36C26319R0078-002.pdf

PDF 5 MB Posted

Attached to
PN: 636-13-103, Replace Boilers 2 & 3 (GI) Federal contract opportunity
Solicitation number
36C26319R0078
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23

About this file

36C26319R0078 S02_Attachment_Specifications_Rev 2 (610 Pages).pdf

View the file

Other files for this federal contract opportunity

Other files attached to PN: 636-13-103, Replace Boilers 2 & 3 (GI), newest first.
File Type Posted
36C26319C0186-000.docx DOCX document
36C26319R0078-0003001.docx DOCX document
36C26319R0078-0003000.docx DOCX document
36C26319R0078-0002000.docx DOCX document
36C26319R0078-0002002.pdf PDF
36C26319R0078-0002001.docx DOCX document
36C26319R0078-0001000.docx DOCX document
36C26319R0078-0001001.docx DOCX document
36C26319R0078-004.docx DOCX document
36C26319R0078-003.pdf PDF
36C26319R0078-001.docx DOCX document
36C26319R0078-000.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

VA MEDICAL CENTER

2201 N Broadwell Avenue

Grand Island, Nebraska 68803

636-13-103 Replace Boilers 2 & 3

Construction Documents

March 15, 2019

CLH Project Number 2018-24

CLH

Calvin L. Hinz

A R C H I T E C T S, P.C.

3705 North 200th Street Omaha, NE 68022-2922

Tel: (402) 291-6941 Fax: (402) 291-9193

11-01-18

00 01 10-i

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 10 Table of Contents 08-13

00 01 15 List of Drawing Sheets 11-15

DIVISION 01 - GENERAL REQUIREMENTS

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 04-13

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 33 32a Submittal List

01 33 32b Submittal Transmittal

01 42 19 Reference Standards 05-16

01 57 19 Temporary Environmental Controls 01-11

01 74 19 Construction Waste Management 06-13

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

DIVISION 03 – CONCRETE

NA

DIVISION 04 – MASONRY

NA

DIVISION 05 – METALS

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

NA

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 53 12 Roofing System Patching 04-12

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

NA

DIVISION 09 – FINISHES

09 91 00 Painting 01-16

00 01 10-ii

DIVISION 10 – SPECIALTIES

NA

DIVISION 11 – EQUIPMENT

NA

DIVISION 12 – FURNISHINGS

NA

DIVISION 13 - SPECIAL CONSTRUCTION

NA

DIVISION 14– CONVEYING EQUIPEMENT

NA

DIVISION 21- FIRE SUPPRESSION

NA

DIVISION 22 – PLUMBING

NA

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 10 Common Work Results for Boiler Plant and Steam

Generation

2-15

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

2-15

23 05 51 Noise and Vibration Control for Boiler Plant 2-15

23 07 11 HVAC and Boiler Plant Insulation 2-15

23 08 00 Commissioning of HVAC 6-13

23 08 11 Demonstrations and Tests for Boiler Plant 2-15

23 09 11 Instrumentation and Control for Boiler Plant 2-15

23 21 11 Boiler Plant Piping Systems 2-15

23 51 00 Breechings and Stacks 5-11

23 52 39 Fire-Tube Boilers 2-15

23 52 95 Temporary Steam Heating Plant 5-11

DIVISION 25 – INTEGRATED AUTOMATION

NA

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 12-01-12

26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-01-13

26 05 26 Grounding and Bonding for Electrical Systems 12-01-12

26 05 33 Raceway and Boxes for Electrical Systems 05-14

26 29 11 Motor Starters 8-14

26 29 21 Disconnect Switches 12-01-12

26 29 21

DIVISION 27 – COMMUNICATIONS

NA

00 01 10-iii

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

NA

DIVISION 31 – EARTHWORK

NA

DIVISION 32 – EXTERIOR IMPROVEMENTS

NA

DIVISION 33 – UTILITIES

NA

DIVISION 34 – TRANSPORTATION

NA

- - - END - - -

00 01 10-iv

This page left blank intentionally.

08/10

00 01 07-1

SECTION 00 01 12

SEALS PAGE

1.1 DESIGN PROFESSIONALS OF RECORD

ARCHITECT Calvin L. Hinz

A-1793

The following Sections:

000002, 000101, 000107, 000115, 011000, 012300, 013300, 017700, 055000, 061053, 072100, 076200, 079200, 081416, 095113, 096513, 096723, 099123, 321313, 321373

STRUCTURAL

ENGINEER

Donn Shaffer

E-6027

The following Sections:

055000, 061053

MECHANICAL

ENGINEER

Gregory Kronaizl

E-5523

The following Sections:

230510, 230512, 230551, 230711, 230800, 230811, 230911, 232111, 235100, 235239, 235295

ELECTRICAL

ENGINEER

Dennis Lux

E-7734

The following Sections:

260511, 260519, 260526, 260533, 262911, 262921

08/10

00 01 07-2

08-13

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWINGS

The Drawings listed below accompanying the specification forma part of the contract.

