DEMOLITION AND CONSTRUCTION AT DFW Federal contract opportunity
Solicitation number
36C78618Q0197
Issued by
Department of Veterans Affairs National Cemetery Administration

About this file

36C78618Q0197 ATTACHMENT D DRAWINGS.pdf

View the file

Other files for this federal contract opportunity

Other files attached to DEMOLITION AND CONSTRUCTION AT DFW, newest first.
File Type Posted
36C78618C0159-000.docx DOCX document
36C78618Q0197-00006001.pdf PDF
36C78618Q0197-00006000.docx DOCX document
36C78618Q0197-00005000.docx DOCX document
36C78618Q0197-00004000.docx DOCX document
36C78618Q0197-00003000.docx DOCX document
36C78618Q0197-00002000.docx DOCX document
36C78618Q0197-00001000.docx DOCX document
36C78618Q0197-005.pdf PDF
36C78618Q0197-003.pdf PDF
36C78618Q0197-001.pdf PDF
36C78618Q0197-006.pdf PDF
36C78618Q0197-002.pdf PDF
36C78618Q0197-000.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ji

II

u

.9

• 0 ,E u II u..

,E

II

u

.9

,E

II

u

.9

II

,l . 9

" 0

,E 0 "

II

,l . 9

1 2

Revisions Date

1 2

3 4 6 7 8 9

D@ o@LJ [nru@[ru 0

DALLAS-FORT WORTH NATIONAL CEMETERY

DALLAS, TEXAS

MAINTENANCE YARD TRENCH D

PROJECT NUMBER 916-18-201

GENERAL NOTES:

1 . ALL CONSTRUCTION WITHIN DALLAS-FW NATIONAL CEMETERY SHALL BE CONDUCTED WITH THE EMPHASIS ON PROPER CEMETERY ETIQUETTE AS THIS IS AN ACTIVE CEMETERY. NO DISRESPECTFUL ACTIVITY WILL BE TOLERATED .

2. COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE CEMETERY DIRECTOR TO AVOID CONFLICTS AND DISRUPTIONS OF SCHEDULED CEREMONIES AND DAILY CEMETERY OPERATIONS. SEQUENCE WORK AS NECESSARY TO ENSURE DAILY

CEMETERY OPERATIONS REMAIN UNINTERRUPTED DURING CONSTRUCTION OPERATIONS .

3. CONTRACTOR SHALL PROVIDE AND MAINTAIN PROPER SIGNS, BARRICADES, CONES, AND FENCES TO PROPERLY PROTECT THE

4.

PUBLIC AND CEMETERY STAFF FROM INJURY. WORK AREAS SHALL BE BARRICADED OFF DURING NON-WORKING HOURS

AND WHEN THERE IS NO ACTIVE CONSTRUCTION AT THE SITE.

THE CONTRACTOR'S REGISTERED PROFESSIONAL LAND SURVEYOR SHALL ESTABLISH AND CONTROL THE PAVEMENT AND TRENCH ALIGNMENTS, GRADES, ELEVATIONS, AND CROSS SECTIONS. THE NEW PAVEMENT SHALL BE INSTALLED SO THAT THE PAVEMENT SLOPES TOWARD THE NEW TRENCH DRAIN BY CONTINUING THE EXISTING SLOPE OF THE EXISTING MAINTENANCE YARD PAVEMENT. CONTRACTOR IS TO LAYOUT AND CONSTRUCT ALL NEW WORK TO MATCH EXISTING GRADING/ELEVATIONS AND TO ENSURE FULL AND COMPLETE PAVEMENT AND TURFGRASS DRAINAGE WITH NO EVIDENCE OF

PONDING OR BIRD BATH AREAS.

5. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING THE EXISTING STORM DRAINAGE SYSTEM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING SEDIMENT RESULTING FROM THIS PROJECT FROM THE

STORM DRAINAGE STRUCTURES AND SYSTEM.

6 ANY DAMAGE INCURRED TO EXISTING UTILITIES, IRRIGATION SYSTEM COMPONENTS, INSIDE AND OUTSIDE THE LIMITS OF WORK DUE TO CONTRACT OPERATIONS INCLUDING DAMAGE TO PAVEMENT, CURB AND GUTTER, SIDEWALKS AND OTHER STRUCTURES BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT. IF ANY EXISTING UTILITIES, UTILITY STRUCTURES, OR IRRIGATION SYSTEM COMPONENTS ARE UNCOVERED OR ENCOUNTERED DURING CONSTRUCTION, THEY SHALL BE SAFEGUARDED, PROTECTED FROM DAMAGE, AND SUPPORTED AS

NECESSARY.

7. ALL AREAS ADJACENT TO THE SITE SHALL BE MAINTAINED IN A CLEAN CONDITION, MUD AND DUST FREE AT ALL TIMES.

CONSTRUCTION OPERATIONS SHALL BE CONDUCTED IN SUCH A WAY AS TO PREVENT TRACKING OF MUD OR SOIL ONTO PUBLIC THOROUGHFARES. AT THE END OF EACH DAY THE CONTRACTOR SHALL CLEAN UP ALL MUD OR SOIL WHICH HAS

BEEN TRACKED ON TO CEMETERY AND PUBLIC STREETS.

8. AREAS OUTSIDE OF THE CONSTRUCTION LIMITS IMPACTED BY OPERATIONS OF THE CONTRACTOR SHALL BE RETURNED TO THE STATE IT WAS FOUND PRIOR TO NEW CONSTRUCTION, EXCEPT WHERE NEW WORK IS SHOWN.

