About this file

36C25719R0017 SOW Annual Maintenenace and Testing Electrical Generators.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Annual Maintenance and Testing of Emergency Electrical Generators, newest first.
File Type Posted
36C25719C0164-000.docx DOCX document
36C25719R0017-A0002000.docx DOCX document
36C25719R0017-A0002001.pdf PDF
36C25719R0017-A0001002.pdf PDF
36C25719R0017-A0001001.pdf PDF
36C25719R0017-A0001000.docx DOCX document
36C25719R0017-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMBINED SYNOPSIS/SOLICIATION 36C25719R0017

Annual Maintenance and Testing for Emergency Electrical Generators

(I) This is a combined synopsis/solicitation for commercial supplies prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation for this action. Proposals are being requested, and a written solicitation will not be issued.

(II) This solicitation is issued as a Request for Quote (RFP). Submit written quotes on RFP 36C25719R0017.

(III) The solicitation document and incorporated provisions and clauses are those in effect through

Federal Acquisition Circular 2019-01.

(IV) Any amendments issued to this solicitation will ONLY be available on the FBO website (www.fbo.gov).

(V) Network Contracting Office 17-SAO WEST intends to award a firm-fixed price contract for Annual Maintenance and Testing for Emergency Electrical Generators located at the Olin E.

Teague VA Medical Center, 1901 Veterans Memorial Drive, Temple, TX 76504 and Doris Miller VA Medical Center, 4800 Memorial Drive, Waco, TX 76711.

(VI) The North American Industrial Classification System (NAICS) code for this procurement is

811310 with a business size standard of $7.5 Million. This procurement is restricted to SDVOSB offerors only to submit proposals. All offerors must be registered in System for Award Management (SAM) at http://www.sam.gov to be considered for an award of a federal contract. The record must be complete and not missing elements such as representations and certifications. SDVOSBs must be registered/certified in VetBiz to be eligible for an award under a SDVOSB set-aside procurement action by the Department of Veterans Affairs.

(VII) The Government will award a contract resulting from this RFP to the responsible offeror whose quote is the lowest price and meets the requirements of the SOW. Proposals are due by 5:00 PM Central Standard Time on Friday March 22, 2019. Proposals received after this date and time will be considered late in accordance with 52.212-1(f) and will not be evaluated. Proposals shall be submitted via email to ross.futch@va.gov.

(VIII) Site Visit is scheduled for Monday March 12, 2019 at 07:30 AM CST at the Olin E.

Teague VA Medical Center, Bldg. 53 Room # 104, 1901 Veterans Memorial Drive, Temple, TX 76504. POC: Alfred Stall, Tel: 254-493-7360 and for Monday March 12, 2019 1:00 PM CST at the Doris Miller VA Medical Center, Bldg 24, 4800 Memorial Drive, Waco, TX 76711. POC: Don Clauder, Tel: 254-749-7784.

(IX) This combined solicitation/synopsis is for the purchase of the following commercial services:

SCHEDULE OF SUPPLIES/SERVICES

SCOPE OF WORK

http://www.fbo.gov/ http://www.sam.gov/

The intent of this Request for Proposal is to enter into a contract to provide Annual Maintenance and Testing for Emergency Electrical Generators Services to include all the necessary personnel, supervision, equipment, tools, transportation, materials, supplies and training to perform the services as specified herein. Services shall be performed at the Central Texas Veterans Health Care System (CTVHCS), Olin E. Teague VA Medical Center, 1901 Veterans Memorial Drive, Temple, TX 76504 and Doris Miller VA Medical Center, 4800 memorial Drive, Waco, TX 76711.

The contract effective period shall be for a 12- month base period, March 29, 2019 through March 28, 2020 with four (4) one-year optional renewal periods.

Price/Cost Schedule

Item Number Quantity Unit Unit Price Amount

1.00 JB __________________ __________________

PROVIDE LABOR AND MATERIALS TO PERFORM ANNUAL

MAINTENANCE AND LOAD BANK TESTING ON THE EMERGENCY

ELECTRICAL GENERATORS ON THE WACO CAMPUS AS LISTED IN THE

STATMENT OF WORK.

