36C25719B0019-005.pdf

PDF 3 MB Posted

Attached to
504-18-107 Replace Elevator Controls Building 28 Federal contract opportunity
Solicitation number
36C25719B0019
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

36C25719B0019 504-18-107 Drawings.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 504-18-107 Replace Elevator Controls Building 28, newest first.
File Type Posted
36C25719C0177-000.docx DOCX document
36C25719B0019-0003000.docx DOCX document
36C25719B0019-0003002.pdf PDF
36C25719B0019-0003001.pdf PDF
36C25719B0019-0002000.docx DOCX document
36C25719B0019-0001000.docx DOCX document
36C25719B0019-006.pdf PDF
36C25719B0019-001.docx DOCX document
36C25719B0019-003.pdf PDF
36C25719B0019-004.pdf PDF
36C25719B0019-002.pdf PDF
36C25719B0019-000.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SM

OKING SHR.

LOT E

LOT I

LOT J LO

T J

AREA 1

LOT I

LOT G

LOT H

LOT M

LOT N

SM

OKING SHR.

SHOPS

WARE-

HOUSE

S 89°47'OO" E 1947.94'

S °1 7' W

4.

(N44°17'57" W 1000.33')

N44°15'49" W 1000.00'

S.W. 9TH AVENUE

U .S H

IG

H W A Y

E.

W A

LK

ER

N

ED

M A N

W E D M A N

S E D M A N

BLD

G

BLD

G

BLD

G

BLD

G

BLDG 29

B

LD

G

B

LD

G

BLD

G

BLD

G

Drawing Number

Project Number

Date

Project Title

Building Number

Location

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEERNOT FOR

CONSTRUCTION

REVISIONS DATE

CONSULTANTS ARCHITECT

LOCATION MAP

AREA OF WORK

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

BROWN CONSULTING

3505 OLSEN BLVD, SUITE 110

AMARILLO, TX 79109

WWW.BROWNCONSULTINGENGINEERS.COM

OF

REPLACE ELEVATOR

CONTROLS BLDG 28

COVER SHEET

504-18-107

12/19/2018 JEH ZDL

G-000

100% CONSTRUCTION DOCUMENTS

6010 W. AMARILLO BLVD, AMARILLO, TX 79106

100% CONSTRUCTION DOCUMENTS

504-18-107 REPLACE ELEVATOR CONTROLS BLDG 28

AMARILLO VA HEALTH CARE SYSTEM

AMARILLO VA HEALTH CARE SYSTEM

6010 W. AMARILLO BLVD, AMARILLO, TX 79106

PROJECT LOCATION

AREA OF WORK

D R A W I N G L I S T

SHEET NUMBER SHEET SEQUENCE SHEET NAME

[01] GENERAL

G-000 1 COVER SHEET

G-001 2 GENERAL INFORMATION

G-011 3 LIFE SAFETY PLAN

[02] ARCHITECTURAL DEMO

AD-101 4 ARCHITECTURAL DEMOLITION

[03] ARCHITECTURE

AS - 101 5 FLOOR PLANS

AS - 102 6 INTERIOR ELEVATIONS

[04] MECHANICAL

MH - 101 7 MECHANICAL FLOOR PLANS

[05] ELECTRICAL

ES - 101 8 ELECTRICAL FLOOR PLANS

01 08 jeh Rectangle jeh Snapshot

FEC

CL

GENERAL NOTES

DRAWINGS TO BE TAKEN AS PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR TO CONFIRM ALL ITEMS REQUIRED TO BE

DEMOLISHED AND EXTENT OF DEMOLITION BASED UPON THE OVERALL DESIGN INTENT OF THE ENTIRE DOCUMENT SET.

1.

VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY DEMOLITION WORK TO CONFIRM ACCURACY IN DRAWINGS. REPORT ANY DISCREPANCIES TO COR. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.

2.

ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.

ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE CONSTRUCTION WORK. PROVIDE DUST PROOFING

3.

ENCLOSURES TO SEPARATE WORK AREAS FROM THE EXISTING FACILITIES.

ALL MATERIALS DEVELOPED AND ACCUMULATED DURING DEMOLITION, UNLESS OTHERWISE NOTED TO BE REUSED, SALVAGED, OR TURNED OVER

TO THE OWNER, SHALL BECOME THE PROPERTY OF THE CONTRACTORS AND RECYCLED OR DISPOSED OF OFF-SITE. REMOVAL OF TRASH AND

4.

DEBRIS SHALL BE IN WHEELED CONTAINER THAT IS COVERED TO PREVENT AIRBORNE DUST/DIRT PARTICLES FROM TRANSFERRING INTO THE

EXISTING HOSPITAL ALONG THE PATH OF REMOVAL. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.

DURING DEMOLITION, PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN PLACE DURING THE RENOVATION WORK.

SHOULD ANY DAMAGE OCCUR, PATCH AND REPAIR ANY DAMAGE TO ADJACENT FINISHED TO MATCH EXISTING.

5.

ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT

NO ADDITIONAL COST TO THE OWNER.

6.

COVER ALL RETURN AIR GRILLS WITHIN THE AREA OF CONSTRUCTION TO PREVENT PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING

SPACES.

7.

REMOVAL OF MECHANICAL, ELECTRICAL AND PLUMBING SHOULD BE LIMITED TO WHAT IS NECESSARY FOR SAFE REMOVAL OF THE INDICATED WALL OR

CEILING. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.

8.

CONTRACTOR TO DEMO ALL FIXTURES, CEILINGS, MECHANICAL, PLUMBING AND ELECTRICAL AS REQUIRED TO COMPLETE THE SCOPE OF WORK

OUTLINED WITHIN THE CONSTRUCTION.

9.

ANY ASBESTOS ABATEMENT TO BE CARRIED OUT BY OWNER.10.

REPORT ANY MISSING OR DAMAGED FIREPROOFING TO THE COR.11.

CODES, STANDARDS, AND EXECUTIVE ORDERS AREA KEY PLAN

MATERIALS LEGEND

SYMBOLS LEGEND

ARCHITECTURAL ABBREVIATIONS

ACS DR ACCESS DOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES

ADC AUTOMATIC DOOR CLOSER

ADH ADHESIVE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFB ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

ALUM ALUMINUM

AR AS REQUIRED

ASB ASBESTOS

AWT ACOUSTICAL WALL TREATMENT

BAT BATTEN

BEV BEVEL

BLKT BLANKET

BM BEAM OR BENCHMARK

BOT BOTTOM

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BTWN BETWEEN

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CORNER BEAD

CBB CEMENTITIOUS BACKER BOARD

CCTV CLOSED CIRCUIT TELEVISION

CD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTS

CEM CEMENT

CER CERAMIC

CFCI CONTRACTOR FURNISHED

CONTRACTOR INSTALLED

CF0I CONTRACTOR FURNISHED

OWNER INSTALLED

CFMF COLD-FORMED METAL FRAMING

CG CORNER GUARD

CHFR CHAMFER

CJ CONSTRUCTION JOINT OR

CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG HT CEILING HEIGHT

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONC FLR CONCRETE FLOOR

CONF CONFERENCE

CONT CONTINUE OR CONTINUOUS

CONTR CONTRACTOR

CORR CORRIDOR

CPRS COMPRESSIBLE

CPT CARPET

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTRL CONTROL

DBL DOUBLE

DEMO DEMOLITION

DET DETAIL

DIA DIAMETER

DL DEAD LOAD

DR DOOR OR DRAIN

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR OR ELEVATION

EQ EQUAL

EQL EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ESC ESCUTCHEON

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXT EXTINGUISHER

F FEMALE

FA FIRE ALARM

FAB FABRIC

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF&E FURNITURE, FIXTURE, & EQUIPMENT

