36C78618R0123-001.docx
DOCX document 156 KB Posted
- Attached to
- Leavenworth janitorial Federal contract opportunity
- Solicitation number
- 36C78618R0123
About this file
36C78618R0123 36C78618R0123_1.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C78618R0123-00003000.docx | DOCX document | |
| 36C78618R0123-00002000.docx | DOCX document | |
| 36C78618R0123-00001000.docx | DOCX document | |
| 36C78618R0123-002.pdf | ||
| 36C78618R0123-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
35C78618R0123
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
35C78618R0123 02-5-2018 Katherine Iacovelli 540-658-7231 3/22/2018 1:00 PM Eastern 43C1 Department of Veterans Affairs NCA Contracting Service 75 Barrett Heights Rd. Suite 309 Stafford, VA 22556 X X 561720 $18 Million X N/A X Leavenworth National Cemetery 150 Muncie Road Leavenworth, KS 66048 43C1 Department of Veterans Affairs NCA Contracting Service 75 Barrett Heights Rd. Suite 309 Stafford VA 22556 www.tungsten-network.com/customer-campaigns/veterans-affairs/
See CONTINUATION Page Request for Janitorial Services at Leavenworth National Cemetery. The Contractor shall furnish all personnel, supervision, transportation, equipment and supplies necessary to perform services.
See Statement of Work for more information 100% SDVOSB set-aside
NAICS - 561720
Size Standard - $18 Million
CONTRACTOR INFO
DUNS:_____________________
EMAIL:___________________________
TEL:_______________________________
There is one site visit sche duled for: Februa ry 13, 2018 at 10:00 am Local time 10am local time, meet at the Administration Building See CONTINUATION Page X X X Katherine Iacovelli Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011) | 5 |
| B.3 PRICE SCHEDULE OF SERVICES | 6 |
| B.4 SITE VISIT | 9 |
| B.5 STATEMENT OF WORK | 10 |
| SECTION C - CONTRACT CLAUSES | 23 |
| C.1 SBA ACT 8(d)(13)(B) | 23 |
| C.2 DIGNITY CLAUSE | 23 |
| C.3 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (JAN 2017) | 24 |
| C.4 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 29 |
| C.5 SUPPLEMENTAL INSURANCE REQUIREMENTS | 30 |
| C.6 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 30 |
| C.7 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2017) | 30 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 36 |
| ATTACHMENT 1 SERVICES SUMMARY | 37 |
| ATTACHMENT 2 WORK SUMMARY & PROGRESS REPORT | 39 |
| ATTACHMENT 3 CONTRACT DISCREPANCY REPORT | 40 |
| ATTACHMENT 4 MAXIMUM CLEANING FREQUENCIES | 41 |
| ATTACHMENT 5 EMPLOYEE STATEMENT OF COMPLIANCE | 42 |
| ATTACHMENT 6 WAGE DETERMINATION | 44 |
| ATTACHMENT 7 PAST PERFORMANCE QUESTIONNAIRE | 54 |
| SECTION E - SOLICITATION PROVISIONS | 55 |
| E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (JAN 2017) | 55 |
| E.2 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 58 |
| E.3 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008) | 58 |
| E.4 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998) | 59 |
| E.5 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014) | 59 |
| E.6 EVALUATION CRITERIA | 61 |
| E.7 SUBMISSION INSTRUCTIONS TO OFFERORS | 62 |
| E.8 VENDOR PORTAL USAGE INFORMATION | 64 |
| E.9 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (JAN 2017) | 65 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
(continuation from Standard Form 1449, block 18A.)
1. CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individuals:
| a. CONTRACTOR: | _________________________________________ |
| ________________________________________ | |
| ______________________________________ |
b. GOVERNMENT: Contracting Officer 36C786
| Department of Veterans Affairs |
| NCA Contracting Service |
| 75 Barrett Heights Rd. Suite 309 |
| Stafford, VA 22556 |
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-34, Payment by Electronic Funds Transfer—Other Than System For Award Management, or |
3. INVOICES: Invoices shall be submitted in arrears after acceptance of work:
c. Other [X] MONTHLY
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
www.tungsten-network.com/customer-campaigns/veterans-affairs/
5. CONTENTS OF INVOICE:
1. Contractor Information (Name, Complete Address, Telephone Number, Taxpayer Identification Number)
1. Date of Invoice
1. Date of Period of Invoice Performance
1. Invoice Number
1. Obligation/Invoice Number (Only one purchase order may be included on each invoice submitted)
1. Cemetery Name
1. Unit Cost
1. Total Invoice Amount
1. Service/Item(s) provided
6. ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
7 SOLICITATIONS:
The Government reserves the right to request performance and payment bonding as a condition for contract award.
a. MISSING PAGES: It is the responsibility of the offeror to examine this solicitation to verify that he or she has received all pages. In addition, in compiling this package, some pages may have been duplicated. If the offeror feels that pages are missing or duplicated, the offeror is encouraged to contact the Contracting Officer at the telephone number shown in Block 7B, Standard Form 1442, Solicitation / Contract / Order for Commercial Items.
b. All proposals must be submitted through the Department of Veterans Affairs - Electronic Management System (eCMS) Vendor Portal website to be considered for award.
c. Please go to the VA eCMS Vendor Portal website at https://www.vendorportal.ecms.va.gov to register. Once on the webpage, proceed to the Vendor Portal Login section located on the far-left side of the webpage and click on ‘Request a user account’ to register. In the event an Offeror is unable to submit a proposal through the Vendor Portal domain, prior to the proposal closing date, contact the VAAS helpdesk at 1-877-634-3739, or via email at VA.Acquisition.Systems@va.gov. Submission of proposals through email will not be accepted. Proposal transmission/uploads must be completed by the date/time specified. Late or incomplete Proposals will not be considered.
