635-CSI-102 OKC Cath Lab 2 Bid Docs Sheets 82-112.pdf

PDF 3 MB Posted

Attached to
Z2DA--Remodel Cath Lab 2 635-CSI-102 Federal contract opportunity
Solicitation number
36C25921R0020
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This document package includes technical specifications and site preparation requirements for the installation of medical equipment for the Z2DA--Remodel Cath Lab 2 opportunity with solicitation number 36C25921R0020 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19. The specifications cover equipment details, plans, electrical details, support details, and minimum site preparation requirements including finished walls, doors, floors, ceilings, electrical outlets and raceways, and a dedicated electrical branch circuit for the equipment. Successful offerors must ensure the site meets these standards before installation can begin.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Remodel Cath Lab 2 635-CSI-102, newest first.
File Type Posted
36C25921R0020 0006.pdf PDF
36C25921R0020 0005.pdf PDF
RFI 1 Cath Lab RFP 022221.pdf PDF
36C25921R0020 0004.pdf PDF
Remodel Cath Lab Walkthrough 2-3-2021.pdf PDF
36C25921R0020 0003.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs Sheets 41-51.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs Sheets 30-40.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs Sheets 18-29.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs Sheets 52-59.pdf PDF
36C25921R0020 0002.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs Sheets 9-17.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs Sheets 73-81.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs Sheets 60-72.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs Sheets 1-8.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs 22Oct2020 - AE Drawings_Part6.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs 22Oct2020 - AE Drawings_Part9.pdf PDF
36C25921R0020 0001.pdf PDF
Specifications.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs 22Oct2020 - AE Drawings_Part8.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs 22Oct2020 - AE Drawings_Part4.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs 22Oct2020 - AE Drawings_Part7.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs 22Oct2020 - AE Drawings_Part5.pdf PDF
635-CSI-102 OKC Cath Lab 2 Bid Docs 22Oct2020 - AE Drawings_Part3.pdf PDF
S02 Past Performance Questionnaire.docx DOCX document
635-CSI-102 OKC Cath Lab 2 Bid Docs 22Oct2020 - AE Drawings_Part2.pdf PDF
SELF-PERFORMED CALCULATIONS 9-5-2019.docx DOCX document
635-CSI-102 OKC Cath Lab 2 Bid Docs 22Oct2020 - AE Drawings_Part1.pdf PDF
36C25921R0020_1.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C1 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

Healthcare www.healthcare.philips.com

Table of Contents

Transport Details ------------------------------------ AD1 Equipment Details -------------------------- AD2 - AD6

Equipment Plan ---------------------------------------- A1 Equipment Legend ------------------------------------ AL General Notes ----------------------------------------- AN

Section A - Equipment Plan

Check List -------------------------------------------- CHK Remote Service Network ----------------------- N1-N2

Electrical Details ---------------------------- ED1 - ED4 Raceway & Conduit Information ------------- E2 - E4 Electrical Plan ------------------------------------------- E1 Electrical Legend -------------------------------------- EL Electrical Notes ---------------------------------------- EN

Section E - Electrical Plan

Support Details ------------------------------ SD1 - SD4 Support Plan - Ceiling -------------------------------- S2 Support Plan - Floor & Wall ------------------------- S1 Support Legend ---------------------------------------- SL Support Notes ------------------------------------------ SN

Section S - Support Plan

Final Site Preparation Support Document The equipment components shown in this drawing package are based on the current proposed purchase and are subject to change if modifications are made to the configuration.

Revision History Note for Architects and/or Contractors: If revisions are listed, these drawings must be thoroughly reviewed so that all changes can be incorporated into your project

Rev. Date Revision Descriptions By

A 5/7/2014 AL/A1: Added 25kVA UPS in equipment closet per PM request. LP

B 9/10/2014 Created Final Site Preparation Support Document. Updated equipment per OA# 6600224430.010000. LP

C 11/14/2014 AL/A1/AD6/SL/S1/EL/E1/E3/E4/ED4: Updated 25kVA UPS information and added knife switch, "SWC". LP

D 8/19/2015 Updated equipment per OA 6600224430.020000. AL/A1/AD6/SL/S1/EL/E1/E3/E4/ED4: Updated 25kVA UPS information, removed "SWC", and planned for internal rotary switch. Added live/reference monitor in control area per change order. Added (2) 21" monitors to FlexVision monitor. LP

E 10/6/2015 Updated equipment per OA 6600250260.010000. AL/A1/EL/E1/E4: Removed "TV3" from control area. LP

F 6/18/2018 Updated drawing to show Short L-Arm per PM request. JV

G 3/4/2020 Updated background and updated drawing per new SRD's. JV

AN

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

Minimum Site Preparation Requirements

A smooth efficient installation is vital to Philips and their customers. Understanding what the minimum site preparation requirements are will help achieve this goal. The following list clearly defines the requirements which must be fulfilled before the installation can begin.

1. Walls to be painted or covered, baseboards installed, floors to be tiled and/or covered, ceiling shall have grid tiles and luminaires installed and operational.

2. Doors and windows, especially radiation protection barriers, installed and finished with locksets operational.

3. All electrical convenience outlets, raceways, wireways, auxiliary fittings, knockouts, cable connectors, terminal and power distribution blocks, cable openings, chase nipples, junction boxes and pull boxes installed and operational.

4. A private supply mains branch circuit with overcurrent protective circuit breaker and manual operable circuit disconnect means shall be present and operational. Definition of "Private supply" means an end-leave of the hospital distribution system after the last overcurrent protective disconnect means from which all equipment included in the Allura ground domain is powered.

