36C26119Q0068-0004001.docx

DOCX document 85 KB Posted

Attached to
EMERGENCY GENERATOR AND AUTOMATIC TRANSFER SWITCH MAINTENANCE Federal contract opportunity
Solicitation number
36C26119Q0068
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

36C26119Q0068 0004 654-19-1-6093-0007 Performance Work Statement Updated 2-25-19.docx

View the file

Other files for this federal contract opportunity

Other files attached to EMERGENCY GENERATOR AND AUTOMATIC TRANSFER SWITCH MAINTENANCE, newest first.
File Type Posted
-16350.docx DOCX document
36C26119Q0068-0005000.docx DOCX document
36C26119Q0068-0004000.docx DOCX document
36C26119Q0068-0003001.pdf PDF
36C26119Q0068-0003000.docx DOCX document
36C26119Q0068-0002000.docx DOCX document
36C26119Q0068-0001001.docx DOCX document
36C26119Q0068-0001000.docx DOCX document
36C26119Q0068-003.docx DOCX document
36C26119Q0068-002.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Part 1

General Information

1. General: This is a non-personnel services contract to provide Emergency Generator and Automatic Transfer Switches (ATS) Testing and Service. The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Emergency Generator and ATS Testing and Service as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: The emergency generators and ATS’s at the VA Sierra Nevada Health Care System (VASNHCS) is paramount to ensuring continued care for the patients in case of a power outage or disruption. Therefore, it’s imperative that the government maintains the generators and ATS’s in accordance with (including, but not limited to) The Joint Commission (TJC), National Fire Protection Association (NFPA) 70, NFPA 99, NFPA 110, manufacturer’s, Federal, State, and local agencies standards and most current editions of the publications.

1.3 Objectives: To ensure compliance with TJC Environment of Care Standards (EC.02.05.07, dtd 1-1-19 (or most current version)), NFPA 70, NFPA 99, NFPA 110, manufacturer’s, Federal, State, and local agencies standards and most current editions of the publications for the emergency generators and ATS’s.

· Rationale for EC.02.05.07: Emergency electrical power supply systems may fail during a power disruption, leaving the hospital unable to deliver safe care, treatment, and services to patients. Testing these systems for sufficient lengths of time at regular frequencies increases the likelihood of detecting reliability problems and reduces the risk of losing this critical resource when it is most needed.

1.4 Scope:

1. Elements of Performance (EPs)

a. EP 4: WEEKLY – Inspect the emergency generators, including all associated components and batteries. The results and completion dates of the weekly inspections are documented.

i. Service is to be completed on the same day of the week, 52 times per year.

1. Note: If a holiday occurs on the day of testing or inspection, the service is to be completed the day before or after.

ii. For full text, refer to NFPA 110-2010: 8.3.1; 8.3.3; 8.3.4; 8.4.1 – or the most current edition.

iii. VASNHCS will provide test forms electronically that will be used for reporting.

b. EP 5: MONTHLY – Test each emergency generator beginning with a cold start under load for at least 30 continuous minutes. The cooldown period is not part of the 30 continuous minutes. The test results and completion dates are documented.

i. Service is to be completed once per month, same day of the same week, monthly (i.e, 3rd Wednesday of each month,12 times per year).

1. Note: If a holiday occurs on the day of testing or inspection, the service is to be completed the weekday before or after.

ii. For full text, refer to NFPA 99-2012, 6.4.4.1 – or the most current edition.

c. EP 6: MONTHLY – Diesel powered emergency generators are conducted with a dynamic load that is at least 30% of the nameplate rating of the generator or meets the manufacturer’s recommended prime movers’ exhaust gas temperature. If the hospital does not meet either 30% of nameplate rating or the recommended exhaust gas temperature during any test in EC.02.05.07, EP 5, then it must test the emergency generator once every 12 months using supplemental (dynamic or static) loads of 50% of nameplate rating for 30 minutes, followed by 75% of nameplate rating for 60 minutes, for a total of 1 ½ continuous hours.

i. Note: Tests for non-diesel-powered generators need only be conducted with available load.

ii. Service is to be completed once per month, same day of the same week monthly (i.e, 3rd Wednesday of each month,12 times per year).

