This Performance Work Statement (PWS) outlines requirements for HVAC coil replacement services at the Dallas VA Medical Center. The contractor must replace multiple steam and chilled water coils across five buildings, using VA-supplied coils. Specific work includes installations for AHU-17 and AHU-32 in Building 2, Swimming Pool AHU in Building 74 (including sheetrock work), AHU-8 in Building 1, and AHU-1 in Building 43 (requiring crane services).
The period of performance is February 15, 2025 to April 30, 2025, with work to be performed during normal duty hours (8:30 AM - 4:00 PM CST, Monday-Friday). The contractor must provide all necessary tools, follow VA safety procedures, and submit detailed field service reports documenting maintenance time, services performed, and parts used. Work must be performed by qualified and licensed HVAC technicians, with contractors required to check in at Engineering Service Office Building 9 for badging before beginning work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 36C25725Q0217 0002.docx | DOCX document | |
| Technical Questions - 36C25725Q0217_1.docx | DOCX document | |
| 36C25725Q0217 0002_1.docx | DOCX document | |
| 36C25725Q0217 0001_1.docx | DOCX document | |
| SF30 36C25725Q0217 0001.docx | DOCX document | |
| S02 36C25725Q0217.docx | DOCX document | |
| Service Contract Act WD 2015-5227_rv24_12-23-2024.pdf | ||
| 36C25725Q0217_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (Revision 1)
HVAC Coil Replacement
A. General: Replace multiple steam coils.
B. Background: Multiple HVAC coils need to be replaced at the Dallas VA Medical Center located at 4500 S. Lancaster Rd, Dallas TX 75216.
C. Description of Work: The contractor shall remove existing coils and replace them with new coils provided by the VA. The contractor shall remove the old coil and haul it off. The contractor shall leave the job site in a safe and clean environment at the end of each day and after the job. The contractor shall be responsible for providing all tools needed to complete the installation and shall follow all VA safety procedures. The contractor shall provide documentation to the Government POC verifying that work is completed and the new coils are functioning to manufacturer specifications. The work is needed in the following areas within the VA Medical Center in Dallas, TX. Qualified and licensed HVAC technicians shall do all work.
1. Building 2-Installation of a VA-supplied chilled water coil for AHU-17. Direct replacement coil install, welding(cutting and re-welding joints on coil piping if needed. This includes the necessary parts to remove the old coil and install a new coil and haul off of the old coil.
2. Building 2-Installation of a VA-supplied chilled water coil for AHU-32. Direct replacement coil install, welding (cutting and re-welding joints on coil piping if needed. This includes the necessary parts to remove the old coil and install a new coil and haul off of the old coil.
3. Building 74-Installation of a VA-supplied chilled water coil for AHU Swimming Pool. Direct replacement coil install, welding(cutting and rewelding joints on coil piping if needed. This includes the necessary parts to remove the old coil and install a new coil. Haul off of old coil included. There is a sheetrock wall near the coil, the contractor shall remove and replace the sheetrock.
4. Building 1-Installation of a VA-supplied chilled water and steam coil for AHU-8. Direct replacement coil install, welding(cutting and re-welding joints on coil piping if needed. This includes the necessary parts to remove the old coil and install a new coil. Haul off of old coil included.
5. Building 43-Installation of a VA-supplied chilled water coil for AHU-1. Direct replacement coil install, welding(cutting and rewelding joints on coil piping if needed. This includes the necessary parts to remove the old coil and install a new coil. Haul off of old coil included. Crane services are recommended for this job.
D. Hours of Performance: Normal duty hours. 8:30 am to 4 pm CST, Monday – Friday.
E. Check-in Requirements: Contractors must report to Engineering Service Office Building 9 to obtain a badge and sign in with the Engineering Service before work begins.
F. Documentation: The contractor shall furnish a detailed field service report upon completion of work to the COR. Payment will not be processed until a properly completed service report is received. The service report shall contain, at a minimum, the following information:
1. Total time spent performing maintenance.
2. Detailed narrative description of the services required
3. Date and time the installation is completed
4. The service report shall itemize every item in the specification. Each item shall state the "as found" condition or values, the "calibrated to" or "adjusted to" values, the factory design tolerances, and a complete description of all work performed concerning the items. Included will be a list of new parts used and recommended future repairs.
G. Period of Performance: February 15, 2025- April 30, 2025.
H. Contracting Officer Technical Representative: Before contract award, the Contracting Officer shall designate a VA Medical Center employee as the COTR. All work coordination shall be made through the COTR. The Contractor shall be provided a copy of the letter of delegation authorizing the COTR at the commencement of the term of the contract. No other person shall be authorized to act in such capacity unless appointed in writing by the Contracting Officer.
End Performance Work Statement