504-18-107 Replace Elevator Controls Building 28 Federal contract opportunity
Solicitation number
36C25719B0019
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

36C25719B0019 Schedule B - Elevator Controls.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 504-18-107 Replace Elevator Controls Building 28, newest first.
File Type Posted
36C25719C0177-000.docx DOCX document
36C25719B0019-0003000.docx DOCX document
36C25719B0019-0003002.pdf PDF
36C25719B0019-0003001.pdf PDF
36C25719B0019-0002000.docx DOCX document
36C25719B0019-0001000.docx DOCX document
36C25719B0019-006.pdf PDF
36C25719B0019-001.docx DOCX document
36C25719B0019-005.pdf PDF
36C25719B0019-003.pdf PDF
36C25719B0019-004.pdf PDF
36C25719B0019-000.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B – SCHDULE OF PRICES/DESCRIPTION

DESCRIPTION: Contractor shall provide all necessary labor, materials, equipment, and supervision to Replace Elevator Control Bldg 28 located at the Amarillo VAMC 6010 W. Amarillo Blvd, Amarillo, Texas. The work shall be in accordance with the provided specifications and drawings.

** NOTE: Award shall be made on the Base Bid unless the base bid is less than the allocated funding for the project. If the Base Bid is less than allocated funding, award shall be made on the basis of a Add Alternate beginning with Add Alternate #1 and proceeding through Add Alternate #5 in order to accommodate allocated funding. Offerors must bid all items in order to be considered.

FAR 36.205 Statutory Cost Limitations states: Solicitations containing one or more items subject to statutory cost limitations shall state - The applicable cost limitation for each affecting item in a separate schedule; That an offer which does not contain separately-prices schedules will not be considered; and That the price on each schedule shall include an approximate apportionment of all estimated direct costs, allocable indirect costs, and profit.

BASE BID:

ITEM UNIT TOTAL

NO. DESCRIPTION OF SERVICE QTY UNIT PRICE AMOUNT

BID:

0001 PROVIDE ALL NECESSARY 1 JB $__________ $_________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY TO REPLACE ELEVATOR

CONTROLS BUILDING 28 PER THE PROVIDED

SPECIFICATIONS AND DRAWINGS

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH A, BASE BID,

ITEMS I THRU IV)

0002 COST OF PERFORMANCE AND 1 EA $___________ $ _________

PAYMENT BONDS

**TOTAL PROJECT DURATION for Base Bid: 90 Calendar days from issuance of the Notice to Proceed to complete the project work.

Base Bid TOTAL (Line items 0001 & 0002) $___________

Base Bid + Bid Add Alternate #1:

0003 Base Bid: PROVIDE ALL NECESSARY 1 JB $________ $__________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY TO REPLACE ELEVATOR

CONTROLS BUILDING 28 PER THE PROVIDED

SPECIFICATIONS AND DRAWINGS

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH A,

BASE BID, ITEMS I THRU IV)

AND ADD TO INCLUDE: 1 JB $_________ $_________

ALL COSTS AND SCOPE ASSOCIATED

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, , PARAGRAPH B,

ADD ALTERNATE #1)

0004 COST OF PERFORMANCE AND 1 EA $_________ $_________

**TOTAL PROJECT DURATION for both the Base Bid and Bid Alterante #1: 90 Calendar days from issuance of the Notice to Proceed to complete the project work.

Base Bid + Bid Alternate #1 TOTAL (Line items 0003 and 0004) $____________

Base Bid + Bid Add Alternate #2:

0005 Base Bid: PROVIDE ALL NECESSARY 1 JB $________ $__________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY TO REPLACE ELEVATOR

CONTROLS BUILDING 28 PER THE PROVIDED

SPECIFICATIONS AND DRAWINGS

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B,

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRPH C,

ADD ALTERNATE #2)

0006 COST OF PERFORMANCE AND 1 EA $_________ $_________

and Bid Alterante #2: 90 Calendar days from issuance of

Base Bid + Bid Alternate #1 and #2 TOTAL (Line items 0005 & 0006) $____________

Base Bid + Bid Add Alternate #3:

0007 Base Bid: PROVIDE ALL NECESSARY 1 JB $________ $__________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY TO REPLACE ELEVATOR

CONTROLS BUILDING 28 PER THE PROVIDED

SPECIFICATIONS AND DRAWINGS

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH C,

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH D,

ADD ALTERNATE #3)

0008 COST OF PERFORMANCE AND 1 EA $_________ $_________

**TOTAL PROJECT DURATION for both the Base Bid

Base Bid + Bid Alternate #1, #2, and #3 TOTAL (Line items 0007 & 0008) $____________

Base Bid + Bid Add Alternate #4:

0009 Base Bid: PROVIDE ALL NECESSARY 1 JB $________ $__________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY TO REPLACE ELEVATOR

CONTROLS BUILDING 28 PER THE PROVIDED

SPECIFICATIONS AND DRAWINGS

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH C,

ADD ALTERNATE #2)

AND ADD TO INCLUDE: 1 JB $_________ $_________

ALL COSTS AND SCOPE ASSOCIATED

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH D,

ADD ALTERNATE #3)

AND ADD TO INCLUDE: 1 JB $_________ $_________

ALL COSTS AND SCOPE ASSOCIATED

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH E,

ADD ALTERNATE #4)

0010 COST OF PERFORMANCE AND 1 EA $_________ $_________

Base Bid + Bid Alternate #1, #2, #3, and #4 TOTAL (Line items 0009 & 0010) $____________

Base Bid + Bid Add Alternate #5:

0011 Base Bid: PROVIDE ALL NECESSARY 1 JB $________ $__________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY TO REPLACE ELEVATOR

CONTROLS BUILDING 28 PER THE PROVIDED

SPECIFICATIONS AND DRAWINGS

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH A,

BASE BID, ITEMS I THRU IV)

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH C,

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH D,

ADD ALTERNATE #3

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH E,

ADD ALTERNATE #4)

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH F,

ADD ALTERNATE #5)

0012 COST OF PERFORMANCE AND 1 EA $_________ $_________

Base Bid + Bid Alternates #1, #2, #3, #4 and #5 TOTAL (Line items 0011 & 0012) $____________