Note that only equipment included in the Allura certification and equipment with which the Allura has a compatibility statement are allowed to be inside the Allura ground domain. All other electrical equipment is not allowed to have a functional connection to the Allura system and shall have no direct galvanic connection to prevent ground loops. 3rd party equipment that does not have a function connection with the Allura system, but that is intended to be used inside the same patient area as the Allura System shall be grounded to the PCB inside the ERB with a ground bonding of <= 200 mOhm for plugable equipment.

5. 120V convenience outlets operational.

6. All support structure correctly installed. All channels, pipes, beams and/or other supporting devices should be level, parallel, and free of lateral or longitudinal movements.

7. All contractor supplied cables pulled and terminated.

8. A dust-free environment in and around the procedure room.

9. All HVAC (heating, ventilating and air conditioning) installed and operational as per specifications.

10. Architectural features such as computer floor, wood floor, casework, bulkheads, installed and finished. When technical cabinets are installed in a closet with doors, it is suggested that the customer install a temperature alarm in the event of an air conditional failure.

11. All plumbing installed and finished.

12. Philips does not install or connect developing tanks, automatic processors or associated equipment, built in illuminators, cassette pass boxes, loading benches and cabinets, lead protective screens, panels or lead glass window and frame. This is to be done by the customer/contractor.

13. Clear door openings for moving equipment into the building must be 42" (1067mm) W x 82" (2083mm) H min. 48" (1219mm) W x 82" (2083mm) H rec., Or larger contingent on an 8'-0" (2438mm) corridor width.

14. Countertop is 30" (765mm) for seated height and 36" (915mm) for standing height.

Note Once Philips has moved equipment into the suite and started the installation, the contractor shall schedule his work around the Philips installation team on site. It is suggested that a telephone be provided in the room to receive telephone calls. This would alleviate facility staff from answering calls for Philips personnel.

Remote Service Diagnostics Medical imaging equipment to be installed by Philips Medical is equipped with a service diagnostic feature which allows for remote and on site service diagnostics. To establish this feature, a RJ45 type ethernet 10/100/1000 Mbit network connector must be installed as shown on plan. Access to customer's network via their remote access server is needed for Remote Service Network (RSN) connectivity. All cost with this feature are the responsibility of the customer.

(16.0)

HVAC Requirement for General Equipment Locations

*Average heat emission during clinical use Data applicable for basic system:

Large monitor + 4 x small monitor in Monitor Ceiling Suspension 1 workstation + 2 x small monitor in Control Room

Add 1706 BTU/hr for additional large monitor Add 273 BTU/hr for additional small monitor Add 1024 BTU/hr for additional workstation See AL sheet for additional heat load in case of UPS

Equipment's designed airflow is from front/side to back. Please design the air handling in the rack cabinet equipment area accordingly.

Heating, ventilation, and air conditioning requirements must maintain temperature at 72° +/- 5°F as well as a non-condensing relative humidity at 20-80% with 10% maximum variation. These temperature and humidity levels must be maintained in all (3) rooms (equipment, examination and control rooms).

(19.0)

General Specifications

1. Responsibility The customer shall be solely responsible, at its expense for preparation of site, including any required structural alterations. The site preparation shall be in accordance with plans and specifications provided by Philips. Compliance with all safety electrical and building codes relevant to the equipment and its installation is the sole responsibility of customer.

The customer shall advise Philips of conditions at or near the site which could adversely affect the installation work and shall ensure that such conditions are corrected and that the site is fully prepared and available to Philips before the installation work is due to begin. The customer shall provide all necessary plumbing, carpentry work, or raceway (conduits, wireways, auxiliary gutters, etc.) required to attach and install products ready for use.

2. Permits Customer shall obtain all permits and licenses required by federal, state/provincial or local authorities in connection with the construction, installation and operation of the products and related rules, regulations, shall bear any expense in obtaining same or in complying with any ordinances and statutes.

3. Radiation Protection The customer or his contractor, at his own expense, shall obtain the service of a licensed radiation physicist to specify radiation protection. (X-Ray Tube output 125 KVp max.)

4. Asbestos and Other Toxic Substances Philips assumes no hazardous waste (i.e., PCB's in existing transformers) exists at the site. If any hazardous material is found, it shall be the sole responsibility of the customer to properly remove and dispose of this material at its expense. Any delays caused in the project for this special handling shall result in Philips time period for completion being extended by like period of time. Philips assumes that no asbestos material is involved in this project in any ceilings, walls or floors. If any asbestos material is found anywhere on the site, it shall be the customer's sole responsibility to properly remove and/or make safe this condition, at the customer's sole expense.

5. Labor In the event local labor conditions make it impossible or undesirable to use Philips' regular employees for such installation and connection, such work shall be performed by laborers supplied by the customer, or by an independent contractor chosen by the customer at the customer's expense, and in such case, Philips agrees to furnish adequate engineering supervision for proper completion of the installation.

6. Schedule The general contractor should provide Philips with a schedule of work to assist in the coordination of delivery of Philips supplied products which are to be installed by the contractor and delivery of the primary equipment.

7. Extended Installation or Turnkey Work by Philips Any room preparation requirements for Philips equipment indicated on these drawings is the responsibility of the customer. If an extended installation or turnkey contract exists between Philips and the customer for room preparation work required by the equipment represented on these drawings, some of the responsibilities of the customer as depicted in these drawings may be assumed by Philips. In the event of a conflict between the work described in the turnkey contract workscope and these drawings, the turnkey contract workscope shall govern.

8. Infection Control and Interim Life Safety Measures Compliance with all Infection Control and Interim Life Safety Measures shall be the sole responsibility of the customer. The customer shall provide all means and methods necessary for compliance with Infection Control (IC) and Interim Life Safety Measures (ILSM) in connection with the construction and installation/operation of the products shown herein and shall bear any expenses related to same.

