RFP Question Answer.pdf

PDF 138 KB Posted

Attached to
J065--Ceiling Mounted Lifts PM Pkg Federal contract opportunity
Solicitation number
36C26222R0061
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This document includes a statement of work and questions and answers related to a federal contract opportunity for preventative maintenance of ceiling-mounted patient lifts at a Department of Veterans Affairs medical center. The contractor will be responsible for providing annual preventative maintenance inspections and repairs for 327 ceiling-mounted lifts across two VA facilities, including replacing batteries and pull cords as needed. The work must be completed within 30 days of award in single visits coordinated with facility staff between 8am and 3:30pm Monday through Friday. The contractor must hold relevant licenses and certifications including a 30-hour OSHA safety card, and be registered in the System for Award Management.

View the file

Other files for this federal contract opportunity

Other files attached to J065--Ceiling Mounted Lifts PM Pkg, newest first.
File Type Posted
ACC Lifts.xlsx XLSX spreadsheet
36C26222R0061 0001_1.docx DOCX document
Main Lifts.pdf PDF
LIFTS PM Schedule.xlsx XLSX spreadsheet
36C26222R0061_1.docx DOCX document
36C26222R0061 RFP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Questions & Answers

Project Name: Ceiling Mounted Lift PM Solicitation Number: 36C26222R0061

Question 1 Q:

The Contracting Officer is noted as Robert Regan in the Instructions to Offerors however, the SF1449 notes the CO as Michael Cordeiro. Which is correct?

A: Michael Cordeiro will be the CO of the contract. Robert Regan will be the contract specialist managing the contract

Question 2

The Price/Cost schedule references Preventive Maintenance only. Section B.3 notes Corrective Maintenance in addition to Preventive Maintenance. Will the government confirm that pricing should include both Preventive and Corrective Maintenance?

A: The vendor shall be responsible for the cost to replace pull cords and batteries. Corrective and Preventative Maintenance Checklist for Ceiling Mounted has been attached.

Question 3

Will the government provide the Corrective and Preventive Maintenance Checklist that’s currently in use?

A: Yes. The Corrective and Preventative Maintenance Checklist for Ceiling Mounted Lifts shall be completed for each lift.

Question 4

Can the government share the current Maintenance Schedule being used for Annual Maintenance of the 327 patient lifts?

A: Scheduled attached.

Question 5

Will the government provide a list of equipment to be serviced, to include make/model/serial numbers?

A: Listing of ceiling mounted lifts for the Main Hospital and the ACC has been attached.

Question 6 Q:

The objectives note battery replacement (#8) and replacing emergency pull cords/lifting straps (#9). Will the government provide replacement batteries, emergency pull cords and lifting straps?

A: The vendor shall be responsible for the cost to replace pull cords and batteries.

Question 7 Q:

For the 30 hour OSHA safety card, is it acceptable for the work supervisor to have completed this training?

Or, must every worker have the OSHA safety card?

A: It is acceptable for the supervisor to possess the 30 hour OSHA safety card.

Question 8

Can the government clarify the term “single visit”? Can a single visit span several weeks?

A: The PM for each lift shall be completed within a single visit, meaning preventative maintenance should not span more than a single day for completion of that individual lift.

Question 9

Item b notes “must be a vendor in our system”. What system is being referred to here?

A:SAM (System of award management) if you’re not in now it’s important to register to do business with the federal government.

Question 10

Q: What is the model number for the ceiling mounted lifts so we can research the manufacturers service requirements and ensure we are covering all required call out for preventative maintenance?

A: The (2) types of lifts we have are Guldmann GH3+, and Arjo Maxi 600.

Question 11

Q: Are all 327 lifts in both facilities the same manufacturer and part number?

A: Correction. There are (21) Guldmann lifts located at the ACC . There are (86) Arjo Ceiling Mounted Lifts, and

(219) Guldmann Ceiling Mounted Lifts located at the main hospital. Total 326 ceiling mounted lifts.

Question 12

Q: Does the VA Healthcare Facility have an idea for how often the PM should be performed or is it left up to the contractor to determine? One visit a month servicing about 28 lifts each month over the course of the year? Or could we service around 60 each month and complete all 327 in the first 6 months of the year? Is there any current prioritization for certain lifts requiring maintenance more than others?

A: PM’s on ceiling mounted lifts are performed on each lift once a year. Refer to answer #8 for the “single visit” reference.