36C25619Q1416 ATTACHMENT 2 - QUALITY ASSURANCE SURVEILLANCE PLAN (QASP).docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| -18278.docx | DOCX document | |
| 36C25619Q1416-0001000.docx | DOCX document | |
| 36C25619Q1416-0001000.docx | DOCX document | |
| 36C25619Q1416-000.docx | DOCX document | |
| 36C25619Q1416-002.docx | DOCX document | |
| 36C25619Q1416-001.docx | DOCX document | |
| 36C25619Q1416-003.pdf | ||
| 36C25619Q1416-003.pdf | ||
| 36C25619Q1416-001.docx | DOCX document | |
| 36C25619Q1416-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2 – QUALITY ASSURANCE SURVEILLANCE PLAN
36C25619Q1416
QUALITY ASSURANCE SURVEILLANCE PLAN
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. OBJECTIVE
a). The objective, as defined in the Statement of Work is the following: The Contractor shall perform the differential testing on double check assemblies and reduced pressure principle assemblies (ranging in size of ½” thru 12”) for compliance with annual MS State Health Department, Division of Water Supply, Cross Connection Control Program, for the Gulf Coast Veterans Health Care System located at 400 Veterans Avenue, Biloxi MS 39531.
b). Contractor is to provide a list of backflow devices that are tested and not certified. The list is to contain location (nearest building and room number/side of building/size/type) of backflow device and description of reason(s) why device could not be certified.
3. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a). Contracting Officer Representative (COR) Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and is responsible for ensuring proper Government surveillance of the Contractor’s performance. The COR is responsible for keeping a quality assurance file and after the contract, or when requested by the CS, providing corresponding documentation to the CS. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The Contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CS for action.
b). Contract Specialist (CS) The CS is responsible for ensuring performance of all necessary actions for effective contracting, ensuring compliance with the contract terms, and safeguarding the interests of the United States in the contractual relationship. The CS is responsible for ensuring that the Contractor receives impartial, fair, and equitable treatment under this contract. The CS is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Upon award or before the performance period start date of the contract, the individuals who will be involved in the execution of this Quality Assurance Surveillance Plan (QASP) will be identified.
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
Performance Requirements Summary Matrix:
The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL). Contractor performance will be rated/evaluated by the COR or other authorized designee using the following metrics in the table below.
| Task |
| ID |
| Indicator |
| Standard |
| Acceptable Quality Level |
| Method of Surveillance |
| Incentive |
Rating
| General |
| 1 |
| Contractor Technician Certifications |
| Contractor shall provide proof of employee certifications qualifying them for the task. |
| provide such information within 5 business days after the initial request by the government. |
| 100% Inspection |
| Past performance |
| 2 |
| Test Reports |
| Contractor shall provide two (2) copies of test reports, (1) CD/DVD copy; and (1) electronic copy for all backflow preventer as per the SOW. |
| provide such information within 5 business days after the initial request by the government. |
| 100% Inspection |
Past performance
5. INCENTIVES
Incentive/Disincentives for Meeting/Not Meeting AQL
1. Positive and negative performance will be documented locally (contract file) and/or in the appropriate contractor performance assessment reporting system/database.
2. Noncompliance to contract standards will be corrected at no cost to the government. The government reserves the right and may elect to measure/document negative performance through utilization of a performance report and/or a contract discrepancy report
3. The contractor shall respond in writing to the Contracting Officer Representative (COR) to all notifications of failure to meet acceptable quality levels within 5 days of issuance by the Contracting Officer Representative and/or the Contract Specialist. The contractor’s response shall include the corrective action taken to rectify the problem and the proposed measure to preclude the recurrence of the problem.
6. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Excellent (“E”) = Exceeds Standards Satisfactory (“S”) = Meets Standards Unsatisfactory (“U”) = Fails To Meet Standards
7. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
8. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.
Signature Contracting Officer’s Representative
Contract Discrepancy Report
| Contract No. |
| Report No. for this Discrepancy: |
Contractor/Manager’s Name:
From: (Name of Project Officer)
Dates
Prepared:
Returned by Contractor:
Action Complete:
Discrepancy or Problem:
Signature of Contracting Officer:
To: (Contracting Officer)
From: (Contractor)
Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence (Attach Continuation Sheet if Necessary)
Signature of Contractor Representative:
Date:
Government Evaluation:
Government Actions:
Close Out
| Name |
| Title |
| Signature |
| Date |
Contractor Notified
Project Officer
Contracting Officer