4.3.1 S3258-cost-schedule.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- On Call Electrical- Eastern Region State and local contract opportunity
- Solicitation number
- 70CNR-S3258
- Issued by
- Nevada
About this file
The document is a cost schedule template (S3258) for a state or local government contract opportunity, intended for vendor pricing submission. The spreadsheet contains 16 line items plus a travel cost line, with blank spaces for vendors to input pricing details. Vendors are instructed to complete the shaded areas and are responsible for ensuring calculation accuracy. The document indicates that travel costs are allowable as billable expenses under current GSA rates.
The cost schedule appears to be part of a competitive bidding process, with vendors expected to propose pricing across multiple line items. The template provides a structured format for cost proposal submission, suggesting a formal procurement process. Travel expenses are capped at 4 units per year, and the document includes a placeholder for calculating the estimated total project value. The template references GSA.gov for current travel rate information, implying potential alignment with federal government pricing guidelines or standards.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 4.2.1 Standard form contract.pdf | ||
| 4.1.2 Scope of Work S3258.doc | DOC document | |
| 4.3.2 Certification-regarding-lobbying.pdf | ||
| 4.1.1 Terms-and-conditions-for-services.pdf | ||
| 4.2.2 Insurance Requirements~2.pdf | ||
| Quote Instructions.pdf | ||
| S3258 RFP - On Call Electrical.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost schedule
| S3258 cost schedule | |||||
| Vendor | |||||
| Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct. | |||||
| Line | Description and term | Type | Price | Est. Usage | Extended |
| 1 | $ - 0 | ||||
| 2 | $ - 0 | ||||
| 3 | $ - 0 | ||||
| 4 | $ - 0 | ||||
| 5 | $ - 0 | ||||
| 6 | $ - 0 | ||||
| 7 | $ - 0 | ||||
| 8 | $ - 0 | ||||
| 9 | $ - 0 | ||||
| 10 | $ - 0 | ||||
| 11 | $ - 0 | ||||
| 12 | $ - 0 | ||||
| 13 | $ - 0 | ||||
| 14 | $ - 0 | ||||
| 15 | $ - 0 | ||||
| 16 | Estimated travel costs | per year | 4 | $ - 0 | |
| Estimated project value | $ - 0 | ||||
| Travel is allowed as a billable costs of this contract, at then current GSA rates. | |||||
| gsa.gov |
&"Times New Roman,Italic"&10Page &P of &N http://www.gsa.gov/
File details come from the government source that posted it. Updated .