Drawings No. Title

1 of 17 GI001 GENERAL INFORMATION COVER SHEET

2 of 17 GI002 LEGEND AND ABBREVIATIONS

3 of 17 7CS101 CIVIL – SITE UTILITY PLAN

4 of 17 7A101 ARCHITECTURAL – DEMOLITION PLAN AND FLOOR PLANS

5 of 17 7A102 ARCHITECTURAL – EQUIPMENT ROUTING PLANS

6 of 17 7MD101 MECHANICAL – FIRST FLOOR DEMOLITION PLAN

7 of 17 7MD601 MECHANICAL – STEAM BOILER PLANT PIPING DIAGRAM

8 of 17 7MP101 MECHANICAL – FIRST FLOOR PLAN

9 of 17 7MP201 MECHANICAL – SECTIONS

10 of 17 7M501 MECHANICAL – DETAILS AND SCHEDULES

11 of 17 7M601 MECHANICAL – STEAM BOILER PLANT PIPING DIAGRAM

12 of 17 7M602 MECHANICAL – BOILER FLOW DIAGRAM

13 of 17 7M603 MECHANICAL – NATURAL GAS, LP GAS AND FUEL OIL

FLOW DIAGRAM

14 of 17 7M604 BOILER FEEDER ISOMETRIC

15 of 17 7ED101 ELECTRICAL – FIRST FLOOR DEMOLITION PLAN

16 of 17 7EP101 ELECTRICAL – FIRST FLOOR PLAN

17 of 17 7E601 ELECTRICAL - SCHEDULES

- - - END OF SECTION 00 01 15 - - -

08-13

00 01 15 - 2

10-01-13

01 00 00 - 1

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 GENERAL INTENTION

1.2 STATEMENT OF BID ITEM(S)

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.4 CONSTRUCTION SECURITY REQUIREMENTS

1.5 FIRE SAFETY

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 INFECTION PREVENTION MEASURES

1.9 DISPOSAL AND RETENTION

1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.11 RESTORATION

1.12 PHYSICAL DATA (Not used)

1.13 PROFESSIONAL SURVEYING SERVICES (not used)

1.14 LAYOUT OF WORK (not used)

1.15 AS-BUILT DRAWINGS

1.16 USE OF ROADWAYS

1.17 RESIDENT ENGINEER'S FIELD OFFICE (not used)

1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT (not used) ..18

1.19 TEMPORARY USE OF EXISTING ELEVATORS (not used)

1.20 TEMPORARY USE OF NEW ELEVATORS (not used)

1.21 TEMPORARY TOILETS (not used)

1.22 AVAILABILITY AND USE OF UTILITY SERVICES

1.23 NEW TELEPHONE EQUIPMENT (not used)

1.24 TESTS

1.25 INSTRUCTIONS

10-01-13

01 00 00 - 2

1.26 GOVERNMENT-FURNISHED PROPERTY (not used)

1.27 RELOCATED EQUIPMENT ITEMS

1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT (not used)

1.29 CONSTRUCTION SIGN (not used)

1.30 SAFETY SIGN (not used)

1.31 PHOTOGRAPHIC DOCUMENTATION (not used)

1.32 FINAL ELEVATION Digital Images (not used)

1.33 HISTORIC PRESERVATION

1.34 VA TRIRIGA CPMS (not used)

1.35 PROJECT CLOSEOUT – CONTRACTOR SUBMITTALS:

05-01-13

01 00 00 - 3

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Project 636-13-103, Replace

Boilers 2 & 3 - Grand Island.

B. Visits to the site by Bidders may be made only by appointment with the

Medical Center Engineering Officer.

C. Offices of Calvin L. Hinz Architect, PC, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or their duly authorized representative.

D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

E. Prior to commencing work, general contractor shall provide proof that a

OSHA designated “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

F. Training:

1. All employees of general contractor or subcontractors shall have the

10-hour or 30-hour OSHA Construction Safety course and other relevant competency training, as determined by RE/COR acting as the

Construction Safety Officer with input from the facility

Construction Safety Committee.