Contract Period: Base POP Begin: 03-29-2019 POP End: 03-28-2020

MAINTENANCE AND LOAD BANK TESTING ON THE EMERGENCY

ELECTRICAL GENERATORS FOR THE TEMPLE CAMPUS AS DESCRIBED

IN THE STATMENT OF WORK.

Contract Period: Base

1.00 LT ___TBD_______________ __________________

SPECIAL TASK ORDER FUNDS TO COVER MECHANICAL AND

ELECTRICAL MALFUNCTIONS THAT MAY ARISE OR BE DISCOVERED

THAT IS NOT SPECIFICALLY COVERED IN THE STATMENT OF WORK

FOR BOTH THE TEMPLE AND WACO CAMPUS. (VA ALLOCATION) **

VA ALLOCATION OF FUNDS FOR REPAIRS WILL BE DETERMINED BY

THE VA **

Contract Period: Base POP Begin: 03-29-2019

LOCAL STOCK NUMBER: 12300.00

PROVIDE LABOR AND MATERILS TO PERFORM COOLING SYSTEM

MAINTENANCE AND FLUSH ON THE EMERGENCY ELECTRICAL

GENERATORS FOR THE WACO CAMPUS AS DESCRIBED IN THE

STATEMANT OF WORK.

** FOR BASE YEAR ONLY**

Contract Period: Base

PROVIDE LABOR AND MATERILS TO PERFORM COOLING SYSTEM

MAINTENANCE AND FLUSH ON THE EMERGENCY ELECTRICAL

GENERATORS FOR THE TEMPLE CAMPUS AS DESCRIBED IN THE

STATEMANT OF WORK.

** FOR BASE YEAR ONLY**

Contract Period: Base

MAINTENANCE AND LOAD BANK TESTING ON THE EMERGENCY

ELECTRICAL GENERATORS ON THE WACO CAMPUS AS LISTED IN THE

STATMENT OF WORK.

Contract Period: Option 1 POP Begin: 03-29-2020 POP End: 03-28-2021

MAINTENANCE AND LOAD BANK TESTING ON THE EMERGENCY

ELECTRICAL GENERATORS FOR THE TEMPLE CAMPUS AS DESCRIBED

IN THE STATMENT OF WORK.

Contract Period: Option 1

1.00 LT _____TBD_____________ __________________

ELECTRICAL MALFUNCTIONS THAT MAY ARISE OR BE DISCOVERED

THAT IS NOT SPECIFICALLY COVERED IN THE STATMENT OF WORK

FOR BOTH THE TEMPLE AND WACO CAMPUS. (VA ALLOCATION) **

VA ALLOCATION OF FUNDS FOR REPAIRS WLLL BE DETRMINED BY

THE VA **

Contract Period: Option 1

MAINTENANCE AND LOAD BANK TESTING ON THE EMERGENCY

ELECTRICAL GENERATORS ON THE WACO CAMPUS AS LISTED IN THE

STATMENT OF WORK.

Contract Period: Option 2 POP Begin: 03-29-2021 POP End: 03-28-2022

MAINTENANCE AND LOAD BANK TESTING ON THE EMERGENCY

ELECTRICAL GENERATORS FOR THE TEMPLE CAMPUS AS DESCRIBED

IN THE STATMENT OF WORK.

Contract Period: Option 2

1.00 LT ____TBD______________ __________________

ELECTRICAL MALFUNCTIONS THAT MAY ARISE OR BE DISCOVERED

THAT IS NOT SPECIFICALLY COVERED IN THE STATMENT OF WORK

FOR BOTH THE TEMPLE AND WACO CAMPUS. (VA ALLOCATION) **

VA ALLOCATION OF FUNDS FOR REPAIRS WLLL BE DETRMINED BY

THE VA **

Contract Period: Option 2

MAINTENANCE AND LOAD BANK TESTING ON THE EMERGENCY

ELECTRICAL GENERATORS ON THE WACO CAMPUS AS LISTED IN THE

STATMENT OF WORK.