Please note – If any of the Proposal Package information is not provided by the proposal due date, your proposal package may be found Technically Non-responsive and removed from further consideration.
8. NOTICE TO PROSPECTIVE CONTRACTOR(S): Prospective awardees MUST be registered with SAM at http://www.sam.gov, and the Online Representations and Certifications Application (ORCA) at http://www.sam.gov prior to award and through final payment. Contract will not be awarded until SAM registration has been completed.
9. VIP DATABASE: Prospective awardees must be certified Prior to Award and through final payment in VIP. NOTE: Vendors not registered in the VIP database by the closing date of the solicitation will be determined to be technically unacceptable and ineligible for award under this solicitation.
10. CONTRACT AWARD: The contract will become effective as soon as practical with no additional cost to the Government for any elapsed time from the original effective date. It is also, understood and agreed that the effective date of this contract will be contingent upon the availability of appropriated funds and in the event appropriations are not available.
11. AUTHORITIES OF GOVERNMENT PERSONNEL: Notwithstanding the Contractors responsibility for total management during the performance of this contract, the administration of the contract will require maximum coordination between the Government and the Contractor. The Government shall provide, at the time of contract award, a list of Government personnel authorized to act as the COR(s).
12. TIME OF DELIVERY:
Work is to be performed Monday through Friday, 5PM to Midnight and as directed during Federal Holidays. Additional work hours may be authorized for the convenience of the Contractor upon written approval of the Contract Officer.
13. POST AWARD CONFERENCE:
Prior to commencement of work, contract awardee and a representative of all subcontractors are required to attend a post award conference with Contracting Officer’s Representative and Contracting Officer/Specialist to assure that all parties understand all contractual obligations and the role that each party serves.
14. GOVERNMENT HOLIDAYS:
Holidays observed by the Federal Government:
| New Year's Day | 1 January | ||
| Martin Luther King's Birthday | Third Monday in January | ||
| President's Day | Third Monday in February | ||
| Memorial Day | Last Monday in May | ||
| Independence Day | 4 July | ||
| Labor Day | First Monday in September | ||
| Columbus Day | Second Monday in October | ||
| Veterans Day | 11 November | ||
| Thanksgiving Day | 4th Thursday in November | ||
| Christmas Day | 25 December |
If a holiday falls on Sunday, the following Monday will be observed as the legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also included would be any day specifically declared by the President of the United States of America as a national holiday.
B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)
This solicitation includes VA Acquisition Regulation (VAAR) 852.219-10, VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside. Accordingly, any contract resulting from this solicitation will include this clause.
The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) retained by VA to assist in assessing the contractor’s compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to contractor’s offices where the contractor’s business records or other proprietary data are retained and to review such business records regarding the contractor’s compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor’s business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor’s compliance with the limitations on subcontracting or percentage of work performance requirement.
35C78618R0123
Page 1 of Page 1 of Page 1 of Page 1 of
B.3 PRICE SCHEDULE OF SERVICES
Base Year: Date of Award through September 30, 2018
CLIN
No.
Description:
Custodial Services
| Qty |
| Unit |
| Unit Cost |
| Total Cost |
| 0001 |
| Custodial Services: Administration Building Maintenance Office/Breakroom/ Bathroom |
| 9 |
| Mo. |
| 0002 |
| Custodial Services: Public Information Center (PIC), |
| 9 |
| Mo. |
| 0003 |
| Carpet Maintenance semi-annually |
| 2 |
| Yr |
| 0004 |
| Window Exteriors semi-annually |
| 2 |
| Yr |
Total Cost:
Option Year 1: October 1, 2018 through September 30, 2019
CLIN
No.
Description:
Custodial Services
| Qty |
| Unit |
| Unit Cost |
| Total Cost |
| 1001 |
| Custodial Services: Administration Building Maintenance Office/Breakroom/ Bathroom |
| 12 |
| Mo. |
| 1002 |
| Custodial Services: Public Information Center (PIC), |
| 12 |
| Mo. |
| 1003 |
| Carpet Maintenance semi-annually |
| 2 |
| Yr |
| 1004 |
| Window Exteriors semi-annually |
| 2 |
| Yr |
Total Cost:
Option Year 2: October 1, 2019 through September 30, 2020
CLIN
No.