FIN FINISH

FIN FLR FINISH FLOOR (ELEVATION)

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLSHG FLASHING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FIX FLUORESCENT FIXTURE

FO FINISHED OPENING

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FR FIRE RATING, FIRE RESISTANCE, OR FRAME

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER OR

FIBER REINFORCED PLASTIC

FT FEET OR FOOT

FURG FURRING

FURN FURNISH OR FURNITURE

FV FIELD VERIFY

FWC FABRIC WALLCOVERING

GA GAGE

GALV GALVANIC OR GALVANIZED

GB GRAB BAR

GD GUARD

GDR GUARD RAIL

GL GLASS

GT GROUT

GYP BD GYPSUM BOARD

H PLAM HIGH PRESSURE PLASTIC LAMINATE

HDR HARDWARE

HM HOLLOW METAL

HDRL HANDRAIL

HORIZ HORIZONTAL

HS HEAT-STRENGTHENED (GLASS)

OR HIGH STRENGTH

HT HEIGHT

ID INSIDE DIAMETER

INSUL INSULATION

INT INTERIOR

KPL KICKPLATE

L ANGLE

LAM GL LAMINATED GLASS

LAV LAVATORY

LD BRG LOAD-BEARING

LF LINEAR FEET (FOOT)

LINO LINOLEUM

LT GA LIGHT GAUGE

LVR LOUVER

LVT LUXURY VINYL TILE

MAX MAXIMUM

MCB METAL CORNER BEAD

MD METAL DECK

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MEL MELAMINE

MEMB MEMBRANE

MF MILL FINISH

MFR REC MANUFACTURER'S RECOMMENDATIONS

MIN MINUTE OR MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MLWK MILLWORK

MO MASONRY OPENING

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTL METAL

MULL MULLION

MW MICROWAVE

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

O/O OUT TO OUT

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OD OUTSIDE DIMENSION OR

OUTSIDE DIAMETER

OFCI OWNER FURNISHED

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED

OWNER INSTALLED

OFF OFFICE

OH DR OVERHEAD (COILING) DOOR

OPP OPPOSITE

PLAM PLASTIC LAMINATE

PLAS PLASTIC

PLYWD PLYWOOD

PMTL PAINTED METAL

PNL PANEL

PR PAIR

PT PAINT

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QTY QUANTITY

QUAL QUALITY

R RADIUS OR RISER

RB RUBBER BASE

RB HK ROBE HOOK

RBR RUBBER

RCP REFLECTED CEILING PLAN

REC RECESSED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REINF REINFORCE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RM ROOM

RO ROUGH OPENING

RV ROOF VENT

SAT SUSPENDED ACOUSTICAL TILE

SCHED SCHEDULE

SCWD SOLID CORE WOOD DOOR

SF SQUARE FOOT (FEET)

SHT SHEET

SHV SHELVING

SIM SIMILAR

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SERVICE SINK

SST STAINLESS STEEL

ST STAIRS

STRUCT STRUCTURAL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STNLS STAINLESS

STOR STORAGE

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

T TREAD

T&G TONGUE AND GROOVE

TB TOWEL BAR

TD TOWEL DISPENSER

TEL TELEPHONE

THRES THRESHOLD

THRU THROUGH

TMPD GL TEMPERED GLASS

TO TOP OF

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWER RACK

TYP TYPICAL

UCD UNDERCUT DOOR

UNO UNLESS NOTED OTHERWISE

UR URINAL

UTIL UTILITY

VAR VARIES

VCT VINYL COMPOSITION TILE

VFAT VINYL FACED ACOUSITCAL TILE

VR VAPOR RETARDER

VMC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W/ WITH

W/O WITHOUT

WBL WOOD BLOCKING

WC WALL COVERING OR WATER CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WD WOOD

WDW WINDOW

WFAB WALL FABRIC

WSCT WAINSCOT

X BRACE CROSS BRACE

YD YARD

ADD ALTERNATES

NOT USED

ROOM NAME,

NUMBER AND

SQUARE FEET

Room name

02 4 8134

SCALE: 1/4"=1'-0"

GRAPHIC SCALE

A000

A000

A000

A000

A000

X/A000

A000

A000

A

CG

3'-6"

COLUMN GRID

KEYNOTE

WALL OR PARTITION TYPE

CORNER GUARD

NORTH ARROW

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW

ELEVATION INDICATOR, INTERIOR, SINGLE VIEW

BUILDING SECTION INDICATOR

ELEVATION INDICATOR

BREAK, STRAIGHT (SEE SECTION INDICATORS,

BUILDING, WITH BREAK STANDARDS)

DETAIL INDICATOR

DETAIL INDICATOR

DETAIL INDICATOR FOR SMALL CONDITIONS

DIMENSION LINE

CENTER LINE

FIRE EXTINGUISHER CABINET

1 1/2"

MATCH LINE

N

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN VOLUNTARY

STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY

OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION

LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)

• NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)

• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• NATIONAL ELECTRICAL CODE (NEC)

• INTERNATIONAL PLUMBING CODE (IPC)

• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318) MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL

CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT.

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01.00.00 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY

TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION.

THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

DURING CONSTRUCTION PROJECT

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO

PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEET ROCK, PLYWOOD,

PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND

SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING

HEPA EQUIPPED AIR FILTRATION UNITS.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS

THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA

VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR

CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY

LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR

SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE

WORKER EXITS THE WORK AREA.

7.DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED

PROJECT IS INSPECTED. AVAHCS SAFETY OFFICER AND INFECTION

CONTROL COORDINATOR AND THOROUGHLY CLEANED BY THE

ENVIRONMENTAL MANAGEMENT SERVICES.

UPON COMPLETION OF EACH PHASE AND PROJECT

1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING

OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY

COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING

UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

5. WET MOP AREA WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC.

REQUIRED INFECTION CONTROL PRECAUTIONS - CLASS IV

KEYPLAN

N

BUILDING 28

CONCRETE/ PRECAST

CONCRETE

SOIL

SAND, EIFS FINISH COAT, OR

CEMENT PLASTER

BRICK

CMU

STONE

FIBERGLASS SEMI RIGID

INSULATION

FIBERGLASS BATT INSULATION

MINERAL WOOL SEMI RIGID

INSULATION

EXPANDED POLYSTYRENE

RIGID INSULATION

EXTRUDED POLYSTYRENE

RIGID INSULATION

POLYISOCYANURATE RIGID

INSULATION

GYPSUM BOARD

EXTERIOR GYPSUM

SHEATHING

EXTERIOR CEMENT

BOARD

COATED GLASS MAT

WATER RESISTANT GYP

BD

PLYWOOD

COVER BOARD

Drawing Number

Project Number

Date

Project Title

Building Number

Location

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEERNOT FOR

CONSTRUCTION

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

BROWN CONSULTING

3505 OLSEN BLVD, SUITE 110

AMARILLO, TX 79109

WWW.BROWNCONSULTINGENGINEERS.COM

OF

REPLACE ELEVATOR

CONTROLS BLDG 28

GENERAL INFORMATION

504-18-107

12/19/2018 JEH EOC

G-001

100% CONSTRUCTION DOCUMENTS

AMARILLO VA HEALTH CARE SYSTEM

6010 W. AMARILLO BLVD, AMARILLO, TX 79106

1. ADD ALTERNATE #1 - RENOVATE AND MODERNIZE ELEVATOR CAB SPACE WITH STAINLESS

STEEL FINISHES AND LVT FLOORING. TO INCLUDE NEW BUTTON PANELS, LIGHTING, CEILING, WALLS, RAILS, FLOOR, AND OTHER TRIM.