(16.0)

Remote Control of Room Lighting

The control of customer lighting must incorporate an electrical isolation system such as demonstrated on Sheet ED3. Lighting scheme is the responsibility of the customer.

(12.0)

Operation

Temperature 67°F (20°C) to 77°F (25°C)

Temperature gradient Max. 1°F / Minute (0.5°C / Minute)

Humidity (non-condensing) Humidity shall be stable within 10% 20% to 80%

Exam Room *6483 BTU/hr

Equipment Room *8189 BTU/hr

Control Room *1706 BTU/hr

Electrical Requirements Mains 40E Cabinet

Maximum Rated Power: 100kW

Supply Configuration: 3 phase, equally sized insulated power conductors and an insulated equipment grounding conductor. Insulated grounding conductor shall have the same or larger size than line conductors. Line wires shall be no smaller than 6 AWG, 90°C or higher temperature rating. The conductor size is dependant on the upstream circuit breaker rating:

2 AWG for 125A circuit breaker rating.

Nominal Line Voltage: 480 VAC, 60 Hz

Branch Power Requirement: 100 kVA (System only; verify UPS power requirements)

Circuit Breaker: 3 phase, Type D 125A with long-time delay and shunt trip

(19.1)

AL

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

Weight (lbs)

Heat Load (btu/hr)

Detail SheetEquipment Designation

Description

Equipment Legend

Optional item furnished by Philips Future Existing Furnished by Philips and installed by contractor Installed by customer/contractor Furnished by customer/contractor and installed by customer/contractor

G

D C B

Furnished and installed by PhilipsA

F E

A MSA Angio Diagnost 7 with Pivot and Tilt 999 205 AD2

A CY Viewing/Control 126 567 AD3

A DB Documentation Box - Mounted on Wheels (Final location to be coordinated with customer and/or local Philips Service)

176 0 AD4

A ATY Exam Room Auxiliary Box 7 1.7 AD4

A MB Image 40E Cabinet 441 1877 AD3

A VB1 Video Connection Box 11 34 AD4

A VB8 Video Connection Box 11 34 AD4

A DBS Dose Aware - Base Station 3.2 85 AD5

A MAV Mavig Ceiling Track w/ Radiation Shield and M LED 3MC Surgical Light

167 350 AD5

A TR M LED 3MC Transformer 17 - AD5

A TV2 One LCD Monitor Carriage 68 239 AD5

D

D

UPS

UPC

4400 UPS Cabinet - 25 kVA

Universal Power Controller - 25 kVA

AD6

AD6

A VB9 Video Connection Box 11 - AD5

A SP Clea Stand with Short L-Arm 2535 1706 AD2

A ME Certeray iX Generator Cabinet 320 2971 AD3

A MR Peripheral 40E Cabinet 441 2049 AD3

A MA Mains 40E Cabinet 826 5464 AD3

A TV 58" + (2) 21" LCD Monitor Suspension 636 1020 AD4

A PDR1 Personal Dose Meter Rack - - AD5

A PDR2 Personal Dose Meter Rack - - AD5

ATY

Exact location to be coordinated by Customer and local Philips service.

C le a / T ab le

Recommended Minimum

2'-8"

Equipment closet doors to be hung from ceiling mounted track, no floor tracks allowed

DB

C us to m er 's

P hy si o

(P H

Y) C oo rd in at e fin al lo ca tio n w ith c us to m er

CY

VB1

VB3 VB4 VB5 VB6 VB7 VB8

MSA

SP

Head End

TV

MAV

9' -9

2'-8"

'-1

1 2"

3'-915 16" 27'-9 9

16"

1' -1

7 8"

9'-111 8"

'-1

11 2"

'-2

MA

MR

MB

ME

AD7 Adaptation Floor Plate ℄

VB2

DBSTV2

U

PCU

PS

VB9

16'-2"

12'-8 3 16"

1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12'

.5 m

1m 1.

5m 2m

2.

5m

3m 3.

5m

PD

R

PD

R

TR

A1 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

* Architect to coordinate with end users/technicians to determine final placement of control desk components prior to installation in order to avoid rework.

Architect to coordinate with Philips Project Manager to reflect final placement on Philips drawings.

Source Location Displayed

VB1 Physio Control FlexVision

VB2 TBD TBD FlexVision

VB3 TBD TBD FlexVision

VB4 TBD TBD FlexVision

VB5 TBD TBD FlexVision

VB6 TBD TBD FlexVision

VB7 TBD TBD FlexVision

VB8 TBD TBD FlexVision

VB9 MB Exam TV2

* Counters and cabinetry shown to be supplied and installed by contractor.

General Notes

Planning Issues and Considerations

Exact equipment configuration to be verified with local Philips Sales. AD7 Adaptation plate is not listed on order but is shown due to Philips Project Manager request.

Equipment Layout Required Ceiling Height: 8' - 10 5

16", +1 4" / -0 (2700mm, +6mm / -0)

Ceiling Height measured from finished floor to bottom of Unistrut.

Short L-Arm is shown on drawing per PM request.

Exact equipment configuration to be verified with local Philips Sales. Monitor and Video Connection Box for Single LCD Monitor on Cart are not listed on order but is shown due to system requirements.

Per 2018 FGI Guidelines, equipment closet should not open into exam room.

Verify with local customer requirements.