Contract Period: Option 3 POP Begin: 03-29-2022 POP End: 03-28-2023

MAINTENANCE AND LOAD BANK TESTING ON THE EMERGENCY

ELECTRICAL GENERATORS FOR THE TEMPLE CAMPUS AS DESCRIBED

IN THE STATMENT OF WORK.

Contract Period: Option 3

1.00 LT ____TBD______________ __________________

ELECTRICAL MALFUNCTIONS THAT MAY ARISE OR BE DISCOVERED

THAT IS NOT SPECIFICALLY COVERED IN THE STATMENT OF WORK

FOR BOTH THE TEMPLE AND WACO CAMPUS. (VA ALLOCATION) **

VA ALLOCATION OF FUNDS FOR REPAIRS WLLL BE DETRMINED BY

THE VA **

Contract Period: Option 3

MAINTENANCE AND LOAD BANK TESTING ON THE EMERGENCY

ELECTRICAL GENERATORS ON THE WACO CAMPUS AS LISTED IN THE

STATMENT OF WORK.

Contract Period: Option 4 POP Begin: 03-29-2023 POP End: 03-28-2024

MAINTENANCE AND LOAD BANK TESTING ON THE EMERGENCY

ELECTRICAL GENERATORS FOR THE TEMPLE CAMPUS AS DESCRIBED

IN THE STATMENT OF WORK.

Contract Period: Option 4

1.00 LT _____TBD_____________ __________________

ELECTRICAL MALFUNCTIONS THAT MAY ARISE OR BE DISCOVERED

THAT IS NOT SPECIFICALLY COVERED IN THE STATMENT OF WORK

FOR BOTH THE TEMPLE AND WACO CAMPUS. (VA ALLOCATION) **

VA ALLOCATION OF FUNDS FOR REPAIRS WLLL BE DETRMINED BY

THE VA **

Contract Period: Option 4

GRAND TOTAL __________________

DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

STATEMENT OF WORK (Base Year) Annual Maintenance and Testing For Emergency Electrical Generators

1. SCOPE: Base Year. Provide all labor, supervision, materials, equipment, tools and ancillary supplies to perform annual load bank testing, oil sample testing for sediment and foreign materials, check fuel oil tanks for contamination of fuel-oil, air-filter change, oil and oil filter replacement, flush and clean cooling system replace thermostat and coolant with OEM specified parts and materials at the Central Texas VA Healthcare Facilities located in Waco and Temple TX. In addition; contractor will provide all labor, parts, tools, equipment and materials to repair generator’s mechanical and electrical malfunctions that may arise or be discovered that is not specifically covered. This will be on a as needed basis and there will be funds allocated to awarded contract for repairs.

a. CONTRACTOR RESPONSIBILITIES: The contractor shall supply all necessary parts, materials, tools and labor to perform the necessary installation, testing and repairs.

The contractor is responsible for the proper disposal of all discarded parts, material, debris and oil upon completion of the following maintenance tasks. Visual inspection of engine and electrical power generation package and all related equipment and systems excluding the automatic transfer switches. The contractor shall document conditions, values and recommendations on contractor provided forms and submit documentation to COR within 72 hours after completion of inspection, contractor is responsible for removal and proper disposal of all waste oil, filters and coolant.

Maintenance Tasks Inspect cooling system, operation of heater(s), cooling value (thermostat) and adding supplemental conditioners to the cooling system to keep coolant nitrate levels between 1200 and 2400 PPM. Inspect hoses, belts and radiator. Inspect and check radiator, lovers and room for air flow restrictions document any corrosion or coolant seepage. Verify proper fluid levels and values, correct as needed prior to load bank test. Check battery voltage prior to initial cranking and record values on contractor's battery test form. Check fuel supply and quality of fuel. Retrieve a fuel sample from bottom of main fuel tank for visual inspection. Replace air-filter elements with a filter the meets or exceeds original manufacturers specifications. Inspect overall air induction system for wear and leakage. Document all findings and work performed.