Description:
Custodial Services
| Qty |
| Unit |
| Unit Cost |
| Total Cost |
| 2001 |
| Custodial Services: Administration Building Maintenance Office/Breakroom/ Bathroom |
| 12 |
| Mo. |
| 2002 |
| Custodial Services: Public Information Center (PIC), |
| 12 |
| Mo. |
| 2003 |
| Carpet Maintenance semi-annually |
| 2 |
| Yr |
| 2004 |
| Window Exteriors semi-annually |
| 2 |
| Yr |
Total Cost:
Option Year 3: October 1, 2020 through September 30, 2021
CLIN
No.
Description:
Custodial Services
| Qty |
| Unit |
| Unit Cost |
| Total Cost |
| 3001 |
| Custodial Services: Administration Building Maintenance Office/Breakroom/ Bathroom |
| 12 |
| Mo. |
| 3002 |
| Custodial Services: Public Information Center (PIC), |
| 12 |
| Mo. |
| 3003 |
| Carpet Maintenance semi-annually |
| 2 |
| Yr |
| 3004 |
| Window Exteriors semi-annually |
| 2 |
| Yr |
Total Cost:
Option Year 4: October 1, 2020 through September 30, 2021
CLIN
No.
Description:
Custodial Services
| Qty |
| Unit |
| Unit Cost |
| Total Cost |
| 4001 |
| Custodial Services: Administration Building Maintenance Office/Breakroom/ Bathroom |
| 12 |
| Mo. |
| 4002 |
| Custodial Services: Public Information Center (PIC), |
| 12 |
| Mo. |
| 4003 |
| Carpet Maintenance semi-annually |
| 2 |
| Yr |
| 4004 |
| Window Exteriors semi-annually |
| 2 |
| Yr |
Total Cost:
Total Cost
| Base Year: |
| $_______________________ |
| Option Year 1: |
| $ ______________________ |
| Option Year 2: |
| $ ______________________ |
| Option Year 3: |
| $ ______________________ |
| Option Year 4: |
| $ ______________________ |
| Aggregate Total (Base + all Option Years): |
| $ ______________________ |
PRICE SCHEDULE: Units and services to be in accordance with the Statement of Work, Technical Specifications, and Terms and Conditions contained in this solicitation.
The schedule price shall be all-inclusive, including all labor, equipment, materials, and supplies to complete the Contract Line Item (CLIN(s)). Offerors shall enter unit cost and total amounts for each CLIN as indicated in the schedule. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid price and the total of the CLINs will be recomputed accordingly.
Offeror is to understand the quantities stated in the schedule are estimates for pricing purposes only and may not be exact.
B.4 SITE VISIT
Offerors are urged and expected to inspect all sites where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. In no event, shall failure to inspect a one or all sites constitute grounds for a claim after contract award.
There is one site visit scheduled for: Tuesday February 13, 2018 at 10:00 am Local time
Meet at the Administration Building.
If you plan to conduct a site visit/inspection at a different time YOU MUST CONTACT the Cemetery to let them know at (913) 727-1376. Please note, there will be no one to give you a tour or answer questions.
Pete Sardo, Cemetery Director, Leavenworth National Cemetery: (913) 727-1376
COR designated in contract.
Alternate COR designated in contract.
POST AWARD CONFERENCE: Prior to commencement of work, contract awardee and all subs are required to attend a conference with the COR and Contracting Officer to assure that all parties understand all contractual obligations and the role that each party serves.
B.5 STATEMENT OF WORK
1. GENERAL INFORMATION:
The Department of Veterans Affairs, National Cemetery Administration (NCA) requires janitorial services to be performed at:
Leavenworth National Cemetery.
150 Muncie Rd.
Leavenworth, KS 66048 Leavenworth National Cemetery is a National Shrine. The standards of maintenance and appearance at this cemetery must reflect this nation’s concern for those interred there. For this reason, the Contractor’s strict adherence to the specifications is required and essential.
2. BACKGROUND:
a. In 1999 Congress passed legislation requiring VA to ensure that National Cemeteries serve as a dignified and respectful setting. Each Cemetery is to be an expression of appreciation and respect of a grateful Nation for the service and sacrifice of her veterans.
b. Further, each National Cemetery is to be maintained as a National Shrine. A National Shrine is defined as a place of honor and memory that declares to the visitor/family who views it as a majestic setting, offering a sense of serenity, historic sacrifice and nobility of purpose. The National Cemetery is a beautiful and awe-inspiring tribute to those who gave much to preserve our Nation’s freedom and way of life.
3. THE NATIONAL CEMETERY ADMINISTRATION MISSION:
The National Cemetery Administration honors veterans with a final resting place and lasting memorial that commemorate their service to our Nation. National Cemeteries are National Shrines. Therefore, the standards for management, maintenance, appearance and operational procedures performed by the Contractor have been established by the National Cemetery Administration to reflect this Nations’ concern and respect for those interred there. For this reason, the Contractor’s strict adherence to the Statement of Work, Work Requirements Summary and Guidance Specifications shall be required and shall be essential.