AD1

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

Detail - Clea Ceiling (C-ARM) Transport Details

Detail - Clea Ceiling (L-ARM) Transport Details

(12.0)

Transport Possibilities

Crate Pallet Kick Wheels Wide Kick Wheels Small Height 77.95" (1980mm) 76.22" (1936mm) 69.02" (1753mm) 77.76" (1975mm)

Weight 2050 lbs (930 kg) 1940 lbs (880 kg) 2061 lbs (935 kg) 1764 lbs (800 kg)

3'-7 5 16"

[1100mm]

8' -2

7 16

[2

0m m

3'-7 5 16"

[1100mm]

8' -0

5 16

[2

6m m

5'-415 16"

[1649mm]

7' -5

9 16

[2

4m m

3'-13 4"

[960mm]

7' -5

1 2"

[2

4m m

Transport Possibilities

Crate Pallet Klick Wheels Wide Klick Wheels Wide Elevator Klick Wheels Small Klick Wheels Small

Elevator Height 57.09" (1450mm) 54.80" (1392mm) 49.25" (1251mm) 79.53" (2020mm) 49.25" (1251mm) 79.53" (2020mm)

Weight 2094 lbs (950 kg) 1973 lbs (895 kg) 1896 lbs (860 kg) 1896 lbs (860 kg) 1896 lbs (860 kg) 1896 lbs (860 kg)

3'-3" [990mm]

9' -9

11 16

[2

0m m

2'-11 7 16"

[900mm]

9' -9

3 4"

[2

0m m

5'-13 4"

[1568mm]

9' -7

1 4"

[2

7m m

5'-13 4"

[1568mm]

7' -9

1 8"

[2

5m m

9' -6

7 8"

[2

8m m

2'-10 1 16"

[865mm]

2'-1013 16"

[884mm]

7' -9

1 8"

[2

5m m

AD2

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

6'-1011 16"

[2100mm]

1' -0

[3 m m

2' -7

3 16

[7 m m

3' -6

3 16

[1

2m m

M ax

Floor Plate ℄

Top

Side

2'-1 9 16"

[650mm]

12'-9 9 16"

[3900mm] Maximum Travel

3' -5

15 16

[1

5m m

5'-1011 16"

[1795mm]

11 7 16"

[290mm]

11 7 16"

[290mm]Front

Table Pivot is optional. This allows the table to rotate -90, +180 degrees about center of table base.

8' -1

5 16

+1

/4

-0

[2

0m m

6m m

-0 ] 45 8"

[1 m m

Hose Arm

185° 120°

R eq ui re d ce ilin g he ig ht

6' -2

13 16

[1

0m m

3'-3" [990mm]

7'-73 4"

[2330mm]

1' -7

1 16

[4 m m

1' -7

1 16

[4 m m

5'-1011 16"

[1795mm]

Optional Table Pivot ℄ (-90, +180 degrees)

Indicates equipment movement

Hose Outlet

Hose Arm

Parked position limited 300mm for shorter rooms

Hose Arm and Outlet on opposite side (Optional)

8'-61 8"

[2594mm]

1' -0

[3 m m

M in

(12.0)

SP

Clea Stand (Short L-Arm) Weight Heat Dissipation

2535 lbs 1706 btu/hr

(12.0)

MSA

Angio Diagnost 7 Weight Heat Dissipation

999 lbs 205 btu/hr

3'-3" [990mm]

Minimum clearance required for installation of carriage into rails (either side)

2'-1 9 16"

[650mm]

1'-11 3 16"

[588mm]

4'-51 8"

[1350mm]

5 16

[8 m

AD3

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

Front Side

Top

1'-0 5 16"

[313mm]

91 8"

[2 m m

Front Side

Top

XPER Module

913 16

[2 m m

8"

[302mm]

37 8"

[9 8m m

Review Module

Front Side

Top

Front Side

Top

Geometry T.S.O.

(Optional)

Imaging Cardio T.S.O.

(Optional)

7" [1 m m

4"

[260mm]

415 16

[1 m m

4"

[260mm]

7 16

[1 m m

Front Side

Top

LCD Monitor

7 16

[1 m m

1'-43 4"

[425mm]

1' -7

1 8"

[4 m m

Front Side

Top

Keyboard / Mouse

83 8"

[2 m m

315 16

[1 m m

1'-7 5 16"

[490mm]

8"

[60mm] 13 8"

[3 5m m

Front Side

Top

Connection Box (See SD3 for mounting options)

55 8"

[1 m m

2'-71 2"

[800mm] 1' -9

9 16

[5 m m

7" [1 m m

7" [1 m m

91 8"

[2 m m

415 16

[1 m m

(12.0)

CY

View/Control (All Components) Weight Heat Dissipation

126 lbs 567 btu/hr

Front

The CRC Cover must be attached to the the wall box.

Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")

CRC Cover CRC Extension

Top

6' -4

15 16

[1

5m m

Side

1'-81 2"

[520mm]

8"

[276mm]

6 5 16"

[160mm]

CRC Cover

1'-95 8"

[550mm]

(14.0)

MA

Mains 40E Cabinet

Weight Heat Dissipation

826 lbs 5464 btu/hr

Top

6' -4

15 16

[1

5m m

Side

1'-81 2"

[520mm]

8"

[175mm]

1'-95 8"

[550mm]

Front

The CRC Cover must be attached to the the wall box.

Acoustic noise level: <= 65 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")

CRC Cover

CRC Cover

(14.0)

MR

Peripheral 40E Cabinet Weight Heat Dissipation

441 lbs 2049 btu/hr

Top

6' -4

15 16

[1

5m m

Side

1'-81 2"

[520mm]

8"

[175mm]

1'-95 8"

[550mm]

Front

The CRC Cover must be attached to the the wall box.

Acoustic noise level: <= 48 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")

CRC Cover

CRC Cover

(14.0)

MB

Image 40E Cabinet Weight Heat Dissipation

441 lbs 1877 btu/hr

Top

6' -4

15 16

[1

5m m

Side

1'-81 2"

[520mm]

8"

[175mm]

1'-95 8"

[550mm]

The CRC Cover must be attached to the the wall box.

Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")

Front

CRC Cover

CRC Cover

(14.0)

ME

Certeray iX Generator 40E Cabinet Weight Heat Dissipation

320 lbs 2971 btu/hr

AD4

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

Front

Top

Side

9 16

[6 5m m

16"

[195mm]

1 4"

[2 m m

(12.0)

ATY

Auxiliary Box Weight Heat Dissipation

7 lbs 1.7 btu/hr

Front

Top

Side

1'-95 8"

[550mm]

4' -0

[1

0m m

3' -8

1 16

[1

0m m

1'-1 3 16"

[335mm]

(12.0)

DB

Documentation Box

Weight Heat Dissipation

176 lbs 0 btu/hr

1' -1

3 16

[3 m m

Front

Top

Side

(13.0)

VB1

VB8

Video Connection Box Weight Heat Dissipation

11 lbs 34 btu/hr

2"

[242mm]

9 7 16"

[240mm]

3 16

[5 5m m

5' -6

9 16

[1

1m m

6' -7

3 16

[2

1m m

Front

For swing labs, 2700mm long ceiling rails are delivered. Maximum longitudinal column travel = 2100mm.

Weight shown is total weight including monitors, suspension, cabling, and options.

Examination Light

(Optional)

Top

Side

6'-43 4"

[1950mm]

6' -1

13 16

[1

5m m

Bearing Forces:

(Tension) Tmax = 661 lbs/support (Shear) Vmax = 150 lbs/support

12'-9 9 16"

[3900mm]

5'-0 5 16"

[1531mm]

360°

R ec om m en de d vi ew in g he ig ht fr om fl oo r.

11'-6 3 16"

[3510mm]

9'-07 8"

[2765mm]

51 8"

[1 m m

913 16

[2 m m

5' -2

1 2"

[1

8m m

(12.0)

TV

58" + (2) 21" LCD Monitor Suspension Weight Heat Dissipation

636 lbs 1020 btu/hr

AD5

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

C4

8'-2 7 16"

[2500mm] 2'-71

2"

[800mm] Max.

Cross Support 1'

-1 1 4"

[3 m m

Radiation Shield

7'-21 4"

[2190mm]

Front

Top

Side

Maximum Travel

50°

1'-8 1 16"

[510mm]

360°

360°

2'-51 2"

[750mm]

360°

1'-11 4"

[336mm]

31 4"

[8 3m m

Detail - Cross Support (Not to scale)

1 16

[1 m m

Two, 12" (12mm) Dia. holes

Bearing Forces:

(Tension) Tmax = 908 lbs/support (Shear) Vmax = 38 lbs/support

Note: For Integris Systems, the post of the Rad Shield post needs to be mounted on the head-end of the table in relation to the Monitor Suspension transverse carriage.

1' -3

13 16

[4 m m

(12.0)

MAV

Mavig Ceiling Track Weight Heat Dissipation

167 lbs 350 btu/hr

2'-1113 16"

[910mm]

(12.0)

TR

M LED 3MC Transformer

Weight Heat Dissipation

17 lbs - btu/hr

Front

Top

Side

9 7 16"

[240mm]

63 8"

[1 m m

3 9 16"

[90mm]

Front

Top

Side

Cable Spooler M LED 3MC Transformer

4"

[286mm]

63 8"

[1 m m

8"

[200mm]

R6'-43 8"

[R1940mm]

M LED 3MC

Surgical Light

45°

Front

Top

Side

(12.0)

TV2

One LCD Monitor Carriage Weight Heat Dissipation

68 lbs 239 btu/hr

5' -4

5 16

[1

4m m

1'-91 2"

[546mm]

2'-53 8"

[746mm]

2'-7 3 16"

[792mm]

4' -9

3 16

[1

3m m

Front

Top

Side

(12.0)

VB9

Video Connection Box

Weight Heat Dissipation

11 lbs 34 btu/hr

21 4"

[5 7m m

8"

[270mm]

9 7 16"

[240mm]

Front

Top

Side

(12.0)

DBS

Dose Aware - Base Station

Weight Heat Dissipation

3.2 lbs 85 btu/hr

4"

[298mm]

95 8"

[2 m m

2 7 16"

[63mm]

(15.0)

PDR1-

PDR2

Personal Dose Meter Rack Weight Heat Dissipation

- lbs - BTU/hr

LeftFront

Top

.7 9"

[2 0m m

15.75" [400mm]

2.

[6

4m m

1.

[4

3m

AD6

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

(15.0)

25 kVA UPS with UPC Weight Heat Dissipation

UPS 1125 lbs 6286 btu/hr

UPC 1020 lbs

RSP 12 lbs 50 btu/hr

Front Side

Universal Power Controller

Top

Front Side

Remote Status Panel

Top71 2"

[190mm] 2"

[51mm]

5" [1 m m

1'-5" [432mm]

4' -1

11 2"

[1

1m m

2'-63 4"

[781mm]

4" [102mm]

4" [1 m m

Front Side

UPS Cabinet

5' -4

15 16

[1

0m m

1'-8" [508mm]

3'-1 1 16"

[942mm]

1' -4

[4 m m

Top

1' -8

[5 m

SN

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

(14.0)

Equipment Support Information

1. General The customer shall be solely responsible, at its expense, for preparation of the site, including any required structural alterations. The site preparation shall be in accordance with this plan and specifications, the architectural/construction drawings and in compliance with all safety and building codes. The customer shall be solely responsible for obtaining all construction permits from jurisdictional authority.

2. Equipment Anchorage Philips provides, with this plan and specifications, information relative to equipment size, weight, shape, anchoring hole locations and forces which may be exerted on anchoring fasteners. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings, information regarding the approved method of equipment anchoring to floors, wall and/or ceiling of the building. Any anchorage test required by local authority shall be the customer's responsibility. Stud type anchor bolts should not be specified as they hinder equipment removal for service. Consult with Philips service prior to specifying anchor methods. Philips equipment must be electrically isolated from anchorage.