1. Note: If a holiday occurs on the day of testing or inspection, the service is to be completed the weekday before or after.

iii. For full text, refer to NFPA 99-2012, 6.4.4.1 – or the most current edition.

d. EP 7: MONTHLY – Test all automatic and manual transfer switches on the inventory. The test results and completion dates are documented.

i. Service is to be completed once per month, same day of the same week monthly (i.e, 3rd Wednesday of each month,12 times per year).

1. Note: If a holiday occurs on the day of testing or inspection, the service is to be completed the day before or after.

ii. For full text, refer to NFPA 99-2012, 6.4.4.1 – or the most current edition.

e. EP 9: EVERY THREE YEARS – Test each emergency generator for a minimum of 4 continuous hours. The test results and completion dates are documented.

i. Service is to be completed every three years +/- 45 days from the last completed. (i.e., April 15, 2017, no sooner than the 45 days prior to and no later than 45 days after April 15, 2020).

ii. For additional guidance, see NFPA 110-2010, Chapter 8 – or most current edition.

f. EP 10: EVERY THREE YEARS – The 36-month diesel-powered emergency generator test uses a dynamic or static load that is at least 30% of the nameplate rating of the generator or meets the manufacturer’s recommended prime mover’s exhaust gas temperature.

i. Service is to be completed every three years +/- 45 days from the last completed. (i.e., April 15, 2017, no sooner than the 45 days prior to and no later than 45 days after April 15, 2020).

ii. Note: Tests for non-diesel-powered generators need only be conducted with available load.

iii. For additional guidance, see NFPA 110-2010, Chapter 8 – or most current edition.

2. Generators and automatic transfer switches to be serviced (see pages 7 – 9)

a. Note: Generators 1 & 2 and ATS 3, 4, 5, 6, 7, 8, 9 will be removed once the major renovation occurs in September 2019, effective October 1, 2019**. Pending the award of the contract, base year will include generators 1 & 2 and ATS’s 3, 4, 5, 6, 7, 8, 9 until notified**.

3. Qualifications of contractors

a. Contractors shall have the Engine Manufacture certification or equivalent training for the maintenance on the emergency generators and ATS’s at VASNHCS, and completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training.

b. Contractors shall have technical trainings and track records of working experience in maintenance, inspection, and testing of the Emergency Electrical Power Supply System and its components in healthcare, industrial, educational, and commercial facilities for a minimum of three continuous years.

c. Contractors shall have safety training, either on-the-job or class-room type in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S - Electrical and the NFPA 70E - Standard for Electrical Safety in the Workplace. The contractor’s employees shall have a certified Electrical Contractor License for the state of Nevada. Training certifications shall be submitted to the Department of Veteran’s Affairs (VA) Contracting Officer (CO) prior to work. If no training certifications are available, the contractor shall certify that the service technician has met this requirement in writing and submit it to the VA CO prior to work.

d. Contractors shall demonstrate familiarity and have ready access to the latest versions of the following references:

i. NFPA 70, National Electrical Code.

ii. NFPA 70B, Recommended Practice for Electrical Equipment Maintenance.

iii. NFPA 70E, Standard for Electrical Safety for the Workplace.

iv. NFPA 110, Standard for Emergency and Standby Power System.

v. OSHA Standard 29 CFR 1910, Subparts I & S.

vi. Operating/Maintenance manuals and specifications of the emergency generators and all associated electrical equipment to be maintained and tested. These documents may be obtained from the VASNHCS, or the equipment manufacturers.

e. Contractors must provide and shall be equipped with all the necessary tools, equipment, and personal protective equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29CFR 1910, Subpart I, and NFPA 70E/NFPA 110.

