 Lift and Profile 3.5.3 Lifting Speeds 3.5.4 Electrical Service 3.5.5 Control 3.5.6 Power Source 3.5.7 Limit Switches 3.5.8 Lift Height 3.5.9
HOIST CARRIER 3.6
Carrier 3.6.1 Speed 3.6.2
BRIDGE SYSTEM 3.7
Speed 3.7.1 Drive 3.7.2 Electrical Service 3.7.3 Bridge Girders 3.7.4 Stops and Bumpers 3.7.5 Bridge Rails 3.7.6
ELECTRICAL 3.8
All push-buttons or other manually operated controls 3.8.1 Bridge Electrification 3.8.2 Motors 3.8.3 Pendant Control Station/Remotes 3.8.4 Transformers 3.8.5
RUNWAY AND SUPPORT COLUMNS 3.9
SCE crane rail 3.9.1 Support Columns 3.6.2
BUILDING 132 REQUIREMENTS 4.0
Standard Products 4.1 Nameplates 4.2 Verification of Dimensions 4.3 Concrete 4.4
ELECTRIC HOIST 4.5
Hoists 4.5.1 Capacity 4.5.2 Lift and Profile 4.5.3 Lifting Speeds 4.5.4 Electrical Service 4.5.5 Control 4.5.6 Power Source 4.5.7 Limit Switches 4.5.8 Lift Height 4.5.9
HOIST CARRIER 4.6
Carrier 4.6.1 Speed 4.6.2
BRIDGE SYSTEM 4.7
Speed 4.7.1 Drive 4.7.2 Electrical Service 4.7.3 Bridge Girders 4.7.4 Stops and Bumpers 4.7.5 Bridge Rails 4.7.6
ELECTRICAL 4.8
All push-buttons or other manually operated controls 4.8.1 Bridge Electrification 4.8.2 Motors 4.8.3 Pendant Control Station/Remotes 4.8.4 Transformers 4.8.5
RUNWAY AND SUPPORT COLUMNS 4.9
SCE crane rail 4.9.1 Support Columns 4.6.2
BUILDING 129 REQUIREMENTS 5.0
Standard Products 5.1 Nameplates 5.2 Verification of Dimensions 5.3 Concrete 5.4
ELECTRIC HOIST 5.5
Hoists 5.5.1 Capacity 5.5.2 Lift and Profile 5.5.3 Lifting Speeds 5.5.4 Electrical Service 5.5.5 Control 5.5.6 Power Source 5.5.7 Limit Switches 5.5.8 Lift Height 5.5.9
HOIST CARRIER 5.6
Carrier 5.6.1 Speed 5.6.2
BRIDGE SYSTEM 5.7
Speed 5.7.1 Drive 5.7.2 Electrical Service 5.7.3 Bridge Girders 5.7.4 Stops and Bumpers 5.7.5 Bridge Rails 5.7.6
ELECTRICAL 5.8
All push-buttons or other manually operated controls 5.8.1 Bridge Electrification 5.8.2 Motors 5.8.3 Pendant Control Station/Remotes 5.8.4 Transformers 5.8.5
RUNWAY AND SUPPORT COLUMNS 5.9
SCE crane rail 5.9.1 Support Columns 5.6.2
BUILDING 108 REQUIREMENTS 6.0
Standard Products 6.1 Nameplates 6.2 Verification of Dimensions 6.3 Existing Items to be removed or relocated 6.4
ELECTRIC HOIST 6.5
Hoists 6.5.1 Capacity 6.5.2 Lift and Profile 6.5.3 Lifting Speeds 6.5.4 Electrical Service 6.5.5
Control 6.5.6 Power Source 6.5.7 Limit Switches 6.5.8 Lift Height 6.5.9
HOIST CARRIER 6.6
Carrier 6.6.1 Speed 6.6.2
BRIDGE SYSTEM 6.7
Speed 6.7.1 Drive 6.7.2 Electrical Service 6.7.3 Bridge Girders 6.7.4 Stops and Bumpers 6.7.5 Bridge Rails 6.7.6
ELECTRICAL 6.8
All push-buttons or other manually operated controls 6.8.1 Bridge Electrification 6.8.2 Motors 6.8.3 Pendant Control Station/Remotes 6.8.4 Transformers 6.8.5
BUILDING 400 REQUIREMENTS 7.0
Building 400 specification 7.1 Maintenance Requirements 7.2 Main Hoist Drum removal 7.2.1 Wire rope replacement 7.2.2 Subcontractors 7.2.3
ACCEPTANCE TESTING 8.0
DELIVERABLES 9.0
Shop Drawings 9.1 Operation and Maintenance Manuals 9.2 Spare Parts Data 9.3
DELIVERY AND STORAGE 10
TECHNICAL DATA 11
INSTALLATION 12
Electrical 12.1 Plumbing 12.2 Concrete 12.3 Foundation Hardware 12.4 Coordination of Trades 12.5 Instruction for Installation 12.6 Utilities 12.7 Electrical 12.7.1 Plumbing 12.7.2 Drainage and waste 12.7.3
b. The features, which must be addressed in the descriptive literature, are necessary to consider the bid responsive. If the bidder’s preprinted literature does not show all these features, the bidder must attach a letter of supplemental information to the literature describing in detail those required features.
c. The failure of descriptive literature to show that the product offered conforms to the requirements of this solicitation will require rejection of the bid.
d. Descriptive literature furnished under this solicitation that contains statements similar to ‘specifications are subject to change without notice’, ‘bid is subject to the following conditions’, or ‘prices are subject to change without notice’ shall not be considered for an award. The government has no assurance the products offered will conform to the specification; therefore, the bid is not considered a firm bid and will not be considered for an award.
e. Bidders who furnish a product catalog to satisfy this requirement must indicate which item is the subject of the bid by citing (highlighting, marking, etc.) model numbers and page numbers from the catalog in Section B of the solicitation along with the bid price.
Bids that fail to clearly establish what item or items are bid will be considered as non-responsive.
JUSTIFICATION FOR DESCRIPTIVE LITERATURE
Signed
DELIVERY: Reasonable delivery for this item is 120 days.
| REQUEST FOR TECHNICAL LITERATURE |
| DELIVERY: Reasonable delivery for this item is 120 days. |
File details come from the government source that posted it. Updated .