2. ADD ALTERNATE #2 - RENOVATE AND MODERNIZE ELEVATOR DOORS AND ENTRY WAYS IN

LOBBIES 1A, 2A, 3A AND 4A AS INDICATED ON THE PLANS. TO INCLUDE NEW STAINLESS

STEEL DOORS, AND STAINLESS STEEL JAMB AND HEAD TRIM TO MATCH.

3. ADD ALTERNATE #3 - RENOVATE AND MODERNIZE ELEVATOR DOORS AND ENTRY WAYS IN

LOBBIES 1B, 2B, 3B AND CART REC 4276 AS INDICATED ON THE PLANS. TO INCLUDE NEW

STAINLESS STEEL DOORS, AND STAINLESS STEEL JAMB AND HEAD TRIM TO MATCH.

4. ADD ALTERNATE #4 - REMOVE AND REPLACE EXISTING WALL FINISH AT SHAFT WALL

SURROUNDING ELEVATOR DOORS IN LOBBIES 1A, 2A, 3A AND 4A AS INDICATED ON THE

PLANS. TO INCLUDE THE REMOVAL OF EXISTING WALL FINISH MATERIAL AND INSTALLATION

OF NEW WALL TILE.

5. ADD ALTERNATE #5 - REMOVE AND REPLACE EXISTING WALL FINISH AT SHAFT WALL

SURROUNDING ELEVATOR DOORS IN LOBBIES 1B, 2B, 3B AND CART REC 4276 AS INDICATED

ON THE PLANS. TO INCLUDE THE REMOVAL OF EXISTING WALL FINISH MATERIAL AND

INSTALLATION OF NEW WALL TILE.

02 08 jeh Rectangle

UP

UP

DN

AGENT CASHIER

ELEV. ELEV. ELEV.

STAIR

LINEN CHUTE

PHARMACY

DRIVER

COMM

REGISTRATION

1206 V

IC

C

A R

D A

ELIGIBILTY

ELIGIBILTY

1204B

E L

IG

IB

IL

T Y

C

ESCORT

S E

C U

R

IT

Y

T R

A V

E L D

IS

T

A N

C E

F E

C

FEC

VENDING

LINEN

STORAGE

STAIR

T E

L E

ELEV. ELEV. ELEV.

RETAIL STORE

RETAIL STORAGE

TRAVEL DISTANCE

125' - 10"

F E

C

ELEV. ELEV. ELEV.

STAIR

LINEN

CHUTE

CLEAN RECEIVING

TELE

SOCIAL

WORKER

WAITING

PATIENT ROOM

PATIENT ROOM

P A

T

IE

N T

R O

O M

REST

3824A

REST

3822A

REST

REST

HAC

TRAVEL DISTANCE

125' - 2"

F E

C

FEC

ELEV. ELEV. ELEV.

STAIR

BED

TOILET

SOILED

STORAGE

GRIEVING

T O

IL

E

T

WAITING

LINEN

STORAGE

TELE

HAC

GRIEVING

ROOM

RESTROOM

BED

4225B3

BED

4225B2

BED

4225B1

NURSE

STATION

TRAVEL DISTANCE

108' - 3"

F E

C

FEC

NFPA 101-2015 EDITION

BUILDING IS EQUIPPED WITH A FULLY AUTOMATIC FIRE SPRINKLER SYSTEM

THROUGHOUT - TO MEET NFPA 13 REQUIREMENTS

CONSTRUCTION TYPE: TYPE II (222) (TABLE A.8.2.1.2)

FIRE RESISTANCE RATINGS (TABLE A.8.2.1.2:)

• COLUMN: 2 HR

• BEAMS, GIRDERS, TRUSSES: 2 HR

• FLOOR/CEILING ASSEMBLIES: 2 HR

• ROOF/CEILING ASSEMBLIES: 1 HR

• EXTERIOR NON-BEARING WALLS: 0 HR (>30' FROM ADJ. BLDG.)

• INTERIOR NON-BEARING WALLS: 0 HR

• SHAFTS - MINIMUM 1/2-HOUR RATING [8.6.5 (3)]

FIRE-RESISTIVE REQUIREMENTS:

• NON COMBUSTIBLE MATERIALS FOR STRUCTURAL FRAME, FLOORS,

ROOF DECK, EXTERIOR NON-BEARING WALLS, INTERIOR NON-

BEARING WALLS (U.N.O. AT EXTERIOR)

CHAPTER 19: EXISTING HEALTH CARE OCCUPANCY

DEAD END CORRIDOR MAXIMUM DISTANCE: 50' (21.2.5.2)

MAXIMUM COMMON PATH OF TRAVEL: 100' (21.2.5.3.1)

MAXIMUM TRAVEL DISTANCE: 200' (21.2.6.2.2)

EGRESS WIDTH PER OCCUPANT (IBC 2015)

MINIMUM STAIR WIDTH = 44 INCHES (IBC 1011.2)

MINIMUM CORRIDOR WIDTH = 72 INCHES (IBC TABLE 1020.2)

MINIMUM EGRESS WIDTH THROUGH DOOR = 32 INCHES (IBC 1010.1.1)

ALL EXIT DOORS PROVIDED ARE 36" LEAF MINIMUM YIELDING 34" CLEAR

EXIT WIDTH .

• 0.15"/PERSON (IBC 2015 1005.3.2, EXCEPTION 1) ALLOWS 226

OCCUPANT LOAD PER DOOR MAX.

FIRE ALARM SYSTEM:

• REQUIRED/PROVIDED MANUAL SYSTEM.