2. Submit training records of all such employees for approval before the start of work.

G. VHA Directive 2011-36, Safety and Health during Construction, dated

9/22/2011 in its entirety is made a part of this section

01 00 00 - 4

1.2 STATEMENT OF BID ITEM(S)

A. ITEM I, REPLACE BOILERS – GRAND ISLAND: Work includes general construction, alterations, drainage, mechanical and electrical work, utility systems, necessary removal of existing structures and construction and certain other items.

B. Bid Deduct NO. 1: Remove all work for Replace PRV Stations.

C. Bid Deduct NO. 2: Remove all work for the Replace PRV Stations and for the Replace System Components.

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Printing and reproduction of contract drawing sets and specifications will be made by the Contractor, at Contractor's expense, from electronic files furnished by Issuing Office.

1.4 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. Badge Requirements: General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

a. Local ID (Minimum ID Requirement for All Employees Performing Work Under this Contract): All employees of the contractor and subcontractor(s) must display a VA issued badge (Non-PIV ID), with photograph, at all times on Medical Center property. Non-PIV IDs allow employees access to public areas of the Medical Center and the construction area, only.

(1) All employees of the contractor and subcontractor(s) will schedule an appointment with the VA NWIHCS Police Service for the employee to be fingerprinted and issued a Non-PIV ID. All employees of the contractor and subcontractor(s) are required to login to the following

01 00 00 - 5 web site: https://va-piv.com and create a user name and password to log into the system. Once the employee has logged into the site they will schedule an appointment to have their phot taken. Once the photo has been completed (approximately 1 hour) the employee will be able to pick-up the Non-PIV ID at the PIV office.

Contractor employees shall not be allowed to work on

Medical Center property until ID has been issued.

Fingerprints, if necessary, will be forwarded to and kept on file by the VA Office of Personnel Management in Washington, D.C. Finger prints are only valid for

120 days. After 120 days if further or additional badging is required the employee will have to reschedule fingerprinting through the link above.

b. Non-PIV Identity Card (Required for Employees Acting in a

Supervisory Capacity, Requiring a VA Issued Key or requiring access to a secure area within the Medical

Center): Employees of the contractor and subcontractor(s) acting in a supervisory capacity and maintaining a sustained presence on site shall be designated “responsible persons” and will require a VA issued Non-PIV Identity

Card, which shall be displayed at all times when on Medical

Center property.

(1) Employee(s) requiring a VA issued Non-PIV Identity Card shall agree to be fingerprinted by the VA NWIHCS Police

Service, have their fingerprints forwarded to and maintained on file by the VA Office of Personnel

Management, have their name and fingerprints shared with local law enforcement agencies, and undergo a background investigation (“Special Agreement Check”) conducted by the VA Human Resources department. The Special Agreement

Check shall be completed and VA identifications shall be issued to designated employee(s) prior to the start of work.

(2) To receive a Non-PIV Identity Card Employee(s) shall submit a completed VA NWIHCS Police Service Fingerprint

Request form to the COR, who will initiate a request for a VA Non-PIV identification card for the designated employee(s). Employee(s) shall also schedule an appointment with the VA NWIHCS Police Service for the employee to be fingerprinted through the On-line

Timetrade Schedule system. To schedule their appointment for fingerprinting, employees are required to login to the following web site: https://va-piv.com and create a user name and password to log into the system.

https://va-piv.com/ https://va-piv.com/

01 00 00 - 6

Once the employee has logged into the site they will schedule an appointment to have their fingerprints taken. Once the fingerprints have been adjudicated

(approximately 24-48 hours) and the Special Agreement

Check has been conducted, the employee will receive an e-mail notification to schedule an appointment to have a

Non-PIV card issued from the PIV office.

(3) At least one responsible person designated by the contractor and approved by the COR or CO shall be present at all times when employees of the contractor or subcontractor(s) are working on Medical Center property.

(4) All PIV Identity Cards issued under this contract shall be returned to the COR at project completion or when requested by the COR or Contracting Officer, and prior to final payment.

c. Local IDs and Non-PIV Identity Cards shall be valid for six months from the date of issue. The contractor shall be responsible for ensuring all employees requiring access beyond the six month period renew badges and identification cards before they expire. Badge/ID card renewal shall be scheduled with the VA NWIHCS Police Service through

Timetrade Schedule system for fingerprinting and card renewal 30-45 day calendar days prior to the ID card expiration. Failure to renew badges/ID cards before the end of their valid period may result in employees losing access to the Medical Center until a new badge/ID card application has been completed and approved, and a new badge/ID card issued. Costs and liabilities associated with delays caused by failure of the contractor’s and subcontractor(s)’ employees to maintain a current badge/ID card shall be born solely by the contractor.

d. All employee information provided to the VA to meet the requirements of this section is protected by the Privacy

