36C25719B0036-002.doc

DOC document 42 KB Posted

Attached to
Modernize Elevator Controls Project No. 671-19-111 Federal contract opportunity
Solicitation number
36C25719B0036
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

36C25719B0036 Schedule B - Elevator Controls.doc

View the file

Other files for this federal contract opportunity

Other files attached to Modernize Elevator Controls Project No. 671-19-111, newest first.
File Type Posted
36C25719C0231-000.docx DOCX document
36C25719B0036-0002000.docx DOCX document
36C25719B0036-0002001.pdf PDF
36C25719B0036-0002000.docx DOCX document
36C25719B0036-0002001.pdf PDF
36C25719B0036-0001002.pdf PDF
36C25719B0036-0001001.pdf PDF
36C25719B0036-0001000.docx DOCX document
36C25719B0036-0001002.pdf PDF
36C25719B0036-0001000.docx DOCX document
36C25719B0036-0001001.pdf PDF
36C25719B0036-004.pdf PDF
36C25719B0036-003.pdf PDF
36C25719B0036-002.doc DOC document
36C25719B0036-001.docx DOCX document
36C25719B0036-001.docx DOCX document
36C25719B0036-004.pdf PDF
36C25719B0036-003.pdf PDF
36C25719B0036-000.docx DOCX document
36C25719B0036-000.docx DOCX document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B – SCHDULE OF PRICES/DESCRIPTION

DESCRIPTION: Contractor shall provide all necessary labor, materials, equipment, and supervision to Replace Elevator Control Bldg 28 located at the Amarillo VAMC 6010 W. Amarillo Blvd, Amarillo, Texas. The work shall be in accordance with the provided specifications and drawings.

BASE BID:

ITEM

UNIT TOTAL

NO. DESCRIPTION OF SERVICE

QTY UNIT PRICE AMOUNT

BID:

PROVIDE ALL NECESSARY

1 JB $__________ $_________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY TO MODERNIZE elevator controls PER THE PROVIDED gr-sow

(SEE GENERAL REQUIREMENT 1.4 STATEMENT

OF BID ITEMS)

COST OF PERFORMANCE AND

1 EA $___________ $ _________

PAYMENT BONDS

**TOTAL PROJECT DURATION: 180 Calendar days from issuance of the Notice to Proceed to complete the project work.

Bid TOTAL (Line items 0001 & 0002) $___________