LIFE SAFETY LEGEND

AREA NOT IN SCOPE

BUILDING EXIT

FEC FIRE EXTINGUISHER CABINET (EXISTING)

PATH OF EGRESS

KEYPLAN

N

BUILDING 28

STAIR 5

PENTHOUSE

TRAVEL DISTANCE

73' - 7"

Railing

Drawing Number

Project Number

Date

Project Title

Building Number

Location

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEERNOT FOR

CONSTRUCTION

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

BROWN CONSULTING

3505 OLSEN BLVD, SUITE 110

AMARILLO, TX 79109

WWW.BROWNCONSULTINGENGINEERS.COM

OF

REPLACE ELEVATOR

CONTROLS BLDG 28

LIFE SAFETY PLAN

504-18-107

12/19/2018 JEH EOC

G-011

100% CONSTRUCTION DOCUMENTS

AMARILLO VA HEALTH CARE SYSTEM

6010 W. AMARILLO BLVD, AMARILLO, TX 79106

NORTH

1/8" = 1'-0"

FLOOR PLAN - FIRST FLOOR

NORTH

1/8" = 1'-0"

LIFE SAFETY PLAN - SECOND FLOOR

NORTH

1/8" = 1'-0"

LIFE SAFETY PLAN - THIRD FLOOR

NORTH

1/8" = 1'-0"

LIFE SAFETY PLAN - FOURTH FLOOR

NORTH

1/8" = 1'-0"

FLOOR PLAN - PENTHOUSE

03 08 jeh Rectangle

UPUP

DN

AGENT CASHIER

ELEVATOR 3 ELEVATOR 2 ELEVATOR 1

STAIR 5

LINEN CHUTE

PHARMACY

DRIVER

COMM

REGISTRATION

1206 V

IC

C

A R

D A

ELIGIBILTY

ELIGIBILTY

1204B

E L

IG

IB

IL

T Y

C

ESCORT

S E

C U

R

IT

Y

LOBBY 1A

LOBBY 1B

5 4

VENDING

LINEN

STORAGE

STAIR 5

T E

L E

RETAIL STORE

RETAIL STORAGE

LOBBY 2A

LOBBY 2B

1 3

5 4

ELEVATOR 3 ELEVATOR 2 ELEVATOR 1

STAIR 5

LINEN

CHUTE

CLEAN RECEIVING

TELE

SOCIAL

WORKER

WAITING

PATIENT ROOM

PATIENT ROOM

P A

T

IE

N T

R O

O M

REST

3824A

REST

3822A

REST

REST

HAC

LOBBY 3A

LOBBY 3B

5 4

ELEVATOR 3 ELEVATOR 2 ELEVATOR 1

STAIR 5

BED

TOILET

SOILED

STORAGE

GRIEVING

T O

IL

E

T

WAITING

LINEN

4276A

STORAGE

TELE

HAC

GRIEVING

ROOM

RESTROOM

BED

4225B3

BED

4225B2

BED

4225B1

NURSE

STATION

CART REC

CLEAN

SOILED

LOBBY 4A

1 3

ELEVATOR 3 ELEVATOR 2 ELEVATOR 1

STAIR 5

PENTHOUSE

Railing

KEYPLAN

N

BUILDING 28

GENERAL DEMOLITION NOTES:

A. ALL ELECTRICAL FIXTURES LOCATED THROUGHOUT THE SCOPE OF WORK ARE TO BE REMOVED AND RECPLACED WITHIN THE NEW WALL ASSEMBLY.

B. ALL EXISTING CEILINGS AND LIGHTING FIXTURES ARE TO BE PROTECTED DURING CONSTRUCTION AND PREPARED TO ACCOMODATE ADJACENT FINISHES AS REQUIRED.

C. ALL EXISTING FLOORING IS TO BE PROTECTED DURING CONSTRUCTION AND PREPARED TO ACCOMODATE ADJACENT FINISHES AS REQUIRED.

D. PROTECT ALL EXISTING ELEMENTS NOT IN SCOPE OF WORK DURING CONSTRUCTION.

E. LEAVE CLEAR ACCESS TO ITEMS IN ADJACENT PHASES DURING CONSTRUCTION.

F. LEAVE CLEAR EXIT WAY ACCESS DURING CONSTRUCTION.

G. PROTECT AND RE-USE WAYFINDING AND SIGNAGE ELEMENTS.

H. DRAWINGS TO BE TAKEN AS PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR TO CONFIRM ALL ITEMS REQUIRED TO BE DEMOLISHED AND EXTENT OF DEMOLITION BASED

UPON THE OVERALL DESIGN INTENT OF THE ENTIRE DOCUMENT SET.

DEMOLITION KEYED NOTES

2 REMOVE EXISTING WALL TILE AND SUBSTRATE. PREPARE SURFACE TO RECEIVE NEW GYPSUM WALL BOARD.

REMOVE EXISTING GYPSUM WALL BOARD FINISH. PROTECT AND RE-USE EXISTING FURRING. PREPARE TO RECEIVE NEW GYPSUM WALL BOARD. (ADD ALTERNATE #4)

3 REMOVE EXISTING AND REPLACE ELEVATOR DOOR, FRAME, AND SILL. (ADD ALTERNATE #2)

4 REMOVE EXISTING GYPSUM WALL BOARD FINISH. PROTECT AND RE-USE EXISTING FURRING. PREPARE TO RECEIVE NEW GYPSUM WALL BOARD. (ADD ALTERNATE #5)

5 REMOVE EXISTING AND REPLACE ELEVATOR DOOR, FRAME, AND SILL. (ADD ALTERNATE #3)

6 REMOVE AND RE-USE EXISTING TILE WALL BASE THROUGHOUT AREA OF WORK.

7 REMOVE EXISTING ELEVATOR CAR INTERIOR AND PREPARE TO RECEIVE NEW FINISH. (ADD ALTERNATE #1)

Drawing Number

Project Number

Date

Project Title

Building Number

Location

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEERNOT FOR

CONSTRUCTION

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

BROWN CONSULTING

3505 OLSEN BLVD, SUITE 110

AMARILLO, TX 79109

WWW.BROWNCONSULTINGENGINEERS.COM

OF

REPLACE ELEVATOR

CONTROLS BLDG 28

ARCHITECTURAL DEMOLITION

504-18-107

12/19/2018 JEH AA

AD-101

100% CONSTRUCTION DOCUMENTS

AMARILLO VA HEALTH CARE SYSTEM

6010 W. AMARILLO BLVD, AMARILLO, TX 79106

NORTH

1/8" = 1'-0"

DEMOLITION - FIRST FLOOR

NORTH

1/8" = 1'-0"

DEMOLITION - SECOND FLOOR

NORTH

1/8" = 1'-0"

DEMOLITION - THIRD FLOOR

NORTH

1/8" = 1'-0"

DEMOLITION - FOURTH FLOOR

NORTH

1/8" = 1'-0"

DEMOLITION - PENTHOUSE

04 08 jeh Rectangle

UPUP

DN

UP

AGENT CASHIER

STAIR 5

LINEN CHUTE

PHARMACY

DRIVER

COMM

REGISTRATION

1206 V

IC

C

A R

D A

ELIGIBILTY

ELIGIBILTY

1204B

E L

IG

IB

IL

T Y

C

ESCORT

S E

C U

R

IT

Y

1 / AS - 102

2 / AS - 102

LOBBY 1A

LOBBY 1B

5 4

ELEVATOR 3 ELEVATOR 2 ELEVATOR 1

KEYPLAN

N

BUILDING 28

VENDING

LINEN

STORAGE

STAIR 5

T E

L E

RETAIL STORE

RETAIL STORAGE

1 / AS - 102

2 / AS - 102

LOBBY 2A

LOBBY 2B

1 3

5 4

ELEVATOR 3 ELEVATOR 2 ELEVATOR 1

STAIR 5

LINEN

CHUTE

CLEAN RECEIVING

TELE

SOCIAL

WORKER

WAITING

PATIENT ROOM

PATIENT ROOM

P A

T

IE

N T

R O

O M

REST

3824A

REST

3822A

REST

REST

HAC

1 / AS - 102

2 / AS - 102

LOBBY 3A

LOBBY 3B

5 4

ELEVATOR 3 ELEVATOR 2 ELEVATOR 1

STAIR 5

BED

TOILET

SOILED

STORAGE

GRIEVING

T O

IL

E

T

WAITING

LINEN

4276A

STORAGE

TELE

HAC

GRIEVING

ROOM

RESTROOM

BED

4225B3

BED

4225B2

BED

4225B1

NURSE

STATION

CART REC

CLEAN

SOILED

1 / AS - 102

2 / AS - 102

LOBBY 4A

1 3

5 4

ELEVATOR 3 ELEVATOR 2 ELEVATOR 1

STAIR 5

PENTHOUSE

1 / AS - 102

2 / AS - 102

Railing

GENERAL NOTES

1. PHASE 1 TO INCLUDE ALL

MODIFICATIONS WITHIN AND

CONCERNING ELEVATOR #1 REFER

GENERAL, MECHANICAL AND

ELECTRICAL SPECIFICATIONS.