4. Scope of work

a. The contractor will provide all the necessary supervision, labor, tools, travel, equipment and materials to accomplish the emergency generator and ATS maintenance on 10 generators, two portable generators, two DUV “Swat Bus”, and 29 ATS’s at the VASNHCS. Services include weekly and monthly inspections, annual service, 4-hour load bank testing (LBT) (Tri-annual), the annual load test, and annual ATS test.

b. The contractor must have at least two years of previous experience maintaining and repairing hospital generators in the Reno Nevada Area. Some maintenance and testing may occur outside of normal work hours, such as: starting with the patient care generators 4, 8, and 10, maintenance and testing will begin at 5:30 am the third Friday of the month. Frequency and days of service are noted in this PWS para 1.4, section 1a, 1b, 1c, 1d, 1e, and 1f. (Elements of Performance, EP4, EP5, EP6, EP7, EP9, & EP10)

c. The contractor shall have a 24-hour per day, 7-days per week, 365 days a year presence in the Reno area to be available for emergencies. The contractor shall be available to respond to emergency calls within 1-hour.

d. The contractor shall provide the following service, in intervals as recommended by the manufacturer and based on current equipment hours:

i. Replace the oil, oil filters, fuel filters, coolant, coolant filters, clean exterior of radiator, replace belts, check associated duct work and louvers and clean as necessary, check louver motors and controls and verify proper operation.

ii. Replace any leaking coolant gaskets, check block heater and repair any leaks.

iii. Check for correct thermostat operation, adjust as necessary, check and replace flexible fuel, coolant lines as necessary.

iv. Test for excessive back pressure on the exhaust system, check the exhaust system hangers and supports.

v. Check flexible exhaust section, tighten control and power wiring connections, check safeties and alarms for proper operation and calibration and notify as necessary.

vi. Calibrate all voltage sensing relays/devices, test generator wiring for insulation breakdown, replace air cleaner, replace governor oil, test injector pump and injectors for flow rate and/or spray pattern.

vii. Check and adjust valve clearances, torque head-bolts, clean and check brush length, notify as necessary.

viii. Check and clean rotor and stator, check and clean commutator and slip rings.

ix. Check bearings and notify as necessary, grease bearings, check and clean exciter and voltage regulator, megger (insulation tester) the windings and record the resistance readings.

x. Check water pumps for leaks, notify as necessary, check clean, and vacuum boxes, panels and cabinets.

xi. Clean and scrub down the prime mover with moist rags and a biodegradable detergent.

xii. Clean and scrub the concrete floor directly under the genset where accessible.

xiii. Maintain all batteries and associated chargers and controls.

e. Transfer switches shall be subjected to one major maintenance and three minor inspections per year.

i. Annual major maintenance to include:

1. Check connections

2. A thermograph or temperature scan shall be done under normal condition load prior to transfer. All wiring harnesses, circuit boards, feeder wires, transformers, circuit boards, relays, controllers, PLC’s, contacts, major mechanical components and any other internal components shall have a thermograph scan. This scan shall be repeated while the EPSS is under load in emergency position. Any temperature of components greater than 650C shall be documented and reported.

3. With power connected to the normal source, measure and record milli-volt drop across each pole. Any reading greater than 25% of the average of all the poles shall be inspected with the ATS de-energized.

4. With power connected to the emergency source, measure and record milli-volt drop across each pole. Any reading greater than 25% of the average of all the poles shall be inspected with the ATS de-energized.

5. With EPS in off position breakers between the EPS and the load terminals of the ATS shall be exercised.

6. The bypass isolation feature shall be operated between normal to emergency and back again. Refer to NFPA 110 A.8.3.5 (1)(D) for testing procedures of said feature.

7. Inspect or test for evidence of overheating or excessive contact corrosion.

8. Inspect insulating materials and/or standoff insulators for signs of contamination (i.e,. dirt, grime, oil). The combination of high humidity and moisture could lead to tracking and or breakdown of the insulating material. Insulators are to be cleaned by an approved solvent and/or alcohol.

9. Inspect control connections, plugs, and harnesses for signs of corrosion, heat. contamination and so forth.

10. Remove all dust and debris in the ATS cabinet, transfer switch mechanism, bus and so forth.

11. Inspect cabinets for proper sealing. Knock out and penetrations in cabinet need to be sealed as well as appropriate gasketing to prevent the introduction of dust and debris.

12. Observe any other proper manufacturers procedure and/or recommendation.

13. Verify control and feature setpoints and operation

14. Measure and record the following data and setpoints:

a. Normal source voltage phase to phase, phase to ground and phase to neutral

b. Engine start time

c. Emergency source voltage phase to phase, phase to ground and phase to neutral

d. Total load current

e. Transfer time delay

f. Return to normal time delay

g. Engine cooldown

h. Verify proper setpoints of all values as recommended in NFPA 110 8.4.5

i. Verify proper operation of all indicator lights, meters, and controls.

f. All LBT shall include the buildings emergency load with additional loading from a load bank machine supplied by the contractor. All LBT shall be coordinated and confirmed with the Contracting Officers Representative (COR) of each division before starting the test. The contractor shall provide and connect or disconnect a temporary emergency generator whenever required to ensure emergency standby power at all times. This includes any scheduled maintenance that requires taking the generator off-line. The contractor shall not interrupt any electrical service without the consent of the COR. The contractor shall be responsible for correcting any incorrect information on the existing equipment list.

5. Notification of environmental spills and damage

a. The contractor shall have in their possession, safety data sheets for every chemical item they bring on station.

b. The contractor shall properly dispose of all hazardous materials including, but not limited to all oils, coolant, fuels, filters, contaminated rags, and adsorbent, per the federal, state and local codes.

c. In the event the contractor spills or releases any un-permitted substance, hazardous substance, or hazardous waste into the environment, the contractor shall immediately report the incident to the contracting officer’s representative, fire department, and the local authority having jurisdiction. The contractor shall be liable for the costs of clean-up and remediation of any spill or release of such substance into the environment.

d. In the event the contractor damages any equipment or property, the contractor shall be held liable for the cost of repair and/or replacement.

6. Report requirements

a. Provide a comprehensive written report of the work completed.

b. Provide four hard three ring binders with all the oil test results, maintenance logs and load bank test sheets plus a CD.

c. The contractor will not have any access to a VA system or VA sensitive information.

7. Frequency documentation

a. Weekly = Same day of the week. 52 times per year. (If a holiday occurs on the day of testing or inspection, the service is to be completed the day before or after.)

b. Monthly = Once per month. Same day of the same week monthly (i.e, 3rd Wednesday of each month), 12 times per year. (If a holiday occurs on the day of testing or inspection, the service is to be completed the weekday before or after.)

c. Annual = Once per year, +/- 30 days from the last completed. (i.e, April 15, 2017. No sooner than 30 days prior to and no later than 30 days after April 15, 2018)

d. Tri-annual = 36 months/every 3 years. +/- 45 days from the last completed. (i.e, April 15, 2017. No sooner than the 45 days prior to and no later than 45 days after April 15, 2020)

8. Contractor and their employee(s) responsibility

a. The contractor shall abide by the rules of the station, which will be provided in the pre-work meeting.

i. Comply with all VASNHCS regulations at all times and conduct themselves in a professional manner.

1. This includes parking in the appropriate spaces. Parking in veteran and/or patient designated parking spaces is prohibited.

ii. Proper badges (above the waist) and good behavioral conduct shall be mandatory.

iii. VASNHCS may demand the contractor remove any persons who pose a threat to the health, safety, or security of the staff, customers, and/or property of VASNHCS.

b. The contractor and the COR shall be jointly responsible to track all additional charges and repairs that are not covered by this contract.

PERFORMANCE WORK STATEMENT

EMERGENCY GENERATOR AND AUTOMATIC TRANSFER SWITCHES TESTING AND SERVICE

VA SIERRA NEVADA HEALTH CARE SYSTEM

654-19-1-6093-0007 (UPDATED 2-25-19)

image2.emf image3.emf image1.emf

File details come from the government source that posted it.