9. TREES NOT INDICATED TO BE REMOVED SHALL BE PROTECTED FROM DAMAGE TO TRUNKS, BRANCHES AND ROOTS.

10. ALL DEBRIS, EXCESS SOIL, CONCRETE, ASPHALT, ETC. SHALL BE REMOVED OFF CEMETERY PROPERTY AND PROPERLY

DISPOSED OF AT AN APPROVED WASTE DISPOSAL SITE .

11. THOROUGHLY CLEAN UP THE WORK AREA AT THE END OF EACH DAY'S WORK, AND AT COMPLETION OF THE PROJECT.

LEAVE PREMISES CLEAN AND FREE OF WASTE, SCRAP, USED EQUIPMENT, OR OTHER MATERIAL INTENTIONALLY OR

INCIDENTALLY DELIVERED TO THE SITE BY CONTRACTOR OR CONTRACTOR'S PERSONNEL.

4 5 6

INS

NATIONAL

CEMETERY

ADMINISTRATION

SHEET INDEX:

X-101

L-101

CD-101

CS-101

CP-101

C-504

C-505

C-506

Drawing Title

TITLE SHEET

EXISTING CONDITIONS

DEMO PLAN

SITE PLAN

PAVING PLAN

SITE DETAILS

PAVEMENT DETAILS

JOINT SEALANT DETAILS

Project Title

COVER SHEET MAINT. YARD

& SHEET INDEX DRAINAGE

I Approved: Division Chief I Buildin=-� umber

E:J� CFC I Approved: Service Director II Location �FW NATIONAL CEMETERY I 8 9 u w u..

Date 01/24/2018

Project No.

916-18-201

DRAWING NO.

X-101 Dwg 1 Of 8

36C78618Q0197

ATTACHMENT D - DRAWINGS

o C ,E "'-� u II

,l .s

0 C ,E

II

,l 0 .s w u..

• 0 ,E e ,E

II

,l .s

II

,l .s

C o C

,E 0 "

II

,l.s

C

Revisions

1 2 3

0 0 0

0 0

�EXISTING STORM-<

DRAIN LINE

0 0

I I I I I I I I I I I I I I I I I I I I I

0 0

EXISTING

FUEL TANK

26'-11"

�REMOVE CONCRETE�

TO NEAREST JOINT

1 7 ' -51 " 1 2 ' �-- 4 ----+---- -----i------ (TYP) -----+-----i

SAWCUT

22'-1"

(TYP)

Date

1 2

1669 SF

"----- BOLLARDS TO REMAIN; ___,,

REMOVE CONC @ BASE

OF ALL BOLLARDS

3 4

I I I I I I I I I I I I I I I I I I

>--EXISTING GRATES

SURFACE INLETS

g'

2'-4" i----1 6'-1 i" -+----i---12'-11 d" --a-I

0 0 0

�REMOVE CONCRETE-----.,.._

TO NEAREST JOINT

i------22' -5" ------'<c--i

1055 SF

+---1 2 ' i---

SAWCUT AND DEMOLISH ___y

EXISTING CONCRETE

PAVEMENT

EXISTING GATE

AND FENCE

NATIONAL

CEMETERY

ADMINISTRATION

BOLLARDS TO REMAIN; �

REMOVE CONC@ BASE

OF ALL BOLLARDS

Drawing Title

DEMO PLAN

I Approved: Division Chief

I Approved: Service Director

Project Title

MAINT. YARD

DRAINAGE

I Buildin=-� umber

E:J� CFC

II Location �FW NATIONAL CEMETERY I

Date

01/24/2018

Project No.

916-18-201

DRAWING NO.

CD-101

Dwg. 3 Of 8 u w u..

o C,E "' u II ,l .s

0 C ,E

II

,l 0 .s w u..

• 0 ,E e ,E

II

,l .s

II

,l .s

C -o C ,E ll

II

,l .s

C -

Revisions Date

2 3 4

0 0 0 0 0 0

0 0 0

7 8 9

NOTES:

1. SEAL ALL PIPE PENETRATIONS

WITH NON-SHRINK GROUT.

w-7 # # # # # # # / � � //,1/ # /,1/ # # # # # # ,,::1/ ,,::1/ ,,::1/ .-:000" � //,1/ # /,1/ # # # # # # ,,::1/ �-<:a I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

0 0

0 0

I --

CONCRETE TRENCH DRAIN

SEE DETAILS D & E,

SHEET C-101

0 0

\ 7

(2) 1 /16 BENDS (22.5 DEG),

BOTH SIDES INTO

6"X6"X6" DBL. WYE FITTING

/I

0 0

HAND TROWEL CONC AROUND

EXIST. BOLLARDS (TYP)

3 4

0 0

, CORE DRILL EXISTING

CONCRETE CATCH BASIN;

INSTALL 6" PVC PIPE.

0 0

6" SOR 35 PVC STORM

DRAIN PIPE

5 6

0 0 0

CONCRETE TRENCH DRAIN

SEE DETAILS D & E,

SHEET C-101

0 0

BORE UNDER UNDISTURBED

CONCRETE, UNDER FENCE AND GATE

NATIONAL

CEMETERY

ADMINISTRATION

Drawing Title

SITE PLAN

Project Title

MAINT. YARD

DRAINAGE

I Approved: Division Chief I Building Number IChecked 1 i5rawn7

I A p pr ov e d se rv ic e

D ire c to r=====� Location

I. DFW NATIONAL CEMETERY

8 9

Date 01/24/2018

Project No.

916-18-201

DRAWING NO.

CS-101

Dwg. 4 Of 8 u w u..