36C25719B0036-0001002.pdf
PDF Posted
- Attached to
- Modernize Elevator Controls Project No. 671-19-111 Federal contract opportunity
- Solicitation number
- 36C25719B0036
About this file
36C25719B0036 0001 Revised Schedule B - Elevator Controls.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25719C0231-000.docx | DOCX document | |
| 36C25719B0036-0002000.docx | DOCX document | |
| 36C25719B0036-0002001.pdf | ||
| 36C25719B0036-0002001.pdf | ||
| 36C25719B0036-0002000.docx | DOCX document | |
| 36C25719B0036-0001001.pdf | ||
| 36C25719B0036-0001000.docx | DOCX document | |
| 36C25719B0036-0001002.pdf | ||
| 36C25719B0036-0001000.docx | DOCX document | |
| 36C25719B0036-0001001.pdf | ||
| 36C25719B0036-004.pdf | ||
| 36C25719B0036-003.pdf | ||
| 36C25719B0036-002.doc | DOC document | |
| 36C25719B0036-001.docx | DOCX document | |
| 36C25719B0036-002.doc | DOC document | |
| 36C25719B0036-001.docx | DOCX document | |
| 36C25719B0036-004.pdf | ||
| 36C25719B0036-003.pdf | ||
| 36C25719B0036-000.docx | DOCX document | |
| 36C25719B0036-000.docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISED
SECTION B – SCHDULE OF PRICES/DESCRIPTION
DESCRIPTION: Contractor shall provide all necessary labor, materials, equipment, and supervision to
Modernize Elevator Control located at the Audie L. Murphy 7400 Merton Minter, Texas, TX 78229. The work shall be in accordance with the provided specifications and drawings.
BID Item (s):
ITEM UNIT TOTAL
NO. DESCRIPTION OF SERVICE QTY UNIT PRICE AMOUNT
BID:
0001 PROVIDE ALL NECESSARY 1 JB $__________ $_________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO MODERNIZE ELEVATOR
CONTROLS PER THE PROVIDED
GR-SOW
(SEE GENERAL REQUIREMENT 1.4 STATEMENT
OF BID ITEMS)
0002 COST OF PERFORMANCE AND 1 EA $___________ $ _________
PAYMENT BONDS
**TOTAL PROJECT DURATION: 400 Calendar days from issuance of the Notice to Proceed to complete the project work.
Bid TOTAL (Line items 0001 & 0002) $___________