Obtain COTR approval to ' Lock unit out and connect resistive load bank in such a manner that emergency power can be manually restored (when possible) upon notification if such an incident should occur COTR must approve all connections and individual unit's circumstances.

Conduct a continuous four (4)-hour load bank test, a 1.0 power factor. Extracted load shall be greater than the .8096 of generator's nameplate value (Example: 100KW - Test @85KW).

Generator loading shall be in graduated increments up to test value to ensure proper operation and not part of the four (4) hour time span. Testing shall be documented in fifteen (15) minutes intervals on contractors provided test sheet. Data shall include the following parameters: time; engine hour at start and completion of test; ambient room temperature;

coolant temperature; oil temperature; lube pressure; fuel pressure (when available); A.C.

frequency (verify Digitally); A.C. voltage (verify digitally): KW (load)(verify digitally).

During testing, an infrared heat gun shall be used to monitor cooling system operation, exhaust temps, oil temp, day tank temps and electrical connections related to test load. These values are not required to be recorded, but critical values should be reported. After removal of load bank, a ten (10) - minute cool down period at no load is required. These values shall be documented on the test sheet as 'Post Test Data'. Upon completion of load bank test, reinstate system wiring to be 'ready for duty' to reduce down time if an outage should occur while performing engine maintenance.

Contractors Engineer Maintenance 2.1: Lock Unit out. Obtain an oil sample for analysis after completion of load test and before changing oil. Remove AC power from battery charger for one (1) hour while performing engine service. Inspect, test and evaluate individual NiCad battery bank cells at the end of one (1) hour. Record values on contractors provided form.

Reinstate charger observing operations. Check 'high rate' or "equalize mode" (if equipped), record value. All values shall be recorded.

Equipment to be serviced:

Temple campus: Manufacturer Serial # Building 063-T Caterpillar 5NA04 Building 163-T Baldor P0804210002 Building 171-T Caterpillar 47BH4242 Building 202-T Caterpillar 6EA0101337 Building 203-T Cummins Onan L950594330 Building 203-T Cummins Onan K950592469 Building 58-T Kohler 0701471 Building 205-T Katolight WA531430 Building 221-T Cummins K110268069 Building 221-T Cummins J110263439 Building 222-T Volvo 2016050645 Building 222-T Volvo 2016050648 Building 222-T Volvo 2016050650 Building 222-T Volvo 2016050652 Portable Generator Wisper Watt

Waco Campus: Serial# Building 1-W Kohler C7A03852 Building 202-W Caterpillar 6CA00618 Building 207-W Caterpillar 6DA03546 Building 225-W Kohler MX1937020513 Building 8&9-W Caterpillar G6B15605 Building 92&93-W Caterpillar G6B16504 Building 90-W Kohler 2329772 Building 91-W Caterpillar GGB16505 Building 7&94-W Cummins B11086453 Building 10&11-W Cummins KO900676 Building 4,5&6-W Cummins B110186452 Building 14-W Caterpillar G5A03813 Portable-W-ENG Kohler 148415 Portable-W-Safety Wisper Watt 8510503

2. SCHEDULE OF WORK: The Contractor shall notify the Contracting officer and the Contracting Officer’s Representative (COR) Don Clauder at 254-749-7784 prior to start of work in Waco, TX and Alfred Stall in Temple, TX. The Contractor shall schedule work through the COR. The Contractor shall coordinate work with COR NLT 10 calendar days before starting work. Work shall be complete with-in 45 days of work start. Other contractors may be working in the same area performing other work. The contractor shall execute work in a manner so as not to impede other contract work.

3. HOURS OF WORK: The normal hours of work are 08:00 to 16:15 (4:15) Monday through Friday. Work shall be performed during normal work hours. Work to be performed in other than normal hours shall be approved/disapproved by the Contracting Officer’s Representative no later than 10 calendar days prior to the start of work.

4. WORKMANSHIP: All work under this contract shall conform to the standards of these specifications. The Contractor at no additional cost to the Government shall correct work not meeting these specifications and repair any damage to government property. Work shall be accomplished by mechanics skilled in the trade with a minimum of 5 consecutive years of experience in generator maintenance. The Contractor shall provide written documentation as to the mechanics work experience to the CO or COR if requested.