4. CONTRACT OBJECTIVES:
a. To maintain the high standards of appearance as a National Shrine, in accordance with best commercial practices and the requirements identified in this solicitation.
b. To have the Contractor perform to its Technical Performance Approach focused on criteria designed to maintain a satisfactory facility condition and present a clean, neat and professional appearance.
c. The life of the contract is planned for one base period with up to four (4) one- year options individually exercised at the VA’s discretion and dependent on the availability of funds.
5. DESCRIPTION OF SERVICES:
The Contractor shall furnish all personnel, supervision, professional expertise, equipment, tools, materials, services, and quality control necessary to ensure that non-personal custodial services are performed at the Cemetery, in a manner that will maintain a satisfactory facility condition and present a clean, neat and professional appearance. The Contractor will provide all required cleaning and products. Prior to departing each evening, Contractor shall ensure that all lights are turned off; all doors are secured/locked and security alarm activated.
Areas to be serviced are located in the Administrative/Maintenance Building (excludes attached maintenance wing spaces), the Public Information Center Restrooms.
Cleaning Service Days:
Administration Building and Maintenance Office/Breakroom/ Bathroom shall be performed and completed Monday through Saturday between the hours of 5:00 P.M. and Midnight except Federal Holidays.
Public Information Center restrooms will be performed Monday through Saturday between the hours of 5:00 P.M and midnight INCLUDING the entire Memorial Day and Veterans Day weekends, respectively on Saturday/Sunday/ Monday – the last Monday in May for Memorial Day.
Square footage:
| Administration Building |
| 2879 square feet |
| Public Information Center Restrooms |
| 840 square feet |
| Maintenance Office/Breakroom/ Bathroom |
| 1736 square feet |
FACILITY CLEANING REQUIREMENTS
Non-Carpeted Floors (Hard Floors: Ceramic Tile, Vinyl, Wood, Concrete, etc.). Hard floors shall be maintained free of grit, soil, dust, scuff and heel marks, stains, spills, debris, litter and other foreign matter by effective routine cleaning. Cleaning shall be accomplished by the most appropriate method (vacuum, sweep, dust mop, damp mop, wet mop, spot clean, etc.) and with cleaning solutions if applicable, for the specific floor type. Ensure only clean water is used during mopping. Water shall be changed when water is dirty.
After cleaning, floor surfaces to include grout shall have a uniform, clean appearance without streaks, swirl marks, detergent residue, or any evidence of soil, stain, film, or standing water. Baseboards, corners, and wall/floor edges shall also be clean. Floors shall be continuously free of all debris such as paper, coins and so forth. Chairs, trash receptacles, and other easily moveable items shall be moved to maintain floors underneath these items and returned to their original and proper position after cleaning. A “Wet Floor” signs shall be used when the floor is wet.
Grime, dirt and debris which accumulate in corners shall be removed as needed.
Carpeted Floors. Carpet areas include all carpeted areas within the administrative office areas, to include offices and cubicles. Carpets shall be maintained free of soil, dirt, debris, litter and other foreign matter by effective routine vacuuming. Efficient vacuum cleaners shall offer high airflow, high efficiency filtration, and an adjustable rotating brush agitation for more effective soil removal.
Any spots and/or spills shall be removed by the carpet manufacturer’s approved methods or other commercially accepted practices as soon as noticed. A heavy-duty spot remover may be required in heavily soiled areas. All tears, burns, and raveling shall be brought to the attention of the Contracting Officer’s Representative (COR). Area and throw rugs shall also receive this service. Floors shall be continuously free of all debris such as paper, coins and so forth. Chairs, trash receptacles, and other easily moveable items shall be moved to maintain floors underneath these items and returned to their original and proper position after cleaning.
After shampooing, the carpeted area shall be uniform in appearance and free of stains and discoloration. All cleaning solutions shall be removed from baseboards, furniture, trash receptacles, chairs and other similar items. Chairs, trash receptacles, and other items shall be moved to clean carpets underneath, and returned to their original location. At the discretion of the COR, all carpet and rug areas shall be vacuumed, shampooed and thoroughly dried.
Entrances, Entrances Platforms, and Parking Areas. Planters in the vicinity of the buildings and cigarette containers shall be free of all visible litter, debris, soil and other foreign matter. Those ashtrays with sand shall be cleaned out as well.
Dusting Surfaces. Dust desks, file cabinets, and all other horizontal office furniture and accessories, including pictures, fire extinguishers. Dust Low dusting includes surfaces within 6 feet of the floor and must be free of dust, lint, cobwebs, and litter. High dusting includes surfaces above 6 feet up to 10 feet. Surfaces could include items such as tables, shelves, bookcases, storage lockers, window sills, hand rails, pictures, clocks, window blinds, walls and partitions, ceiling fans, light fixtures, air registers, tube heat radiators, water supply piping, and ceiling structural framing braces.
Clean Horizontal Surfaces. All chair seats shall be free of dirt, food particles and other foreign matter. Counter tops including lunch room counters, vending machines and lunch room tables and chairs shall be disinfected. Surfaces such as chair legs, table legs, desktops, phones, air registers and vents, frames, moldings, horizontal ledges, and baseboards shall be free of film, dirt, smudges, water, or other foreign matter by routine and spot cleaning. Ensure all corners are free of dust and cobwebs.