3. Floor Loading and Surface Philips provides, with this plan and specifications, information relative to size, weight and shape of floor mounted equipment. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings confirmation of the structural adequacy of the floor upon which the equipment will be placed. Any load test required by local authority, shall be the customer's responsibility.

The floor surface upon which Philips equipment is to be placed/anchored shall be flat and level to within 1

16" (2mm) over a length of 39" (1m).

4. Ceiling Support Apparatus

a. Philips provides, with this plan and specifications, information relative to size, weight and shape of ceiling supported equipment. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings, information regarding the approved method of structural support apparatus, fasteners and anchorage to which Philips will attach equipment.

Any anchorage and/or load test required by local authority shall be the customer's responsibility. Philips equipment must be electrically isolated from anchorage.

b. Contractor to clearly mark Philips equipment longitudinal centerline on bottom of each structural support.

c. The structural support apparatus surface to which Philips equipment is to be attached, shall have horizontal equipment attachment surfaces parallel, square and level to within .236" (6mm) per entire span.

d. Any drilling and/or tapping of holes required to attach Philips equipment to the structural support apparatus shall be the responsibility of the customer.

e. Fasteners/anchors (i.e., bolts, spring nuts, lock and flat washers) and strip closures shall be provided by the customer.

5. Lighting Luminaires shall be placed in such a position that they are not obscured by equipment or its movement, nor shall they interfere with Philips ceiling rails and equipment movement or otherwise adversely affect the equipment. Such luminaire locations shall be the sole responsibility of the customer.

6. Ceiling Obstructions There shall be no obstructions that project below the finished ceiling in the area covered by ceiling suspended equipment travel.

7. Seismic Anchorage (For Seismic Zones Only) All seismic anchorage hardware, including brackets, backing plates, bolts, etc., shall be supplied and installed by the customer/contractor unless otherwise specified within the support legend on this sheet. Installation of electronic cabinets to meet seismic anchorage requirements must be accomplished using flush mounted expansion type anchor/bolt systems to facilitate the removal of a cabinet for maintenance. Do not use threaded rod/adhesive anchor systems. Consult with Philips regarding any anchor system issues. Philips equipment must be electrically isolated from anchorage.

8. Floor Obstructions/ Floor Coverings There shall be no obstructions on the floor (sliding door tracks, etc.) in front of the Philips technical cabinets. Floor must be clear to allow cabinets to be pulled away from the wall for service.

Contractor to verify with Philips the preferred floor covering installation method.

9. Safety Factors Ceiling loads as mentioned in the PRD are worst case loads and excluding safety factors. Proper safety factors need to be applied by Design Professional/Engineer of Record.

10. Stiffness Requirements of Ceiling Horizontal Stiffness: preferred 10,000,000 Newton/meter - 57.1 klb/in, minimal 6,000,000 Newton/meter - 34.2 klb/in Vertical Stiffness: preferred 10,000,000 Newton/meter - 57.1 klb/in, minimal 6,000,000 Newton/meter - 34.2 klb/in Rotation Stiffness: minimal 20,000,000 Newtonmeter/Rad - 177,014 (klb in)/Rad For Clea Stand (1160 kg or 11600 N), the maximum allowed deflection of the ceiling construction is 1.93 mm.

(19.0)

Center frequency [Hz] 1 1.25 1.6 2 2.5 3.15 4 5 6.3 8

Terts band value [μm/s]

(RMS) 50.8 50.8 50.8 50.8 63.5 80.01 101.6 127 160 203.2

Center frequency [Hz] 10 12.5 16 20 25 31.5 40 50 63 80

Terts band value [μm/s]

(RMS) 254 317.5 406.4 406.4 406.4 406.4 406.4 406.4 406.4 406.4

Center frequency [Hz] 100 125 160 200

Terts band value [μm/s]

(RMS) 406.4 406.4 406.4 406.4

Equipment Support Information

11. Requirements for External Vibration The maximum allowed external vibration level of floors and ceilings, to which the equipment is mounted that will not adversely affect the image quality, is specified in terms of RMS velocity levels in 1/3-octave or terts bands, as follows:

Terts Band Specification for External Vibrations

A graphical representation of this specification is given below:

Terts Band Specification for External Vibrations

Terts band spectra shall be calculated on the basis of time traces with a duration of 10 minutes (600 seconds), taken at representative locations and during representative times during working days.

SL

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

Floor & Wall Support Legend

Item Number

Description

Detail Sheet

Optional Future Existing Furnished by Philips and installed/anchored by contractor Installed/anchored by customer/contractor Furnished and installed by customer/contractor and installed/anchored by customer/contractor

G

D C B

Furnished and installed/anchored by Philips (exceptions may exist, see Note 2)A

F E

See S1 for Floor & Wall Support Layout

Ceiling Support Legend

Item Number

Description

Detail Sheet

Optional Future Existing Furnished by Philips and installed by contractor Installed by customer/contractor Furnished by customer/contractor and installed by customer/contractor

G

D C B

Furnished and installed by PhilipsA

F E

See S2 for Ceiling Support Layout

Notes:

1. Anchors for items that are installed/anchored by customer/contractor shall be provided by customer/contractor.

2. Anchors for items that are installed/anchored by Philips shall be provided by

Philips. If customer's engineering documents specify anchors other than those listed in this document, the anchors shall be provided by customer/contractor and installed by Philips.

3. In all instances, the wall and/or floor support are the sole responsibility of the customer/contractor. The customer's architect/engineer of record shall specify wall and/or floor support sufficient for the bolt forces shown on the details.

