36C25719B0019-002.pdf
PDF 149 KB Posted
- Attached to
- 504-18-107 Replace Elevator Controls Building 28 Federal contract opportunity
- Solicitation number
- 36C25719B0019
About this file
36C25719B0019 Schedule B - Elevator Controls.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25719C0177-000.docx | DOCX document | |
| 36C25719B0019-0003000.docx | DOCX document | |
| 36C25719B0019-0003002.pdf | ||
| 36C25719B0019-0003001.pdf | ||
| 36C25719B0019-0002000.docx | DOCX document | |
| 36C25719B0019-0001000.docx | DOCX document | |
| 36C25719B0019-006.pdf | ||
| 36C25719B0019-001.docx | DOCX document | |
| 36C25719B0019-005.pdf | ||
| 36C25719B0019-003.pdf | ||
| 36C25719B0019-004.pdf | ||
| 36C25719B0019-000.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B – SCHDULE OF PRICES/DESCRIPTION
DESCRIPTION: Contractor shall provide all necessary labor, materials, equipment, and supervision to Replace Elevator Control Bldg 28 located at the Amarillo VAMC 6010 W. Amarillo Blvd, Amarillo, Texas. The work shall be in accordance with the provided specifications and drawings.
** NOTE: Award shall be made on the Base Bid unless the base bid is less than the allocated funding for the project. If the Base Bid is less than allocated funding, award shall be made on the basis of a Add Alternate beginning with Add Alternate #1 and proceeding through Add Alternate #5 in order to accommodate allocated funding. Offerors must bid all items in order to be considered.
FAR 36.205 Statutory Cost Limitations states: Solicitations containing one or more items subject to statutory cost limitations shall state - The applicable cost limitation for each affecting item in a separate schedule; That an offer which does not contain separately-prices schedules will not be considered; and That the price on each schedule shall include an approximate apportionment of all estimated direct costs, allocable indirect costs, and profit.
BASE BID:
ITEM UNIT TOTAL
NO. DESCRIPTION OF SERVICE QTY UNIT PRICE AMOUNT
BID:
0001 PROVIDE ALL NECESSARY 1 JB $__________ $_________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO REPLACE ELEVATOR
CONTROLS BUILDING 28 PER THE PROVIDED
SPECIFICATIONS AND DRAWINGS
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH A, BASE BID,
ITEMS I THRU IV)
0002 COST OF PERFORMANCE AND 1 EA $___________ $ _________
PAYMENT BONDS
**TOTAL PROJECT DURATION for Base Bid: 90 Calendar days from issuance of the Notice to Proceed to complete the project work.
Base Bid TOTAL (Line items 0001 & 0002) $___________
Base Bid + Bid Add Alternate #1:
0003 Base Bid: PROVIDE ALL NECESSARY 1 JB $________ $__________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO REPLACE ELEVATOR
CONTROLS BUILDING 28 PER THE PROVIDED
SPECIFICATIONS AND DRAWINGS
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH A,
BASE BID, ITEMS I THRU IV)
AND ADD TO INCLUDE: 1 JB $_________ $_________
ALL COSTS AND SCOPE ASSOCIATED
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, , PARAGRAPH B,
ADD ALTERNATE #1)
0004 COST OF PERFORMANCE AND 1 EA $_________ $_________
**TOTAL PROJECT DURATION for both the Base Bid and Bid Alterante #1: 90 Calendar days from issuance of the Notice to Proceed to complete the project work.
Base Bid + Bid Alternate #1 TOTAL (Line items 0003 and 0004) $____________
Base Bid + Bid Add Alternate #2:
0005 Base Bid: PROVIDE ALL NECESSARY 1 JB $________ $__________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO REPLACE ELEVATOR
CONTROLS BUILDING 28 PER THE PROVIDED
SPECIFICATIONS AND DRAWINGS
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH B,
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRPH C,
ADD ALTERNATE #2)
0006 COST OF PERFORMANCE AND 1 EA $_________ $_________
and Bid Alterante #2: 90 Calendar days from issuance of
Base Bid + Bid Alternate #1 and #2 TOTAL (Line items 0005 & 0006) $____________
Base Bid + Bid Add Alternate #3:
0007 Base Bid: PROVIDE ALL NECESSARY 1 JB $________ $__________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO REPLACE ELEVATOR
CONTROLS BUILDING 28 PER THE PROVIDED
SPECIFICATIONS AND DRAWINGS
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH C,
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH D,
ADD ALTERNATE #3)
0008 COST OF PERFORMANCE AND 1 EA $_________ $_________
**TOTAL PROJECT DURATION for both the Base Bid
Base Bid + Bid Alternate #1, #2, and #3 TOTAL (Line items 0007 & 0008) $____________
Base Bid + Bid Add Alternate #4:
0009 Base Bid: PROVIDE ALL NECESSARY 1 JB $________ $__________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO REPLACE ELEVATOR
CONTROLS BUILDING 28 PER THE PROVIDED
SPECIFICATIONS AND DRAWINGS
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH C,
ADD ALTERNATE #2)
AND ADD TO INCLUDE: 1 JB $_________ $_________
ALL COSTS AND SCOPE ASSOCIATED
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH D,
ADD ALTERNATE #3)
AND ADD TO INCLUDE: 1 JB $_________ $_________
ALL COSTS AND SCOPE ASSOCIATED
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH E,
ADD ALTERNATE #4)
0010 COST OF PERFORMANCE AND 1 EA $_________ $_________
Base Bid + Bid Alternate #1, #2, #3, and #4 TOTAL (Line items 0009 & 0010) $____________
Base Bid + Bid Add Alternate #5:
0011 Base Bid: PROVIDE ALL NECESSARY 1 JB $________ $__________
LABOR, MATERIALS, AND EQUIPMENT
NECESSARY TO REPLACE ELEVATOR
CONTROLS BUILDING 28 PER THE PROVIDED
SPECIFICATIONS AND DRAWINGS
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH A,
BASE BID, ITEMS I THRU IV)
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH C,
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH D,
ADD ALTERNATE #3
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH E,
ADD ALTERNATE #4)
(SEE GENERAL REQUIREMENT 1.3 STATEMENT
OF BID ITEMS, PARAGRAPH F,
ADD ALTERNATE #5)
0012 COST OF PERFORMANCE AND 1 EA $_________ $_________
Base Bid + Bid Alternates #1, #2, #3, #4 and #5 TOTAL (Line items 0011 & 0012) $____________
| SECTION B – SCHDULE OF PRICES/DESCRIPTION |
| PAYMENT BONDS |
| PAYMENT BONDS |
| PAYMENT BONDS |
| PAYMENT BONDS |
| PAYMENT BONDS |
| PAYMENT BONDS |
File details come from the government source that posted it.