Clean Vertical Surfaces. Spot clean all doors, door frames, and push plate and areas around light switches. Thoroughly clean soiled wall coverings and chairs throughout the contract coverage area. Spray wipe door handles.
Interior Glass and Entrance Glass. All interior glass (not including building envelope window glass; see para. 5.c.ii.) and entrance glass (inside and out) including glass in doors, partitions, walls, display cases, and directory boards shall show no traces of film, dirt, smudges, water, or other foreign matter. Exterior glass entrance ways (doors and windows) shall be cleaned daily as well as cleaning and polishing of door tracks.
Polishing. Items that shine such as wood surfaces, mirrors and stainless steel shall be polished with appropriate cleaners/polishes.
Clean Floor (Walk-Off) Mats. Vacuum and/or clean interior and exterior floor mats. Mats shall be free of all visible lint, litter, debris, soil and other foreign matter. Soil and moisture underneath mats shall be removed and mats returned to their normal location.
Trash Collection/Removal. All trash containers shall be emptied, trash transported and disposed in designated area(s), and containers returned to their original locations. The Contractor shall provide and replace any obviously soiled, worn or torn plastic liners. Trash receptacles shall be left clean, free of foreign matter and free of odors.
Janitor’s Closet. Left clean, organized and maintained, kept locked.
Submittal of Facility Defects. When routine facility defects (e.g. dripping faucet, loose door, loose window frames, etc.) are found, they shall be reported to the COR.
RESTROOMS/DRINKING FOUNTAINS CLEANING REQUIREMENTS.
Clean and Disinfect. All surfaces of sinks, counters, toilets, urinals, lavatories, showers, shower mats, dispensers, plumbing fixtures and faucets, exposed pipes, partitions, dispensers, walls, stalls, stall doors, entry doors (including handle, kick plates, ventilation grates, metal guards), light fixture covers, benches, handicap support bars, and other such surfaces shall be cleaned and disinfected using a germicidal detergent. Restrooms shall have a clean scent or no odor at all. Showers, toilets, and urinals will be free of spots, water spots, scale buildup, soap scum, odors, and any other deposits. Mirrors shall be clean and have no streaks or other removable matter. Partitions shall be smudge, stain free. Vents (within 72 inches of the floor) shall be clean. Restroom sinks, countertops, and fixtures shall be free from water and scale deposits, soil, streaks, and other removable matter. Walls and grout below six feet shall be free of all film, spots, and detergent buildup.
Restroom Floor Care. All floor surfaces shall be maintained in accordance with paragraph 4.a.i. by effective routine cleaning. Moveable items shall be tilted or moved to sweep and damp mop underneath. Grout on the wall and floor tiles shall be free of dirt, scum, mildew, and residue.
Pour all mop and/or cleaning water down the designated floor drains. Sink shall not be used as a drain.
Stock Restroom Supplies. Contractor shall ensure restrooms are stocked sufficiently so any provided supplies including toilet tissue, toilet seat protectors, paper towels, and hand soap do not run out. Supplies shall be stored in designated areas. If supplies run out prior to the next service date, the contractor shall refill within two (2) hours of notification.
Restroom Trash Removal. All trash containers in restrooms and locker rooms, including sanitary napkin disposal containers, shall be emptied, trash disposed, and containers returned to or reassembled in their original locations. The Contractor shall provide and replace any obviously soiled, worn or torn plastic trash can liners. Trash receptacles shall be left clean, free of foreign matter and free of odors.
Restroom Checklists. The Contractor’s employee(s) on duty shall sign off daily on the restroom checklists, which are generally located in the foyers of the public restrooms and staff restrooms.
Drinking Fountains. Contractor shall clean all facility drinking fountains, usually located outside the restrooms: two (2) in the PIC breezeway, two (2) inside the Admin office area, and two (2) in the Maintenance office area. All porcelain and polished metal surfaces, including the orifices and drain, as well as exterior surfaces of fountains shall be cleaned and disinfected. Drinking fountains shall be free of streaks, stains, spots, smudges, scale, and other obvious soil.
PERIODIC CLEANING SERVICES (Services performed on a monthly, semi-annual, or annual basis).
Carpet Restorative Cleaning. Carpets shall be deep cleaned in order to remove embedded soil from carpet fibers. Deep cleaning shall employ an effective technique and/or method to address soil suspension, soil extraction and drying. After deep cleaning, the carpeted area shall show an improvement in visible appearance. All cleaning solutions shall be removed from baseboards, furniture, trash receptacles, chairs, and other similar items. Chairs, trash receptacles, and other items shall be moved to clean carpets underneath and returned to their original location after the carpet has dried.
Window Cleaning. All interior and exterior glass surfaces that are in integral part of the outer surface of the building shall be cleaned to show no traces of film, dirt, smudges, water, or other foreign matter. Screens shall be removed and re-installed as necessary.