5. DAILY PROGRESS REPORTS: The Contractor shall notify the COR, (Don Clauder @ 254-749-7784) in Waco, TX and Alfred Stall in Temple, TX @ 254-493-7360 upon completion of Electrical generator testing and maintenance and prior to leaving the Waco or Temple Campus.

6. WORKING CONDITIONS: The buildings and the surrounding site areas will be occupied and Government operations will continue on a normal, temporary or restricted basis for the duration of the contract. The Contractor shall take all precautions to ensure that his operations are conducted in a manner so as not to interfere with the normal operation of surrounding facilities. The Contractor shall execute work in a safe manner and shall not subject personnel to unsafe conditions. The Contractor shall provide safety barricades, devices, and equipment to protect personnel and property and repair damage caused by construction operations. Take all precautions to protect the building and its occupants during the construction period

7. SITE VISIT: The Contractor shall visit the site to determine the full extent of the work.

Failure to inspect the site will not constitute grounds for a claim after contract award. A site visit will be scheduled through the Contracting Officer.

8. DISPOSAL: Disposal of materials removed under this contract at an approved disposal site in accordance with all local, state, and federal laws, regulations, and guidelines are the Contractor’s sole responsibility. The contractor shall adhere to all OSHA requirements concerning removal, transporting, and disposal of the material.

9. CLEAN-UP: The Contractor shall keep the area neat and tidy and free of debris at the end of each workday.

10. TEMPORARY FACILITIES: Temporary electrical power and water may be provided by the Government at no cost to the Contractor from existing lines and sources located at the building site. The characteristics and source locations may be verified by a visit to the site.

11. The Contractor shall provide ample temporary storage space for materials requiring shelter from the weather, and security and safety protection. All onsite storage must have approval from the CO and COR. Contractor shall submit temporary storage request to the CO and the COR for approval /disapproval no later than 21 calendar days prior to start of work. The storage facilities shall be located in the areas of the facility designated by the Contracting Officer’s Representative.

12. SAFETY AND FIRE: All fire and safety rules and regulations are applicable; NFPA and SBCCI dated 1999. The Contractor shall comply with EM385-1-1 dated 1987 for minimum safety requirements.

13. PERMITS: The Contractor shall be responsible for obtaining any licenses and permits and complying with any laws, codes, and regulations applicable to the execution of this work as required Federally and by the State of Texas.

14. WARRANTEE: The contractor shall warrantee work to be free of defects and workmanship for a period of 1 year from date of acceptance. Date of acceptance is established by the Contracting Officer.

15. STATEMENT OF WORK: The Contractor shall perform installation, testing and maintenance of all materials and equipment and return the emergency electrical generators to normal operational condition.

16. QUALITY ASSURANCE: The Contracting Officer reserves the right to conduct any inspections or perform any tests deemed necessary at any time during the execution of the contract to determine conformance with the requirements of theses specifications.

END OF STATEMENT OF WORK

STATEMENT OF WORK (Option Years) Annual Maintenance and Testing For Emergency Electrical Generators

1. SCOPE: Option Years. Provide all labor, supervision, materials, equipment, tools and ancillary supplies to perform annual load bank testing, oil sample testing for sediment and foreign materials, check fuel oil and fuel oil tanks for contamination of fuel-oil, check air-filter notify contracting officers representative if replacement is needed, replace oil and oil filter replacement at the Central Texas VA Healthcare Facilities located in Waco and Temple TX. In addition;

contractor will provide all labor, parts, tools, equipment and materials to repair generator’s mechanical and electrical malfunctions that may arise or be discovered that is not specifically covered. This will be on a as needed basis and there will be funds allocated to awarded contract for repairs.

a. CONTRACTOR RESPONSIBILITIES: The contractor shall supply all necessary parts, materials, tools and labor to perform the necessary installation, testing and repairs. The contractor is responsible for the proper disposal of all discarded parts, material, debris and oil upon completion of the following maintenance tasks. Visual inspection of engine and electrical power generation package and all related equipment and systems excluding the automatic transfer switches. The contractor shall document conditions, values and recommendations on contractor provided forms and submit documentation to COR within 72 hours after completion of inspection, contractor is responsible for removal and proper disposal of all waste oil and filters.