Act of 1974. The VA follows the requirements of the Privacy

Act, which protects personal information that the VA maintains in “systems of records”. Information provided to the VA may not be disclosed unless permitted pursuant to 38

CFR 1.500 – 1.599. Records provided to and maintained by the VA may not be altered or destroyed, except as authorized by 38 CFR 1.579.

e. Keys, access cards, and identification cards shall remain the property of the government, and shall be returned to the government at contract completion, when the employee’s presence is no longer required at the Medical Center, or when requested by the COR or CO. Contractor shall reimburse

01 00 00 - 7 the government for the replacement cost of any keys, electronic access cards, or government issued identification cards lost or damaged as a result of negligence or malicious act by employees of the contractor or subcontractor(s).

2. For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 days’ notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the

Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Project Manager for the purpose of security inspections of every area of project including tool boxes and parked machines.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.

D. Document Control:

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

01 00 00 - 8

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting

Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of

Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the

VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

E. Motor Vehicle Restrictions

1. General Contractor and its employees shall only park in designated areas.

1.5 FIRE SAFETY

A. Applicable Publications: Publications listed below form part of this

Article to extent referenced. Publications are referenced in text by basic designations only.

1. American Society for Testing and Materials (ASTM):

E84-2009 ............Surface Burning Characteristics of Building

Materials

2. National Fire Protection Association (NFPA):

10-2010 .............Standard for Portable Fire Extinguishers

30-2008 .............Flammable and Combustible Liquids Code

51B-2009 ............Standard for Fire Prevention During Welding, Cutting and Other Hot Work

70-2011 .............National Electrical Code

01 00 00 - 9

101-2012 ............Life Safety Code

241-2009 ............Standard for Safeguarding Construction, Alteration, and Demolition Operations

3. Occupational Safety and Health Administration (OSHA):

29 CFR 1926 .........Safety and Health Regulations for Construction

4. VHA Directive 2005-007

B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to COTR for review for compliance with VHA

Directive 2005-007, NFPA 101 and NFPA 241. Prior to beginning work, all employees of the contractor and/or any subcontractors shall undergo a safety briefing provided by the general contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc.

Provide documentation to the COTR that all construction workers have undergone contractor’s safety briefing.

C. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.

D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).

E. Temporary Construction Partitions: (Not Used)

F. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.

G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with

COTR.

01 00 00 - 10

H. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily and report findings and corrective actions weekly to COTR.

I. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA

241 and NFPA 10.

J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.

M. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with COTR. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the COTR.

N. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with COTR.

O. Hot Work: Perform and safeguard hot work operations in accordance with

NFPA 241 and NFPA 51B. Coordinate with COTR. Obtain permits from COTR at least 24 hours in advance.

P. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to COTR.

Q. Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under construction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas.

R. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.

S. Perform other construction, alteration and demolition operations in accordance with 29 CFR 1926.

01 00 00 - 11

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in executing the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the COTR.

E. Workmen are subject to rules of Medical Center applicable to their conduct.

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not

01 00 00 - 12 permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by Resident Engineer where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing: To insure such executions, Contractor shall furnish the COTR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COTR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work in successive phases mutually agreeable to

Medical Center Director, COTR and Contractor.

H. Building No. 7 will be occupied during performance of work.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel through other construction areas which serve as routes of access to such affected areas and equipment.

Coordinate alteration work in areas occupied by Department of

Veterans Affairs so that Medical Center operations will continue during the construction period.

I. Construction Fence: (If Required) Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, 01 00 00 - 13 including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COTR.

J. When a building is turned over to Contractor, Contractor shall accept entire responsibility therefore.

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COTR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COTR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the

Medical Center Director’s prior knowledge and written approval.

Refer to specification Sections 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS

INSTALLATIONS and 28 05 11, REQUIREMENTS FOR ELECTRONIC SAFETY AND

SECURITY INSTALLATIONS for additional requirements.

01 00 00 - 14

2. Contractor shall submit a request to interrupt any such services to

COTR, in writing, 48 hours in advance of proposed interruption.

Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COTR.

5. In case of a contract construction emergency, service will be interrupted on approval of COTR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times.

01 00 00 - 15

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COTR.

N. Coordinate the work for this contract with other construction operations as directed by COTR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COTR of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COTR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of

COTR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by

Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR

52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR 852.236-88).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COTR together shall make a thorough re-survey

01 00 00 - 16 of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 INFECTION PREVENTION MEASURES

A. Implement the requirements of VAMC’s Infection Control Risk Assessment

(ICRA) team. ICRA Group may monitor dust in the vicinity of the construction work and require the Contractor to take corrective action immediately if the safe levels are exceeded.