6. CONTRACTOR FURNISHED EQUIPMENT/SUPPLIES
i. The contractor shall furnish all supplies necessary to perform all services required. Supplies and equipment shall meet the specifications below and comply with VA, Federal, or State Occupational Safety and Health Standards and Fire regulations.
ii. All items shall be approved by the COR prior to being used. New supplies or changes in previously approved material shall require product literature and may require samples.
iii. Contractor personnel shall not use steel wool, abrasive metal cleaners, or any other cleaning materials or supplies which could cause damage to property. At no time shall chairs, wastebaskets, brooms, mops or any other items normally placed on the floor be place on any surface of furniture or equipment.
iv. Contractor’s equipment shall be compatible with existing sources of furnished electrical power. All equipment shall comply with current safety standards. All electrically operated equipment shall be equipped with hospital quit-type motor, be third-wire grounded, and equipped with an appropriate length of UL approved three-conductor cord. Extension cords are prohibited. Equipment will be checked for electrical safety and records maintained.
v. All wheeled and movable equipment shall be equipped with protective non-marking wheels and rubber bumpers or guards around the entire perimeter. No part of the equipment (except fixed handles) shall protrude beyond the rubber bumpers.
vi. When not in use, equipment shall be stored in designated areas only. Trash containers shall be washed each day prior to storage. All equipment shall be cleaned with a disinfectant-detergent each day prior to storage.
vii. Supplies and equipment shall not be transported in trash barrels, mop buckets, etc. All material not immediately used shall be properly stored.
viii. Supplies and equipment reserved for use in designate areas shall not be transferred to the other areas. All such items assigned shall be plainly marked with the area’s designation.
In adherence to paragraph B.5, Contractor shall ensure restrooms and kitchen areas are stocked sufficiently with contractor-provided supplies. Supplies shall be purchased according to requirements in B.7 and FAR 52.208-9. The following extra backup supplies shall be stored in janitor’s closet, but are not limited to:
1. Hand soap for restrooms and breakroom areas
2. Toilet paper for restrooms
3. Hand paper towels for restrooms
4. Rolled paper towels for kitchen area
5. Wastebasket liners for all building waste receptacles
6. Cleaning supplies
ix. Mops – Mop heads shall be washed in janitor’s closet sinks.
x. Vacuum Cleaners – All vacuum equipment shall have hospital use micro-static impaction type filtration system, which shall filter out all dust and bacteria particles larger than 0.3 microns. All vacuum equipment (i.e. tank, hose, and bag) shall be cleaned daily with disinfectant-detergent. Vacuum filters shall be cleaned weekly.
xi. Other Items –
1. Contractor signs and safety warning devices – OSHA approved devices and signs shall contain easily understood directions.
2. Contractor Equipment – The Cemetery shall not be held responsible for any items of Contractor’s equipment which may be lost, damaged or stolen. The contractor shall tag all contractor owned equipment for identification.
7. GREEN CLEANING
i. The Contractor shall use green cleaning products and processes. Green cleaning is a planned and organized approach to cleaning that is designed to protect the occupants and workers' health and reduce the impact on human health and the environment. Unlike a traditional cleaning program, a green custodial program takes a holistic approach to building cleaning and goes beyond simple appearances to focus on health and the environmental impacts.
ii. Green cleaning products and processes include, but are not limited to products containing recycled content, environmentally preferable products and services, vacuum cleaners with HEPA filtration, bio-based products, and products and services that minimize the use of energy, water, and other resources. In addition to compliance with these requirements, the Contractor shall follow all applicable standard industry practices including, but not limited to those published by the National Institute of Building Sciences (NIBS), American Society of Testing Materials (ASTM), and Carpet and Rug Institute (CRI), as well as applicable standards of the Environmental Protection Agency (EPA).
iii. The Contractor shall take every precaution to ensure that if available, only safe and environmentally preferable products are used. Preference must be given to cleaning products that meet the following: United States Department of Agriculture (USDA) designated bio-based products, Green Seal certified (Standard GS-37 for Commercial and Institutional Cleaners, Comprehensive Procurement Guidelines (CPG)), and applicable Executive Orders.
iv. The Contractor shall give preference to supplies and products that are "environmentally preferable". The list of Comprehensive Procurement Guideline (CPG) items and their associated Recovered Materials Advisory Notices (RMAN’s) are available at http://www.epa.gov/cpg. Items such as trash bags are on the CPG list. Information on CPG items can be found at: http://www.epa.gov/cpg/products.htm. This includes concentrated and ready-to-use cleaning chemicals (spray bottles must be labeled with the contents) that use ecologically sound packaging, are phosphate-free, non-corrosive, non-combustible, non-poisonous, non-reactive, and non-aerosol; contain no carcinogens, mutagens and teratogens; contain no ozone-depleting substances; and are bio-based and fully biodegradable. Such products must have lower toxicity, and reduced potential for skin, eye, and, respiratory irritation than comparable products used for the same purpose and must contain no unnecessary dyes or fragrances. Concentrates are preferable compared to ready-to-use products and should be used wherever possible. Furthermore, dilution control equipment (use equipment or systems consistent with those specified or recommended by the manufacturer of the concentrate products) should be employed to ensure correct dilutions of concentrates and to protect workers from exposure to concentrated chemicals. Preference must be given to cleaning products meeting the following Green Seal Standards: GS-37 for Commercial and Institutional Cleaners for those product categories covered by this Standard and GS-34 for Degreasers (http://www.greenseal.org/findaproduct/index.cfm#cleaners).
v. The Contractor must give preference to floor finishes and floor maintenance products that are free of metals, such as zinc, arsenic, lead, cadmium, cobalt, chromium, mercury, nickel, or selenium.