2.PHASE 2 TO INCLUDE ALL

MODIFICATIONS WITHIN AND

CONCERNING ELEVATOR #2 REFER

GENERAL, MECHANICAL AND

ELECTRICAL SPECIFICATIONS.

3. PHASE 3 TO INCLUDE ALL

MODIFICATIONS WITHIN AND

CONCERNING ELEVATOR #3 REFER

GENERAL, MECHANICAL AND

ELECTRICAL SPECIFICATIONS.

4. REFER TO FINISH SCHEDULE ON

SHEET AS-102 FOR WALL AND

ELEVATOR FINISHES.

5. LEAVE CLEAR ACCESS TO ITEMS

IN ADJACENT PHASES DURING

CONSTRUCTION.

6. LEAVE CLEAR EXIT WAY ACCESS

DURING CONSTRUCTION.

FLOOR PLAN - SCOPE OF WORK LEGEND

AREA OF NO WORK

PHASE 1

PHASE 2

PHASE 3

ELEVATOR 3 ELEVATOR 1ELEVATOR 2 EXISTING ELEVATOR CAR.

REMOVE AND REFINISH ADD

ALTERNATE #1 (TYP. EACH CAR)

PHASE III PHASE II PHASE I

DEMOLITION KEYED NOTES

2 NEW GYPSUM WALL BOARD.

NEW GYPSUM WALL BOARD. (ADD ALTERNATE #4)

3 REPLACE ELEVATOR DOOR, FRAME, AND SILL. (ADD ALTERNATE #2)

4 NEW GYPSUM WALL BOARD. (ADD ALTERNATE #5)

5 REPLACE ELEVATOR DOOR, FRAME, AND SILL. (ADD ALTERNATE #3)

6 RE-USE EXISTING TILE WALL BASE.

7 PREPARE TO RECEIVE NEW FINISH. (ADD ALTERNATE #1)

Drawing Number

Project Number

Date

Project Title

Building Number

Location

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEERNOT FOR

CONSTRUCTION

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

BROWN CONSULTING

3505 OLSEN BLVD, SUITE 110

AMARILLO, TX 79109

WWW.BROWNCONSULTINGENGINEERS.COM

OF

REPLACE ELEVATOR

CONTROLS BLDG 28

FLOOR PLANS

504-18-107

12/19/2018 JEH ZDL

AS - 101

100% CONSTRUCTION DOCUMENTS

AMARILLO VA HEALTH CARE SYSTEM

6010 W. AMARILLO BLVD, AMARILLO, TX 79106

NORTH

1/8" = 1'-0"

FLOOR PLAN - FIRST FLOOR

NORTH

1/8" = 1'-0"

FLOOR PLAN - SECOND FLOOR

NORTH

1/8" = 1'-0"

FLOOR PLAN - THIRD FLOOR

NORTH

1/8" = 1'-0"

FLOOR PLAN - FOURTH FLOOR

NORTH

1/8" = 1'-0"

FLOOR PLAN - PENTHOUSE

NORTH

1/2" = 1'-0"

PHASING PLAN

ELEVATOR EQUIPMENT

05 08 jeh Rectangle

LEVEL 1

0' - 0"

LEVEL 2

13' - 4"

LEVEL 3

26' - 8"

LEVEL 4

40' - 0"

PENTHOUSE

54' - 6"

EXISTING CEILING TO REMAIN.

(TYP. ALL FLOORS)

EXISTING FLOOR AND FINISH TO

REMAIN (TYP. ALL FLOORS)

EXISTING ELEVATOR DOOR AND

TRIM. REMOVE AND REPLACE

ADD ALT #2

EXISTING WALL FINISH.

REMOVE AND REPLACE WITH

NEW GYPSUM WALL BOARD

OVER EXISTING FURRING TO 6"

ABOVE CEILING. PAINT P1. ADD

ALT #3

EXISTING ELEVATOR DOOR AND

TRIM. REMOVE AND REPLACE

ADD ALT #2

NEW RUBBER BASE, ADD ALT. #3

EXISTING WALL FINISH.

REMOVE AND REPLACE WITH

NEW GYPSUM WALL BOARD

OVER EXISTING FURRING TO 6"

ABOVE CEILING. PAINT P1. ADD

ALT #3

RE-USE EXISTING WALL BASE

EXISTING ELEVATOR DOOR AND

TRIM. REMOVE AND REPLACE

ADD ALT #2

EXISTING ELEVATOR DOOR AND

TRIM. REMOVE AND REPLACE

ADD ALT #2

EXISTING WALL FINISH.

REMOVE AND REPLACE WITH

NEW GYPSUM WALL BOARD

OVER EXISTING FURRING TO 6"

ABOVE CEILING. PAINT P1. ADD

ALT #3

EXISTING WALL FINISH.

REMOVE AND REPLACE WITH

NEW GYPSUM WALL BOARD

OVER EXISTING FURRING TO 6"

ABOVE CEILING. PAINT P1. ADD

ALT #3

NEW RUBBER BASE, ADD ALT. #3

NEW RUBBER BASE, ADD ALT. #3

PROVIDE AND INSTALL CALL

BUTTON AND HALL SIGNALS PER

MANUFACTURER'S

RECOMMENDATIONS. (TYP. ALL

ELEVATOR DOORS)

ELEVATOR PIT

LEVEL 1

0' - 0"

LEVEL 2

13' - 4"

LEVEL 3

26' - 8"

LEVEL 4

40' - 0"

PENTHOUSE

54' - 6"

EXISTING ELEVATOR DOOR AND

TRIM. REMOVE AND REPLACE

ADD ALT #4

NEW RUBBER BASE, ADD ALT. #5

EXISTING WALL FINISH.

REMOVE AND REPLACE WITH

NEW GYPSUM WALL BOARD

OVER EXISTING FURRING TO 6"

ABOVE CEILING. PAINT P1. ADD

ALT #5

EXISTING ELEVATOR DOOR AND

TRIM. REMOVE AND REPLACE

ADD ALT #4

NEW RUBBER BASE, ADD ALT. #5

EXISTING WALL FINISH.

REMOVE AND REPLACE WITH

NEW GYPSUM WALL BOARD

OVER EXISTING FURRING TO 6"

ABOVE CEILING. PAINT P1. ADD

ALT #5

EXISTING ELEVATOR DOOR AND

TRIM. REMOVE AND REPLACE

ADD ALT #4

NEW RUBBER BASE, ADD ALT. #5

EXISTING WALL FINISH.

