About this file

This document contains responses to clarification questions for a solicitation to replace HVAC systems in Building 18 at a Veterans Affairs medical center. The project involves replacing all HVAC units, drain pans, steam lines, electrical disconnects, and refrigerant lines. For the unit currently with a drain pan, the existing pan must be replaced. All other units will require new drain pans. Only materials forward of the electrical and steam disconnects from the coils can be reused; all other materials must be replaced. Steam line sizes feeding the units range from 1 to 2 inches for supply and condensate return. Refrigerant line sizes are 1 inch for liquid lines and 1-1/4 to 2-5/8 inches for suction lines. These line sizes are provided for reference only as the replacement units will dictate new line sizes.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--671A4-23-002 Replace HVAC - Laundry Building 18, newest first.
File Type Posted
Amendment 36C25723B0012 0009.docx DOCX document
AHU-2-4.pdf PDF
AHU-2-1.pdf PDF
AHU-1-5.pdf PDF
Provision 52.211-6 - Brand Name of Equal.pdf PDF
IMG_0041.pdf PDF
IMG_0039.pdf PDF
IMG_0038.pdf PDF
IMG_0035.pdf PDF
AHU-1-1.pdf PDF
IMG_0044.pdf PDF
IMG_0043.pdf PDF
IMG_0042.pdf PDF
IMG_0040.pdf PDF
IMG_0036.pdf PDF
AHU-2-3.pdf PDF
AHU-2-2.pdf PDF
AHU-1-3.pdf PDF
AHU-1-2.pdf PDF
AHU-1-4.pdf PDF
36C25723B0012 0008.docx DOCX document
36C25723B0012 0007.docx DOCX document
AMENDED SOW - Replace Laundry HVAC BLDG 18.pdf PDF
36C25723B0012 0006.docx DOCX document
Answers RFIs - Replace HVAC BLDG 18 36C25723B0012.pdf PDF
20OCT2022 BLDG-18 HVAC Pre Bid SIGN IN.pdf PDF
36C25723B0012 0005.docx DOCX document
Amendment 36C25723B0012 0004.pdf PDF
Amendment 36C25723B0012 0003.pdf PDF
36C25723B0012 0002.docx DOCX document
Replace Luandry HVAC BLDG 18_Pre-Bid Sign In.pdf PDF
36C25723B0012 0001.docx DOCX document
As-Builts for Laundry AC Units Color.pdf PDF
36C25723B0012_1.docx DOCX document
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING REQUIREMENT.pdf PDF
SELF-PERFORMED CALCULATIONS.pdf PDF
OSHA - EMR requirement.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Currently only one unit has a drain pan. Are we to replace the existing drain pan and provide a drain pan for the other unit?

A: In short Yes: all units will need to have drain pans.

2. Can the government clarify what materials for this project the contractor can re-use?

A: From the electrical disconnect from units and the steam disconnect from coils forward all materials will need to be replaced.

3. Can the government provide the existing line sizes for steam, suction and liquid for each complete unit?

A: The steam feed to the Train unit in the “dirty side” is 2” for steam supply and condensate return , suction on both circuits is 1 ½”, Liquid side for both circuits is 1” and the steam feed in the McQuay unit “clean side” is 2” for supply and condensate return, the sizes of the suction 2 5/8” on both circuits and liquid are 1 ½” on both circuits. However, other than the steam lines, these will be moot as they will be replaced and dictated by the replacement units. Measurements should have been taken during project pre bid walk through for verification we strive for accuracy but provide these numbers as a reference information only.