Answers RFIs - Replace HVAC BLDG 18 36C25723B0012.pdf
PDF 208 KB Posted
- Attached to
- Y1DA--671A4-23-002 Replace HVAC - Laundry Building 18 Federal contract opportunity
- Solicitation number
- 36C25723B0012
About this file
This document contains responses to questions regarding a federal solicitation to replace HVAC equipment in Building 18 at a Department of Veterans Affairs medical center. The solicitation seeks to replace aging air handling units, condensing units, and associated piping and controls in the building's laundry facility. Responses indicate the project scope includes removing existing equipment and installing new, energy-efficient equipment that meets specified tonnages and connections. Temporary cooling will be provided by the agency during construction. Work may be completed in phases and some restrictions apply due to the laundry facility's operating hours. The awarded contractor will be responsible for disconnecting and reconnecting eligible existing electrical components and integrating new controls and equipment into the facility's BAS system. No significant environmental hazards were reported at the site.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. The period of performance for this project isn’t commensurate with the proposed SOW.
Lead times for chillers and AHUS are 6-9 months and VFDs are one year. With this project being heavily HVAC equipment dependent, no meaningful work can be accomplished until the mechanical and electrical equipment is in hand. Will the government consider delaying the NTP until the start of physical construction? If not, will the government extend the POP to account for the extremely long lead times we are encountering for this equipment? Will the government allow the contractor to submit for no-cost time extensions to account for the extremely long lead times we are facing?
The NTP will not change. Yes, a no-cost time extension could be granted after confirming hard times with the manufacture. Once this is done, the COR will notify CO and the CO will decide on the time extension.
2. Does this project have any access restrictions such as restricted work hours, work periods, etc.?
Standard working hours are 0700-1630. No access restrictions however, during demo please note: the Laundry Facility working hours are 0600-1400. The VA will be flexible regarding working with contractor work hours.
3. Can the AHU and Condensers be replaced in phases? Will Temp cooling be required for this project?
Yes, this project can be done in phases. Temp cooling is already set up; VA will handle.
4. Please confirm the electrical scope of work for this project is limited to disconnect and reconnection of the equipment.
Yes, if disconnect is sized appropriately for new equipment (does not require a larger feed) and meets all code requirements. Contractor may use existing conduits and J- Boxes if compatible with new equipment requirements and needs/locations.
5. Will the new equipment need to be tied into the BAS?
Yes, it is currently on its own local thermostat however, we would like a control point for the BAS (Tridium compatible).
6. Please advise who the JCI and/or Tridium POC is for the facility.
POC: David Dorband, 15007 Pintail, San Antonio, TX 78253, 210-900-5171
7. Are there any known environmental hazards that need to be abated to allow for the project SOW to be completed such as ACM, Lead, etc.?
None that are known.
8. Will crane and rigging work need to be scheduled for weekends?
No, not necessarily however, we can discuss and be flexible, if need be, for work hours.
9. Please confirm the SOW of work is to take place only in Bldg. 18 Laundry.
Yes, only BLDG-18.
10. Please provide a typical coil connection detail for the DX and heating coils.
Current coil connection specs are steam for heating and refrigerant for cooling. This information can be found in the VA Master Construction Specifications (Ref: PG-18-1, Division 23 – Heating, Ventilating, and Air Conditioning and PG-18-4, Division 23 – HVAC and Steam).
11. Will the interconnecting piping between the AHU and Condensers need to be replaced? If so, please advise on the pipe size and insulation specifications requirements.
Yes, pipe size will be determined by the manufacturer’s recommendation for our current specifications and what is listed in VA Master Construction Specifications (Ref: PG-18-1, Division 23 – Heating, Ventilating, and Air Conditioning and PG-18-4, Division 23 – HVAC and Steam).
12. Are auxiliary drain pans required?
Yes, they are required.
13. Does the existing roof have a warranty? If so, please provide the manufacturer warranty information as well as the approved list of roof contractors.
Yes, Garland Roofing; POC: Clayton Daniels, (512)-994-5544 Warranty Number 1100998-A Effective Date 07/15/2011 Fifteen Year (15) Years High Performance Built-Up
14. Please advise who the site fire alarm contractor is.
Fire Alarm Control Systems, Inc.
12961 Park Central, Suite 1440 San Antonio, Texas 78216 facsinc@facssa.com TX Fire Alarm License ACR-1416 210-344-2901
15. Will the new AHUs and Condensers need to be connected to the facility BAS?
Yes, they are not currently connected but we need a control point to connect to the BAS (REF Question #5).
Please see the attached amended (in red) SOW. These changes were brought to light after the Pre-Bid meeting. The summary of changes (what change/what section) are as follows:
1. Specifications of Tonnage – #2 Scope of Work, Product Data - Air-Cooled Condensing Units (Industrial)) Model Number RAUJD124B (AHU-2, Clean Side)
2. External disconnect - #2 Scope of Work, Disconnect non fused - R410A
3. Proper Air Change Calculations - #2 Scope of Work, Performance Data - Performance Climate Changer
(CSAA)
4. Drain Pan Area Coverage – #2 Scope of Work, General Section; Drain Pans
Additional Government Holiday (Juneteenth) - #10 Government Holidays mailto:facsinc@facssa.com