REMOVE AND REPLACE WITH

NEW GYPSUM WALL BOARD

OVER EXISTING FURRING TO 6"

ABOVE CEILING. PAINT P1. ADD

ALT #5

EXISTING ELEVATOR DOOR AND

TRIM. REMOVE AND REPLACE

ADD ALT #4

NEW RUBBER BASE, ADD ALT. #5

EXISTING WALL FINISH.

REMOVE AND REPLACE WITH

NEW GYPSUM WALL BOARD

OVER EXISTING FURRING TO 6"

ABOVE CEILING. PAINT P1. ADD

ALT #5

EXISTING CEILING TO REMAIN.

(TYP. ALL FLOORS)

EXISTING FLOOR AND FINISH

TO REMAIN (TYP. ALL FLOORS)

PROVIDE AND INSTALL CALL

BUTTON AND HALL SIGNALS

PER MANUFACTURER'S

RECOMMENDATIONS. (TYP. ALL

ELEVATOR DOORS)

ELEVATOR PIT

FINISH SCHEDULE

ROOM NAME/NUMBER

FLOOR

FINISHES

FLOOR FINISHES WALL FINISHES WALL FINISHES WALL FINISHES WALL FINISHES CEILING FINISHES

REMARKSMATERIAL BASE NORTH EAST SOUTH WEST MATERIAL

ELEVATOR 1

ELEVATOR 2

ELEVATOR 3

LOBBY 1A

LOBBY 2A

LOBBY 3A

LOBBY 4A

LOBBY 1B

LOBBY 2B

LOBBY 3B

CART REC 4276

STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL

STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL

STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL

LVT

LVT

LVT ADD ALTERNATE #1

ADD ALTERNATE #3

ADD ALTERNATE #5

TILE (REUSE/MATCH EXISTING)

RUBBER BASE 1

RUBBER BASE 1

RUBBER BASE 1

RUBBER BASE 1

RUBBER BASE 1

RUBBER BASE 1

RUBBER BASE 1

ADD ALTERNATE #5

ADD ALTERNATE #5

ADD ALTERNATE #5

ADD ALTERNATE #3

ADD ALTERNATE #3

ADD ALTERNATE #3

ADD ALTERNATE #1

ADD ALTERNATE #1

GYPSUM WALL BOARD

PAINTED P1

GYPSUM WALL BOARD

PAINTED P1

GYPSUM WALL BOARD

PAINTED P1

GYPSUM WALL BOARD

PAINTED P1

GYPSUM WALL BOARD

PAINTED P1

GYPSUM WALL BOARD

PAINTED P1

GYPSUM WALL BOARD

PAINTED P1

GYPSUM WALL BOARD

PAINTED P1

Drawing Number

Project Number

Date

Project Title

Building Number

Location

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEERNOT FOR

CONSTRUCTION

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

BROWN CONSULTING

3505 OLSEN BLVD, SUITE 110

AMARILLO, TX 79109

WWW.BROWNCONSULTINGENGINEERS.COM

OF

REPLACE ELEVATOR

CONTROLS BLDG 28

INTERIOR ELEVATIONS

504-18-107

12/19/2018 JEH AA

AS - 102

100% CONSTRUCTION DOCUMENTS

AMARILLO VA HEALTH CARE SYSTEM

6010 W. AMARILLO BLVD, AMARILLO, TX 79106

1/4" = 1'-0"

ELEVATION - WEST

1/4" = 1'-0"

ELEVATION - EAST

06 08 jeh Rectangle

DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

08-6231

Office of Construction and Facilities Management

REVISIONS DATE

CONSULTANTS ARCHITECT

on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot

3 4 5 6

E

F

BROWN CONSULTING

3505 OLSEN BLVD, SUITE 110 Drawing Number

Project Number

Date

Project Title

Building Number

Location

Checked

Dwg

M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER

on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

1 2 3 4 5 6 7 8 9

A

1 2 7 8 9

B

C

D

E

F

A

B

C

D

AMARILLO, TX 79109

WWW.BROWNCONSULTINGENGINEERS.COM

OF

12/19/2018 SAM KEH

REPLACE ELEVATOR

CONTROLS BLDG 28

AMARILLO VA HEALTH CARE SYSTEM

6010 W. AMARILLO BLVD, AMARILLO, TX 79106

504-18-107

100% CONSTRUCTION DOCUMENTS

KEYPLAN

N

MH - 101

1/8" = 1'-0"1 DEMOLITION FLOOR PLAN - FOURTH FLOOR

1/8" = 1'-0"2 DEMOLITION FLOOR PLAN - PENTHOUSE

1/8" = 1'-0"3 FLOOR PLAN - FOURTH FLOOR

1/8" = 1'-0"4 FLOOR PLAN - PENTHOUSE

1. COORDINATE ALL WORK WITH EXISTING GENERAL CONDITIONS,

ARCHITECTURAL, STRUCTURAL, PLUMBING, FIRE PROTECTION, AND

ELECTRICAL SYSTEMS.

TEMPERATURE CONTROLS CONTRACTOR SHALL EXTEND THE

EXISTING BUILDING EMCS AS REQUIRED TO SERVE NEW ELEVATOR

HOISTWAY PRESSURIZATION SYSTEM.

REPAIR DUCT THRU WALL AS REQUIRED FOR AIR TIGHT SEAL DUE TO

REMOVAL OF FIRE DAMPER. REINSTALL EXISTING GRATE COVERING

OPENING INTO ELEVATOR HOISTWAY. SEAL ALL EXISTING DUCT TO

MEET CURRENT SMACNA STANDARDS.

ROUTE NEW 36x36 ELEVATOR HOISTWAY PRESSURIZATION DUCT

DOWN THRU ROOF AND CONNECT TO EXISTING AS SHOWN. REFER TO

DETAIL 1 THIS SHEET.

INSTALL MOTORIZED ISOLATION DAMPER IN ELEVATOR HOISTWAY

PRESSURIZATION DUCT. FABRICATE WEATHER-TIGHT SHEET METAL

ENCLOSURE TO HOUSE DAMPER ACTUATOR. DAMPER ACTUATOR

SHALL BE NORMALLY CLOSED FAST ACTING TYPE. REFER TO

SEQUENCE OF OPERATION THIS SHEET.

MOUNT SUPPLY FAN ON EQUIPMENT SUPPORT RAILS AND

RESTRAINED SPRING ISOLATORS. REFER TO DETAIL 1 THIS SHEET.

MOUNT VARIABLE FREQUENCY DRIVE SERVING SF-1 ON WALL.

EXISTING VENTILATION DUCT TO REMAIN.

REMOVE EXISTING FIRE DAMPER SHOWN DASHED.

REMOVE EXISTING VENTILATION HOOD AND ASSOCIATED MOTORIZED

DAMPER SHOWN DASHED. REMOVE ASSOCIATED ROOF CURB.

ASSOCIATED 36x36 DUCT TURNED UP TO REMAIN. CONTRACTOR TO

DELIVER VENTILATION HOOD TO OWNER. COORDINATE DETAILS WITH

VA PROJECT ENGINEER.

REMOVE EXISTING ELECTRIC UNIT HEATER SHOWN DASHED.

MECHANICAL FLOOR PLANS

2.

ELEV. ELEV. ELEV.

