36C25918R0498-002.docx

DOCX document 18 KB Posted

Attached to
Building 141 Heating System (VA-18-00069228) Federal contract opportunity
Solicitation number
36C25918R0498
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

36C25918R0498 S02 - Calculation Worksheet for Self-Performed and Subcontracted Work.docx

View the file

Other files for this federal contract opportunity

Other files attached to Building 141 Heating System (VA-18-00069228), newest first.
File Type Posted
36C25918C0296-000.docx DOCX document
36C25918R0498-0002001.pdf PDF
36C25918R0498-0002000.docx DOCX document
36C25918R0498-0001000.docx DOCX document
36C25918R0498-004.pdf PDF
36C25918R0498-001.docx DOCX document
36C25918R0498-003.docx DOCX document
36C25918R0498-010.pdf PDF
36C25918R0498-007.pdf PDF
36C25918R0498-009.pdf PDF
36C25918R0498-005.pdf PDF
36C25918R0498-008.pdf PDF
36C25918R0498-006.pdf PDF
36C25918R0498-000.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK

Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division and name
SDVOSB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs

Division 01

$
$

Division 02

$
$

Division 03

$
$

(Add additional lines as necessary for each Division applicable to this project)

$
$
$
$
Sub Total (Personnel Costs, Material/Equipment Costs)
$
Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $_________________

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________

3. Remainder is ‘Total amount of work to be self-performed under the

Contract’:$__________________
4. Self-performed work = Line 3/Line 1 x 100 =__________%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

___________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)

File details come from the government source that posted it.