Technical Questions and Answers.pdf
PDF 9 KB Posted
- Attached to
- Y1PZ--Shade Structure Relocation Federal contract opportunity
- Solicitation number
- 36C25723Q1174
About this file
This document contains technical questions and answers related to solicitation number 36C25723Q1174 for the relocation of a shade structure. The existing concrete piers will remain in place for the new structure location. Power will be provided by others and the existing lighting equipment and materials will be reinstalled once reassembly is complete. A utility map of the new location will be provided by the VA, though the contractor is responsible for field verification. The contractor will be responsible for repairing any damages to concrete, asphalt or underground utilities caused by the required crane during teardown and reinstallation. Clause 52.246-25 will be added to the solicitation addressing contractor liability. The solicitation is from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 for the relocation of a shade structure identified as Y1PZ.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25723Q1174 0001.pdf | ||
| Attachment 2 - Wage Determination Bell County 2015-5237.pdf | ||
| Attachment 1 - Temple VA Shade Structure specs.pdf | ||
| 36C25723Q1174.pdf | ||
| 36C25723Q1174_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Questions and Answers
Request for Quote 36C25723Q1174
1. Will the existing concrete piers remain in place or will the contractor be required to demo and remove them?
Answer: Yes, existing piers will remain in place.
2. Will the contractor be required to provide power to the lights in the new location or will the structure not have power installed in the new location?
Answer: No, power will be provided by others. Per the SOW, existing lighting equipment and associated materials shall be reinstalled once the structure is reassembled.
3. Will the VA provide a utility map for the new location?
Answer: Yes, although the contractor is still responsible to field verify.
4. A crane will be required for teardown and re-installation. Will the contractor be responsible to repair any damaged concrete/asphalt or damaged underground utilities?
Answer: Yes, damages associated with this project will be the responsibility of the contractor to repair. Clause 52.246-25 will be added to the solicitation.
File details come from the government source that posted it. Updated .