Maintenance Tasks

Inspect cooling system, operation of heater(s), cooling value (thermostat) and adding supplemental conditioners to the cooling system to keep coolant nitrate levels between 1200 and 2400 PPM. Inspect hoses, belts and radiator. Inspect and check radiator, lovers and room for air flow restrictions document any corrosion or coolant seepage. Verify proper fluid levels and values, correct as needed prior to load bank test. Check battery voltage prior to initial cranking and record values on contractor's battery test form. Check fuel supply and quality of fuel. Retrieve a fuel sample from bottom of main fuel tank for visual inspection. Inspect air-filter elements, notify the contracting officer representative if filter element needs to be replaced. Inspect overall air induction system for wear and leakage. Document all findings and work performed. Obtain COTR approval to ' Lock unit out and connect resistive load bank in such a manner that emergency power can be manually restored (when possible) upon notification if such an incident should occur COTR must approve all connections and individual unit's circumstances.

Conduct a continuous four (4)-hour load bank test, a 1.0 power factor. Extracted load shall be greater than the .8096 of generator's nameplate value (Example: 100KW - Test @85KW). Generator loading shall be in graduated increments up to test value to ensure proper operation and not part of the four (4) hour time span. Testing shall be documented in fifteen (15) minutes intervals on contractors provided test sheet. Data shall include the following parameters: time; engine hour at start and completion of test; ambient room temperature; coolant temperature; oil temperature; lube pressure; fuel pressure (when available); A.C. frequency (verify Digitally); A.C. voltage (verify digitally): KW (load)(verify digitally). During testing, an infrared heat gun shall be used to monitor cooling system operation, exhaust temps, oil temp, day tank temps and electrical connections related to test load. These values are not required to be recorded, but critical values should be reported.

After removal of load bank, a ten (10) - minute cool down period at no load is required.

These values shall be documented on the test sheet as 'Post Test Data'. Upon completion of load bank test, reinstate system wiring to be 'ready for duty' to reduce down time if an outage should occur while performing engine maintenance.

Contractors Engineer Maintenance 2.1: Lock Unit out. Obtain an oil sample for analysis after completion of load test and before changing oil. Remove AC power from battery charger for one (1) hour while performing engine service. Inspect, test and evaluate individual NiCad battery bank cells at the end of one (1) hour. Record values on contractors provided form.

Reinstate charger observing operations. Check 'high rate' or "equalize mode" (if equipped), record value. All values shall be recorded.

Equipment to be serviced:

Temple campus: Manufacturer Serial # Building 163-T Caterpillar 5NA04 Building 163-T Baldor P0804210002 Building 171-T Caterpillar 47BH4242 Building 202-T Cummins Onan 25210163 Building 202-T Cummins Onan 25210446 Building 58-T Kohler 0701471 Building 205-T Katolight WA531430 Building 221-T Cummins 25210163 Building 221-T Cummins 25210446 Building 222-T Volvo 2016050645 Building 222-T Volvo 2016050648 Building 222-T Volvo 2016050650 Building 222-T Volvo 2016050652 Portable Generator Wisper Watt

Waco Campus: Serial# Building 1-W Kohler C7A03852 Building 202-W Caterpillar 6CA00618 Building 207-W Caterpillar 6DA03546 Building 225-W Kohler MX1937020513 Building 8&9-W Caterpillar G6B Building 92&93-W Caterpillar G6B16504 Building 90-W Kohler 2329772 Building 91-W Caterpillar GB16505 Building 7&94-W Cummins B1108645 Building 10&11-W Cummins KO900676 Building 4,5&6-W Cummins B110186452 Building 14-W Caterpillar G5A03813 Portable-W-ENG Kohler 148415 Portable-W-Safety Wisper Watt 8510503

2. SCHEDULE OF WORK: The Contractor shall notify the Contracting officer and the Contracting Officer’s Representative (COR) Don Clauder at 254-749-7784 prior to start of work in Waco, TX and Alfred Stall in Temple, TX. The Contractor shall schedule work through the COR. The Contractor shall coordinate work with COR NLT 10 calendar days before starting work. Work shall be complete with-in 45 days of work start. Other contractors may be working in the same area performing other work. The contractor shall execute work in a manner so as not to impede other; contract work.

