Questions and Answers - Part B.pdf

PDF 66 KB Posted

Attached to
Replace Roof Top Unit (RFU), Blower Assembly, and Heating Coil Federal contract opportunity
Solicitation number
36C25724Q0972
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This document is a Questions and Answers (Q&A) document related to a federal contract opportunity for the replacement of a Roof Top Unit (RTU), blower assembly, and heating coil.

The key details are:

  • There is no asbestos, lead, mold, or other hazardous material abatement required as part of this project. The contractor is to stop work and contact the Contracting Officer's Representative (COR) if asbestos is suspected.
  • The ICRA (Infection Control Risk Assessment) level for the project has not been determined yet.
  • There is a required subcontractor, the Siemens Dallas Branch, that the general contractor must hire.
  • All work can be performed during regular working hours and does not need to be completed in phases.
  • There are no drawings provided for the Statement of Work (SOW), and no as-built drawings for the MEP (Mechanical, Electrical, Plumbing) work will be provided.
  • ICRA containment requirements for the project are to be determined.
  • The VA does want to replace insulation and heat trace for any hot water piping inside the building.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Roof Top Unit (RFU), Blower Assembly, and Heating Coil, newest first.
File Type Posted
Questions and Answers.pdf PDF
S02 36C25724Q0972 0002.pdf PDF
S02 36C25724Q0972 0001.pdf PDF
S02 36C25724Q0972.pdf PDF
P07 WD 2015-5273.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Are we to dispose/abate of any asbestos, lead, mold, or other hazardous material as part of this project? If so, provide appropriate hazardous material site survey report. NO. If asbestos is suspected job is to stop. Contact COR. VA will test and abate if required.

2. What will the ICRA level be for this project? Not determined yet.

3. Are there any required/proprietary subcontractors the general contractor is to hire associated with this project? Yes. Siemens Dallas Branch.

4. Will all work associated with this project be able to be performed during regular working hours? Yes

5. Will this work need to be completed in “phases”? No

6. Are there any drawings for the provided SOW? No

7. Can the VA provide as built drawings for the MEP work to be done in the appropriate areas?

No

8. Is there required ICRA containment for the project? What areas? To be determined

9. Does VA want to replace insulation and heat trace for any HW piping inside of the building?

Yes