36C26319B0011-0001003.docx

DOCX document 14 KB Posted

Attached to
Project 636A6-19-312 - Water Heaters Replacement Federal contract opportunity
Solicitation number
36C26319B0011
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23

About this file

36C26319B0011 0001 36C26319B0011 - Questions and Answers - A0001.docx

View the file

Other files for this federal contract opportunity

Other files attached to Project 636A6-19-312 - Water Heaters Replacement, newest first.
File Type Posted
36C26319C0194-000.docx DOCX document
36C26319B0011-0002000.docx DOCX document
36C26319B0011-0001002.pdf PDF
36C26319B0011-0001004.pdf PDF
36C26319B0011-0001000.docx DOCX document
36C26319B0011-0001001.docx DOCX document
36C26319B0011-004.pdf PDF
36C26319B0011-002.pdf PDF
36C26319B0011-005.pdf PDF
36C26319B0011-003.pdf PDF
36C26319B0011-001.docx DOCX document
36C26319B0011-000.docx DOCX document
36C26319B0011-000.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR QUESTIONS AND ANSWERS – PROJECT 636A6-19-312 – REPLACE WATER HEATERS

SOLICITATION 36C26319B0011

ITEM NO.
DATE QUESTION RECEIVED
DATE QUESTION ANSWERED
QUESTION
GOVERNMENT RESPONSE
1.
July 17,2019
July 19, 2019

This project is listed as 100 calendar days from notice to proceed. Water heat manufacturers are informing us that the lead time on the model specified and comparable models have a lead time of 7 weeks. The specified lead time will not likely be adequate to execute the contract once one accounts for submittals and review and lead time. Can this timeline be extended?

Based on Governments additional research regarding lead time, Bid Item I (Base Bid) will be extended from 100 Calendar Days to 160 Calendar Days – extended additional 60 Calendar Days.

Bid Item II: (Alternate Schedule) will be extended from 30 Calendar Days to 90 Calendar Days – extended additional 60 Calendar Days.

2.
July 17,2019
July 19, 2019

The CAD Detail No.: SD232113-11.DWG “Heat Exchanger – Steam to Hot Water” is noted that on the steam supply that control valves are needed in 2/3 & 1/3 size arrangement, Typ. with a bypass for each.

The existing water heaters are not piped this way.

Are the control valves are in 2/3 & 1/3 size arrangement, Typ. with a bypass needed for each?

Please Disregard the 1/3 & 2/3 steam control valve requirement shown on drawing Attachment 2 – Heat Exchanger Iso diagram. Drawing SD232113-11 refers to hot water heat exchangers used for hydronic heating and Does Not refer the hot water heaters to be installed on this project. The intent of its inclusion was to simply show a horizontal type arrangement and was not meant to be used for design purposes