36C25918R0585-0001001.pdf
PDF 955 KB Posted
- Attached to
- 660-18-250 "Emergent Fixes B. 8 Canteen" Construction Services Federal contract opportunity
- Solicitation number
- 36C25918R0585
About this file
36C25918R0585 0001 S02 OSH-2018-016 Mold Risk Management.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25918R0585-0002000.docx | DOCX document | |
| 36C25918R0585-0001002.pdf | ||
| 36C25918R0585-0001000.docx | DOCX document | |
| 36C25918R0585-003.docx | DOCX document | |
| 36C25918R0585-004.pdf | ||
| 36C25918R0585-005.docx | DOCX document | |
| 36C25918R0585-002.zip | ZIP file | |
| 36C25918R0585-001.docx | DOCX document | |
| 36C25918R0585-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA FORM 2105 Automated P a g e | 1
Department of Veterans Affairs Memorandum
Date: March 8, 2018
From: Brian Treasure, Occupational Safety & Health Specialist (00QS)
Subj: Mold Risk Management
Re: OSH-2018-016
To:
Thru:
Joshua Farber, Service Chief, Engineering (138) Carlos Aguilar, Service Chief, Occupational Safety & Health Department (00QS)
In the absence of specific regulations and policies, here is guidance on dealing with indoor fungal (mold) growth at the SLC VA campus to establish standard work practices.
Molds can be found almost anywhere; they can grow on virtually any organic substance, as long as moisture and oxygen are present. When excessive moisture accumulates in buildings or on building materials, mold growth will often occur, particularly if the moisture problem remains undiscovered or unaddressed.
Many types of mold exist. All molds have the potential to cause health effects. Molds can produce allergens that can trigger allergic reactions or even asthma attacks in people allergic to mold. Others are known to produce potent toxins and/or irritants.
There are no specific regulatory limits for mold exposure, only guidelines. Mold spore levels should be the same or less indoors vs. outdoor levels. The same types of mold spores should be present in the indoors and outdoors.
Since mold requires water to grow, it is important to prevent moisture problems in SLC VA buildings. Moisture problems may include roof leaks, landscaping or gutters that direct water into or under buildings. Delayed maintenance or insufficient maintenance is also associated with moisture problems.
I. Water Intrusion Investigation
The three primary indicators of a possible fungal growth are visual signs; musty odor or smell; and water intrusion. Any one of these three indicators warrant further investigation for fungal growth within the vicinity. The vicinity includes adjacent areas horizontally and vertically;
hidden or inaccessible areas (i.e. inside walls); and interstitial spaces. See Attachment A for a checklist for tools to aid in the investigation. There are five questions to the investigation.
1. What is the source of water?
a. Water from broken pipe
b. Water from roof leak
c. Water from ground
d. Water from accidents/weather
e. Water from vandalism
f. Water from condensation
2. What is the extent of the water intrusion?
OSH-2018-0
P a g e | 2
a. Water flows down hill
b. Pools in low points
c. Travel is affected by the absorbency of effected materials
3. Is there secondary water damage?
a. Wicking
b. Condensation/vapor
c. Substrate acclimation
d. Ice
e. Subterranean
4. Is there microbial growth?
a. Bacteria, such as Legionella
b. Viruses
c. Fungi
5. What is the extent of microbial spread?
a. Moisture mapping
If fungal growth is discovered during the Water Intrusion Investigation, any exposed area should be covered with poly and securely taped down with impermeable tape (i.e. duct tape) to prevent the inadvertent spread of mold spores.
II. Remediation and General Guidelines:
Respond quickly with appropriate actions to stop water damage and limit potential exposure to building occupants. There should be an immediate remediation response (24 – 48 hours) and thorough clean-up, drying and removal of water damaged materials (Attachment D).
Make necessary changes to correct the underlying moisture problem. If the relative humidity (RH) is the cause of the moisture it should be reduced to < 60%.
The goal of remediation is to remove or clean contaminated materials to prevent emissions from entering occupied, non-remediation areas and to protect workers performing the abatement. It is also to clean non-porous and semi-porous structurally sound building materials.