8. CHEMICAL STORAGE AND SAFETY DATA SHEETS
a. The Contractor shall furnish to the COR all Safety Data Sheets (SDS) for any materials used in the performance of this contract. All new products used during the life of the contract must have SDS provided to the COR prior to bringing these products on site and being used. The Contractor shall use only commercially available products that meet Federal, State, and local codes. These requirements shall include those identified in Executive Order 13423. The COR must contact the Contractor immediately if any item is deemed inappropriate for use under this contract.
b. Contractor shall maintain the SDS in a location accessible to all employees and shall advise the COR of their location. The SDS shall be available for inspection by the COR on request.
c. Contractor shall store chemicals and cleaning supplies in an area designated by the COR (see paragraph 11, USE OF CEMETERY FACILITIES). Contractor shall provide spill containers for all liquids and ALL CONTAINERS shall be clearly markers as to content.
9. STANDARDS OF EMPLOYEE CONDUCT:
Contractor personnel shall be required to adhere to the following standards of dress and conduct, as briefly mentioned here, while performing work in the National Cemetery. These standards and regulations are enforceable under Title 38, U.S.C., Part I, Chapter 9, Section 901.
a. Contractor personnel shall be fully clothed at all times, to include upper garment to cover body from the waist to the neck and long pants or slacks. Clothing shall be presentable and suitable to the work while maintaining proper appearance and decorum indicative for a National Shrine. Clothing shall be clean and cleanliness and personal hygiene are imperative. T-shirts and/or tank tops as outer garments are prohibited. Garments, which have a message, slogan or printing of any kind other than the Contractor’s business attire, are prohibited. Protective/safety clothing and shoes shall meet or exceed OSHA and state requirements. Uniform shirts and hats are acceptable as long as they meet the other attire requirements and are uniform among all Contractor employees
b. Behavior and language must be appropriate, reverent, and respectful at all times. The Contractor’s personnel shall not engage in loud or boisterous behavior, angry outbursts or use profane or abusive language at any time on Government premises. Playing radios and/or electronic games/devices shall only be done at lunchtime and in a designated break area. Due to the sensitive mission of the Cemetery, Contractor employees will come into daily contact with grieving individuals, therefore Contractor employees will exercise and exhibit absolute decorum, courtesy, and respect while within the cemetery or at its perimeter or entrances. Inquiries from Cemetery visitors shall be politely referred to Government Cemetery staff. Gratuities of any kind are strictly prohibited.
c. The Contractor’s personnel shall consume food and beverage only within areas designated by the COR. Intoxication, and violence or criminal acts of any kind will not be tolerated and is cause for immediate removal from Government property. Use or sale of intoxicating beverages and/or drugs is strictly prohibited, and use of tobacco products is only allowed in specific areas designated by the COR.
10. PARKING AND VA REGULATIONS:
Contractor employees may park privately owned vehicles in the area designated for parking by the COR. It is the responsibility of the Contractor to ensure his employees park in the appropriate designated parking areas. The Cemetery will not validate or make reimbursement for parking violations of the Contractor’s employees under any conditions. Smoking is prohibited inside any buildings at the Cemetery. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation/summons answerable in the United States (Federal) District Court, or other appropriate jurisdiction/agency.
11. USE OF CEMETERY FACILITIES:
a. The Cemetery shall provide the contractor space for supplies and equipment storage.
b. The Government shall not be responsible for any loss, damage, or theft of Contractor items. Contractor shall be responsible for acceptable standards of housekeeping and custodial maintenance of Cemetery facilities used by Contractor's employees.
c. Electricity and water WILL be furnished by the Government for the Contractor’s use. Phone service will NOT be furnished by the Government for the Contractor’s use.