STAIR 5

GRIEVING

TO

IL

E T

WAITING

LINEN

STORAGE

TELE

HAC

GRIEVING

ROOM

RESTROOM

BED

4225B3

BED

4225B2

BED

4225B1

UP

EX 36x36

STAIR 5

PENTHOUSE

DN

M

DN

STAIR 5

PENTHOUSE

SF-136x36

M2

UP

ELEV. ELEV. ELEV.

STAIR 5

GRIEVING

TO

IL

E T

WAITING

LINEN

STORAGE

TELE

HAC

GRIEVING

ROOM

RESTROOM

BED

4225B3

BED

4225B2

BED

4225B1

EX 36x36

FAN SCHEDULE

MARK CFM SP HP RPM TYPE ROTATION DRIVE ELECTRICAL EXAMPLE: COOK

SF-1 12,000 0.75 5 1074 UTILITY VENT SET CLOCKWISE BELT 460/3/60 270 CPS

NOTES: 1. FAN SELECTED AT ELEVATION OF 3600 FEET.

2. PROVIDE FAN WITH FACTORY WIRED DISCONNECT, PREMIUM EFFICIENCY MOTOR, AND SHAFT SEAL.

3. PROVIDE FAN WITH OSHA WEATHER COVER, STEEL ACCESS DOOR, SPIRAL INLET GUARD, AND STEEL DRAIN.

4. PROVIDE FAN WITH HEAT SHIELD, EXTENDED LUBE LINES, AND ROTARY BELT TENSIONER.

5. PROVIDE FAN WITH SPRING ISOLATORS (6).

6. FAN SHALL BE UL LISTED FOR SMOKE CONTROL APPLICATION.

FLASH AND

COUNTERFLASH

CANT

STRIP

CANT

STRIP

RESTRAINED SPRING

ISOLATORS

FLEXIBLE

CONNECTOR

PRESSURIZATION FAN

ON MANUFACTURER

SKID FRAMING

(2) THYBAR 12" TALL

EQUIPMENT RAIL

SUPPORTS (OR EQUAL)

THYBAR 12" TALL TC-3

INSULATED ROOF

CURB (OR EQUAL)

FLASHING AND

COUNTER FLASH

PRESSURIZATION FAN INSTALLATION DETAIL

DO NOT

INSULATE DUCT

FABRICATE WEATHER TIGHT SHEET METAL

ENCLOSURE TO HOUSE DAMPER ACTUATOR

CONNECT NEW 36x36

DUCT TO EXISTING

BELOW ROOF

VFD

FAN

S/S

FAN

SPEED

M

DISCHARGE

INTO ELEVATOR

HOISTWAY

OPPOSED BLADE

DAMPER WITH 24V

FAST ACTING

ACTUATOR

SF-1

P

DIFFERENTIAL

PRESSURE ACROSS

HOISTWAY TO LOBBY

AT FIRST FLOOR

SYSTEM CONSISTS OF:

1. ROOF MOUNTED SUPPLY FAN WITH VARIABLE FREQUENCY DRIVE (VFD)

2. DUCT MOUNTED MOTORIZED CONTROL DAMPER

TEMPERATURE CONTROLS CONTRACTOR TO PROVIDE:

1. EMCS CONTROLLER

2. 24V DAMPER ACTUATOR

3. DIFFERENTIAL PRESSURE SENSOR

4. CURRENT TRANSDUCER

OPERATION:

1. THE CONTROL DAMPER SHALL BE NORMALLY POWERED CLOSED.

2. UPON SIGNAL FROM THE FIRE ALARM PANEL, THE CONTROL DAMPER SHALL SPRING RETURN OPEN

AND A SIGNAL SHALL BE SENT TO THE VFD TO ENERGIZE THE FAN.

3. THE VFD SHALL RAMP UP THE FAN SPEED TO MAINTAIN A POSITIVE PRESSURE IN THE ELEVATOR

HOISTWAY OF 0.10" W.G. IN RELATION TO THE FIRST FLOOR LOBBY.

4. ON LOSS OF SIGNAL FROM THE FIRE ALARM PANEL, THE FAN SHALL DE-ENERGIZE AND THE

CONTROL DAMPER SHALL BE POWERED CLOSED.

MONITORING AND ALARMS:

1. FAN STATUS

2. AN ALARM SHALL BE GENERATED TO THE EMCS WHEN THE FAN IS RUNNING.

WORK BY OTHERS:

1. DIVISION 26 TO PROVIDE POWER WIRING TO VFD AND TO FAN.

EXISTING 36x36 DUCT TO

ELEVATOR HOISTWAY

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text X

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text 106163

AutoCAD SHX Text SETH A. McCLELLAN

AutoCAD SHX Text December 19, 2018

AutoCAD SHX Text

KEYED NOTES:

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

DEMOLITION KEYED NOTES:

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

ELEVATOR HOISTWAY PRESSURIZATION SEQUENCE OF OPERATION

DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

08-6231

Office of Construction and Facilities Management

REVISIONS DATE

CONSULTANTS ARCHITECT

on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot

3 4 5 6

E

F

BROWN CONSULTING

3505 OLSEN BLVD, SUITE 110 Drawing Number

Project Number

Date

Project Title

Building Number

Location

Checked

Dwg

M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER

on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

1 2 3 4 5 6 7 8 9

A

1 2 7 8 9

B

C

D

E

F

A

B

C

D

AMARILLO, TX 79109

WWW.BROWNCONSULTINGENGINEERS.COM

OF

12/19/2018 JDH JCF

AMARILLO VA HEALTH CARE SYSTEM

6010 W. AMARILLO BLVD, AMARILLO, TX 79106

504-18-107REPLACE ELEVATOR

CONTROLS BLDG 28

100% CONSTRUCTION DOCUMENTS

KEYPLAN

N

ES - 101

1/8" = 1'-0"1 ELECTRICAL DEMOLITION FLOOR PLAN - PENTHOUSE

1/8" = 1'-0"3 ELECTRICAL FLOOR PLAN - PENTHOUSE

1. COORDINATE ALL WORK WITH EXISTING GENERAL CONDITIONS, ARCHITECTURAL, STRUCTURAL, PLUMBING, FIRE PROTECTION, AND MECHANICAL SYSTEMS.

CONTRACTOR TO VERIFY LOCATIONS OF ALL EXISTING ELECTRICAL EQUIPMENT, DEVICES, ETC.

DEVICES/EQUIPMENT SHOWN MAY NOT REPRESENT ALL DEVICES/EQUIPMENT AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING/RELOCATING DEVICES/EQUIPMENT NOT SHOWN AS REQUIRED

FOR DEMOLITION.

EXISTING PANEL EEDPA.

EXISTING SERVICE DISCONNECT SWITCH FOR ELEVATOR S1. INSTALL NEW 3-4, 1-8 GND BETWEEN EXISTING C/B IN EXISTING PANEL EEDPA AND EXISTING SERVICE DISCONNECT SWITCH. UTILIZE EXISTING

CONDUIT.

EXISTING SERVICE DISCONNECT SWITCH FOR ELEVATOR P1. INSTALL NEW 3-4, 1-8 GND BETWEEN EXISTING C/B IN EXISTING PANEL EEDPA AND EXISTING SERVICE DISCONNECT SWITCH. UTILIZE EXISTING

CONDUIT.

EXISTING SERVICE DISCONNECT SWITCH FOR ELEVATOR P2. INSTALL NEW 3-4, 1-8 GND BETWEEN EXISTING C/B IN EXISTING PANEL EEDPA AND EXISTING SERVICE DISCONNECT SWITCH. UTILIZE EXISTING

CONDUIT.

