36C25619Q0905-003.pdf
PDF 264 KB Posted
- Attached to
- MH RRTP Support Services Federal contract opportunity
- Solicitation number
- 36C25619Q0905
About this file
36C25619Q0905 S02 - 36C25619Q0905 Attachment D.1 - QASP.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25620D0003-000.docx | DOCX document | |
| 36C25619Q0905-002.docx | DOCX document | |
| 36C25619Q0905-005.pdf | ||
| 36C25619Q0905-004.pdf | ||
| 36C25619Q0905-001.docx | DOCX document | |
| 36C25619Q0905-001.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment D.1 Quality Assurance Surveillance Plan (QASP)
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored?
• How monitoring will take place.
• Who will conduct the monitoring?
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship.
The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Christopher D. Vu
Organization or Agency: Department of Veterans Affairs (VA), Network Contracting Office 16 (NCO 16)
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Elizabeth Nosen Organization or Agency: Department of Veterans Affairs, G.V. (Sonny) Montgomery VAMC, Jackson, MS
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary:
Alternate:
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. 100% surveillance: accomplished by physically observing contract performance.
b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.
c. VALIDATED USER/CUSTOMER COMPLAINTS. Customer complaint data is compiled quarterly and reviewed by the contractor employee’s designated director of services – any validated complaints against a Contractor that are not resolved within the required seven day period will be further investigated.
d. RANDOM SAMPLING. Patient treatment files to be reviewed will be randomly selected and over the period of services.
All reviews and reports will be conducted in compliance with VA Privacy and Information security standards.
e. Verification and/or documentation provided by Contractor.
6.QASP PERFORMANCE REPORT DATE: __________________
Measures PWS Reference
Performance Requirement
Standard Acceptable Quality Level
Surveillance Method
Met AQL/DID NOT MEET AQL-
CPAR RATING/ADD COMMENTS
Non-Clinical Information Return
– Deviation from Routine Care
7.1.1.1, 6.4 Clinical information is provided back to the respective residential program (TRP or
ADTP)
Information is provided within twenty-four (24) hours of the event.
90% Periodic Inspection, coinciding with ongoing reviews of maintenance and repair logs during routine facility inspection visits.
Access 7.1.1.2, 7.5.3.8
An adequate number of beds will be available in a ready state to accommodate TRP and ADTP admissions
Empty beds will be ready for occupancy within two
(2) hours of notification by TRP or ADTP.
90% Periodic Inspection, observed through monthly reports from contractor.
Accreditation 7.1.1.3, 2.1.2
Contractor will work with VA MH RRTP in their efforts to maintain accreditation standards of Joint Commission on Accreditation of Rehabilitation Facilities (CARF), as relevant to contracted services
Contractor will comply with Joint Commission and CARF standards as they relate to the VA MH RRTP unit. Contractor will facilitate inspections of the facility and relevant records as requested. Contractor will be responsive to request for corrective action resulting from inspections.
90% Periodic Inspection, by both VA staff and external accrediting bodies (e.g., Joint Commission, CARF).
Staff Qualifications 7.1.1.4 Staff employed by the contractor will have continuing education relevant to addictions and trauma.
Staff will receive a minimum of ten (10) Continuing Educaiton Units per year in the areas of substance abuse and trauma.
Veteran care staff hired by the contractor will not have participated in a TRP or ADTP residential program within the past two (2) years.
90% Periodic Inspection of staff training and employment records
Veteran Safety – Reporting 7.1.1.5 Veteran safety incidents reported to the respective treatment program (TRP or ADTP) or on-call psychiatrist.
All incidents reported within one (1) hour of the incident.
Direct observations and periodic inspection, observed through communication and residential treatment records.
Veteran Safety – Incident Resolution
7.1.1.6 All Veteran safety
incidents are investigated, confirmed, and resolved.
Contractor will consult with the appropriate program manager within one (1) business day of the event.
Periodic inspection:
reviewed during analysis of critical incidents, routine site inspections, and any accreditation surveys.
Veteran Satisfaction 7.1.1.7 Contractor assesses patient satisfaction and solicits complaints and suggestions regarding the quality of care.
Contractor representative attends monthly stakeholder meeting to receive and respond to feedback. Veteran satisfaction survey is administered by contractor, with results tallied and reported to TRP and ADTP on at least a quarterly basis.
Periodic inspection:
attendance at stakeholder meeting. User survey and quarterly roll-up reports that include any qualitative statements from veterans.
7. CPAR RATINGS ASSIGNED TO QASP ITEMS:
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/pdfs/CPARS-Guidance.pdf p. A2-1):
EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.
SATISFACTORY:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.
MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTO
RY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
https://www.cpars.gov/pdfs/CPARS-Guidance.pdf
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR
PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
See Sample on following page.
9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
COR NAME/TITLE DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
CONTRACT REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CR PREPARED
b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE.
(Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION.
13. GOVERNMENT ACTIONS
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
| Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP. |
| a. DIRECT OBSERVATION. 100% surveillance: accomplished by physically observing contract performance. |
| a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR). |