36C26220Q0528-0001002.pdf
PDF Posted
- Attached to
- Z2DZ--Replace 5 KV Load Interrupter Switchgear Federal contract opportunity
- Solicitation number
- 36C26220Q0528
About this file
36C26220Q0528 0001 Building 99 - Main Switchgear.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26220Q0528-0001000.docx | DOCX document | |
| 36C26220Q0528-0001001.pdf | ||
| 36C26220Q0528-003.pdf | ||
| 36C26220Q0528-004.pdf | ||
| 36C26220Q0528-001.docx | DOCX document | |
| 36C26220Q0528-002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VETERAN ELECTRICAL POWER SYSTEMS 1223 S. FLOWER ST. BURBANK, CA 91502 (818) 861‐7610
May 23, 2018
Subject: VA Sepulveda Building 99 Main Switchgear
| At | the | request | of | VA | Sepulveda | Ambulatory | Care | Center, | Veteran | Electrical | Power | |||
| Systems | inspected | and | tested | the | electrical | system | that | feeds | building | 99 | to | establish | the | |
| condition | of | the | current | system. | Multiple | deficiencies | were | found | throughout | the |
Switchgear.
| Excessive | signs | of | heat | from | the | Incoming | power | from | R3 | and | R4 | feed. | Cables | are | melting |
| back | the | insulation. |
VETERAN ELECTRICAL POWER SYSTEMS 1223 S. FLOWER ST. BURBANK, CA 91502 (818) 861‐7610
Signs of tracking on the insulators
VETERAN ELECTRICAL POWER SYSTEMS 1223 S. FLOWER ST. BURBANK, CA 91502 (818) 861‐7610
The complete Substation
VETERAN ELECTRICAL POWER SYSTEMS 1223 S. FLOWER ST. BURBANK, CA 91502 (818) 861‐7610
Switchgear has excessive corrosion with water marks throughout the inside of each cabinet
VETERAN ELECTRICAL POWER SYSTEMS 1223 S. FLOWER ST. BURBANK, CA 91502 (818) 861‐7610
Load Interrupter Switch blades showing signs of excessive heat.
| Recommendation: | VEPS | recommends | replacing | the | switchgear, | as | well | as | the | incoming | line | |||||
| from | R3 | and | R4 | to | the | outgoing | line | to | building | 99. | The | test | Results | were | unsatisfactory | per |
| NETA | Standards. | |||||||||||||||
| If | there | are | any | questions | please | feel | free | to | contact | me. |
Respectfully,
| Sergio | Rangel | |||
| Operations | Manager | |||
| Veteran | Electrical | Power | Systems, | Inc. |