EXISTING FIRE ALARM SYSTEM ELEVATOR SHUNT TRIP RELAY.

EXISTING FIRE ALARM SYSTEM ELEVATOR CABINET.

EXISTING ISOLATION TRANSFORMER FOR ELEVATOR S1.

EXISTING ISOLATION TRANSFORMER FOR ELEVATOR P1.

EXISTING ISOLATION TRANSFORMER FOR ELEVATOR P2.

EXISTING FIRE ALARM SYSTEM SMOKE DETECTOR.

CONNECT TO NEW ELEVATOR S1 CONTROLLER AND INSTALL NEW 3-4, 1-8 GND, 1-1/2"C. TO EXISTING

ISOLATION TRANSFORMER. FINAL CONNECTION WITH FLEXIBLE METAL CONDUIT.

CONNECT TO NEW ELEVATOR P1 CONTROLLER AND INSTALL NEW 3-4, 1-8 GND, 1-1/2"C. TO EXISTING

ISOLATION TRANSFORMER. FINAL CONNECTION WITH FLEXIBLE METAL CONDUIT.

CONNECT TO NEW ELEVATOR P2 CONTROLLER AND INSTALL NEW 3-4, 1-8 GND, 1-1/2"C. TO EXISTING

ISOLATION TRANSFORMER. FINAL CONNECTION WITH FLEXIBLE METAL CONDUIT.

CONNECT TO ELEVATOR HOISTWAY PRESSURIZATION FAN. REFER TO MECHANICAL EQUIPMENT

CONNECTION CHART FOR DETAILS. INSTALL 3-12, 1-12G, 3/4"C. FROM VFD TO SF-1.

PROVIDE NEW FIRE ALARM SYSTEM ELEVATOR RECALL RELAYS (PRIMARY LANDING, SECONDARY

LANDING AND FIRE HAT) FOR REPLACED ELEVATORS AND MOUNT ON WALL NEXT TO EXISTING RELAY.

CONNECT TO NEW ELEVATOR CONTROLLERS AS REQUIRED.

CONNECT TO EXISTING 480V 3Ø LIFE SAFETY PANEL AS INDICATED. INSTALL A NEW 20/3 C/B IN EXISTING SPACE AS INDICATED. EXISTING PANEL EL3BH IS SQUARE D NF 480Y/277V 3Ø 4W 125A PANELBOARD.

CONTRACTOR TO VERIFY. REVISE PANEL DIRECTORY CARD AS NECESSARY.

INSTALL A NEW GFI RECEPTACLE IN EXISTING LOCATION AND CONNECT TO EXISTING CIRCUIT.

EXISTING PANEL EEDPA TO REMAIN.

EXISTING SERVICE DISCONNECT SWITCH FOR ELEVATOR S1 TO REMAIN. EXISTING WIRING FROM SERVICE DISCONNECT SWITCH BACK TO C/B IN EXISTING PANEL EEDPA TO BE REMOVED. EXISTING

CONDUIT TO REMAIN.

EXISTING SERVICE DISCONNECT SWITCH FOR ELEVATOR P1 TO REMAIN. EXISTING WIRING FROM SERVICE DISCONNECT SWITCH BACK TO C/B IN EXISTING PANEL EEDPA TO BE REMOVED. EXISTING

CONDUIT TO REMAIN.

EXISTING SERVICE DISCONNECT SWITCH FOR ELEVATOR P2 TO REMAIN. EXISTING WIRING FROM SERVICE DISCONNECT SWITCH BACK TO C/B IN EXISTING PANEL EEDPA TO BE REMOVED. EXISTING

CONDUIT TO REMAIN.

EXISTING FIRE ALARM SYSTEM ELEVATOR SHUNT TRIP RELAY TO REMAIN.

EXISTING FIRE ALARM SYSTEM ELEVATOR CABINET TO REMAIN.

EXISTING ISOLATION TRANSFORMER FOR ELEVATOR S1 TO REMAIN.

EXISTING ISOLATION TRANSFORMER FOR ELEVATOR P1 TO REMAIN.

EXISTING ISOLATION TRANSFORMER FOR ELEVATOR P2 TO REMAIN.

EXISTING FIRE ALARM SYSTEM SMOKE DETECTOR TO REMAIN.

REMOVE AND DISCARD EXISTING POWER CONNECTION TO UNIT HEATER AND ALL ASSOCIATED WIRING

AND CONDUIT.

REMOVE AND DISCARD EXISTING POWER CONNECTION TO MOTORIZED DAMPER AND ALL ASSOCIATED

WIRING AND CONDUIT.

REMOVE EXISTING POWER CONNECTION TO ELEVATOR S1 CONTROLLER. REMOVE AND DISCARD

EXISTING WIRING AND CONDUIT FROM EXISTING CONTROLLER BACK TO ISOLATION TRANSFORMER.

REFER TO ELECTRICAL FLOOR PLAN FOR DETAILS.

REMOVE EXISTING POWER CONNECTION TO ELEVATOR P1 CONTROLLER. REMOVE AND DISCARD

EXISTING WIRING AND CONDUIT FROM EXISTING CONTROLLER BACK TO ISOLATION TRANSFORMER.

REFER TO ELECTRICAL FLOOR PLAN FOR DETAILS.

REMOVE EXISTING POWER CONNECTION TO ELEVATOR P2 CONTROLLER. REMOVE AND DISCARD

EXISTING WIRING AND CONDUIT FROM EXISTING CONTROLLER BACK TO ISOLATION TRANSFORMER.

REFER TO ELECTRICAL FLOOR PLAN FOR DETAILS.

REMOVE AND DISCARD EXISTING RECEPTACLE. ALL ASSOCIATED WIRING AND CONDUIT TO REMAIN.

RECEPTACLE TO BE REPLACED AND ALL ASSOCIATED WIRING AND CONDUIT TO BE RE-USED. REFER TO

ELECTRICAL FLOOR PLAN FOR DETAILS.

ELECTRICAL FLOOR PLANS

2.

1. COORDINATE ALL WORK WITH EXISTING GENERAL CONDITIONS, ARCHITECTURAL, STRUCTURAL, PLUMBING, FIRE PROTECTION, AND MECHANICAL SYSTEMS.

1" = 20'-0"2 FOURTH FLOOR KEYPLAN

STAIR 5

PENTHOUSE

DN

M

J J J

J

J

S

1 2

7 8 9

S

S

S

S

S

S

S

DN

STAIR 5

PENTHOUSE

SF-1

J J J

1 2

7 8 9

J

SS S

S S

SSS

10 10 10

EL3BH-20,22,24

10 16

GFI

GFI

PANEL EL3BH

1807_AVAHCS ARCHITECTURAL DRAWINGS REPLACE ELEVATOR CONTROLS
Sheets
G-000 - COVER SHEET
G-001 - GENERAL INFORMATION
G-011 - LIFE SAFETY PLAN
AD-101 - ARCHITECTURAL DEMOLITION
AS - 101 - FLOOR PLANS
AS - 102 - INTERIOR ELEVATIONS
MH - 101 MECHANICAL FLOOR PLANS
ES - 101 ELECTRICAL FLOOR PLANS
Sheets and Views
ES - 101