36C25918R0498-0002000.docx

DOCX document 19 KB Posted

Attached to
Building 141 Heating System (VA-18-00069228) Federal contract opportunity
Solicitation number
36C25918R0498
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

36C25918R0498 0002 36C25918R0498 0002.docx

View the file

Other files for this federal contract opportunity

Other files attached to Building 141 Heating System (VA-18-00069228), newest first.
File Type Posted
36C25918C0296-000.docx DOCX document
36C25918R0498-0002001.pdf PDF
36C25918R0498-0001000.docx DOCX document
36C25918R0498-010.pdf PDF
36C25918R0498-007.pdf PDF
36C25918R0498-002.docx DOCX document
36C25918R0498-009.pdf PDF
36C25918R0498-005.pdf PDF
36C25918R0498-008.pdf PDF
36C25918R0498-006.pdf PDF
36C25918R0498-004.pdf PDF
36C25918R0498-001.docx DOCX document
36C25918R0498-003.docx DOCX document
36C25918R0498-000.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 06-26-2018 436-17-104 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 To all Offerors/Bidders

36C25918R0498

X x x The purpose of this amendment if to include the answers to questions received and the site visit sign in sheet.

All other terms and conditions remain the same.

Questions and Answers for Building 141 Heating System

1. Can you tell me where you would like the Key personnel listed on the technical requirements?

This has been removed from the instructions to offerors.

2. Please confirm if normal business hours are acceptable with the exception of work done in Directors office?

The specifications states that up to 80% of the work will have to be done at night or on the weekends. Plan you schedule accordingly. We have no space available to shift staff around during construction. The VA will work with the contractor as and if space is available to work on during the regular business hours from (7:00a to 5:00p).

3. For work above ceilings; Do ceiling tiles need to be placed back into grid each night?

As discussed in the site walkthrough the ceiling tiles required to be removed should be stored on site and protected. They do not have to be replaced each night when work is going on in an area, but should be reinstalled in the work zone in 3-4 days or as soon as work is completed.

The contractor will be required to cover all desks, equipment, etc. each day. Then at the end of the work day the contractor will be required to remove the covers and clean the areas so the office or space can be used the next work day. The repeat the process the next day if required.

The director’s office suite will be required to be completed all in one scheduled work period.

4. Regarding pipe chase along elevator shaft; When furring shaft out for new piping there will be a conflict with existing door on the 2nd floor. Please confirm that filling in existing door opening and relocating door is required.

The HVAC main S & R piping can be positioned to the east side of the space on the second floor adjacent to the dumb waiter elevator to avoid conflicts with the hallway door. The VA believes this will correct the problem associated with the pipe routing.

5. Confirm ICRA requirements.

The IRCA should be a Group 1 (Low Risk) activity, Type “C” which generates moderate to elevated levels of dust, requires greater than 1 work shift to complete in cases. It will require filters HEPA in office work areas during construction (class II). The risk will be mitigated by the contractor having to wipe down and clean the work zones each day at the end of the shift.

6. We are confused about the language listed within specifications section 23 09 23 pertaining to “this facility’s existing direct-digital control system is manufactured by Schnieder Automation and it’s ECC is located in Building 150.” The existing facility’s direct-digital control system is manufactured by Johnson Controls and is connected to the ADX server located in Building 150. Please clarify.

The existing building controls system is in the process of being upgraded to Schnieder Automation or approved equal. Schnieder Automation is now being used in most of the hospital facility. Any system submitted must have an open back Net format to allow programing changes by staff if required.

The control system is also required to be connected to the VA energy engineer’s office computer, located in room 206 of building 141.