3. HOURS OF WORK: The normal hours of work are 08:00 to 16:15 (4:15) Monday through Friday. Work shall be performed during normal work hours. Work to be performed in other than normal hours shall be approved/disapproved by the Contracting Officer’s Representative no later than 10 calendar days prior to the start of work.

4. WORKMANSHIP: All work under this contract shall conform to the standards of these specifications. The Contractor at no additional cost to the Government shall correct work not meeting these specifications and repair any damage to government property. Work shall be accomplished by mechanics skilled in the trade with a minimum of 5 consecutive years of experience in generator maintenance. The Contractor shall provide written documentation as to the mechanics work experience to the CO or COR if requested.

5. DAILY PROGRESS REPORTS: The Contractor shall notify the COR, (Don Clauder @ 254-598-8209) in Waco, TX and Alfred Stall in Temple, TX @ 254-534-4287 upon completion of Electrical generator testing and maintenance and prior to leaving the Waco or Temple Campus.

6. WORKING CONDITIONS: The buildings and the surrounding site areas will be occupied and Government operations will continue on a normal, temporary or restricted basis for the duration of the contract. The Contractor shall take all precautions to ensure that his operations are conducted in a manner so as not to interfere with the normal operation of surrounding facilities. The Contractor shall execute work in a safe manner and shall not subject personnel to unsafe conditions. The Contractor shall provide safety barricades, devices, and equipment to protect personnel and property and repair damage caused by construction operations. Take all precautions to protect the building and its occupants during the construction period

7. SITE VISIT: The Contractor shall visit the site to determine the full extent of the work.

Failure to inspect the site will not constitute grounds for a claim after contract award. A site visit will be scheduled through the Contracting Officer.

8. DISPOSAL: Disposal of materials removed under this contract at an approved disposal site in accordance with all local, state, and federal laws, regulations, and guidelines are the Contractor’s sole responsibility. The contractor shall adhere to all OSHA requirements concerning removal, transporting, and disposal of the material.

9. CLEAN-UP: The Contractor shall keep the area neat and tidy and free of debris at the end of each workday.

10. TEMPORARY FACILITIES: Temporary electrical power and water may be provided by the Government at no cost to the Contractor from existing lines and sources located at the building site. The characteristics and source locations may be verified by a visit to the site.

11. The Contractor shall provide ample temporary storage space for materials requiring shelter from the weather, and security and safety protection. All onsite storage must have approval from the CO and COR. Contractor shall submit temporary storage request to the CO and the COR for approval /disapproval no later than 21 calendar days prior to start of work. The storage facilities shall be located in the areas of the facility designated by the Contracting Officer’s Representative.

12. SAFETY AND FIRE: All fire and safety rules and regulations are applicable; NFPA and SBCCI dated 1999. The Contractor shall comply with EM385-1-1 dated 1987 for minimum safety requirements.

13. PERMITS: The Contractor shall be responsible for obtaining any licenses and permits and complying with any laws, codes, and regulations applicable to the execution of this work as required Federally and by the State of Texas.

14. WARRANTEE: The contractor shall warrantee work to be free of defects and workmanship for a period of 1 year from date of acceptance. Date of acceptance is established by the Contracting Officer.

15. STATEMENT OF WORK: The Contractor shall perform installation, testing and maintenance of all materials and equipment and return the emergency electrical generators to normal operational condition.

17 QUALITY ASSURANCE: The Contracting Officer reserves the right to conduct any inspections or perform any tests deemed necessary at any time during the execution of the contract to determine conformance with the requirements of theses specifications.

END OF STATEMENT OF WORK

The following Federal Acquisition Regulation (FAR) and Veterans Affairs Acquisition Regulation (VAAR) clauses and provisions are applicable to this acquisition and are available for view at:

http://farsite.hill.af.mil/

FAR Provisions:

52.204-7 System for Award Management 52.204-16 Commercial and Government Entity Code Reporting 52.209-5 Certification Regarding Responsibility Matters 52.212-1 Instructions to Offerors- Commercial Items 52.212-2 Evaluation-Commercial Items http://farsite.hill.af.mil/

52.212-3 Offers Representation and Certification -Commercial Items

52.216-1 Type Of Contract 52.233-2 Service of Protest 52.237-1 Site Visit 52.252-1 Solicitation Provisions Incorporated by Reference

The government will award a firm-fixed price contract to the vendor whose proposal represents the Lowest Price Technically Acceptable (LPTA) for the government. To be rated technically acceptable, bidder must submit information with bid to show they have 5 years experience performing generator maintenance, 2 references for past performance also must be submitted with bid. Technical and past performance, when combined are less important than price.

(End of Provision)

VAAR Provisions:

852.233-70 Protest Content/Alternative Dispute Resolution 852.233-71 Alternative Protest Procedure

FAR Clauses:

52.203-17 Contractor Employee Whistleblower Rights and Requirements to Inform

Employees of Whistleblower Rights 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper 52.204-13 System for Award Management Maintenance 52.204-18 Commercial and Government Entity Code 52.212-4 Contract Terms and Conditions- Commercial Items 52.217-8 Option to Extend Services 52.217-9 Option to Extend the Term of the contract 52.237-2 Protection of Government Buildings, equipment, and Vegetation 52.228-5 Insurance -work on a Government Installation Supplemental Insurance Requirements 52.252-2 Clauses Incorporated by reference 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive

Orders-Commercial Items

- 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

- 52.209-19 Prohibition on Contracting for hardware, Software and Services Developed by Kaspersky Lab and Other Covered Entities

- 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations

- 52.233-3 Protest After Award

- 52.233-4 Applicable Law for Breach of Contract claim

- 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

- 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment

- 52.222-3 Convict Labor

- 52.222-21 Prohibition of Segregated Facilities

- 52.222-26 Equal Opportunity

- 52.222-35 Equal Opportunity for Veterans

- 52.222-36 Equal Opportunity for Workers with Disabilities

- 52.222-41 Service Contract Labor Standards

- 52.223-18 Encouraging Contractor Policies to Ban Text Messaging

While Driving

- 52.232-33 Payment by Electronic Funds Transfer- System for Award

Management

- 52.203-6 Restrictions on Subcontractor Sales to the Government

- 52.204-14 Service Contract Reporting Requirements

- 52.209-9 Update of Publicly Available Information Regarding

Responsibility matters

- 52.219-8 Utilization of Small Business Concerns

- 52-219-28 Post Award Small business program representation

- 52.222-17 Nondisplacement of Qualified Workers

- 52.222-37 Employment Reports on Veterans

- 52.222-40 Notification of Employee Rights Under National Labor

Relations

- 52.222-50 Combat Trafficking in Persons

- 52.222-54 Employment Eligibility Verification

- 52.222-60 Paycheck Transparency

- 52.225-13 Restrictions on Certain Foreign Purchases

- 52.222-41 Service Contract Labor Standards

- 52.222-42 Statement of Equivalent Rates for Federal Hires

- 52.222-43 Fair labor Standards Act and Service Contract Labor Standards-Price

Adjustment (Multiple Year and Option Contracts)

- 52.222-55 Minimum Wages Under Executive Order 13658

- 52.222-62 Paid Sick Leave Under Executive Order 13706

- 52.232-33 Payment by Electronic funds Transfer-System for Award

Management

52.252-2 Clauses incorporated by Reference

VAAR Clauses:

852.203-70 Commercial Advertising 852.219-10 VA Notice of Total Service-Disabled Veteran-Owned Business Set-Aside 852.219-74 Limitations on Subcontracting-Monitoring and Compliance 852.232-72 Electronic Submission of Payment Requests 852.237-70 Contractor Responsibilities