Porous materials should be discarded.
All rememdiations will require an Infection Control Risk Assessment (ICRA) and most will require a Construction Safety Risk Assessment (CSRA) and an Interim Life Safety Measures (ILSM) review.
The extent of the microbial spread will dictate the level of remediation response. There are five levels of remediation response. Attachment B goes into detail on the recommendations for each level. The levels are basically categorized as:
1. Level I – small isolated areas (10 ft2 or less)
2. Level II – mid-sized isolated areas (10 – 30 ft2)
3. Level III – large isolated areas (30 – 100 ft2)
4. Level IV – extensive contamination (>100 contiguous ft2 in an area)
5. Level V – remediation of HVAC systems (small <10 ft2, large >10 ft2)
P a g e | 3
Regardless of the remediation response level, any time there are associated health complaints, an IAQ/IH should be consulted.
It should also be noted that the use of a chemical or biocide that kills organisms such as mold (chlorine bleach, for example) is not recommended as a routine practice during mold cleanup. Killing microorganisms usually does not destroy their antigenic or toxigenic properties.
Communication with staff is essential for successful mold remediation. Some employees will naturally be concerned about mold growth in their work area. Staffs’ perceptions of the health risk may rise if they perceive that information is being withheld from them. The status of water intrusion investigations and remediation should be openly communicated including information on any known or suspected health risks.
Establish that the health and safety of veterans, employees and visitors are top priorities.
Demonstrate that the staffs’ concerns are understood and taken seriously. Identify a person whom employees can contact directly to discuss questions and comments about remediation activities.
Surgery recovery patients, people with immune suppression, asthma, hypersensitivity pneumonitis, severe allergies, or chronic inflammatory lung diseases should be removed from affected areas during remediation.
III. Quality Assurance Guidelines:
Stringent quality assurance (QA) principles should be followed to ensure that mold remediation is successful. Documentation should be written and photographed (Attachment C).
Documentation should include:
1. Elimination of water; and
2. Extent of microbial spread; and
3. Appropriate containment protocols used; and
4. Appropriate PPE use; and
5. Mold removal & appropriate cleaning; and
6. Clearance sampling; and
7. Status of hidden areas; and
8. Repair or removal of water intrusion source.
Mold remediation contractors should be trained and understand specifications in mold, containment, personal protective equipment (PPE), respiratory protection plan, and hazard communication. They should be water damage certified (IICRC or Association of Specialists in Cleaning and Restoration (ASCR) water loss institute (WLI)). They should be trained and experienced in decontamination and moving property. They need to be licensed general contractors when dealing with structural components. Consideration should also be given as to whether the remediation and reconstruction are fiscally beneficial as a turnkey unit.
The use of viable air sampling to establish a pre-remediation baseline within an indoor environment should be done if there is a potential or concern of an Environmental/Toxic Exposure event(s). Non-viable air sampling would typically be sufficient for a basic remediation.
Air samples must be analyzed by a lab that is AIHA Environmental Microbiology
Laboratory Accreditation Program (EMLAP) accredited.
P a g e | 4
Medical evaluations are recommended for individuals with persistent health problems that appear to be related to mold, and infants (<1 yr) should be evaluated by an appropriate physician.
The aim of this memorandum is to establish general guidance on dealing with indoor fungal (mold) growth at the SLC VA campus to establish standard work practices. Each case, however, is somewhat different, so if there is a situation not addressed by these basic guidelines, industry best practices should be used.
The recommendations presented are based on information derived from US Environmental Protection Agency (EPA); US Occupational Safety and Health Administration (OSHA); American Conference of Government Industrial Hygienists (ACGIH); American Industrial Hygiene Association (AIHA); Institute of Inspection, Cleaning and Restoration Certification (IICRC); and New York City Department of Health (NYC DOH) publications.
I am happy to answer any questions you may have. I can be reached at 801.582.1565 x4450.