B. Establish and maintain a dust control program as part of the contractor’s infection preventive measures in accordance with the guidelines provided by ICRA Group. Prior to start of work, prepare a plan detailing project-specific dust protection measures, including periodic status reports, and submit to COTR for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA AND SAMPLES.

01 00 00 - 17

1. All personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center.

C. Medical center Infection Control personnel shall monitor for airborne disease (e.g. aspergillosis) as appropriate during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality. In addition:

1. The COTR and VAMC Infection Control personnel shall review pressure differential monitoring documentation to verify that pressure differentials in the construction zone are appropriate for their settings. The requirement for negative air pressure in the construction zone shall depend on the location and type of activity.

Upon notification, the contractor shall implement corrective measures to restore proper pressure differentials as needed.

2. In case of any problem, the medical center, along with assistance from the contractor, shall conduct an environmental assessment to find and eliminate the source.

D. In general, following preventive measures shall be adopted during construction to keep down dust and prevent mold.

1. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by COTR. Blank off ducts and diffusers to prevent circulation of dust into occupied areas during construction.

2. Do not perform dust producing tasks within occupied areas without the approval of the COTR.

E. Final Cleanup:

1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.

2. Perform HEPA vacuum cleaning of all surfaces in the construction area. This includes walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc.

01 00 00 - 18

3. All new air ducts shall be cleaned prior to final inspection.

1.9 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COTR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by

01 00 00 - 19 the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.11 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COTR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COTR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including

01 00 00 - 20 telephone) which are indicated on drawings and which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.12 PHYSICAL DATA (NOT USED)

1.13 PROFESSIONAL SURVEYING SERVICES (NOT USED)

1.14 LAYOUT OF WORK (NOT USED)

1.15 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COTR’s review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings to the COTR within 15 calendar days after each completed phase and after the acceptance of the project by the COTR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.16 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COTR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed by the Contractor at Contractor's expense.

When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

01 00 00 - 21

1.17 RESIDENT ENGINEER'S FIELD OFFICE (NOT USED)

1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT (NOT USED)

1.19 TEMPORARY USE OF EXISTING ELEVATORS (NOT USED)

1.20 TEMPORARY USE OF NEW ELEVATORS (NOT USED)

1.21 TEMPORARY TOILETS (NOT USED)

1.22 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the

Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.

C. Contractor shall install meters at Contractor's expense and furnish the

Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.

D. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:

1. Obtain heat by connecting to Medical Center heating distribution system.

a. Steam is available at no cost to Contractor.

E. Electricity (for Construction and Testing): Furnish all temporary electric services.

F. Water (for Construction and Testing): Furnish temporary water service.

01 00 00 - 22

1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection. Water is available at no cost to the Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (COTR's discretion) of use of water from Medical Center's system.

G. Steam: Furnish steam system for testing required in various sections of specifications.

1. Obtain steam for testing by connecting to the Medical Center steam distribution system. Steam is available at no cost to the

Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve steam-use so none is wasted. Failure to stop leakage or other waste will be cause for revocation (at COTR's discretion), of use of steam from the Medical Center's system.

H. Fuel: Natural and LP gas and burner fuel oil required for boiler cleaning, normal initial boiler-burner setup and adjusting, and for performing the specified boiler tests will be furnished by the

Government. Fuel required for prolonged boiler-burner setup, adjustments, or modifications due to improper design or operation of boiler, burner, or control devices shall be furnished by the Contractor at Contractor's expense.

1.23 NEW TELEPHONE EQUIPMENT (NOT USED)

1.24 TESTS

A. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.

B. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer.

Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.

01 00 00 - 23

C. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire complex which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a complex which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.

D. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably short period of time during which operating and environmental conditions remain reasonably constant.

E. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.

1.25 INSTRUCTIONS

A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the Resident Engineer coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, 01 00 00 - 24 component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.

C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed instructions to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed.

This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the Resident Engineer and shall be considered concluded only when the

Resident Engineer is satisfied in regard to complete and thorough coverage. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the Resident Engineer, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.

1.26 GOVERNMENT-FURNISHED PROPERTY (NOT USED)

1.27 RELOCATED EQUIPMENT ITEMS

A. Contractor shall disconnect, dismantle as necessary, remove and reinstall in new location, all existing equipment and items indicated by or otherwise shown to be relocated by the Contractor.

B. Perform relocation of such equipment or items at such times and in such a manner as directed by the Resident Engineer.

C. Suitably cap existing service lines, such as steam, condensate return, water, drain, gas, air, vacuum and/or electrical,…