12. SUPERVISION AND TRAINING:
a. Contract Manager. The Contractor shall establish and maintain an office through which the Contract Manager or alternate(s) can be contacted during work hours. The Contract Manager or alternate shall be available during standard duty hours to meet on the Cemetery within one (1) hour with the Government personnel designated by the CO to discuss problem areas. The Contractor shall provide the COR telephone number(s) where surveillance results and complaints can be reported. The Contractor shall also provide to the COR the names and phone numbers of Contractor POCs for after business hours including nights, weekends, and holidays. This information will be kept and updated by the Contractor whenever personnel changes occur. The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this contract.
b. The Contract Manager shall speak English fluently in addition to the language of the staff performing the Contract. There shall be at least one Contractor employee fluent in English at the site at all times during the working hours of the Contractor’s employees. If there is an extended period when only non-English speakers are present they can be sent home.
c. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor is expected to remove any employees from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government. If the Contractor fails to act in this regard, or the reason for a removal is immediately required to protect the interests of the Government, the COR may direct the removal of an employee from the premises. Contractor objections to any such action will be referred to the Contacting Officer (CO) for final resolution; however, the Contractor will first immediately comply with COR direction pending any CO final resolution at a later time or date. The Contractor will not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR, and is later found invalid and/or unreasonable by the Contracting Officer.
d. The Contractor shall also be responsible for training and safety precautions for Contractor employees performing work under these specifications. Training shall be accomplished within the first thirty (30) days of employment, with refresher courses on an annual basis. OSHA standards shall be observed by the Contractor in all work performed. Contractor shall ensure that appropriate safety equipment is used by Contractor personnel and shall be used as prescribed by OSHA standards, including hard hats, safety shoes, safety glasses, and hearing protection devices. The following OSHA and NFPA standards and codes are to be adhered to, and records will indicate by name and date when employees are trained in the following:
i. National Fire Protection Association (NFPA): 10-1998 Standard for Portable Fire Extinguishers
ii. Occupational Safety and Health Administration (OSHA) 29 CFR 1910 Safety and Health Regulations for Personal Protection, Safety Color Codes, Portable Power Tools, Electrical Safety and Portable Electric Equipment.
iii. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.
iv. Hazard Communications (OSHA, HCS, 29 Code, FR 1910.1200)
v. Hazard spills/Waste Handling
vi. Universal Precautions (OSHA, 29 CFR Part 1910.1030)
vii. Equipment Operations Training (Utility Training)
viii. Initial Environmental Management System (EMS) awareness training and annual EMS awareness refresher training if the contract is greater than one (1) year. The COR or designated appointee will be responsible for providing the EMS training, as well as providing the method of training. Individual documentation processes will be established by the COR or designated appointee.
13. INSPECTION AND CLEANING OF CEMETERY FACILITIES:
a. The Contractor shall perform a weekly inspection and keep records of such. During this inspection the appearance of the Cemetery will be observed, and any deficiencies noted within the scope of the contract will be corrected as soon as practicable. Items that need correcting outside the scope of the contract will be reported to the COR or his/her representative.
b. The Contractor shall be required to submit inspection reports and work accomplished to the COR weekly. The COR is located at the Fort Snelling National Cemetery. The inspection forms will be provided to the Contractor. (See “Work Summary and Progress Report”, Attachment 2)
14. QUALITY ASSURANCE:
a. The Government COR will conduct surveillance activities and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. These surveillance activities will be accomplished in a manner which is timely to ensure no defects are initiated after Contractor has provided the services. The COR will utilize the Contractor’s work schedule, to plan their inspections and surveillance activities. The COR will record inspection and surveillance results which then become the official National Cemetery Administration record of the Contractor’s performance.
b. Actions:
i. Normally, the COR will verbally advise or give a written inspection report to the Contractor of discrepancies the first time they occur and ask the Contractor to correct the problem. A notation will be made on the COR checklist of the date and the time the deficiency was discovered and the date and time the Contractor was notified.
ii. If the Government created any of the discrepancies, these will not be counted against the Contractor's performance. When the Government has caused the Contractor to perform in an unsatisfactory manner, the COR will forward a written notice to the responsible organizational element requesting corrective action be taken.
iii. When the Contractor is not meeting the acceptable limits of satisfactory performance, a CDR will be issued to the Contractor. The seriousness of the failures should govern whether to issue CDR at the end of the period, or as soon as work performance is less than satisfactory.
iv. When a CDR is issued for a service, the Contracting Officer and/or the COR may exercise any contractual remedy available for non-performance, in accordance with FAR 52.212-4, “Inspection and Acceptance”.
v. If the Contractor does not achieve satisfactory performance by the end of the next period or agreed suspense date, further actions may be considered, to include a determination on whether continued performance by the contractor is feasible.
vi. When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide the CO a Contract Discrepancy Report (CDR) for issuance to the Contractor. The Contractor shall respond to the CDR IAW instructions provided and return it to the CO within ten (10) calendar days of receipt. The CO will have ten (10) calendar days to respond back to the Contractor with acceptance or rejection of the Contractors’ response to the CDR.
c. Performance Evaluation Meeting:
i. The issuance of a Contract Discrepancy Report (CDR) found at Attachment 4 may be cause for the scheduling of a meeting among the Contractor, Contracting Officer, and the COR. A mutual effort will be made to resolve all problems identified. The Government will prepare written minutes of the meeting. The Contractor, Contracting Officer, and the COR will sign minutes of the meeting(s).
ii. Should the Contractor not concur with the minutes, they will so state their objections in writing to the Contracting Officer, within ten calendar days, and also explain the reasons for non-concurrence. The Contracting Officer will review and consider the reasons submitted for the Contractor's non-concurrence and make a decision to revise or uphold the comments as written.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.