Brian Treasure Peer Reviewed:
Occupational Safety & Health Specialist Chris Dunyon Engineering
Attachments:
A: Water Intrusion Investigation Tool Kit checklist B. Remediation Levels Recommendations C. Mold Remediation Quality Assurance checklist D. Guidelines for Response to Clean Water Damage
P a g e | 5
Attachment A Water Intrusion Investigation Tool Kit
□ Moisture Meter
□ ATP Meter (Bio-Reveal)
□ FLIR camera
□ Bore scope camera
□ Drill (for drilling hole for bore scope camera)
□ Flashlight
□ Ladder
□ Architectural drawings
□ Green, yellow, red stickers (for moisture mapping)
□ Sharpie
□ Poly and duct tape
□ Air pump & cartridges (optional)
P a g e | 6
Attachment B Remediation Levels Recommendations
Level I Recommendations (<10 ft2)
• Remediation conducted by regular building staff that have received HazCom training
• PPE used (N95 resp. gloves, eye protection)
• Vacate area but not adjacent areas
• Containment – No / Dust suppression - Yes
• Contaminated materials bagged
• Wet wiping of work area
• Work areas left clean and dry
Level II Recommendations (10-30 ft2)
• Level I plus:
o Cover work area with plastic sheet(s) and sealed with tape to contain dust debris o HEPA vacuuming and wet wiping of work area
Level III Recommendations (30-100 ft2)
Level II plus:
o A safety and health professional should be consulted for project oversight o Use trained personnel o Contain work area and adjacent work areas o Contain HVAC system in work and adjacent areas o Vacate adjacent work areas o Vacate nearby compromised individuals
Level IV Recommendations (100+ft2)
Level III plus:
o Use full-face respirators and disposable clothing for workers o Negative pressure containment w/HEPA filtration, airlocks, and decontamination room o Wet wipe and/or HEPA vacuum outside of waste containers o Clearance air monitoring
Level V Recommendations
Small (<10 ft2):
o HazCom trained building staff o N-95 respirators, gloves, glasses o Shut down HVAC o Cover work area & use dust suppression o Remove growth-supporting materials (liners, filters, etc.)
o Wet wipe/HEPA vacuum work area
P a g e | 7 o Biocides if appropriate
Large (>10 ft2)/Same as Small (<10 ft2) plus:
o Use a health and safety professional for oversight o Full face respirators for areas >30 ft2 o Isolate work areas with negative pressure, HEPA filters, airlocks, decontamination room o Wet wipe/HEPA vacuum waste containers (>30 ft2) o Clearance air monitoring
P a g e | 8
Attachment C Mold Remediation Quality Assurance Checklist
1. Pooled or standing water has been eliminated:
□ Copy of completed Electronic Work Order (EWO)
□ Photo(s)
2. Extent of microbial spread:
□ Moisture map
3. Safety documents:
□ ICRA (Infection Control Risk Assessment)
□ Copy of all SDSs
□ CSRA (Construction Safety Risk Assessment) *if required
□ ILSM (Interim Life Safety Measure) *if required
4. Appropriate containment protocols used:
□ Copy of remediation plan/design paperwork
5. Appropriate PPE used:
6. Mold removed and all surfaces cleaned appropriately:
□ Photo(s)
7. Clearance sampling:
□ Copy of EMLAP lab report(s)
□ Photo(s) of pump location(s)
8. Status of hidden areas:
□ Drawings/maps of interstitial space(s)/pipe chase(s)
□ Photo(s) (inside – bore scope, outside)
9. Repair or removal of water intrusion source:
□ Copy of completed Electronic Work Order (EWO)
10. Completed Remediation QA Package filed with:
□ COR/Facility Maintenance files
□ Occupational Safety/IH
□ Infection Control
P a g e | 9
Attachment D
| 2018-03-08T15:35:33-0700 | |
| CHRISTOPHER L DUNYON 1457809 |
| 2018-03-08T15:39:33-0700 | |
| BRIAN W TREASURE 1390258 |
File details come from the government source that posted it.