B F1 Support in wall for Control Room Connection Box (CY) SD3

A F1 Anchors in wall for Control Room Connection Box (CY) SD3

A C1 2 - Philips Clea Rails SD1

SD2

A C2 2 - Philips Monitor Equipment Rails SD2

B C3 Unistrut (P1000/P1001, P5500/P5501, or equivalent in meeting Philips ceiling requirements, geometry of channel and geometry of fixing block) - Bottom of Unistrut 1/4" (6mm) to 1/2" (13mm) Below Finished Ceiling

SD2

A C4 Mavig Ceiling Track AD5

D F2 AD7 Adaptation Plate SD1

B F3 Personal Dose Meter Rack (Qty: 2) SD2

C le a / T ab le

F1

13'-23 8"

3' -6

3'

-6

3'-6"

Level of floor ± 1 16" (2mm) per 39" (1m) within this area.

F2

9' -9

AD7 Adaptation Floor Plate ℄

6' -7

16'-2"

1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12'

.5 m

1m 1.

5m 2m

2.

5m

3m 3.

5m

F3

F3

6' -0

2'

-0

S1 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

Refer to Floor/Wall Support Legend - Sheet SL

Floor & Wall Support Layout Required Ceiling Height: 8' - 10 5

16", +1 4" / -0 (2700mm, +6mm / -0)

Ceiling Height measured from finished floor to bottom of Unistrut.

C le a / T ab le

1' -6

5 8" 1'

-6 5 8"

16" 1'-2" 2'-2" 2'-2" 2'-2" 2'-2" 2'-2" 2'-2" 3'-2" 511

16"

8"

16"

2' -0

7 8"

7'-11"

7'-213 16"

2' -8

1 4" 3'

-5 9 16

5' -0

5'

-0

8"

16"

C1

C3 Typ.

Ceiling Clearance See Sheet "SD2"

C1

C2

C2 C4

9' -9

AD7 Adaptation Floor Plate ℄ 16'-2"

1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12'

.5 m

1m 1.

5m 2m

2.

5m

3m 3.

5m

S2 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

Refer to Ceiling Support Legend - Sheet SL

Ceiling Support Layout Required Ceiling Height: 8' - 10 5

16", +1

SD1

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

F2 C1

AD7 Table Floor Plate to Floor Bolt Forces:

(Tension) Tmax = 1950 lbs/bolt (Shear) Vmax = 776 lbs/bolt

(12.0)

Clea Clea Bearing Forces:

(Tension) Tmax = 2931 lbs/support (Shear) Vmax = 1227 lbs/support

27" (685mm) maximum allowed distance between unistrut (seven unistrut required) Floor plate supplied by Philips / installed by Contractor. Counterbored holes are sized for 12" (12mm) anchors per Seismic requirements.

Note: The bearing force shown for the Clea is the maximum instantaneous equipment bearing load that can result from abusive use of the system. This force can occur at two locations simultaneously on the same Unistrut (or equal) rail. If seismic forces must be considered, please refer to the seismic calculation sheets provided by Philips for the specific system components.

8"

[73mm]

4'-1015 16"

[1497mm]

6' -2

13 16

[1

0m m

Hose Outlet

Floor Plate ℄ (Scribe Mark)

3' -1

3 16

[9 m m

12'-9 9 16"

[3900mm]

Max.

16"

[93mm] 2'-2"

[660mm]

8"

[150mm]

2'-2" [660mm]

2'-2" [660mm]

2'-2" [660mm]

2'-2" [660mm]

1'-2" [355mm]

AD7 Adaptation Plate

Detail - Structural Allura FD20 (Ceiling) (Not Site Specific)

F2

Detail - Clip Rail Spacing (Not to scale)

(12.0)

Detail - Cable Hose Outlet (Not to scale)

2'-113 8" ± 0.06"

[899mm ± 1.5mm]

2"

[115mm]

7 16

[1 m m

4"

[248mm]

1" [2

5m m

2"

[115mm]

1" [2

5m m

Six mounting holes, M6

2' -1

11 16

[6 m m

Detail - AD7 Adaptation Plate - Notes for Installation (Not to scale)

1. 1.44" (40mm) thick floor plate, surface mounted with top of slab.

2. Level within 1

16" (1.5mm) across surface of plate.

(13.0)

2'-413 16"

[732mm]

715 16

[2 m m

715 16

[2 m m

4"

[235mm]

4"

[235mm]

16"

[72mm]

Stand

Use six holes, 0.91" (25mm) dia.

Counterbored 1.5" (40mm) dia.

Note: The bolts need to be 58" (15.8mm) (M16) to allow the use of the insulation bush.

Isolation Washer Isolation Bush

Philips provided insulation plate in between floor and floor plate. Floor plate must be isolated from anchors and electrical boxes.

Detail - AD7 SyncraTilt/Tilt Table, Fixed/Pivot Base - Clearance Area (Not to scale)

1'-13 4"

[350mm]

1'-11 3 16"

[588mm]

2'-4" [711mm]

1'-11 7 16"

[595mm]

1' -1

015 16

[5 m m

Floor Plate ℄

Philips Surface Mounted Floor Plate

Area available for additional customer and/or non-Philips equipment such as Med Gases, electrical outlets, etc.

(14.0)

9 16

[4 0m m

73°

41 2"

[1 m m

1'

-2 3 8"

[3 m m

2'-8" [813mm]

SD2

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

C1 C2 C3

Detail - Restricted Ceiling Area for Objects that Project Below Finished Ceiling (Not site specific)

(14.0)

5'-3" [1600mm]

13'-3" [4039mm]

5' -0

[1

4m m

5' -0

[1

4m m

6' -3

[1

5m m

6' -3

[1

5m m

Table Floor Plate ℄

St an d / T ab le

B

A

A

B

A No objects that project below finished ceiling are allowed in this area (lights, smoke detectors, sprinkler heads, etc).

No objects that project more than 4.5" (115mm) below finished ceiling are allowed in this area (lights, smoke detectors, sprinkler heads, soffit, etc).

6'-10" [2083mm]

(19.0)

Detail - Clip Rail Cross-Section (Not to scale)

Cover ClipSelf-locking

Bolt, M10x40

Clip Rail

Fixing Block

8"

[72mm]

4" [101mm]

16"

[151mm]

4"

[159mm]

315 16

[1 m m

Detail - Philips Fixing Block for Philips Ceiling Rails (Clip Rails) (Not to scale)

P1000/P1001/P5500/P5501 Unistrut (or equal)*

See S2 Sheet

See S2 Sheet

General Requirements:

1. Philips does not specify the overhead equipment support structure. Unistrut may or may not be used. If Unistrut are used, it is up to Unistrut and the structural engineer for the project to determine which of its products are appropriate for each project.

2. *P1000/P1001/P5500/P5501 Unistrut or equivalent is specified. An equivalent may be used as long as it meets Philips ceiling requirements, geometry of channel, and geometry of fixing block to be installed inside unistrut.

Finished Ceiling Requirements:

1. Finished ceiling must NOT be lower than the bottom of the Unistrut in order to prevent damage to the finished ceiling during the installation of clip rails. Finished ceiling height to be mounted 4" (6mm) to 12" (13mm) above bottom of Unistrut.

Fixing Block Installation Requirements:

1. Nothing shall be attached to the Unistrut with any fastener that protrudes into the Unistrut which would interfere with positioning of the fixing block.

2. Fixing blocks for Philips ceiling rails (Clip rails) are designed to be installed in P1000/P1001/5500/5501 Unistrut.

3. The inside of the Unistrut must be clear of obstructions (including paint).

Unistrut Requirements:

1. Unistrut elements must be rigid and comply with the ceiling structure requirements. See SN sheet, line #4 "Ceiling Support Apparatus".

2. Welding Unistrut may warp Unistrut and deteriorate the structural integrity of the Unistrut. Consult the Structural Engineer of Record prior to welding any Unistrut.

Fixing Block

Finished Ceiling1/ 4"

[6 m m ] t o 1/

2" [1

3m m

Table ℄

Screws to be kept 3/4" or higher above the bottom of the unistrut channel

3 4" [1

9m m

4"

[32mm]

5 8" [1

6m m

6" [152mm]

16"

[21mm]

1 16

[2 m m

16"

[2mm] 8"

[4mm]

3 5 16"

[84mm]

8"

[48mm]

Detail - Personal Dose Meter Template (Not to scale)

(15.0) F3

To be made locally.

Use template for drilling holes.

17.61" [447mm]

.12" [3mm]

4.

[1 m m

2.

[5

7m m

2.48" [63mm]

3.13" [80mm]

3.13" [80mm]

3.13" [80mm]

3.13" [80mm]

R.13"

[R3.4mm](5x)

SD3

K on in kl ijk e Ph ilip s

El ec tro ni cs N

.V . 2

2.

A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.

Pr oj ec t D et ai ls Ph ili ps

C on ta ct s Pr oj ec t D ra w in g

N um be r

N -W

ES

G D at e

D ra w n:

/4

/2

Q uo te

O rd er

A llu ra F

D

C ei lin g

VA

O kl ah om a

C ity

O kl ah om a C ity , O

K -R oo m st F lo or

8.20.14

1-

ZM

C 9D

A R ev . 4

.0

TH

E

D R

AW

IN

G S

AN

D

R

EL

AT

ED

IN

ST

R U

C

TI

O N

S

PR

O

VI

D

ED

B Y

PH

IL

IP

S

AR

E

AC

C

EP

TA

BL

E

FO

R

U

SE

B Y

TH

E

H O

SP

IT

AL

'S

A R

C H

IT

EC

T O

R E

N G

IN

EE

R T

O U

SE

F

O R

T H

E D

EV

EL

O

PM

EN

T

O F

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Pr oj ec t M an ag er

C on ta ct

N um be r:

Em ai l:

Ti m

W rig ht (2

) 5

-2 tim .w rig ht ph ilip s.

co m

D ra w n

By :J or ge

V al le

F1

Bolt Forces:

(Tension) Tmax = 14 lbs/bolt (Shear) Vmax = 25 lbs/bolt

Equipment Option Anchor Style (provided by Philips)

Anchor Size (provided by Philips)

Qty.

Support Size & Material

(provided & installed by customer/contractor)

Mavig Ceiling Track A Bolts, flat washer, lock washer, spring nuts

A307 Grade or ASME Grade 5 Bolts: 38"

(10mm) x 2" (50mm) L Spring Nuts: 38" (10mm)

8 Unistrut

Control Room Connection Box (CY)

A Round Phillips Head Self Drilling Screws #10-16 x 1 12" (38mm) L 3

Drywall with minimum 20 gauge Steel backing

B SPAX Multipurpose flat head screw

#10 x 1 12" (38mm) L 3 Drywall with minimum 20 gauge

Steel backing

C Toggler Snaptoggle and

(round head screws) #BA and (#10-24 x 2 12" (63.5mm) L) 3 Minimum 58" (16mm) Drywall

Anchors for items that are installed/anchored by customer/contractor shall be provided by customer/contractor. Anchors for items that are installed/anchored by Philips shall be provided by Philips. If customer's engineering documents specify anchors other than those listed below, the anchors shall be provided by customer/contractor and installed by Philips. In all instances, the wall and/or floor support are the sole responsibility of the customer/contractor. The customer's architect/engineer of record shall specify wall and/or floor support sufficient for the bolt forces shown on the details.

Pre-Evaluated and -Approved Anchor…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .